CN106193279A - Agent structure wall prestressed structure and time building method of agent structure wall - Google Patents

Agent structure wall prestressed structure and time building method of agent structure wall Download PDF

Info

Publication number
CN106193279A
CN106193279A CN201610729941.8A CN201610729941A CN106193279A CN 106193279 A CN106193279 A CN 106193279A CN 201610729941 A CN201610729941 A CN 201610729941A CN 106193279 A CN106193279 A CN 106193279A
Authority
CN
China
Prior art keywords
sleeve pipe
agent
strand wires
steel strand
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610729941.8A
Other languages
Chinese (zh)
Other versions
CN106193279B (en
Inventor
张忠宇
黄�俊
李宏
马波
杨奎
郭映飞
邢冬冬
陈聪
姜益涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JSTI Group Co Ltd
Original Assignee
JSTI Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JSTI Group Co Ltd filed Critical JSTI Group Co Ltd
Priority to CN201610729941.8A priority Critical patent/CN106193279B/en
Publication of CN106193279A publication Critical patent/CN106193279A/en
Application granted granted Critical
Publication of CN106193279B publication Critical patent/CN106193279B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0007Base structures; Cellars
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/08Members specially adapted to be used in prestressed constructions

Abstract

The present invention relates to Construction Technique of Underground Works field, particularly relate to agent structure wall construction and improve and time building method improvement of agent structure wall.Agent structure wall prestressed structure, including side wall and base plate, also includes the pre-sleeve pipe in hollow structure being embedded in side wall and base plate, and the first end of sleeve pipe stretches out base plate, and the second end of sleeve pipe stretches out side wall;Being equipped with steel strand wires in sleeve pipe, steel strand wires can be extracted out from sleeve pipe;Being applied with prestressing force on steel strand wires, the prestressing force of applying is used for resisting side wall deformation.Agent structure wall prestressed structure in the present invention, is not only simple in structure, and can effectively reduce back the interference building in operation process, greatly reduces the labor operation intensity of workman.Agent structure wall prestressed structure is used to replace steel pipe support replacement operation, solve before top board during steel pipe support replacement do not pours, because directly removing lateral water that steel pipe support causes, soil pressure cause greatly that foundation pit deformation is excessive, tension and the problem of destroying sidewall structure outside side wall.

Description

Agent structure wall prestressed structure and time building method of agent structure wall
Technical field
The present invention relates to Construction Technique of Underground Works field, particularly relate to agent structure wall construction and improve and agent structure wall Return building method improve.
Background technology
During underground engineering cut and cover tunneling, the deep foundation pit support of larger proportion uses " vertical retaining structure+multiple tracks Support " design, such as: vertical retaining structure uses SMW engineering method stake, cast-in-situ bored pile or diaphram wall, wherein, Support generally uses reinforced concrete support or steel pipe support.The excavation of foundation pit stage, the most from top to bottom the stage excavation soil body and and Time set up support.Agent structure returns the stage of building, and pours agent structure plate, wall construction from bottom to top, and successively removes support.Typically The deep basal pit degree of depth about 10~20 meters, indivedual deep basal pits, more than 30 meters, support and lay vertical spacing about 3~5 meters, and agent structure is returned and built Impact supported is divided into multistage construction.Agent structure segmentation is returned and is built in construction, and agent structure not yet forms effective beaer System, from safety, economy point, generally uses support replacement operation, and the operation of support replacement operation is as shown in Figure 1 to Figure 4.
Fig. 1 is the structure chart that Support of Foundation Pit Excavation completes after-pouring tunnel structure base plate, wherein, and the both sides in substrate hole 400 It is provided with building enclosure 100, is provided with concrete between two building enclosures 100 and supports the 300, first supporting steel pipe 601 and the second supporting steel Pipe 602, the pre-position between two building enclosures 100 is additionally provided with stand column pile 500.In work progress, complete above-mentioned After structure sets up, first carry out pouring of tunnel floor 200.
Fig. 2 is the structure chart removing the second supporting steel pipe after-pouring tunnel sidewalls.Complete after tunnel floor 200 pours, Remove the second supporting steel pipe 602 played a supporting role, then carry out pouring of tunnel sidewalls 700.Tunnel floor 200 and tunnel Construction joint between side wall 700 should ensure that flat smooth.
Fig. 3 is the structure chart installed and remove the first supporting steel pipe after support replacement steel pipe.After tunnel sidewalls 700 pours, Support replacement steel pipe 900 is installed between two tunnel sidewalls 700, then the first supporting steel pipe 601 is removed.
Fig. 4 is the structure chart having removed support replacement steel pipe after tunnel roof has poured.After installing support replacement steel pipe 900, carry out Pouring of tunnel roof 800, removes support replacement steel pipe 900 after having poured.
Above-mentioned underground engineering agent structure return build the stage use support replacement maneuver there is problems in that
1) there is interference with main structure construction scaffold in the support replacement steel pipe that support replacement installation exercise uses, and affects agent structure Returning and build operation, there is resentment, and then brings potential safety hazard in part unit in charge of construction;
2) support replacement steel pipe dismounting operation is implemented after agent structure completes, and not only working space is little, traffic condition is poor, and Owing to being difficult with big machinery, the labor intensity causing operator is big, construction risk is high.
For these reasons, complete agent structure wall, the angle of plate bearing capacity from making full use of, propose to complete In agent structure wall, plate, Shi Hanzhang is to substitute the solution of support replacement.
Therefore, it is necessary to propose time building method of a kind of agent structure wall prestressed structure and agent structure wall, it is possible to fill Divide and utilize the bearing capacity having completed agent structure wall, plate, while ensureing enabling capabilities, substitute support replacement job execution structure And construction method, thus eliminate safe hidden trouble, reduce difficulty of construction.
Summary of the invention
(1) to solve the technical problem that
It is an object of the present invention to propose a kind of agent structure wall prestressed structure, this prestressed structure can be filled Point utilizing and to have completed the bearing capacity of agent structure wall, plate, solve that support replacement job execution structure in prior art exists executes Work difficulty is big, unit in charge of construction exists resentment, support replacement steel pipe is removed and the problem of traffic condition difference.
Further object is that, propose a kind of master that constructing operation difficulty is low, easy to operate, labor intensity is low Time building method of body structural wall.
(2) technical scheme
In order to achieve the above object, on the one hand, the main technical schemes that the present invention uses includes:
A kind of agent structure wall prestressed structure, including side wall and base plate, also includes pre-being embedded in described side wall and base plate The sleeve pipe in hollow structure, the first end of described sleeve pipe stretches out described base plate, and the second end of described sleeve pipe stretches out described side wall;
Being equipped with steel strand wires in described sleeve pipe, described steel strand wires can be extracted out from described sleeve pipe;
Being applied with prestressing force on described steel strand wires, the described prestressing force of applying is used for resisting the deformation of described side wall.
Further, the first end of described sleeve pipe and the second end being respectively arranged with anchorage, described anchorage is for applying Described steel strand wires after prestressing force are fixed.
Preferably, described sleeve pipe curved structure in described side wall and base plate is arranged, and described arcuate structure runs through described Side wall and base plate;
Described sleeve pipe is away from described side face of wall 6cm ± 1cm;
Radius of curvature R 100cm of described arcuate structure.
Further, the length direction along described side wall is arranged with the described sleeve pipe of predetermined quantity in parallel.
Preferably, described in adjacent two between sleeve pipe at a distance of 1.5m ± 0.1m.
In order to achieve the above object, on the other hand, the main technical schemes that the present invention uses includes:
Time building method of a kind of agent structure wall, comprises the following steps:
Step S10, steel strand wires are penetrated in the sleeve pipe of hollow structure;
Step S20, by described sleeve pipe pre-embedding in pre-position, carry out base plate the most successively and side wall pour;
Step S30, carry out the steel strand wires in described sleeve pipe stretching Shi Hanzhang, Shi Hanzhang complete after by solid Described steel strand wires are fixed by locking member;
After step S40, one-piece casting complete, remove described steel strand wires and fixture;
Step S50, block described sleeve pipe.
Further, step S20 comprises the steps of
Step S21, before pouring base plate, a part for described sleeve pipe is embedded at described base plate position in advance, and The first end making described sleeve pipe stretches out described base plate;
Step S22, before pouring side wall, is embedded in the remainder of described sleeve pipe at described side wall position in advance, And make the second end of described sleeve pipe stretch out described side wall.
Further, in step S30, the concrete strength when pouring described side wall reaches the 70% of design strength After 80%, carry out described steel strand wires stretching Shi Hanzhang.
Preferably, described fixture is anchorage.
Further, in step S50, cement mortar is used to block described sleeve pipe.
(3) beneficial effect
The invention has the beneficial effects as follows: the agent structure wall prestressed structure in the present invention, be not only simple in structure, Er Qieneng Enough effectively reduce back the interference building in operation process, greatly reduce the labor operation intensity of workman.
Using agent structure wall prestressed structure to replace steel pipe support replacement operation, during solving steel pipe support replacement, top board does not waters Before building, because directly removing lateral water that steel pipe support causes, soil pressure cause greatly that foundation pit deformation is excessive, outside side wall tension and break The problem of bad sidewall structure.
Shi Hanzhang on present invention steel strand wires in sleeve pipe, steel strand wires are to applying counteracted by pressure base outside structure side wall The part lateral pressure in hole, it is ensured that during pouring top board in the case of not setting up steel pipe support replacement, foundation pit deformation is at safe model In enclosing.
Time building method of the agent structure wall in the present invention is simple, easy to operate, and operating process is compared to existing technology In the human and material resources used of steel pipe support replacement operation few, greatly reduce construction cost, greatly improve the warp of unit in charge of construction Ji benefit, is suitable for large-scale promotion and uses.
Accompanying drawing explanation
Fig. 1 is the structure chart that Support of Foundation Pit Excavation completes after-pouring tunnel structure base plate;
Fig. 2 is the structure chart removing the second supporting steel pipe after-pouring tunnel sidewalls;
Fig. 3 is the structure chart installed and remove the first supporting steel pipe after support replacement steel pipe;
Fig. 4 is the structure chart having removed support replacement steel pipe after tunnel roof has poured;
Fig. 5 is the cross section semi-cutaway of agent structure wall prestressed structure;
Fig. 6 is the plan structure figure of agent structure wall prestressed structure;
Fig. 7 is the part-structure figure of agent structure wall prestressed structure.
[description of reference numerals]
100, building enclosure;
200, tunnel floor;
300, concrete supports;
400, at the bottom of foundation ditch;
500, stand column pile;
601, the first supporting steel pipe;
602, the second supporting steel pipe;
700, tunnel sidewalls;
800, tunnel roof;
900, support replacement steel pipe;
1, steel strand wires;
2, anchorage;
3, sleeve pipe;
4, side wall;
5, base plate.
Detailed description of the invention
In order to preferably explain the present invention, in order to understand, below in conjunction with the accompanying drawings, by detailed description of the invention, to this Bright it is described in detail.
Embodiment one
As shown in Figure 5, Figure 6, it is the agent structure wall prestressed structure of the present embodiment proposition, including side wall 4 and base plate 5. In order to ensure that whole foundation ditch in top board casting process, especially side wall 4 do not produce moderate finite deformation, pre-buried in side wall 4 and base plate 5 Having the sleeve pipe 3 in hollow structure, be equipped with steel strand wires 1 in sleeve pipe 3, steel strand wires 1 can be extracted out from sleeve pipe 3.
As one preferred embodiment, the cross section of sleeve pipe 3 is cirque structure, but is not limited to annular knot Structure, can also use in some cases cross section be square hollow structure or other be capable of sleeve pipe 3 effect structure.
Being extracted out from sleeve pipe 3 by steel strand wires 1 for convenience, the first end of sleeve pipe 3 stretches out base plate 5, and the second end of sleeve pipe 3 is stretched Go out side wall 4.In the present embodiment, steel strand wires 1 being used multiple-anticorrosion measure, be coated with anti-corrosive grease outside steel strand wires 1, single bag gathers After ethylene, whole Shu Zaiyong polyethylene tube wraps up." steel strand wires for prestressed concrete " are met when steel strand wires 1 are chosen (GB/T5224) standard, and according to the Structure Calculation steel strand wires 1 required prestress value provided, steel strand wires 1 are carried out type selecting.? It is noted that problems with during calculated prestressing force, building the stage returning, the prestressing force of steel strand wires 1 participates in foundation pit supporting construction and calculates and base Hole Stability Checking process, the pre-stress design value of steel strand wires 1 it is ensured that in the case of construction period is not provided with support replacement, body junction Structure deformation of wall value is in safety range.
In order to solve before top board during steel pipe support replacement of the prior art do not pours, cause because directly removing steel pipe support Lateral water, soil pressure cause greatly that foundation pit deformation is excessive, tension and the problem of destroying sidewall structure outside side wall.Need in this reality Executing Shi Hanzhang on the steel strand wires 1 in example, the prestressing force of applying is for resisting the deformation of side wall 4 and foundation ditch.
In order to ensure to keep steel strand wires 1 not move after to steel strand wires 1 Shi Hanzhang, the first end of sleeve pipe 3 and second Being respectively arranged with anchorage 2 on end, anchorage 2 is for being fixed the steel strand wires 1 after Shi Hanzhang.In the present embodiment, anchor Using clip type structure when tool 2 is fixed, it is preferred that the code name of anchorage 2 is YJM, the code name that fixture is selected is YJJ, the company of use The code name connecing device is YJL.Anchorage 2 fixed system in the present embodiment is mainly protected by nut, anchor ingot set, internal and external casing and pyrocondensation The parts compositions such as set.Anchor ingot overlaps and is connected reliably between steel strand wires 1, and safety is high, and steel strand wires 1 boundling penetrates anchor ingot set, can root According to stress needing adjust extruding force and compress length, plastic deformation after making anchor ingot set be squeezed and produce to steel strand wires 1 Bond stress ensure that un-slipped.Meanwhile, the hardness ratio steel strand wires 1 of anchor ingot set are low, damage steel strand wires 1 not quite, can reach Higher efficiency of anchorage.Additionally, no matter steel strand wires 1 stress how, anchor ingot set is all constant, at steel to its bond stress Twisted wire 1 stress is all without getting loose in the case of negative stress.Owing to being provided with pyrocondensation protection set, pyrocondensation protection set wraps in anchor ingot set Periphery, plays sealing and protects externally threaded effect in transportation.And have spacer between steel strand wires 1 in anchor ingot set, can According to different tonnages, use the most steel strand wires.Said structure is a kind of mode selected in the present embodiment, but makes Above-mentioned a kind of mode it is not limited to, as long as being capable of the fixing of steel strand wires 1 during with.
As one preferred embodiment, sleeve pipe 3 curved structure in side wall 4 and base plate 5 is arranged, and arcuate structure passes through Wear side wall 4 and base plate 5.The arcuate structure that sleeve pipe 3 is bent to form should on the premise of ensureing structural concrete protective layer thickness to the greatest extent The outside of possible close agent structure side wall.The sleeve pipe 3 outer surface 6cm ± 1cm away from side wall 4, the corner of arcuate structure is kept away Exempting to use right-angle structure, right-angle structure easily causes the damage of sleeve pipe 3 and causes overall structure to use.Preferably, sleeve pipe 3 Radius of curvature R 100cm of arcuate structure, but the bending radius of arcuate structure is also unsuitable excessive, can enter based on experience value Row determines, it is possible to ensure that sleeve pipe 3 plays a role.
As it is shown in fig. 7, be the sleeve pipe 3 distance apart from the left outside sidewall of side wall 4 at a of position, distance herein be 6cm ± 1cm;Being the sleeve pipe 3 distance apart from side wall 4 bottom outer wall at the b of position, distance herein is also 6cm ± 1cm;For set at the c of position The arcuate structure of pipe 3, radian herein is R 100cm.
In order to ensure whole side wall 4 and the stability of foundation ditch, the length direction along side wall 4 is arranged with predetermined quantity in parallel Sleeve pipe 3.This predetermined quantity is that the length difference according to side wall 4 is determined.One preferably, is overlapped according to adjacent two Between pipe 3, the quantity of sleeve pipe 3 is configured, preferably between each adjacent two sleeve pipes 3 apart by the mode at a distance of 1.5m ± 0.1m Equal.
Agent structure wall prestressed structure in the present embodiment, is not only simple in structure, and can effectively reduce Hui Zhuzuo Interference during industry, greatly reduces the labor operation intensity of workman.
The present embodiment is applied outside structure side wall 4 by Shi Hanzhang on the steel strand wires 1 in sleeve pipe 3, steel strand wires 1 The part lateral pressure of counteracted by pressure foundation ditch, it is ensured that during pouring top board in the case of not setting up steel pipe support replacement, foundation ditch becomes Shape is in safety range.
Embodiment two
Present embodiment discloses the building method that returns of a kind of agent structure wall, this time building method is the knot in using embodiment one Structure carries out back building.
Agent structure wall in the present embodiment returns building method, comprises the following steps:
Step S10, steel strand wires are penetrated in the sleeve pipe of hollow structure.Require that steel strand wires can be at sleeve pipe in this step Middle being twitched, sleeve pipe can not be to the tension of steel strand wires parcel.
Step S20, by sleeve pipe pre-embedding in pre-position, carry out base plate the most successively and side wall pour.This step has again Body comprises following two step:
Step S21, before pouring base plate, a part for sleeve pipe is embedded at base plate position in advance, and makes sleeve pipe First end stretches out base plate.
Step S22, before pouring side wall, is embedded in the remainder of sleeve pipe in advance at side wall position, and makes sleeve pipe The second end stretch out side wall.
Step S30, the steel strand wires in sleeve pipe are carried out stretch Shi Hanzhang, Shi Hanzhang passes through fixture after completing Steel strand wires are fixed.In this step, the process of Shi Hanzhang needs the concrete strength when pouring side wall to reach After 70% the 80% of design strength, preferably 75%, carry out steel strand wires stretching Shi Hanzhang.Preferably, in this step The fixture used is anchorage.
After step S40, one-piece casting complete, remove steel strand wires and fixture;
Step S50, closure sleeve pipe, it is preferred to use sleeve pipe is blocked by cement mortar.
Time building method of the agent structure wall in the present embodiment is simple, easy to operate, compares existing in operating process The human and material resources that steel pipe support replacement operation in technology is used are few, greatly reduce construction cost, greatly improve unit in charge of construction Economic benefit, be suitable for large-scale promotion use.
Above content is only presently preferred embodiments of the present invention, for those of ordinary skill in the art, according to the present invention's Thought, the most all will change, and this specification content should not be construed as the present invention Restriction.

Claims (10)

1. an agent structure wall prestressed structure, including side wall (4) and base plate (5), it is characterised in that also include pre-being embedded in institute Stating the sleeve pipe (3) in hollow structure in side wall (4) and base plate (5), the first end of described sleeve pipe (3) stretches out described base plate (5), Second end of described sleeve pipe (3) stretches out described side wall (4);
Being equipped with steel strand wires (1) in described sleeve pipe (3), described steel strand wires (1) can be extracted out from described sleeve pipe (3);
Described steel strand wires are applied with prestressing force on (1), and the described prestressing force of applying is used for resisting described side wall (4) deformation.
2. agent structure wall prestressed structure as claimed in claim 1, it is characterised in that the first end of described sleeve pipe (3) and Being respectively arranged with anchorage (2) on second end, described anchorage (2) is solid for carrying out the described steel strand wires (1) after Shi Hanzhang Fixed.
3. agent structure wall prestressed structure as claimed in claim 2, it is characterised in that described sleeve pipe (3) is at described side wall (4) curved structure is arranged and in base plate (5), and described arcuate structure runs through described side wall (4) and base plate (5);
The described sleeve pipe (3) outer surface 6cm ± 1cm away from described side wall (4);
Radius of curvature R 100cm of described arcuate structure.
4. the agent structure wall prestressed structure as described in any one of claims 1 to 3, it is characterised in that along described side wall (4) Length direction be arranged with the described sleeve pipe (3) of predetermined quantity in parallel.
5. agent structure wall prestressed structure as claimed in claim 4, it is characterised in that described in adjacent two between sleeve pipe (3) At a distance of 1.5m ± 0.1m.
6. a time building method for agent structure wall, described time building method is applied to the master as described in any one of claim 1 to 5 In body structural wall prestressed structure, it is characterised in that comprise the following steps:
Step S10, steel strand wires (1) are penetrated in the sleeve pipe (3) in hollow structure;
Step S20, described sleeve pipe (3) is embedded in pre-position, carries out base plate (5) the most successively and side wall (4) pours;
Step S30, the steel strand wires (1) in described sleeve pipe (3) are carried out stretch Shi Hanzhang, Shi Hanzhang passes through after completing Described steel strand wires (1) are fixed by fixture;
After step S40, one-piece casting complete, remove described steel strand wires (1) and fixture;
Step S50, block described sleeve pipe (3).
7. time building method of agent structure wall as claimed in claim 6, it is characterised in that comprise the steps of in step S20
Step S21, before pouring base plate (5), a part for described sleeve pipe (3) is embedded in described base plate (5) position in advance Place, and make the first end of described sleeve pipe (3) stretch out described base plate (5);
Step S22, before pouring side wall (4), is embedded in described side wall (4) institute in advance in place by the remainder of described sleeve pipe (3) Put place, and make the second end of described sleeve pipe (3) stretch out described side wall (4).
8. time building method of agent structure wall as claimed in claim 6, it is characterised in that in step S30, when pouring described side After concrete strength during wall (4) reaches 70% the 80% of design strength, described steel strand wires (1) are carried out stretching and applies in advance should Power.
9. time building method of the agent structure wall as described in claim 6 to 8 any one, it is characterised in that described fixture For anchorage (2).
10. time building method of agent structure wall as claimed in claim 6, it is characterised in that in step S50, use cement bonded sand Slurry blocks described sleeve pipe (3).
CN201610729941.8A 2016-08-25 2016-08-25 Time building method of main structure wall prestressed structure and main structure wall Active CN106193279B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610729941.8A CN106193279B (en) 2016-08-25 2016-08-25 Time building method of main structure wall prestressed structure and main structure wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610729941.8A CN106193279B (en) 2016-08-25 2016-08-25 Time building method of main structure wall prestressed structure and main structure wall

Publications (2)

Publication Number Publication Date
CN106193279A true CN106193279A (en) 2016-12-07
CN106193279B CN106193279B (en) 2019-08-23

Family

ID=57524042

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610729941.8A Active CN106193279B (en) 2016-08-25 2016-08-25 Time building method of main structure wall prestressed structure and main structure wall

Country Status (1)

Country Link
CN (1) CN106193279B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1334380A (en) * 2001-08-30 2002-02-06 上海市建工设计研究院 Prestressed underground continuous wall
KR20090020770A (en) * 2007-08-24 2009-02-27 김승관 Permanent type anchor having fixing steel pipes with different length according to the weight
CN203200777U (en) * 2013-04-01 2013-09-18 中铁隧道勘测设计院有限公司 Prestress continuous wall with recyclable stranded steel wire
CN103835311A (en) * 2014-02-25 2014-06-04 中交第一航务工程勘察设计院有限公司 Post-tensioned prestressing underground diaphragm wall and construction method
CN206070725U (en) * 2016-08-25 2017-04-05 苏交科集团股份有限公司 Agent structure wall prestressed structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1334380A (en) * 2001-08-30 2002-02-06 上海市建工设计研究院 Prestressed underground continuous wall
KR20090020770A (en) * 2007-08-24 2009-02-27 김승관 Permanent type anchor having fixing steel pipes with different length according to the weight
CN203200777U (en) * 2013-04-01 2013-09-18 中铁隧道勘测设计院有限公司 Prestress continuous wall with recyclable stranded steel wire
CN103835311A (en) * 2014-02-25 2014-06-04 中交第一航务工程勘察设计院有限公司 Post-tensioned prestressing underground diaphragm wall and construction method
CN206070725U (en) * 2016-08-25 2017-04-05 苏交科集团股份有限公司 Agent structure wall prestressed structure

Also Published As

Publication number Publication date
CN106193279B (en) 2019-08-23

Similar Documents

Publication Publication Date Title
CN102031784B (en) Slope protection pile pouring and cable bolting construction method for deep foundation pit
CN104499504B (en) A kind of road inspection well and construction method thereof
CN204491425U (en) A kind of external prestressing strengthening structure of T-shaped bridge diaphragm
CN104878835B (en) Strip footing increases basement structure behind house
CN105605308B (en) Municipal blow-off line laying construction method
CN109281250B (en) Arch ring linearity and prestress control construction method for deck type external cable multi-arch bridge
CN104405165B (en) The assembled mixing station storage bin partition wall of a kind of repeatable utilization and construction method thereof
CN204983662U (en) To drawing screw rod and steel pipe framed bent combination unilateral formwork device
CN103161474B (en) Construction method of down hole interchange roadway
CN104196036B (en) Based on foundation pit supporting construction and the supporting method of old outer wall of basement structure
CN201991009U (en) Deep foundation pit shoring system using poured slope-supporting piles and anchor ropes
CN203035204U (en) Large-section tunnel second lining grouping formwork trolley
CN206070725U (en) Agent structure wall prestressed structure
CN204199296U (en) Based on the foundation pit supporting construction of old outer wall of basement structure
CN103469732A (en) Construction method of preformed holes for foundation bolts of bridge support
CN106193279A (en) Agent structure wall prestressed structure and time building method of agent structure wall
CN211873014U (en) System for bailey truss protects cable
CN103233426A (en) Bailey beam support free of buttress in soft foundation and supporting method thereof
CN209082534U (en) Hanging operating platform sets up device in a kind of more piece open caisson
CN111119963A (en) Large-span cavern two-lining steel bar hanging bracket combined structure and construction method
CN102561378A (en) Concrete pile cap structure and construction method thereof
CN105780938A (en) Vertical construction seam construction method of core tube bottom board for super high-rise
CN202450780U (en) Combined threaded rod
CN206457827U (en) A kind of shaped steel coupling beam structure detachably reclaimed
CN103806450A (en) Double-row pile foundation pit reinforcement structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 210017 No. 223 Simon Street, Jiangsu, Nanjing

Patentee after: JSTI GROUP Co.,Ltd.

Address before: 210017 No. 2200 Chengxin Avenue, Jiangning New District, Nanjing, Jiangsu.

Patentee before: JSTI GROUP Co.,Ltd.