CN106121706A - Ventilation and dust removal integrated system for medium-length tunnel - Google Patents

Ventilation and dust removal integrated system for medium-length tunnel Download PDF

Info

Publication number
CN106121706A
CN106121706A CN201610643988.2A CN201610643988A CN106121706A CN 106121706 A CN106121706 A CN 106121706A CN 201610643988 A CN201610643988 A CN 201610643988A CN 106121706 A CN106121706 A CN 106121706A
Authority
CN
China
Prior art keywords
breeches pipe
tunnel
pipe
air
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610643988.2A
Other languages
Chinese (zh)
Other versions
CN106121706B (en
Inventor
钱栋栋
冀文有
王猛
邓良强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu CRRC Urban Development Co Ltd
Original Assignee
CRRC Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRRC Construction Engineering Co Ltd filed Critical CRRC Construction Engineering Co Ltd
Priority to CN201610643988.2A priority Critical patent/CN106121706B/en
Publication of CN106121706A publication Critical patent/CN106121706A/en
Application granted granted Critical
Publication of CN106121706B publication Critical patent/CN106121706B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F5/00Means or methods for preventing, binding, depositing, or removing dust; Preventing explosions or fires
    • E21F5/02Means or methods for preventing, binding, depositing, or removing dust; Preventing explosions or fires by wetting or spraying
    • E21F5/04Spraying barriers

Abstract

The invention discloses a ventilation and dust removal integrated system for a medium-length tunnel, which comprises a water cannon, a fan and a flexible air pipe, wherein the fan is arranged at the opening of the tunnel, the flexible air pipe is horizontally laid in the tunnel along the extending direction of the tunnel, the blower supplies air to the soft air pipe, the water cannon is arranged in the tunnel, the soft air pipe adopts a Y-shaped tail part, and a hard Y-shaped three-way pipe matched with the Y-shaped tail part is sleeved in the Y-shaped tail part, the Y-shaped three-way pipe comprises an air inlet fork pipe, an air outlet and water outlet fork pipe and a water inlet fork pipe, the air inlet fork pipe and the air outlet and water outlet fork pipe are horizontally and coaxially arranged, the end of the water inlet fork pipe is provided with a flange plate for connecting with a jet orifice of a water cannon, and the inlet fork pipe are acute angles, the radius between the inlet fork pipe and the outlet fork pipe is convenient for water to smoothly spray into the outlet fork pipe from the inlet fork pipe, and the diameters of the inlet fork pipe and the outlet fork pipe are larger than that of the inlet fork pipe. The special dust-settling device is specially used for medium and long tunnels, can ensure ventilation and can effectively and quickly settle dust.

Description

Medium tunnel dust removal by ventilation integrated system
Technical field
The present invention relates to medium tunnel technical field, be specifically related to a kind of medium tunnel dust control by ventilation in work progress Integrated system.
Background technology
Medium tunnel is in work progress, for ventilating in ensureing tunnel, it will usually arrange in tunnel by blower fan and airduct The ventilating system constituted, thus provide enough oxygen for workmen.The subject matter existed is: (1) is for ensureing effect of ventilating Really, airduct distance tunnel tunnel face is relatively near, is easy to damage in blasting process;(2) ventilate an only point, and ventilation effect is not Preferable;(3), after explosion completes, tunnel passes through Natural Dust Suppression, at least needs half an hour, affects construction speed.
Summary of the invention
It is desirable to provide one both can guarantee that ventilation, again can effectively quickly depositing dust be exclusively used in medium tunnel construction Ventilation depositing dust integrated system.
To this end, the technical solution adopted in the present invention is: a kind of medium tunnel dust removal by ventilation integrated system, including water cannon, Blower fan and pneumatic hose, described assembling is at tunnel portal, and pneumatic hose is laid along bearing of trend level in tunnel in tunnel, And be pneumatic hose air feed by blower fan, described water cannon is arranged in tunnel, and described pneumatic hose uses " y " shape afterbody, and " y " shape afterbody Inside be cased with " y " shape tee T of matched hard, described " y " shape tee T include air intake breeches pipe, air-out water outlet breeches pipe and Water inlet breeches pipe, air intake breeches pipe, air-out water outlet breeches pipe level be coaxially disposed, the termination of water inlet breeches pipe be provided with ring flange for water The jet of big gun is connected, and water inlet breeches pipe is at an acute angle with air intake breeches pipe, intake rounding between breeches pipe and air-out water outlet breeches pipe so that Yu Shuicong water inlet breeches pipe sprays into air-out water outlet breeches pipe smoothly, and described air intake breeches pipe, the diameter of air-out water outlet breeches pipe are pitched more than water inlet The diameter of pipe.
Preferred as such scheme, described water cannon is arranged on the sidewall in tunnel, and water gun elevation is 60 ° and can be Left-right rotation in the range of 180 °, assembling is on the sidewall of tunnel portal, and the setting height(from bottom) of pneumatic hose is more than 2.5m, optimizes Installation site, is not take up normal construction region in tunnel.
Further, the termination of described air-out water outlet breeches pipe flushes with the afterbody of pneumatic hose, and air-out and water outlet are more smooth and easy.
It addition, the jet junction of described water inlet breeches pipe and water cannon is provided with sealing structure, it is to avoid connecting portion leaks Gas leakage.
Beneficial effects of the present invention:
(1) distance of airduct distance tunnel tunnel face is determined by the water spray range of water cannon, and the range of usual small-sized water cannon is 30m 40m, the range of large-scale water cannon is about 100m, and the distance of traditional airduct distance tunnel tunnel face is 20m, sets up After water cannon, the distance of airduct distance face increases, and saves the length of airduct, it is to avoid airduct damages in blasting process, Extend the service life of airduct;
(2) afterbody of ventilation duct rotates with the rotation of water cannon, makes ventilation be become a face by a point, and ventilation effect shows Write and improve;
(3), after explosion completes, tunnel utilizes the water cannon quick depositing dust of water spray, has saved the waiting time, has substantially increased construction Progress.
Accompanying drawing explanation
Fig. 1 is present invention scheme of installation in medium tunnel.
Fig. 2 is the structural representation of " y " shape tee T in Fig. 1.
Detailed description of the invention
Below by embodiment and combine accompanying drawing, the invention will be further described:
Shown in Fig. 1, Fig. 2, a kind of medium tunnel dust removal by ventilation integrated system, mainly by water cannon 1, blower fan 2 and light air Pipe 3 forms.Blower fan 2 is arranged on tunnel portal, and pneumatic hose 3 is laid along bearing of trend level in tunnel in tunnel, and by wind Machine 2 is pneumatic hose 3 air feed.Pneumatic hose 3 carries out installing admittedly by the some mounting brackets laid along tunnel bearing of trend or hook Fixed, pneumatic hose 3 is made preferably with non-woven fabrics.
Water cannon 1 is arranged in tunnel by mounting bracket, and water cannon is generally used for depositing dust during outdoor earth excavation, in middle length In tunnel, explosion depositing dust there is no application.Pneumatic hose 3 is cased with matched hard in using " y " shape afterbody, and " y " shape afterbody " y " shape tee T 4." y " shape tee T 4 includes air intake breeches pipe 4a, air-out water outlet breeches pipe 4b and water inlet breeches pipe 4c, air intake breeches pipe 4a, air-out water outlet breeches pipe 4b level are coaxially disposed, and the termination of water inlet breeches pipe 4c is provided with ring flange 4d for the injection with water cannon 1 Mouthful be connected, and water inlet breeches pipe 4c be at an acute angle with air intake breeches pipe 4a, intake rounding between breeches pipe 4c and air-out water outlet breeches pipe 4b so that Yu Shuicong water inlet breeches pipe 4c spray into air-out water outlet breeches pipe 4b, air intake breeches pipe 4a smoothly, the diameter of air-out water outlet breeches pipe 4b be more than into The diameter of water breeches pipe 4c.
Preferably, water cannon 1 is arranged on the sidewall in tunnel, the elevation angle of water cannon 1 be 60 ° and can be in the range of 180 ° about Rotating, blower fan 2 is arranged on the sidewall of tunnel portal, and the setting height(from bottom) of pneumatic hose 3 is more than 2.5m.Air-out water outlet breeches pipe 4b's Termination flushes with the afterbody of pneumatic hose 3.Water inlet breeches pipe 4c is provided with sealing structure with the jet junction of water cannon 1.

Claims (4)

1. a medium tunnel dust removal by ventilation integrated system, it is characterised in that: include water cannon (1), blower fan (2) and pneumatic hose (3), Described blower fan (2) is arranged on tunnel portal, and pneumatic hose (3) is laid along bearing of trend level in tunnel in tunnel, and by wind Machine (2) is pneumatic hose (3) air feed, and described water cannon (1) is arranged in tunnel, and described pneumatic hose (3) uses " y " shape afterbody, and " y " Being cased with " y " shape tee T (4) of matched hard in shape afterbody, described " y " shape tee T (4) include air intake breeches pipe (4a), air-out water outlet breeches pipe (4b) and water inlet breeches pipe (4c), air intake breeches pipe (4a), air-out water outlet breeches pipe (4b) level coaxially set Putting, the termination of water inlet breeches pipe (4c) is provided with ring flange (4d) and is used for being connected with the jet of water cannon (1), and water inlet breeches pipe (4c) At an acute angle with air intake breeches pipe (4a), rounding between water inlet breeches pipe (4c) and air-out water outlet breeches pipe (4b) is so that water is from water inlet breeches pipe (4c) spraying into air-out water outlet breeches pipe (4b) smoothly, described air intake breeches pipe (4a), the diameter of air-out water outlet breeches pipe (4b) are more than water inlet The diameter of breeches pipe (4c).
Medium tunnel dust removal by ventilation integrated system the most according to claim 1, it is characterised in that: described water cannon (1) is installed On sidewall in tunnel, the elevation angle of water cannon (1) be 60 ° and can in the range of 180 ° left-right rotation, blower fan (2) is arranged on tunnel On the sidewall at hole, the setting height(from bottom) of pneumatic hose (3) is more than 2.5m.
Medium tunnel dust removal by ventilation integrated system the most according to claim 1, it is characterised in that: described air-out water outlet breeches pipe (4b) termination flushes with the afterbody of pneumatic hose (3).
Medium tunnel dust removal by ventilation integrated system the most according to claim 1, it is characterised in that: described water inlet breeches pipe (4c) The jet junction of water cannon (1) is provided with sealing structure.
CN201610643988.2A 2016-08-08 2016-08-08 Ventilation and dust removal integrated system for medium-length tunnel Active CN106121706B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610643988.2A CN106121706B (en) 2016-08-08 2016-08-08 Ventilation and dust removal integrated system for medium-length tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610643988.2A CN106121706B (en) 2016-08-08 2016-08-08 Ventilation and dust removal integrated system for medium-length tunnel

Publications (2)

Publication Number Publication Date
CN106121706A true CN106121706A (en) 2016-11-16
CN106121706B CN106121706B (en) 2018-09-18

Family

ID=57257377

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610643988.2A Active CN106121706B (en) 2016-08-08 2016-08-08 Ventilation and dust removal integrated system for medium-length tunnel

Country Status (1)

Country Link
CN (1) CN106121706B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107795332A (en) * 2017-11-03 2018-03-13 贵州桥梁建设集团有限责任公司 A kind of constructing tunnel heat sink and method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04272400A (en) * 1991-02-27 1992-09-29 Kumagai Gumi Co Ltd Ventilation method in local space of tunnel, etc. by tornado
CN101586468A (en) * 2009-06-24 2009-11-25 中煤第一建设公司第四十九工程处 Automatic sprayer of blasting
CN201424955Y (en) * 2009-05-08 2010-03-17 朱树来 Dust-suppressing gas-diluting device with linkage of wind and water
CN201851148U (en) * 2010-10-26 2011-06-01 中铁五局集团第一工程有限责任公司 Simple tunnel dust settling station
CN203939516U (en) * 2014-07-10 2014-11-12 中铁二十局集团第二工程有限公司 Long distance tunnel construction ventilation system
CN205154226U (en) * 2015-11-23 2016-04-13 西南交通大学 Construction ventilation of tunnel system
CN205154232U (en) * 2015-10-23 2016-04-13 西南交通大学 Tunnel removes haze system
CN205277471U (en) * 2015-12-15 2016-06-01 西南交通大学 High and cold construction ventilation of tunnel system in plateau
CN205977258U (en) * 2016-08-08 2017-02-22 中车建设工程有限公司 Integrative system of medium tunnel dust removal by ventilation

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04272400A (en) * 1991-02-27 1992-09-29 Kumagai Gumi Co Ltd Ventilation method in local space of tunnel, etc. by tornado
CN201424955Y (en) * 2009-05-08 2010-03-17 朱树来 Dust-suppressing gas-diluting device with linkage of wind and water
CN101586468A (en) * 2009-06-24 2009-11-25 中煤第一建设公司第四十九工程处 Automatic sprayer of blasting
CN201851148U (en) * 2010-10-26 2011-06-01 中铁五局集团第一工程有限责任公司 Simple tunnel dust settling station
CN203939516U (en) * 2014-07-10 2014-11-12 中铁二十局集团第二工程有限公司 Long distance tunnel construction ventilation system
CN205154232U (en) * 2015-10-23 2016-04-13 西南交通大学 Tunnel removes haze system
CN205154226U (en) * 2015-11-23 2016-04-13 西南交通大学 Construction ventilation of tunnel system
CN205277471U (en) * 2015-12-15 2016-06-01 西南交通大学 High and cold construction ventilation of tunnel system in plateau
CN205977258U (en) * 2016-08-08 2017-02-22 中车建设工程有限公司 Integrative system of medium tunnel dust removal by ventilation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107795332A (en) * 2017-11-03 2018-03-13 贵州桥梁建设集团有限责任公司 A kind of constructing tunnel heat sink and method

Also Published As

Publication number Publication date
CN106121706B (en) 2018-09-18

Similar Documents

Publication Publication Date Title
RU2532077C2 (en) Wind turbine capacity improvement system
CN202355752U (en) Fire-fighting hose reel
CN103816754A (en) Efficient energy-saving air-assisted spray dust remover
CN209145623U (en) A kind of construction ventilation of tunnel dust pelletizing system
CN105202938A (en) Novel air cooling tower
CN207228029U (en) A kind of efficient device for reducing dust of building engineering construction
CN106121706A (en) Ventilation and dust removal integrated system for medium-length tunnel
CN205977258U (en) Integrative system of medium tunnel dust removal by ventilation
CN202109611U (en) Improved air exchanger
CN206530817U (en) A kind of gas pipeline muffling device
CN206539343U (en) Mining hydrodynamic force dust settler
US20210010455A1 (en) Wind flow operated ventilation and energy harnessing device
CN202538994U (en) Sprayer
CN213331172U (en) Insert formula air water linkage spraying soon and connect
CN201443837U (en) Electric cable and pipe gallery ventilating system
CN204941540U (en) A kind of boosting type efficient dust-remove blower system
CN211397645U (en) Tunnel is with parcel formula spraying ventilation unit
CN210033517U (en) Tunnel malleation ventilation dust device
CN210087372U (en) Rotary dust-removing spray head for mine
CN206769942U (en) A kind of tunnel construction sprinkling dust-removing device
CN208330447U (en) A kind of tunnel veil dust-extraction unit
CN207161396U (en) A kind of firefighting fan of dedusting noise reduction
CN207539057U (en) A kind of rust-proof type spraying device
CN105257599A (en) Mine ventilator
CN205002624U (en) Novel air cooling tower

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191128

Address after: 215000 NO.115, Yinsheng Road, Shengpu Town, Suzhou Industrial Park, Suzhou City, Jiangsu Province

Patentee after: SUZHOU CHINA VEHICLE CONSTRUCTION ENGINEERING CO., LTD.

Address before: 100078 Beijing city Fengtai District park is a district 15 building five floor 501, 503

Patentee before: CRRC CONSTRUCTION ENGINEERING Co.,Ltd.

TR01 Transfer of patent right
CP03 Change of name, title or address

Address after: 214104 room 301-218, block a, Xidong chuangrong building, No. 78, Danshan Road, anzhen street, Xishan District, Wuxi City, Jiangsu Province

Patentee after: Jiangsu CRRC Urban Development Co.,Ltd.

Address before: 215000 NO.115 Yinsheng Road, Shengpu Town, Suzhou Industrial Park, Jiangsu Province

Patentee before: SUZHOU CHINA VEHICLE CONSTRUCTION ENGINEERING Co.,Ltd.

CP03 Change of name, title or address