Summary of the invention
The purpose of the present invention is aiming at the drawbacks described above that prior art exists, it is provided that a kind of drilling well hydraulic top drives back-up tong
Device.
A kind of drilling well hydraulic top drives back-up tong device, and its technical scheme is: include back-up tong guide rail, roller, back-up tong main body, liquid
Pressure power, spring, lever, axle and the one or six prism block teeth, the two or six prism block teeth, lever is assemblied in back-up tong master by axle
Body, described lever is made up of lever left end, lever body, restraining belt, block teeth, and lever left end lower surface is by spring supporting, lever
Lower end, equipped with block teeth, is connected by restraining belt between two block teeth, and the one or six prism block teeth and the two or six prism block teeth assemble respectively
In two six prism holes that back-up tong main body right-hand member is prefabricated, and drilling rod kernel of section, the one or six prism block teeth and the two or six prism
The kernel of section of block teeth is wired to 120 degree;
Hydraulic power includes hydraulic cylinder, liquid presses piston pole, arc shoe plate, and liquid presses piston pole lower end is through preformed hole in back-up tong main body
After install arc shoe plate, make arc shoe plate be positioned at directly over lever left end, described liquid presses piston pole arc hoof when descending
Sheet contacts with lever left end, and promotes lever left end to move downward, and whole lever pivots, and lever lower end promotes drilling rod to the right
Motion, described arc shoe plate size, more than preformed hole aperture in back-up tong main body, can drive when above carrying and move on whole back-up tong, back-up tong
Main body is assemblied on back-up tong guide rail, is moved up and down by roller.
Above-mentioned block teeth, the one or six prism block teeth and the two or six prism block teeth are made up of high-abrasive material.
The above-mentioned a length of 30 ~ 55cm of lever left end, a length of 30 ~ 45cm in lever lower end, restraining belt 6c a length of 90 ~
130cm。
The reserved six prismatic breach coordinated with the one or six prism block teeth or the two or six prism block teeth of above-mentioned back-up tong main body, and
Two six prismatic breach have two groups of four edges parallel to each other.
The drilling well hydraulic top that the present invention mentions drives back-up tong device, when drilling rod snaps through journey, comprises the following steps:
The first step, the preparatory stage:
According to different tube diameters before beginning drilling well, from back-up tong main body, mention the one or six prism block teeth and the two or six prism block teeth,
Rotation makes work surface face toward drilling rod, only need to adjust once after conversion drilling rod caliber every time;
Second step, descending phase, drilling rod clamps in advance:
The oil-filled supercharging of hydraulic cylinder forward, liquid presses piston pole, arc shoe plate and the whole downward rigid translational motion of back-up tong main body, the back of the body
Pincers entirety is displaced downwardly to back-up tong guide rail least significant end, makes drilling rod enter and steps up region, and during this, spring is not affected by compression, only serves dimension
Hold the position effect of lever;
3rd step, clamping drilling rod:
Liquid presses piston pole continues downwards, and arc shoe plate promotes lever left end to move downward, and spring is compressed, simultaneously lever start around
Axle rotates, and the restraining belt of lever lower end contacts drilling rod and pushes away to the right, until the restraining belt of lever lower end, block teeth and six prism teeth
Block is matched for clamping tightly drilling rod;Restraining belt, block teeth motor process as follows, when restraining belt complete envelope drilling rod, restraining belt is by both sides
Block teeth pull to centre, and block teeth touch drilling rod, promote drilling rod and the laminating of six prism block teeth, and drilling rod out-of-roundness is corrected, restraining belt
A length of 90 ~ 130cm, there is flexibility and rigid grasp simultaneously, the common rotation retraining drilling rod, hydraulic pressure maintains 20 ~ 30 seconds;
4th step, top is driven main shaft brill and is turned, and tightens drilling rod and protection pipe nipple;
5th step, constraint relief, loosens drilling rod:
After upper button completes, hydraulic cylinder is the most oil-filled, and liquid presses piston pole and arc shoe plate are up, and spring makes lever opposite direction rotate,
The clamping of lever lower end releases;
6th step, in the up stage, back-up tong resets:
On the upside of arc shoe plate goes upward to back-up tong main body after preformed hole, whole back-up tong main body along with liquid presses piston pole move up from
Spud in bar working region;
The work process of shackle is similar, and simply main shaft direction of rotation is different, repeats no more.
The invention has the beneficial effects as follows: the invention has the advantages that the hydraulic cylinder of an only vertical direction, failure rate is low, make
Use the life-span long, be not susceptible to winter freeze, simple in construction, lightweight, low cost of manufacture.It is big to the envelope angle of drilling rod, it is possible to
Folded drilling rod is carried out certain set round effect, makes shackle on the drilling rod of certain deformation more smooth.Clamping part integrated use
Flexible and rigid grasp, it is possible to realize different calibers flexibly is tight, and clamping performance is good.
Detailed description of the invention
In conjunction with accompanying drawing 1-5, the invention will be further described:
A kind of drilling well hydraulic top drives back-up tong device, and its technical scheme is: include back-up tong guide rail 1, roller, back-up tong main body 3, hydraulic pressure
Power 4, spring 5, lever 6, axle the 7 and the 1st prism block teeth the 8, the 2nd 6 prism block teeth 10, lever 6 is assemblied in by axle 7
Back-up tong back-up tong main body 3, described lever 6 is made up of lever left end 6a, lever body 6b, restraining belt 6c, block teeth 6d, lever left end 6a
Lower surface is supported by spring 5, and lever lower end, equipped with block teeth 6d, is connected by restraining belt 6c between two block teeth, the one or six prism tooth
Block the 8 and the 2nd 6 prism block teeth 10 are respectively assembled in two six prism holes that back-up tong main body 3 right-hand member is prefabricated, and drilling rod 9 cross section
Center, the kernel of section of the one or six prism block teeth the 8 and the 2nd 6 prism block teeth 10 are wired to 120 degree, two six prism block teeth away from
Drilling rod centre distance is 60 ~ 80cm.Drilling rod to different tube diameters, restraining belt can adjust block teeth spacing.It addition, lever left end is
Tabular, lever lower end uses the block teeth formation of flexible restraining belt and rigidity to meet compound constant, wherein steely in restraining belt
The tension core of silk etc..
Hydraulic power 4 includes hydraulic cylinder 4a, liquid presses piston pole 4b, arc shoe plate 4c, and liquid presses piston pole 4b lower end is through the back of the body
Install arc shoe plate 4c on clamp main body 3 after preformed hole, make arc shoe plate 4c be positioned at directly over lever left end 6a, described at hydraulic pressure
When piston rod 4b is descending, arc shoe plate 4c contacts with lever left end 6a, and promotes lever left end 6a to move downward, whole lever 6 around
Axle 7 rotates, and lever lower end promotes drilling rod to move right, and described arc shoe plate 4c size is more than preformed hole aperture in back-up tong main body 3,
On can drive when carrying and move on whole back-up tong, back-up tong main body 3 is assemblied on back-up tong guide rail 1, is moved up and down by roller.
Wherein, described block teeth 6d, the one or six prism block teeth the 8 and the 2nd 6 prism block teeth 10 are made up of high-abrasive material.Above-mentioned
The lever a length of 30 ~ 55cm of left end 6a, a length of 30 ~ 45cm in lever lower end, a length of 90 ~ 130cm of restraining belt 6c.Above-mentioned
The reserved six prismatic breach coordinated with the one or six prism block teeth the 8 or the 2nd 6 prism block teeth 10 of back-up tong main body 3, and two six ribs
V notch v has two groups of four edges parallel to each other, and six ribs are processed into corresponding radian according to each different caliber, use every time
Time have only to rotate to the rib dismounting appropriate section of correspondence, remaining rib still maintains the original state.The application diameter of six block teeth is according to this
For: 88.9mm, 139.7mm, 101.6mm, 137.92mm, 114.3mm, 127mm.
5-10 referring to the drawings, the drilling well hydraulic top that the present invention mentions drives back-up tong device, and its technical scheme is as follows: on drilling rod
When snapping through journey,
The first step, the preparatory stage (such as Fig. 5):
According to different tube diameters before beginning drilling well, from back-up tong main body, mention the one or six prism block teeth the 8 and the 2nd 6 prism block teeth
10, rotate and make work surface face toward drilling rod, only need to adjust once after conversion drilling rod caliber every time;
Second step, descending phase, drilling rod clamp in advance (as Fig. 6,7):
The oil-filled supercharging of hydraulic cylinder 4a forward, liquid presses piston pole 4b, arc shoe plate 4c and the downward rigid translation of whole back-up tong main body 3
Motion, back-up tong entirety is displaced downwardly to back-up tong guide rail least significant end, makes drilling rod enter and steps up region, and during this, spring 5 is not affected by compression,
Only serve the position effect maintaining lever;
3rd step, clamping drilling rod (such as Fig. 8):
Liquid presses piston pole 4b continues downwards, and arc shoe plate 4c promotes lever left end 6a to move downward, and spring 5 is compressed, simultaneously thick stick
Bar 6 starts to rotate around axle 7, and restraining belt 6c of lever lower end contacts drilling rod and pushes away to the right, until restraining belt 6c of lever lower end,
Block teeth 6d and six prism block teeth are matched for clamping tightly drilling rod 9;Restraining belt 6c, block teeth 6d motor process as follows, when restraining belt 6c is complete
During envelope drilling rod 9, both sides block teeth 6d is pulled by restraining belt 6c to centre, and block teeth 6d touches drilling rod 9, promotes drilling rod and six prisms
Block teeth are fitted, and drilling rod out-of-roundness is corrected, and a length of 90 ~ 130cm of restraining belt has flexibility and rigid grasp, the most simultaneously
The rotation of bundle drilling rod, hydraulic pressure maintains 20 ~ 30 seconds;
4th step, top is driven main shaft and is bored and turn, tightens drilling rod and protection pipe nipple (same as the prior art repeat no more);
5th step, constraint relief, loosens drilling rod (such as Fig. 9):
After upper button completes, hydraulic cylinder 4a is the most oil-filled, and liquid presses piston pole 4b and arc shoe plate 4c is up, and spring 5 makes lever 6 negative side
To rotation, the clamping of lever lower end releases;
6th step, in the up stage, back-up tong resets (such as Figure 10):
Going upward on the upside of back-up tong main body 3 after preformed hole until arc shoe plate 4c, whole back-up tong main body is along with liquid presses piston pole 4b upwards
Move away drilling rod working region;
The work process of shackle is similar, and simply main shaft direction of rotation is different, repeats no more.
Advantages of the present invention is as follows:
1, envelope angle is big, it is possible to added drilling rod carries out certain school circle function, has certain fitting to the drilling rod with deformation
By property, extend the service life of drilling rod.Owing to six prism dissimilar tooth forms on the right side of lever are the pipe diameter determing for different size
, each prism to the envelope angle of drilling rod more than 80 degree, the compound constant envelope angle of left end more than 100 degree, total envelope
Angle is not less than 260 degree;
2, flexible and rigid composite clamps, and clamping performance is good.The design of lever 6c and 6d part, makes restraining belt 6c first contact brill
Bar, along with the increase enveloping surface of thrust is also increasing, it is possible to ensure that three part block teeth reach maximum clamping force simultaneously.Existing flexibility
Constraint has again rigid constraint, and clamping force is more uniform, and clamping stability is good.Compared with traditional rigid grasp, reach identical
The clamping force that clamping effect needs is less.Opposing twisting property is good, extends the service life of drilling rod;
3, simple in construction, low cost of manufacture.Only one of which hydraulic cylinder is achieved that the descending of back-up tong and two different directions of clamping
On action, effectively avoid the redundancy of structure.Overall structure is simple, and part parts are few.Owing to not having the hydraulic pressure of level to set
Standby, the weight of this back-up tong is substantially reduced, it is to avoid drilling rod eccentric wear phenomenon.Also simplify integrated hydraulic system simultaneously, reduce system
Cause this.The fault rate of back-up tong reduces, and reliability is greatly improved;
4, can automatic centering.Roomy guide rail ensure that back-up tong main body is horizontal.Six prism block teeth 8 parts are (such as Fig. 5
Shown in) processing different annular mouth for six kinds of different calibers, it is ensured that the drilling rod for different tube diameters has preferably
Adaptability, keeps face contact to greatest extent.And the position of six prisms and angle ensure that drilling rod steps up rear and top guarantor
Shield a shortcoming or fault and be connected on a centrage, it is achieved that the automatic centering of drilling rod;
5, abrasion is less, and not damaged is in drilling rod.Restraining belt 6c in left side is far longer than block teeth and drilling rod with the coefficient of friction of drilling rod
Between coefficient of friction, compared with traditional rigid grasp, reach the clamping force that identical clamping effect needs little, protect drilling rod
Box cupling, extends drilling life of drill pipe;
6, regular maintenance is convenient.After end-of-job, back-up tong vertical direction activity space is big, for changing block teeth, protection pipe nipple or IBOP
Provide bigger working space.Only need to remove the most replaceable whole back-up tong of roller.The big energy of back-up tong vertical direction activity space
Enough exempting from damages drilling rod;
7, the held tight to different calibers can be realized flexibly.Clamping part on the left of the design has flexible restraint ties, energy
Enough spacing that two block teeth 6ds are adjusted flexibly for different tube diameters, adapt to different calibers i.e. automatically.By six on the right side of rotating
Prism block teeth 8, it is possible to produce specific aim clamping with different tube diameters;
8, vertical spring has damping and the function fluctuated.On drilling rod during shackle, due to the elastic work of spring 5
With, back-up tong is on the premise of the drilling rod of clamping, additionally it is possible to provides a vertical floating space flexibly, makes up what pitch was brought
The deviation of the vertical direction of main shaft is driven on drilling rod and top;
9, hydraulic cylinder life is longer, and winter is not susceptible to the phenomenon that freezes.The design only has a vertical hydraulic cylinder, hydraulic oil
Better tightness.On back-up tong in shackle work process, inevitably have drilling fluid, even landwaste and trickle down back-up tong master
On body, the back-up tong with horizontal hydraulic cylinder easily produces hydraulic cylinder serious wear, the easy leakage of oil of summer operation, holds when winter works
Easily freeze;
10, the anti-torsion active force that back-up tong guide rail provides is big, and the width of back-up tong is 2 ~ 3 times of drill pipe diameter, has roomy simultaneously
Back-up tong guide rail, there is preferable twisting action performance.