CN106120808A - A kind of in the soft comprehensive support method moulded in clay foundation ditch - Google Patents

A kind of in the soft comprehensive support method moulded in clay foundation ditch Download PDF

Info

Publication number
CN106120808A
CN106120808A CN201610602764.7A CN201610602764A CN106120808A CN 106120808 A CN106120808 A CN 106120808A CN 201610602764 A CN201610602764 A CN 201610602764A CN 106120808 A CN106120808 A CN 106120808A
Authority
CN
China
Prior art keywords
casting
pipe
slip
pressure slip
foundation ditch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610602764.7A
Other languages
Chinese (zh)
Inventor
常策
王伟
唐兵传
张贵廷
吴小飞
崔建博
其他发明人请求不公开姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201610602764.7A priority Critical patent/CN106120808A/en
Publication of CN106120808A publication Critical patent/CN106120808A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/54Piles with prefabricated supports or anchoring parts; Anchoring piles

Abstract

A kind of in the soft comprehensive support method moulded in clay foundation ditch, specifically comprise the following steps that 1) judge that whether soil property character be soft to mould clay soil property according to soil property situation, determine rear excavation pit;2) when under excavation of foundation pit to Guan Liang 23 meters, make anchor cable and high-pressure slip-casting pipe, use water drilling and casing pipe hole forming technique to carry out pore-forming operation, bottom hole, carry out rotating enlarged footing process formation rotation dig stake;3) after pore-forming, sleeve pipe put into by anchor cable and high-pressure slip-casting pipe, anchor cable is fixed by anchorage cable anchoring backing plate, filler ring is had on high-pressure slip-casting pipe, bottom high-pressure slip-casting pipe putting hole, carry out a common pressure grouting 4) after a common pressure grouting waits 8 12 minutes again, after initial set, carry out secondary high-pressure slip-casting, slip casting process starts hole forming machine and retreats follow-up sleeve pipe, starts to start churning pipe and carries out anchoring section churning.Deep foundation pit support in silty clay is used rotation to dig bored concrete pile+churning anchored pile support system thus can ensure that support system is stablized by the present invention, it is ensured that the safety of engineering pile.

Description

A kind of in the soft comprehensive support method moulded in clay foundation ditch
Technical field
The present invention relates to comprehensive support method field, particularly relate in the soft comprehensive support method moulded in clay foundation ditch.
Background technology
Deep Foundation Pit Supporting Project has become a kind of comprehensive engineering.In today that building industry develops rapidly, to deep base The research of hole supporting never stopped.China's foundation ditch the seventies in last century also ratio shallower, representativeness is that how high-rise District of Shanghai is Building is provided with the single floor basement of degree of depth 4m, and the foundation depth that Beijing area subway engineering has reaches 20m.Experience 80, the nineties Development, the deep-foundation pit engineering of China begins to take shape, and foundation depth, scale continue to increase, Design of Deep Foundation Pit Support and construction warp Testing increasingly mature, country has promulgated corresponding specification simultaneously.The deep-foundation pit engineering of China enters fast development in recent years In the stage, foundation ditch scale, the degree of depth are bigger, and construction environment is complicated and control requires higher, and deep-foundation pit engineering is faced with more acute Challenge.
Under different soil conditions, carry out deep foundation pit construction, it is necessary to this soil property situation is fully studied, take rationally Pattern foundation pit supporting structure measure, just can ensure that orderly the carrying out of engineering safety.The rock-soil layer good to caking property, can use dry drilling work Skill, it is not necessary to sleeve so that pore-forming efficiency is high.And the soft the loosest caving ground of clay of moulding, or having groundwater occurrence, hole wall is not Stable, so how this applies corresponding technique in silty clay aqueous, that silt content is the highest, how technological parameter determines, Can ensure that stablizing of support system, it is ensured that the safety of engineering pile is a more scabrous problem.
Summary of the invention
In order to solve the problem of above-mentioned existence, the present invention provides a kind of in the soft comprehensive support method moulded in clay foundation ditch, Use rotation to dig bored concrete pile+churning anchored pile support system deep foundation pit support in silty clay thus can ensure that the steady of support system Fixed, it is ensured that the safety of engineering pile, for reaching this purpose, the present invention provides a kind of in the soft comprehensive support method moulded in clay foundation ditch, Specifically comprise the following steps that
1) judge that whether soil property character be soft to mould clay soil property according to soil property situation, determine rear excavation pit;
2) when 2-3 rice under excavation of foundation pit to Guan Liang, make anchor cable and high-pressure slip-casting pipe, use water drilling and casing pipe hole forming technique to carry out Pore-forming operation, carries out rotating enlarged footing process formation rotation bottom hole and digs stake;
3), after pore-forming, sleeve pipe put into by anchor cable and high-pressure slip-casting pipe, and anchor cable is fixed by anchorage cable anchoring backing plate, high-pressure slip-casting There is filler ring on pipe, bottom high-pressure slip-casting pipe putting hole, carry out a common pressure grouting,;
4) carrying out secondary high-pressure slip-casting after a common pressure grouting waits 8-12 minute again after initial set, slip casting process starts pore-forming Machine retreats follow-up sleeve pipe, starts to start churning pipe and carries out anchoring section churning.
Further improvement of the present invention, described foundation ditch one side roof part has gutter, can arrange gutter for the ease of draining.
Further improvement of the present invention, there is a casting nail described foundation ditch side, and the present invention can use soil nailing to reinforce.
The invention provides a kind of in the soft comprehensive support method moulded in clay foundation ditch, it uses rotation to dig bored concrete pile+churning Anchored pile support system, after its excavation of foundation pit to respective depth, uses water drilling and casing pipe hole forming technique to carry out pore-forming operation, in hole Bottom carries out rotating enlarged footing and processes, and carries out a common pressure grouting afterwards, then carries out secondary high-pressure slip-casting, treats a common pressure grouting After initial set, starting hole forming machine and retreat follow-up sleeve pipe, start to start churning pipe and carry out anchoring section churning, above method is applicable to soft moulding Clay foundation ditch, it can be ensured that stablizing of support system, it is ensured that the safety of engineering pile.
Accompanying drawing explanation
Fig. 1 is schematic diagram of the present invention;
Illustrate;
1, foundation ditch;2, stake is dug in rotation;3, soil nailing;4, high-pressure slip-casting pipe;5, anchorage cable anchoring backing plate;6, filler ring;7, anchor cable;8, draining Ditch.
Detailed description of the invention
With detailed description of the invention, the present invention is described in further detail below in conjunction with the accompanying drawings:
The present invention provides a kind of in the soft comprehensive support method moulded in clay foundation ditch, and deep foundation pit support in silty clay is used rotation Dig bored concrete pile+churning anchored pile support system thus can ensure that stablizing of support system, it is ensured that the safety of engineering pile.
As an embodiment of the present invention, the present invention provides a kind of at the soft comprehensive support method moulded in clay foundation ditch, tool Body step is as follows:
1) judge that whether soil property character be soft to mould clay soil property according to soil property situation, determine rear excavation pit 1;
2) it is excavated to 2-3 rice under Guan Liang when foundation ditch 1, makes anchor cable 7 and high-pressure slip-casting pipe 4, use water drilling and casing pipe hole forming technique Carry out pore-forming operation, bottom hole, carry out rotating enlarged footing process formation rotation dig stake 2;
3) after pore-forming, sleeve pipe put into by anchor cable 7 and high-pressure slip-casting pipe 8, and anchor cable 7 is fixed by anchorage cable anchoring backing plate 5, high pressure There is filler ring 6 in Grouting Pipe 8, bottom high-pressure slip-casting pipe 4 putting hole, carry out a common pressure grouting;
4) carrying out secondary high-pressure slip-casting after a common pressure grouting waits 8-12 minute again after initial set, slip casting process starts pore-forming Machine retreats follow-up sleeve pipe, starts to start churning pipe and carries out anchoring section churning.
As one specific embodiment of the present invention, what the present invention provided as shown in Figure 1 a kind of moulds in clay foundation ditch soft Comprehensive support method, specifically comprises the following steps that
1) judge that whether soil property character be soft to mould clay soil property according to soil property situation, determine rear excavation pit 1, described foundation ditch side Gutter is arranged at top, can arrange gutter for the ease of draining, and there is a casting nail described foundation ditch side, and the present invention can use soil nailing Reinforce;
2) it is excavated to 2-3 rice under Guan Liang when foundation ditch 1, makes anchor cable 7 and high-pressure slip-casting pipe 4, use water drilling and casing pipe hole forming technique Carry out pore-forming operation, bottom hole, carry out rotating enlarged footing process formation rotation dig stake 2;
3) after pore-forming, sleeve pipe put into by anchor cable 7 and high-pressure slip-casting pipe 8, and anchor cable 7 is fixed by anchorage cable anchoring backing plate 5, high pressure There is filler ring 6 in Grouting Pipe 8, bottom high-pressure slip-casting pipe 4 putting hole, carry out a common pressure grouting;
4) carrying out secondary high-pressure slip-casting after a common pressure grouting waits 8-12 minute again after initial set, slip casting process starts pore-forming Machine retreats follow-up sleeve pipe, starts to start churning pipe and carries out anchoring section churning.
The above, be only presently preferred embodiments of the present invention, is not the limit that the present invention makees any other form System, and any amendment made according to the technical spirit of the present invention or equivalent variations, still fall within present invention model required for protection Enclose.

Claims (3)

1., in the soft comprehensive support method moulded in clay foundation ditch, comprise the following steps that, it is characterised in that:
1) judge that whether soil property character be soft to mould clay soil property according to soil property situation, determine rear excavation pit (1);
2) it is excavated to 2-3 rice under Guan Liang when foundation ditch (1), makes anchor cable (7) and high-pressure slip-casting pipe (4), use water drilling to become with sleeve pipe Hole technique carries out pore-forming operation, carries out rotating enlarged footing process formation rotation and dig stake (2) bottom hole;
3) after pore-forming, sleeve pipe put into by anchor cable (7) and high-pressure slip-casting pipe (8), and anchor cable (7) is carried out by anchorage cable anchoring backing plate (5) Fixing, high-pressure slip-casting pipe (8) has filler ring (6), bottom high-pressure slip-casting pipe (4) putting hole, carries out a common pressure grouting;
4) carrying out secondary high-pressure slip-casting after a common pressure grouting waits 8-12 minute again after initial set, slip casting process starts pore-forming Machine retreats follow-up sleeve pipe, starts to start churning pipe and carries out anchoring section churning.
It is the most according to claim 1 a kind of in the soft comprehensive support method moulded in clay foundation ditch, it is characterised in that: described base Hole (1) one side roof part has gutter (8).
It is the most according to claim 1 a kind of in the soft comprehensive support method moulded in clay foundation ditch, it is characterised in that: described base There is casting nail (3) (1) side, hole.
CN201610602764.7A 2016-07-28 2016-07-28 A kind of in the soft comprehensive support method moulded in clay foundation ditch Pending CN106120808A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610602764.7A CN106120808A (en) 2016-07-28 2016-07-28 A kind of in the soft comprehensive support method moulded in clay foundation ditch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610602764.7A CN106120808A (en) 2016-07-28 2016-07-28 A kind of in the soft comprehensive support method moulded in clay foundation ditch

Publications (1)

Publication Number Publication Date
CN106120808A true CN106120808A (en) 2016-11-16

Family

ID=57290343

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610602764.7A Pending CN106120808A (en) 2016-07-28 2016-07-28 A kind of in the soft comprehensive support method moulded in clay foundation ditch

Country Status (1)

Country Link
CN (1) CN106120808A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522235A (en) * 2016-11-01 2017-03-22 中化二建集团有限公司 Narrow site deep foundation pit excavation supporting construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1811131A (en) * 2005-01-28 2006-08-02 曹兴明 Enlarged head roof bolt and its construction process
CN101532292A (en) * 2008-03-14 2009-09-16 上海市基础工程公司 Construction process for jet grouting anchor rod
CN101644053A (en) * 2009-09-04 2010-02-10 凌光荣 Method for enhancing pulling-resistant and tensile-resistant capability of soft and weak soil layer anchor rod/anchor rope
KR101026188B1 (en) * 2010-06-17 2011-03-31 토양건영 주식회사 Pile made by using grouting method and construction method for as the same
CN202466594U (en) * 2011-12-29 2012-10-03 标力建设集团有限公司 Horizontal jet grouting soil anchoring and cast-in-place pile compound foundation pit supporting structure
CN105604065A (en) * 2015-12-08 2016-05-25 西南有色昆明勘测设计(院)股份有限公司 Foundation fit support and peat-soil deep-foundation-pit-support high-pressure jet grouting anchoring method
CN205329689U (en) * 2016-01-12 2016-06-22 周同和 Lower part enlarges compound stock of section pressure type

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1811131A (en) * 2005-01-28 2006-08-02 曹兴明 Enlarged head roof bolt and its construction process
CN101532292A (en) * 2008-03-14 2009-09-16 上海市基础工程公司 Construction process for jet grouting anchor rod
CN101644053A (en) * 2009-09-04 2010-02-10 凌光荣 Method for enhancing pulling-resistant and tensile-resistant capability of soft and weak soil layer anchor rod/anchor rope
KR101026188B1 (en) * 2010-06-17 2011-03-31 토양건영 주식회사 Pile made by using grouting method and construction method for as the same
CN202466594U (en) * 2011-12-29 2012-10-03 标力建设集团有限公司 Horizontal jet grouting soil anchoring and cast-in-place pile compound foundation pit supporting structure
CN105604065A (en) * 2015-12-08 2016-05-25 西南有色昆明勘测设计(院)股份有限公司 Foundation fit support and peat-soil deep-foundation-pit-support high-pressure jet grouting anchoring method
CN205329689U (en) * 2016-01-12 2016-06-22 周同和 Lower part enlarges compound stock of section pressure type

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522235A (en) * 2016-11-01 2017-03-22 中化二建集团有限公司 Narrow site deep foundation pit excavation supporting construction method

Similar Documents

Publication Publication Date Title
CN110230309B (en) Karst area bridge karst cave pile foundation construction method
CN101818505B (en) Soil pressure testing method for a cutting edge of caisson
CN102605772A (en) Construction method for revolving digging cast-in-place pile
CN111042146A (en) Construction method of deep foundation pit supporting anti-seepage system of coastal karst stratum
CN102011591A (en) Grouting process for working surface of deep well
CN109898521A (en) A kind of anchored pile supporting and construction method for foundation pit external corner
CN105089023A (en) Improving method for concrete floor of hydropower house and structure of concrete floor
CN203530988U (en) One-time forming major-diameter anchor rod foundation pit supporting structure
CN106978817A (en) A kind of Novel retaining wall based process pattern and a kind of Novel retaining wall
CN109487777A (en) A method of a reinforcing deep soft soil foundation of filling the span of a man's arms is formed using slip casing by pressure
CN110144936A (en) One kind adjoining the unilateral formwork of support pile outer wall of basement and construction method
CN103343534A (en) Closed precipitation method for foundation pit construction
CN106120808A (en) A kind of in the soft comprehensive support method moulded in clay foundation ditch
CN103243721B (en) Highrise Building With Raft Foundation and Core Walls Structure excavation construction method under Unfavorable geology condition
CN112049140A (en) Large buried depth rock crack reinforcing anti-seepage grouting process
CN102220764A (en) Deep foundation pit bracing system and construction method thereof
CN204386602U (en) A kind of surge shaft pit shaft collapses chamber backfill supplementary structure
CN110747861A (en) High-water-level deep foundation pit excavation construction method
CN206233232U (en) A kind of upper and lower part expansion type soil cement is combined pile tube
CN101858074A (en) Construction method and device for on-site water injection test
CN206706748U (en) Wet spraying pile controlling stream modeling shape sea sand hydraulic reclamation area pile foundation
CN102061701A (en) Construction method for installing vertical grounding electrode by punching and pouring pile
CN205399410U (en) Dig first slip casting club -footed pile of drilling soon
CN210482285U (en) Soft soil foundation manual hole digging pile structure
CN103195061B (en) Multi-functional casing pipe part and anchor rod construction method using same

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161116