drilling platform
bearing
platform self
leveling device
self
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610472507.6A
Other languages
Chinese (zh)
Other versions
CN106120687A (en
Inventor
马晓东
徐启利
赵鹍鹏
张爱花
张立超
刘自明
张红心
徐烨
胡环
王杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd MBEC filed Critical China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority to CN201610472507.6A priority Critical patent/CN106120687B/en
Publication of CN106120687A publication Critical patent/CN106120687A/en
Application granted granted Critical
Publication of CN106120687B publication Critical patent/CN106120687B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0039Methods for placing the offshore structure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0056Platforms with supporting legs

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention discloses a kind of construction methods of drilling platform self-level(l)ing installation, are related to field of bridge construction, this method includes the following steps:S1:Multiple drilling platform self-regulated leveling devices are installed on drilling platform;S2:The drilling platform integral hoisting of drilling platform self-regulated leveling device will be installed, transferred after transporting to pier position;S3:Measure height of the drilling platform in each installation drilling platform self-level(l)ing setting position, design height difference adjusting range;S4:Adjustment regulating mechanism makes its elongation, and supporting pile is driven to move downward, until supporting pile bottom end bearing capacity is more than drilling platform after the gravity of drilling platform self-level(l)ing setting position point, continues to extend regulating mechanism, moves upwards casing;S5:Step S4 is repeated, until the difference in height of any two position after difference in height adjusting range, fixes bearing beam and connector.The present invention is based on drilling platform self-regulated leveling devices, can improve construction efficiency and smooth drilling platform can be established on the sea of no reference object.

Description

The construction method of drilling platform self-level(l)ing installation
Technical field
The present invention relates to field of bridge construction, and in particular to a kind of construction method of drilling platform self-level(l)ing installation.
Background technology
With the development of bridge technology, bridge moves towards Sea World from great rivers, in face of complicated ocean ring Border, the basis that constructs a bridge are the key that relationship bridge construction success or failure.Conventional borehole platform generally combines connection using steel pipe driven pile The structure type of clone, steel pipe driven pile need to be by root inserting piling, then installs bracing between stake, low construction efficiency, and in ocean ring Under border there is very big problem in steel-pipe pile inserting piling self stability, easily occur stake, deviation phenomenon, and subsequent construction is fairly cumbersome.And Offshore construction can be converted into prefabrication construction by integral installation formula drilling platform, then in place using large-scale floating crane integral installation, Realize bridge construction batch production, prefabricated, reduction Potential Working Time For Operation At Sea, raising construction efficiency.It is applied in drilling platform integral hoisting How working hour makes drilling platform accurate in place on the sea without any reference object and establishes smooth work in the sea bed face of fluctuating Industry platform becomes the difficult point of prefabricated construction.
Invention content
For defect in the prior art, the purpose of the present invention is to provide a kind of drilling platform self-level(l)ing installations Construction method can improve construction efficiency and smooth drilling platform can be established on the sea of no reference object.
To achieve the above objectives, the technical solution adopted by the present invention is that:A kind of construction party of drilling platform self-level(l)ing installation Method, based on a kind of drilling platform self-regulated leveling device, the drilling platform self-regulated leveling device includes:Casing, supporting pile, distribution beam And connector, the supporting pile can move back and forth in described sleeve pipe, described sleeve pipe outer wall is fixed with bearing, outside the supporting pile Wall is fixed with bearing beam, and the bearing beam is between the bearing and distribution beam, and the bearing, bearing beam and distribution beam are detachable Ground is connected with the connector, and the drilling platform self-regulated leveling device further includes regulating mechanism, described regulating mechanism one end and institute It states supporting pile to fix, the other end is fixed with the distribution beam, and the regulating mechanism can be stretched between the supporting pile and distribution beam Contracting, it is characterised in that:This method includes the following steps:
S1:Multiple drilling platform self-regulated leveling devices are installed on drilling platform;
S2:The drilling platform integral hoisting of drilling platform self-regulated leveling device will be installed, transferred after transporting to pier position;
S3:After drilling platform decentralization, height of the drilling platform in each installation drilling platform self-level(l)ing setting position is measured, Calculate the difference in height of each two position, and design height difference adjusting range;
S4:Drilling platform self-regulated leveling device is adjusted, is first fixed bearing and distribution beam with connector, and unclamp bearing beam With the connection of connector, adjustment regulating mechanism makes its elongation, supporting pile is driven to move downward, until supporting pile bottom end bearing capacity is big After gravity of the drilling platform in drilling platform self-level(l)ing setting position point, continue to extend regulating mechanism, move upwards casing;
S5:Step S4 is repeated, until the difference in height of arbitrary described two positions is after difference in height adjusting range, it is fixed Bearing beam and connector.
Based on the above technical solution, the connector be spiral, the spiral through the bearing, Bearing beam and distribution beam, the bearing, bearing beam and distribution beam respectively by the first nut, the second nut and third nut removably It is fixed with the spiral;By tightening first nut and third nut by bearing and distribution beam and spiral shell in step S4 Line reinforcing bar is fixed, and is unclamped bearing beam and spiral by unclamping second nut.
Based on the above technical solution, the regulating mechanism is jack.
Based on the above technical solution, the connector be spiral, the spiral through the bearing, Bearing beam and distribution beam, the bearing, bearing beam and distribution beam respectively by the first nut, the second nut and third nut removably It is fixed with the spiral.
Based on the above technical solution, the bearing is welded on the top opening of described sleeve pipe.
Based on the above technical solution, the bearing beam is welded on the end of the supporting pile.
Based on the above technical solution, described sleeve pipe is steel sleeve.
Based on the above technical solution, the regulating mechanism is jack.
Compared with prior art, the advantage of the invention is that:
(1) drilling platform self-regulated leveling device of the invention, all structures in factory process and are installed in place.And tradition Drilling platform is compared by the way of steel pipe driven pile combination bracing, easy for installation, reduces Potential Working Time For Operation At Sea, raising is applied Work efficiency rate.
(2) drilling platform self-regulated leveling device of the invention, including bearing, bearing beam, distribution beam and regulating mechanism.Bearing, pad Beam and distribution beam are connected using spiral, form three layers of force structure, three layers of force structure may be separately formed between any two by Power system plays different effects.It is real with reference to three layers of force structure of bearing, bearing beam and distribution beam by adjusting regulating mechanism The leveling work of drilling platform is showed, it is accurate in place and in fluctuating on the sea without any reference object to solve drilling platform The problem of smooth job platform is established in sea bed face.
Description of the drawings
Fig. 1 is the structure diagram of drilling platform self-regulated leveling device in the present invention;
Fig. 2 is sectional views of the Fig. 1 along A-A directions;
Fig. 3 is sectional views of the Fig. 1 along B-B directions;
Fig. 4 be install drilling platform self-regulated leveling device after drilling platform structure diagram.
In figure:1- casings, 11- bearings, 2- supporting piles, 21- bearing beams, 3- distribution beams, 4- connectors, 5- regulating mechanisms, 6- First nut, the second nuts of 7-, 8- third nuts, 9- drilling platforms, 100- drilling platform self-regulated leveling devices.
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawings and embodiments.
Shown in Figure 1, the present invention provides a kind of drilling platform self-regulated leveling device 100, including casing 1, supporting pile 2, Distribution beam 3, connector 4 and regulating mechanism 5.
Casing 1 is steel sleeve, is fixed with bearing 11 on outer wall, and the bearing 11 in the present invention by the way of welding using fixing At the top opening of casing 1.
Supporting pile 2 can be moved back and forth in the casing 1, and 2 outer wall of supporting pile is fixed with bearing beam 21, the bearing beam 21 in the present invention The end of supporting pile 2 is fixed on by the way of welding.
Bearing beam 21 is between bearing 11 and distribution beam 3, and bearing 11, bearing beam 21 and distribution beam 3 are removably with connecting Fitting 4 is connected, and the connector 4 in the present invention is spiral, and spiral runs through bearing 11, bearing beam 21 and distribution beam 3, bearing 11st, bearing beam 21 and distribution beam 3 respectively by the first nut 6, the second nut 7 and third nut 8 removably with the screw-thread steel Muscle is fixed.
5 one end of regulating mechanism is fixed with supporting pile 2, and the other end is fixed with distribution beam 3, and regulating mechanism 5 can be in 2 He of supporting pile It stretches between distribution beam 3.After the connection for unclamping bearing beam 21 and connector 4, adjustment regulating mechanism 5 can drive supporting pile 2 to Lower movement, the present invention in regulating mechanism 5 be jack.
Brief description once the present invention in drilling platform self-regulated leveling device 100 operation principle, when drilling platform self-regulated After leveling device 100 is mounted on drilling platform 9, by being transferred after integral hoisting to pier position, leveling work is just proceeded by.Leveling In the process, bearing 11 and distribution beam 3 are fixed with spiral by tightening the first nut 6 and third nut 8 first, simultaneously The second nut 7 is unclamped to unclamp bearing beam 21 and spiral.Top lifting jack, supporting pile 2 move downward under pressure, when 2 bottom end bearing capacity of supporting pile is more than drilling platform 9 after the gravity of 100 location point of drilling platform self-regulated leveling device, and supporting pile 2 is not It moves still further below, jack 7 continues top lifting, and casing 1 will drive distribution beam 3 to move upwardly together at this time, and it is high to have reached adjustment The purpose of degree.So as to drilling platform 9 be made accurate in place on the sea without any reference object using the present invention and risen and fallen Sea bed face establish smooth job platform.
The present invention also provides a kind of method using above-mentioned 100 leveling drilling platform 9 of drilling platform self-regulated leveling device, the party Method includes the following steps:
S1:Multiple drilling platform self-regulated leveling devices 100 are installed on drilling platform 9;
To reduce over-water construction process, 100 all structures of drilling platform self-regulated leveling device in factory process and are installed just Position.After drilling platform 9 completes, the quantity of drilling platform self-regulated leveling device 100 is arranged as required to, it is shown in Figure 4, this 4 sets of drilling platform self-regulated leveling devices 100 are mounted on drilling platform 9 altogether in invention.Steel pipe is used with conventional borehole platform The mode of driven pile combination bracing is compared, easy for installation, reduces Potential Working Time For Operation At Sea, improves construction efficiency.
S2:9 integral hoisting of drilling platform of drilling platform self-regulated leveling device 100 will be installed, transferred after transporting to pier position;
According to 9 gravity of drilling platform, size, suitable crane barge equipment is selected to carry out integral hoisting, band after transporting to pier position The whole decentralization of drilling platform self-regulated leveling device 100.Drilling platform 9 is cast anchor alignment system before transferring using crane barge equipment itself institute band It is positioned, adjusts and integrally transferred in the range of its plan-position to positioning accuracy, 1 base opening meeting of casing under the effect of gravity after implantation It is inserted into the certain depth of sea bed.According to the soft or hard degree of sea bed, casing 1 is inserted into sea bed depth and also will appear deviation, causes drilling flat The basic quadrangle height difference of platform 9 differs, and need to carry out follow-up leveling construction.
S3:After drilling platform 9 is transferred, drilling platform 9 is measured in each 100 position of installation drilling platform self-regulated leveling device Highly, the difference in height of each two position, and design height difference adjusting range are calculated;
Drilling platform self-regulated leveling device 100 in the present invention is altogether 4, after the height for having measured this 4 positions, is calculated The difference in height of each two position, then according to actual conditions design height difference adjusting range.
S4:Drilling platform self-regulated leveling device 100 is adjusted, first fixes bearing 11 and distribution beam 3 with connector 4, and The connection of bearing beam 21 and connector 4 is unclamped, adjustment regulating mechanism 5 makes its elongation, supporting pile 2 is driven to move downward, until bearing 2 bottom end bearing capacities of stake are more than drilling platform 9 after the gravity of 100 location point of drilling platform self-regulated leveling device, continue elongation and adjust Mechanism 5 moves upwards casing 1;
Connector 4 in the present invention is spiral, and spiral runs through bearing 11, bearing beam 21 and distribution beam 3, bearing 11st, bearing beam 21 and distribution beam 3 respectively by the first nut 6, the second nut 7 and third nut 8 removably with the screw-thread steel Muscle is fixed.Bearing 11 and distribution beam 3 with spiral are fixed by tightening the first nut 6 and third nut 8, pass through release Second nut 7 unclamps bearing beam 21 and spiral.In addition, the regulating mechanism 5 in the present invention is jack, top lifting jack, Supporting pile 2 moves downward under pressure, when 2 bottom end bearing capacity of supporting pile is more than drilling platform 9 in drilling platform self-level(l)ing After the gravity of 100 location point of device, supporting pile 2 no longer moves downward, and jack 7 continues top lifting, and casing 1 will drive point at this time It is moved upwardly together with beam 3, has achieved the purpose that adjust height.
S5:Step S4 is repeated, until the difference in height of any two position after difference in height adjusting range, fixes bearing beam 21 with connector 4.
Tighten the second nut 7 to fix bearing beam 21 with spiral, jack oil return, then 9 weight of drilling platform convert to Supporting pile 2 is born, and removes distribution beam 3 and jack, continues subsequent construction.
The present invention is not limited to the above-described embodiments, for those skilled in the art, is not departing from Under the premise of the principle of the invention, several improvements and modifications can also be made, these improvements and modifications are also considered as the protection of the present invention Within the scope of.The content not being described in detail in this specification belongs to the prior art well known to professional and technical personnel in the field.

Claims (7)

1. a kind of construction method of drilling platform self-level(l)ing installation, described based on a kind of drilling platform self-regulated leveling device (100) Drilling platform self-regulated leveling device (100) includes:Casing (1), supporting pile (2), distribution beam (3) and connector (4), the supporting pile (2) it can be moved back and forth in described sleeve pipe (1), described sleeve pipe (1) outer wall is fixed with bearing (11), supporting pile (2) outer wall Bearing beam (21) is fixed with, the bearing beam (21) is between the bearing (11) and distribution beam (3), and the bearing (11), pad Beam (21) and distribution beam (3) are removably connected with the connector (4), and the drilling platform self-regulated leveling device (100) is also Including regulating mechanism (5), described regulating mechanism (5) one end is fixed with the supporting pile (2), the other end and the distribution beam (3) Fixed, the regulating mechanism (5) can stretch between the supporting pile (2) and distribution beam (3), which is characterized in that this method packet Include following steps:
S1:Multiple drilling platform self-regulated leveling devices (100) are installed on drilling platform (9);
S2:Drilling platform (9) integral hoisting of drilling platform self-regulated leveling device (100) will be installed, will be transferred after transporting to pier position;
S3:After drilling platform (9) decentralization, drilling platform (9) is measured in each installation drilling platform self-regulated leveling device (100) position Height, calculate the difference in height of each two position, and design height difference adjusting range;
S4:Drilling platform self-regulated leveling device (100) is adjusted, it is solid with connector (4) first by bearing (11) and distribution beam (3) It is fixed, and the connection of bearing beam (21) and connector (4) is unclamped, adjustment regulating mechanism (5) makes its elongation, drives supporting pile (2) downward Movement, until supporting pile (2) bottom end bearing capacity is more than drilling platform (9) in drilling platform self-regulated leveling device (100) location point After gravity, continue to extend regulating mechanism (5), move upwards casing (1);
S5:Step S4 is repeated, until the difference in height of arbitrary described two positions fixes bearing beam after difference in height adjusting range (21) with connector (4).
2. drilling platform self-regulated leveling device (100) as described in claim 1, it is characterised in that:The connector (4) is screw thread Reinforcing bar, the spiral run through the bearing (11), bearing beam (21) and distribution beam (3), the bearing (11), bearing beam (21) and Distribution beam (3) is removably consolidated respectively by the first nut (6), the second nut (7) and third nut (8) with the spiral It is fixed.
3. drilling platform self-regulated leveling device (100) as described in claim 1, it is characterised in that:The bearing (11) is welded on The top opening of described sleeve pipe (1).
4. drilling platform self-regulated leveling device (100) as described in claim 1, it is characterised in that:The bearing beam (21) is welded on The end of the supporting pile (2).
5. drilling platform self-regulated leveling device (100) as described in claim 1, it is characterised in that:Described sleeve pipe (1) is steel bushing Pipe.
6. the method as described in claim 1, it is characterised in that:The connector (4) is spiral, and the spiral passes through The bearing (11), bearing beam (21) and distribution beam (3) are worn, the bearing (11), bearing beam (21) and distribution beam (3) pass through respectively One nut (6), the second nut (7) and third nut (8) are removably fixed with the spiral;By tightening in step S4 First nut (6) and third nut (8) fix bearing (11) and distribution beam (3) with spiral, by unclamping The second nut (7) is stated to unclamp bearing beam (21) and spiral.
7. the method as described in claim 1, it is characterised in that:The regulating mechanism (5) is jack.
CN201610472507.6A 2016-06-24 2016-06-24 The construction method of drilling platform self-level(l)ing installation Active CN106120687B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610472507.6A CN106120687B (en) 2016-06-24 2016-06-24 The construction method of drilling platform self-level(l)ing installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610472507.6A CN106120687B (en) 2016-06-24 2016-06-24 The construction method of drilling platform self-level(l)ing installation

Publications (2)

Publication Number Publication Date
CN106120687A CN106120687A (en) 2016-11-16
CN106120687B true CN106120687B (en) 2018-07-06

Family

ID=57266443

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610472507.6A Active CN106120687B (en) 2016-06-24 2016-06-24 The construction method of drilling platform self-level(l)ing installation

Country Status (1)

Country Link
CN (1) CN106120687B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1267814B (en) * 1965-04-30 1968-05-09 Torsten Nicolaus Ljung Method for synchronizing the movement of several drives connected in parallel
CN200978413Y (en) * 2006-12-05 2007-11-21 中国石化集团胜利石油管理局钻井工艺研究院 Repeatedly-usable lifting gear
CN103147430A (en) * 2013-03-14 2013-06-12 广东精铟机械有限公司 Multifunctional ring beam lifting device
CN204780836U (en) * 2015-06-10 2015-11-18 中交第二航务工程局有限公司 Fixed drilling platform of adjustable floating
CN105155494A (en) * 2015-08-12 2015-12-16 王金宁 Multifunctional combined type lifting platform in water
CN105442517A (en) * 2015-11-27 2016-03-30 中交武汉港湾工程设计研究院有限公司 Pile top pushing and positioning device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1267814B (en) * 1965-04-30 1968-05-09 Torsten Nicolaus Ljung Method for synchronizing the movement of several drives connected in parallel
CN200978413Y (en) * 2006-12-05 2007-11-21 中国石化集团胜利石油管理局钻井工艺研究院 Repeatedly-usable lifting gear
CN103147430A (en) * 2013-03-14 2013-06-12 广东精铟机械有限公司 Multifunctional ring beam lifting device
CN204780836U (en) * 2015-06-10 2015-11-18 中交第二航务工程局有限公司 Fixed drilling platform of adjustable floating
CN105155494A (en) * 2015-08-12 2015-12-16 王金宁 Multifunctional combined type lifting platform in water
CN105442517A (en) * 2015-11-27 2016-03-30 中交武汉港湾工程设计研究院有限公司 Pile top pushing and positioning device

Also Published As

Publication number Publication date
CN106120687A (en) 2016-11-16

Similar Documents

Publication Publication Date Title
RU2543835C2 (en) Installation of submersible supporting structures
EP3456960B1 (en) Auxiliary floating system for the installation and/or transport of marine structures and method comprising said system
JP2011112045A (en) Wind turbine fixing and lifting apparatus and movable operating platform on water
JP2011112044A (en) Wind turbine fixing and lifting apparatus and movable operating platform on water
CN104480865B (en) A kind of Large Steel open caisson accurate positioning method
CN106012864A (en) Method for lifting and installing whole bridge arch rib
CN206034408U (en) A back pitching pile formula jacket structure for marine booster station
JP2010234980A (en) Fixing bottom sitting member, tension mooring floating body system and installation method therefor
CN210482355U (en) Offshore wind power jacket foundation pile sinking retainer
US4913591A (en) Mobile marine platform and method of installation
CN106088120B (en) A kind of cofferdam decentralization construction method
CN106662068A (en) Wind turbine assembly system and related method
WO2011102738A2 (en) A method and vessel for offshore transport and installation of windmill assemblies
EP0234874A2 (en) Offshore platforms
CN205917601U (en) Integrally lift up device of bridge arch rib
CN204780836U (en) Fixed drilling platform of adjustable floating
EP2796713A1 (en) Floating precast-concrete structure for supporting a wind turbine
CN106120687B (en) The construction method of drilling platform self-level(l)ing installation
CN105401564B (en) Construction method for fixing tidal current energy power generation device to water bottom and tidal current energy power generation device
EP3904674A1 (en) Floating platform for high-power wind turbines
CN109050812A (en) A kind of pier
CN103527146A (en) Screw pump liquid draining well mouth operating platform used on floating type drilling platform
CN209816899U (en) Floating pile-stabilizing platform for construction of steel pipe piles of offshore jacket type fan foundation
CN114541438A (en) Steel cofferdam with positioning function and positioning method thereof
EP3307956B1 (en) Foundation pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant