CN106115479A - Both shoulders four hang four crane beam attachment structures - Google Patents

Both shoulders four hang four crane beam attachment structures Download PDF

Info

Publication number
CN106115479A
CN106115479A CN201610663462.0A CN201610663462A CN106115479A CN 106115479 A CN106115479 A CN 106115479A CN 201610663462 A CN201610663462 A CN 201610663462A CN 106115479 A CN106115479 A CN 106115479A
Authority
CN
China
Prior art keywords
crane beam
steel column
crane
shoulders
wing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610663462.0A
Other languages
Chinese (zh)
Inventor
张秉文
芮秀明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Fuhuang Steel Structure Co Ltd
Original Assignee
Anhui Fuhuang Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Fuhuang Steel Structure Co Ltd filed Critical Anhui Fuhuang Steel Structure Co Ltd
Priority to CN201610663462.0A priority Critical patent/CN106115479A/en
Publication of CN106115479A publication Critical patent/CN106115479A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C7/00Runways, tracks or trackways for trolleys or cranes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a kind of both shoulders four and hang four crane beam attachment structures, it is characterized in that arranging steel column is " H " shape steel column, the horizontal layout arranging crane beam is: four crane beam offices, road are on the position of two parallel lines, article two, parallel lines symmetry office is in the outside of steel column two ends wing plate, and parallel with the plane of two ends wing plate, four road crane beams coexist same straight line two-by-two;On steel column, being in the outside of two ends wing plate fixing welding steel corbel respectively, form the version of both shoulders bracket, coexistence twice crane beam on the same line is the most jointly to be erected on the steel corbel of side with termination;Connecting plate, stiffener and angle brace is utilized to form gusseted between crane beam and steel column.In the present invention, four road crane beam horizontal layout are reasonable, uniform force, support firm.

Description

Both shoulders four hang four crane beam attachment structures
Technical field
The present invention relates to the setting of crane beam during steel building is executed, more specifically for the Factory Building with center pillar Class is built, and utilizes center pillar to arrange the attachment structure of multiple tracks crane beam.
Background technology
Crane Rail beam is dynamic job, and flashy load is very big, the connection in prior art, between steel column and crane beam Structure is to utilize connecting plate to weld between crane beam with steel column, owing to the narrow and small welding operation in gap is inconvenient for, especially Being for multiple tracks crane beam, its welding quality is difficult to ensure that, has the phenomenon of weld seam drawing crack to occur, cause peace time in use Full hidden danger, causes serious threat to the safety of structure and workmen.
Summary of the invention
The present invention is the weak point for avoiding above-mentioned prior art to exist, it is provided that a kind of simple in construction, safe and reliable The double davit angle brace of both shoulders and crane beam attachment structure, to ensure structure and personal security.
The present invention solves that technical problem adopts the following technical scheme that
Both shoulders four of the present invention hang the feature of four crane beam attachment structures:
Arranging steel column is " H " shape steel column, and described " H " shape steel column has web and is in the two ends wing plate at web two ends, institute State two ends wing plate and form each flank for symmetrical centre in the both sides of web with web;
The horizontal layout arranging crane beam is: four crane beam offices, road, on the position of two parallel lines, are put down for described two Line symmetry office is in the outside of steel column two ends wing plate and parallel with the plane of described two ends wing plate, described four road crane beams Coexist same straight line two-by-two;
On described steel column, being in the outside of two ends wing plate fixing welding steel corbel respectively, both sides steel corbel is in same The version of both shoulders bracket is formed on height;Described coexistence twice crane beam on the same line is the most common with termination It is erected on the steel corbel of side;
The attachment structure arranged between crane beam and steel column is:
On steel column, the fixing welding in the outside of each flank L-square is as support, at web and the two ends wing plate of described steel column Between the fixing welding stiffener in level, make the end face of crane beam top flange plate, the end face of L-square and the top of stiffener Face is on same elevation location;
Utilize the connecting plate in level to carry out lateral connection between described crane beam top flange plate and L-square, putting more energy into Utilize the angle brace in level to be attached between plate and crane beam top flange plate, be total to connecting plate and crane beam with described angle brace With the gusseted formed on horizontal plane.
Both shoulders four of the present invention hang the feature of four crane beam attachment structures and lie also in: connecting plate and crane beam top flange plate it Between, between connecting plate and L-square;Between angle brace and crane beam top flange plate, and between angle brace and stiffener, all use bolt Connect;
Both shoulders four of the present invention hang the feature of four crane beam attachment structures and lie also in described angle brace is to use angle steel.
Compared with the prior art, the present invention has the beneficial effect that:
1, in the present invention, four road crane beam horizontal layout are reasonable, uniform force, build for the Factory Building class with center pillar, profit Form symmetrical both shoulders bracket with center pillar, with both shoulders bracket, both sides totally four road crane beams are formed vertical supporting, and utilize Angle brace forms plane trigonometry to crane beam and supports, and its stabilized structure is reliable.
2, in the present invention, angle brace connection has obvious cushioning effect, and protection bolt is difficult to loosen.
3, present configuration easily operation simple, on-the-spot, the form because using welding that can be prevented effectively from is at long-term vibration load The lower problem producing weld seam drawing crack of effect, it is ensured that long-term work reliable.
Accompanying drawing explanation
Fig. 1 is plan structure schematic diagram of the present invention;
Fig. 2 is facade structures schematic diagram of the present invention;
Label in figure: 11 webs, 12 two ends wing plates, 21 first crane beams, 22 second crane beams, 23 the 3rd road drivings Beam, 24 the 4th road crane beams, 3 steel corbels, 4 L-squares, 5 stiffeners, 6 crane beam top flange plates, 7 connecting plates, 8 angle braces.
Accompanying drawing explanation
Seeing Fig. 1 and Fig. 2, in the present embodiment, both shoulders four hang four crane beam attachment structures and are:
Arranging steel column is " H " shape steel column, and " H " shape steel column has web 11 and is in the two ends wing plate 12 at web 11 two ends, Two ends wing plate 12 forms each flank for symmetrical centre in the both sides of web 11 with web 11.
The horizontal layout arranging crane beam is: four crane beam offices, road on the position of two parallel lines, two parallel lines Symmetrical office is in the outside of steel column two ends wing plate 12 and parallel with the plane of two ends wing plate 12, and four road crane beams coexist two-by-two Same straight line;In the present embodiment as shown in Figure 1, four road crane beams are first crane beam 21 respectively, second crane beam 22, 3rd road crane beam 23 and the 4th road driving 24, wherein, first crane beam 21 and second crane beam 22 coexist same straight line On position, on the 3rd road crane beam 23 and the 4th road driving 24 same linear position of coexistence.
As in figure 2 it is shown, on steel column, be in the outside of two ends wing plate fixing welding steel corbel 3, both sides steel corbel 3 respectively It is on sustained height the version forming both shoulders bracket;Coexistence twice crane beam on the same line is relative with termination Jointly it is erected on side steel corbel 3.
The attachment structure arranged between crane beam and steel column is:
On steel column, the fixing welding in the outside of each flank L-square 4 is as support, steel column web and two ends wing plate it Between the fixing welding stiffener 5 in level, make the end face of crane beam top flange plate 6, the end face of L-square 4 and stiffener 5 End face is on same elevation location.
Utilize the connecting plate 7 in level to carry out lateral connection between crane beam top flange plate 6 and L-square 4, putting more energy into The angle brace 8 in level is utilized to be attached between plate 5 and crane beam top flange plate 6, with angle brace 8 and connecting plate 7 and crane beam The gusseted being collectively forming on horizontal plane;
Stiffener 5 shown in Fig. 1 has twice, and twice stiffener office is in the web both sides of steel column, and side stiffener is right The crane beam in both sides is claimed jointly to provide the strong point, the connection between four road crane beams and corresponding side stiffener to be formed with four altogether Road angle brace 8, the form of i.e. four davits, this form effectively increases the steadiness of structure.
In being embodied as, between connecting plate 7 and crane beam top flange plate 6, between connecting plate 7 and L-square 4, in corner Between support 8 and crane beam top flange plate 6 and the most with bolts between angle brace 8 and stiffener 5, angle brace 8 is to use angle Steel.Angle brace, crane beam top flange plate and connecting plate define stability triangle structure so that car driving process middle rolling car beam of being expert at is protected Keep steady fixed, and can effectively damping.Node is simple, be prone to construction, structure is firm, support performance is strong in order to connect for the present invention, can play Significantly cushioning effect.

Claims (3)

1. both shoulders four hang four crane beam attachment structures, it is characterized in that:
Arranging steel column is " H " shape steel column, and described " H " shape steel column has web and is in the two ends wing plate at web two ends, described two End wing plate forms each flank for symmetrical centre in the both sides of web with web;
The horizontal layout arranging crane beam is: four crane beam offices, road on the position of two parallel lines, described two parallel lines Symmetrical office is in the outside of steel column two ends wing plate and parallel with the plane of described two ends wing plate, and described four road crane beams are two-by-two Coexist same straight line;
On described steel column, being in the outside of two ends wing plate fixing welding steel corbel respectively, both sides steel corbel is in sustained height The version of upper formation both shoulders bracket;Described coexistence twice crane beam on the same line is the most jointly to set up with termination On the steel corbel of side;
The attachment structure arranged between crane beam and steel column is:
On steel column, the outside of each flank fixing welding L-square is as support, between the web and two ends wing plate of described steel column The fixing welding stiffener in level, makes at the end face of the end face of crane beam top flange plate, the end face of L-square and stiffener On same elevation location;
Utilize the connecting plate in level to carry out lateral connection between described crane beam top flange plate and L-square, stiffener with The angle brace in level is utilized to be attached between crane beam top flange plate, with described angle brace and connecting plate and the common shape of crane beam Become the gusseted on horizontal plane.
Both shoulders four the most according to claim 1 hang four crane beam attachment structures, it is characterized in that:
Between connecting plate and crane beam top flange plate, between connecting plate and L-square;Between angle brace and crane beam top flange plate, And it is the most with bolts between angle brace and stiffener.
Both shoulders four the most according to claim 1 hang four crane beam attachment structures, it is characterized in that described angle brace is to use angle steel.
CN201610663462.0A 2016-08-12 2016-08-12 Both shoulders four hang four crane beam attachment structures Pending CN106115479A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610663462.0A CN106115479A (en) 2016-08-12 2016-08-12 Both shoulders four hang four crane beam attachment structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610663462.0A CN106115479A (en) 2016-08-12 2016-08-12 Both shoulders four hang four crane beam attachment structures

Publications (1)

Publication Number Publication Date
CN106115479A true CN106115479A (en) 2016-11-16

Family

ID=57259164

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610663462.0A Pending CN106115479A (en) 2016-08-12 2016-08-12 Both shoulders four hang four crane beam attachment structures

Country Status (1)

Country Link
CN (1) CN106115479A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202245739U (en) * 2011-10-08 2012-05-30 沈艳艳 Support table mechanism for crane beam
RU2469948C2 (en) * 2011-03-29 2012-12-20 Государственное Образовательное Учреждение Высшего Профессионального Образования Пензенский государственный университет архитектуры и строительства Method for complete unloading of reinforced concrete cantilever of column against action of crane beams
CN202785310U (en) * 2012-07-17 2013-03-13 陆春燕 Side-span mounting joint mechanism for crane beam structure
CN204850046U (en) * 2015-07-24 2015-12-09 安徽富煌钢构股份有限公司 Many davits of both shoulders and crane beam connection structure
CN205855813U (en) * 2016-08-12 2017-01-04 安徽富煌钢构股份有限公司 Both shoulders four hang four crane beam attachment structures

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2469948C2 (en) * 2011-03-29 2012-12-20 Государственное Образовательное Учреждение Высшего Профессионального Образования Пензенский государственный университет архитектуры и строительства Method for complete unloading of reinforced concrete cantilever of column against action of crane beams
CN202245739U (en) * 2011-10-08 2012-05-30 沈艳艳 Support table mechanism for crane beam
CN202785310U (en) * 2012-07-17 2013-03-13 陆春燕 Side-span mounting joint mechanism for crane beam structure
CN204850046U (en) * 2015-07-24 2015-12-09 安徽富煌钢构股份有限公司 Many davits of both shoulders and crane beam connection structure
CN205855813U (en) * 2016-08-12 2017-01-04 安徽富煌钢构股份有限公司 Both shoulders four hang four crane beam attachment structures

Similar Documents

Publication Publication Date Title
CN101225706A (en) Attached self-elevating aerial work platform
CN102284820B (en) Method for overturning box beam
WO2017101767A1 (en) Double-track beam for magnetic-levitation rail-wrap-type rail transit
CN103266778B (en) Detachable triangular scaffold and steel truss assembly construction method
CN103410101A (en) Tower crane conversion method for construction of parabola-shaped ultrahigh pier
CN202481960U (en) Wall-attached frame of tower crane
CN211665584U (en) Staple bolt installation construction hanging flower basket on column pier
CN205855813U (en) Both shoulders four hang four crane beam attachment structures
CN105040589A (en) Stayed-cable steel anchor beam structure
CN113120775B (en) A curtain wall double-track lifting system
CN207844882U (en) Steel column and crane beam connecting structure
CN203127978U (en) Combined type automatic escalator truss
CN202220400U (en) Lap joint type formwork support beam
CN106115479A (en) Both shoulders four hang four crane beam attachment structures
CN202430827U (en) Adjustable connecting support for unit type stone decorative line of curtain wall of super high-rise building
CN205855814U (en) The double davit angle brace of both shoulders and crane beam attachment structure
CN103601081B (en) Support system is climbed in tower crane
CN106044554A (en) Connection structure for double-shoulder double-davit angle braces and crane beams
CN102127962B (en) The bidirectional stress base section of the attached lift scaffold improved
CN202249004U (en) Improved steel structure plant structure
CN204727504U (en) A kind of support connecting structure of tower crane support beam
CN204590258U (en) A kind ofly be suitable for the lower end that box-shaped support is connected with i-shaped roof beam and build node
CN108755438A (en) A kind of Y types pier Construction of continuous beam π types holder and its construction method of installation
CN201915616U (en) Improved bidirectional stressed foundation joint attached to lifting scaffold
CN102102440B (en) Improved multifunctional wall-attached support base of attached lifting scaffold

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161116

WD01 Invention patent application deemed withdrawn after publication