CN106113420A - One cuts gate materials road delayed ejector mechanism - Google Patents

One cuts gate materials road delayed ejector mechanism Download PDF

Info

Publication number
CN106113420A
CN106113420A CN201610758164.XA CN201610758164A CN106113420A CN 106113420 A CN106113420 A CN 106113420A CN 201610758164 A CN201610758164 A CN 201610758164A CN 106113420 A CN106113420 A CN 106113420A
Authority
CN
China
Prior art keywords
push rod
ejector pin
ejector
connecting rod
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610758164.XA
Other languages
Chinese (zh)
Other versions
CN106113420B (en
Inventor
杨松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Yuzhiyang Marketing Planning Co ltd
Original Assignee
HUAYANG ELECTRIC Co OF GUIZHOU GUIHANG AUTOMOTIVE COMPONENTS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUAYANG ELECTRIC Co OF GUIZHOU GUIHANG AUTOMOTIVE COMPONENTS CO Ltd filed Critical HUAYANG ELECTRIC Co OF GUIZHOU GUIHANG AUTOMOTIVE COMPONENTS CO Ltd
Priority to CN201610758164.XA priority Critical patent/CN106113420B/en
Publication of CN106113420A publication Critical patent/CN106113420A/en
Application granted granted Critical
Publication of CN106113420B publication Critical patent/CN106113420B/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/40Removing or ejecting moulded articles
    • B29C45/4005Ejector constructions; Ejector operating mechanisms

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Mechanical Engineering (AREA)
  • Moulds For Moulding Plastics Or The Like (AREA)

Abstract

本发明公开了一种切浇口料道延时顶出机构,包括料道顶杆(2)和零件顶杆(7),零件顶杆(7)安装在顶杆固定板(1)上,料道顶杆(2)下端穿过顶杆固定板(1),顶杆固定板(1)下方是顶杆垫板(3),顶杆垫板(3)下方是底板(6),顶杆垫板(3)和底板(6)中部开设有通孔,孔中安装机床连接杆(5),机床连接杆(5)上开设有一道槽,该槽将机床连接杆(5)的上半段分成两半,槽中有一块延时顶料镶件(4),料道顶杆(2)的下端压在延时顶料镶件(4)上。通过本机构,可以将料道和零件按照顺序顶出,先顶出零件,再顶出料道,防止料道在顶出过程中弹飞零件或者弹伤零件。

The invention discloses a delayed ejection mechanism for a sprue cutting channel, which comprises a material channel ejector pin (2) and a component ejector pin (7). The part ejector pin (7) is installed on an ejector pin fixing plate (1), The lower end of the ejector pin (2) passes through the ejector pin fixing plate (1), the ejector pin backing plate (3) is below the ejector pin fixing plate (1), the bottom plate (6) is under the ejector pin backing plate (3), and the top There is a through hole in the middle part of the backing plate (3) and the bottom plate (6), and the machine tool connecting rod (5) is installed in the hole, and a groove is opened on the machine tool connecting rod (5), which connects the upper part of the machine tool connecting rod (5). The half section is divided into two halves, and a time-delay ejector insert (4) is arranged in the groove, and the lower end of the feedway ejector pin (2) is pressed on the delay ejector insert (4). Through this mechanism, the material channel and parts can be ejected in sequence, the parts are ejected first, and then the material channel is ejected, so as to prevent the material channel from flying or damaging the parts during the ejection process.

Description

一种切浇口料道延时顶出机构A Delayed Ejection Mechanism for a Gate Cutting Channel

技术领域technical field

本发明涉及一种注射模具,特别是涉及一种注射模具的顶出机构。The invention relates to an injection mold, in particular to an ejection mechanism of the injection mold.

背景技术Background technique

零件在注射完成后顶出时,现有的顶出机构将料道和零件一起顶出,由于普遍采用切浇口,料道和零件顶出后分离,顶出过程中料道可能会弹飞零件或料道弹伤零件外观,因此需要将料道和零件分别按照次序顶出。When the part is ejected after the injection is completed, the existing ejection mechanism ejects the material channel and the part together. Since the gate is generally used, the material channel and the part are separated after ejection, and the material channel may bounce off during the ejection process. The appearance of the part or the feeder is damaged by bullets, so the feeder and the parts need to be ejected in order.

发明内容Contents of the invention

本发明要解决的技术问题:针对料道和零件同时顶出存在的上述问题,提供了一种将料道和零件依次顶出的机构。The technical problem to be solved by the present invention is to provide a mechanism for sequentially ejecting the material channel and parts in view of the above-mentioned problems of simultaneous ejection of the material channel and parts.

本发明技术方案:Technical scheme of the present invention:

一种切浇口料道延时顶出机构,包括料道顶杆和零件顶杆,零件顶杆安装在顶杆固定板上,料道顶杆下端穿过顶杆固定板,顶杆固定板下方是顶杆垫板,顶杆垫板下方是底板,顶杆垫板和底板中部开设有通孔,孔中安装机床连接杆,机床连接杆上开设有一道槽,该槽将机床连接杆的上半段分成两半,槽中有一块延时顶料镶件,料道顶杆的下端压在延时顶料镶件上。A delay ejection mechanism for a sprue-cut material channel, including a material channel ejector pin and a part ejector pin, the part ejector pin is installed on the ejector pin fixing plate, the lower end of the material channel ejector pin passes through the ejector pin fixing plate, and the ejector pin fixing plate Below is the backing plate of the ejector rod, and the base plate is below the backing plate of the ejector rod. A through hole is opened in the middle of the backing plate of the ejector rod and the bottom plate, and the connecting rod of the machine tool is installed in the hole. The upper half is divided into two halves, and there is a time-delay ejector insert in the groove, and the lower end of the ejector rod of the feedway is pressed on the delay ejector insert.

槽的深度大于顶杆垫板的厚度,延时顶料镶件的宽度大于机床连接杆的直径。The depth of the groove is greater than the thickness of the backing plate of the ejector rod, and the width of the delay ejector insert is greater than the diameter of the connecting rod of the machine tool.

本发明的有益效果:Beneficial effects of the present invention:

通过本机构,可以将料道和零件按照顺序顶出,先顶出零件,再顶出料道,防止料道在顶出过程中弹飞零件或者弹伤零件。Through this mechanism, the material channel and parts can be ejected in sequence, the parts are ejected first, and then the material channel is ejected, so as to prevent the material channel from flying or damaging the parts during the ejection process.

附图说明:Description of drawings:

图1为本发明的正向剖视图。Figure 1 is a front sectional view of the present invention.

图2为本发明的侧向剖视图。Figure 2 is a side sectional view of the present invention.

图3为图2的局部放大图。FIG. 3 is a partially enlarged view of FIG. 2 .

具体实施方式:detailed description:

实施例:如图,零件顶杆5安装在顶杆固定板1上,顶杆固定板1下方依次是顶杆垫板3和底板6,顶杆垫板3和底板6中部开设有通孔,用于安装机床连接杆5,机床连接杆5穿过顶杆垫板3和底板6顶在顶杆固定板1下方。机床连接杆5上开设有一道槽,该槽将机床连接杆5的上半段分成左右两半,槽中有一块矩形的延时顶料镶件4,料道顶杆2的下端穿过顶杆垫板3压在延时顶料镶件4上。槽的深度比顶杆垫板3的厚度超出5-7mm(视为顶出零件距离而定),延时顶料镶件4的宽度比机床连接杆5的直径大10%左右,在合模状态下延时顶料镶件4相对机床连接杆5上设有的槽是悬空状态,顶料镶件4两端压在底板6上。零件顶出时,机床连接杆5推动顶杆垫板3向上运动,同时零件顶杆5向上运动开始顶出料道,而由于延时顶料镶件4此时是悬空在槽中,机床连接杆5此时不能推动延时顶料镶件4运动,从而料道顶杆2也不动,直到槽的底部顶到延时顶料镶件4后才开始将料道顶出。Embodiment: As shown in the figure, the ejector rod 5 of the part is installed on the ejector rod fixing plate 1. Below the ejector rod fixing plate 1 are the ejector rod backing plate 3 and the bottom plate 6 in sequence. A through hole is opened in the middle of the ejector rod backing plate 3 and the bottom plate 6. It is used to install the connecting rod 5 of the machine tool. The connecting rod 5 of the machine tool passes through the backing plate 3 and the bottom plate 6 of the ejector rod and pushes under the fixing plate 1 of the ejector rod. There is a groove on the connecting rod 5 of the machine tool, which divides the upper half of the connecting rod 5 into two halves. There is a rectangular time-delay ejector insert 4 in the groove, and the lower end of the feeder ejector rod 2 passes through the ejector The rod backing plate 3 is pressed on the delay top material insert 4. The depth of the groove is 5-7mm higher than the thickness of the ejector rod backing plate 3 (determined as the distance of the ejected part), and the width of the delay ejector insert 4 is about 10% larger than the diameter of the machine connecting rod 5. Under the state, the groove that the time-delay ejector insert 4 is provided with relative to the machine tool connecting rod 5 is in a suspended state, and the two ends of the ejector insert 4 are pressed on the base plate 6 . When the part is ejected, the machine tool connecting rod 5 pushes the ejector rod backing plate 3 to move upward, and at the same time, the part ejector rod 5 moves upward to start ejecting the material path, and because of the delay, the ejector insert 4 is suspended in the groove at this time, and the machine tool connection Bar 5 can't push delay ejector insert 4 to move at this moment, thereby forehearth push rod 2 also does not move, and just begins to forehearth ejection after the bottom of groove pushes delay ejector insert 4.

Claims (2)

1. cut a gate materials road delayed ejector mechanism, including material road push rod (2) and part push rod (7), it is characterised in that: part Push rod (7) is arranged in push rod fixed plate (1), and material push rod (2) lower end, road is through push rod fixed plate (1), under push rod fixed plate (1) Side is push rod backing plate (3), and push rod backing plate (3) lower section is base plate (6), and push rod backing plate (3) and base plate (6) middle part offer through hole, Installing lathe connecting rod (5) in hole, lathe connecting rod offers a groove on (5), and this groove is by the upper semisection of lathe connecting rod (5) It is split into two halves, groove has one piece of time delay liftout mold insert (4), the lower end of material road push rod (2) are pressed in time delay liftout mold insert (4).
The most according to claim 1 cut gate materials road delayed ejector mechanism, it is characterised in that: the degree of depth of groove is more than push rod pad The thickness of plate (3), the width of time delay liftout mold insert (4) is more than the diameter of lathe connecting rod (5).
CN201610758164.XA 2016-08-30 2016-08-30 One kind cutting cast gate material path delayed ejector mechanism Withdrawn - After Issue CN106113420B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610758164.XA CN106113420B (en) 2016-08-30 2016-08-30 One kind cutting cast gate material path delayed ejector mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610758164.XA CN106113420B (en) 2016-08-30 2016-08-30 One kind cutting cast gate material path delayed ejector mechanism

Publications (2)

Publication Number Publication Date
CN106113420A true CN106113420A (en) 2016-11-16
CN106113420B CN106113420B (en) 2018-12-04

Family

ID=57272862

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610758164.XA Withdrawn - After Issue CN106113420B (en) 2016-08-30 2016-08-30 One kind cutting cast gate material path delayed ejector mechanism

Country Status (1)

Country Link
CN (1) CN106113420B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09174621A (en) * 1995-12-21 1997-07-08 Fanuc Ltd Structure of sprue part ejector pin in die gate cutting
CN201881517U (en) * 2010-11-05 2011-06-29 富港电子(东莞)有限公司 injection mold
CN102328386A (en) * 2011-07-15 2012-01-25 凡嘉科技(无锡)有限公司 Gate ejection structure of mould
CN103481468A (en) * 2013-09-24 2014-01-01 凡嘉科技(无锡)有限公司 Mould ejection mechanism capable of automatically separating side gate
CN205969831U (en) * 2016-08-30 2017-02-22 贵州贵航汽车零部件股份有限公司华阳电器公司 Cut runner material way time delay ejection mechanism

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09174621A (en) * 1995-12-21 1997-07-08 Fanuc Ltd Structure of sprue part ejector pin in die gate cutting
CN201881517U (en) * 2010-11-05 2011-06-29 富港电子(东莞)有限公司 injection mold
CN102328386A (en) * 2011-07-15 2012-01-25 凡嘉科技(无锡)有限公司 Gate ejection structure of mould
CN103481468A (en) * 2013-09-24 2014-01-01 凡嘉科技(无锡)有限公司 Mould ejection mechanism capable of automatically separating side gate
CN205969831U (en) * 2016-08-30 2017-02-22 贵州贵航汽车零部件股份有限公司华阳电器公司 Cut runner material way time delay ejection mechanism

Also Published As

Publication number Publication date
CN106113420B (en) 2018-12-04

Similar Documents

Publication Publication Date Title
CN104589603B (en) A kind of ejecting mechanism and use the mould of this ejecting mechanism
CN107414007B (en) Supporting wheel automatic assembly spin riveting machine
CN103934957B (en) A kind of automated insert injection mold
CN102909833B (en) Mechanism used for cutting off side gate in mold automatically and suitable for injection mold
CN104118716A (en) Storage Nail Rack for Nailer
US20120213883A1 (en) Injection mold
CN207432666U (en) Injection mould
US2698464A (en) Method of forming gate-free injection molded products
JP5794242B2 (en) Mold
CN107614401A (en) Charging method and feeding device
CN104227996B (en) Automatic gate cutting structure in injection mold mould
CN106113420B (en) One kind cutting cast gate material path delayed ejector mechanism
CN110394951B (en) A mold structure with a slide block that automatically breaks the gate
CN205167472U (en) Ejecting mould structure of cubic
CN107718458A (en) Injection mold and control method thereof
CN205800107U (en) Plastic mould and ejector delay mechanism thereof
CN205969831U (en) Cut runner material way time delay ejection mechanism
CN210679496U (en) Injection mold for thin-wall product
CN105346023A (en) Injection mould capable of automatically cutting off side sprue in mould
CN201161449Y (en) Ejector plate advanced resetting mechanism of die
CN204546932U (en) Injection mould runner separating mechanism
CN107253316A (en) Connect the injection mold of cup
CN221641629U (en) Die capable of separating and ejecting product and water gap material
CN205219611U (en) Security mold insert mould with high merging precision
CN218838512U (en) Gelatin inlet automatic gate breaking structure of injection mold

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201028

Address after: 221321 second floor, e-commerce Park, Guanhu Town, Pizhou City, Xuzhou City, Jiangsu Province

Patentee after: Xuzhou yuzhiyang marketing planning Co.,Ltd.

Address before: 550009, Qingshui River Road, Xiaohe District, Guizhou, Guiyang, 1

Patentee before: HUAYANG ELECTRIC COMPANY OF GUIZHOU GUIHANG AUTOMOTIVE COMPONENTS Co.,Ltd.

TR01 Transfer of patent right
AV01 Patent right actively abandoned

Granted publication date: 20181204

Effective date of abandoning: 20250819

AV01 Patent right actively abandoned

Granted publication date: 20181204

Effective date of abandoning: 20250819

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned