CN106113353B - Large-diameter steel pipe plastic-coated equipment - Google Patents

Large-diameter steel pipe plastic-coated equipment Download PDF

Info

Publication number
CN106113353B
CN106113353B CN201610651717.1A CN201610651717A CN106113353B CN 106113353 B CN106113353 B CN 106113353B CN 201610651717 A CN201610651717 A CN 201610651717A CN 106113353 B CN106113353 B CN 106113353B
Authority
CN
China
Prior art keywords
steel pipe
powder
plastic
plastic coating
walking frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610651717.1A
Other languages
Chinese (zh)
Other versions
CN106113353A (en
Inventor
罗峰
邓志昌
罗旭成
刘京都
杨长松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gaomi Tianyi Machinery Technology Co ltd
Original Assignee
Gaomi Tianyi Machinery Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gaomi Tianyi Machinery Technology Co ltd filed Critical Gaomi Tianyi Machinery Technology Co ltd
Priority to CN201610651717.1A priority Critical patent/CN106113353B/en
Publication of CN106113353A publication Critical patent/CN106113353A/en
Application granted granted Critical
Publication of CN106113353B publication Critical patent/CN106113353B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C41/00Shaping by coating a mould, core or other substrate, i.e. by depositing material and stripping-off the shaped article; Apparatus therefor
    • B29C41/02Shaping by coating a mould, core or other substrate, i.e. by depositing material and stripping-off the shaped article; Apparatus therefor for making articles of definite length, i.e. discrete articles
    • B29C41/20Shaping by coating a mould, core or other substrate, i.e. by depositing material and stripping-off the shaped article; Apparatus therefor for making articles of definite length, i.e. discrete articles incorporating preformed parts or layers, e.g. moulding inserts or for coating articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C41/00Shaping by coating a mould, core or other substrate, i.e. by depositing material and stripping-off the shaped article; Apparatus therefor
    • B29C41/34Component parts, details or accessories; Auxiliary operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C41/00Shaping by coating a mould, core or other substrate, i.e. by depositing material and stripping-off the shaped article; Apparatus therefor
    • B29C41/34Component parts, details or accessories; Auxiliary operations
    • B29C41/36Feeding the material on to the mould, core or other substrate
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29LINDEXING SCHEME ASSOCIATED WITH SUBCLASS B29C, RELATING TO PARTICULAR ARTICLES
    • B29L2023/00Tubular articles
    • B29L2023/22Tubes or pipes, i.e. rigid

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Coating Apparatus (AREA)

Abstract

本发明公开了一种大口径钢管涂塑设备,包括底架,所述底架设置有钢管旋转装置,导轨与所述钢管旋转装置所承托钢管的回转轴线平行设置,所述导轨上设置有由动力装置驱动的行走架,所述行走架设置有外涂塑装置和内涂塑装置,所述内涂塑装置位于所述外涂塑装置的下方,所述外涂塑装置包括粉料槽,所述粉料槽固定于所述行走架,所述粉料槽的下料口处设置有由动力装置驱动的闸板,所述内涂塑装置包括翻料轴,所述翻料轴转动安装于所述行走架,所述翻料轴的一端连接有翻转驱动机构,另一端固定连接有可轴向伸入所述钢管内的翻料斗。该设备能够对大口径钢管同时进行内外涂塑,涂装速度快,钢管的涂层均匀,粉末回收率高。

The invention discloses a plastic-coating equipment for large-diameter steel pipes. A walking frame driven by a power unit, the walking frame is provided with an outer plastic coating device and an inner plastic coating device, the inner plastic coating device is located below the outer plastic coating device, and the outer plastic coating device includes a powder trough , the powder trough is fixed on the walking frame, the discharge port of the powder trough is provided with a gate driven by a power device, the inner plastic coating device includes a turning shaft, and the turning shaft rotates Installed on the walking frame, one end of the turning shaft is connected with a turning drive mechanism, and the other end is fixedly connected with a turning hopper that can axially extend into the steel pipe. The equipment can simultaneously carry out internal and external plastic coating on large-diameter steel pipes, with fast coating speed, uniform coating of steel pipes and high powder recovery rate.

Description

大口径钢管涂塑设备Large diameter steel pipe plastic coating equipment

技术领域technical field

本发明涉及大口径钢管涂塑设备技术领域,尤其涉及一种大口径钢管涂塑设备。The invention relates to the technical field of plastic-coating equipment for large-diameter steel pipes, in particular to plastic-coating equipment for large-diameter steel pipes.

背景技术Background technique

内外涂塑钢管是在钢管壁融溶一层聚乙烯(PE)树脂、乙烯-丙烯酸共聚物(EAA)、环氧(EP)粉末、无毒聚丙烯(PP)或无毒聚氯乙烯(PVC)等有机物而构成的钢塑复合型管材,涂塑钢管不但具有钢管的高强度、易连接、耐水流冲击等优点,还克服了钢管遇水易腐蚀、污染、结垢及塑料管强度不高、消防性能差等缺点。The inner and outer plastic-coated steel pipes are made by melting a layer of polyethylene (PE) resin, ethylene-acrylic acid copolymer (EAA), epoxy (EP) powder, non-toxic polypropylene (PP) or non-toxic polyvinyl chloride (PVC) on the steel pipe wall. ) and other organic substances, the plastic-coated steel pipe not only has the advantages of high strength, easy connection, and water impact resistance, but also overcomes the corrosion, pollution, scaling and low strength of the plastic pipe , poor fire performance and other shortcomings.

大口径钢管一般是指管口直径在300mm~2400mm的钢管,可根据不同的需要涂敷聚氯乙烯(PVC)、聚乙烯(PE)、环氧树脂(EPOZY)等各种不同性能的塑料涂层。对大口径钢管进行涂塑,能降低钢管的输送阻力,提高流量及输送效率,减少输送压力损失。大口径涂敷钢管广泛应用于自来水、天然气、石油、化工、医药、通讯、电力、海洋等工程领域。Large-diameter steel pipes generally refer to steel pipes with a nozzle diameter of 300mm to 2400mm, which can be coated with plastic coatings with different properties such as polyvinyl chloride (PVC), polyethylene (PE), epoxy resin (EPOZY), etc. Floor. Plastic-coating large-diameter steel pipes can reduce the conveying resistance of steel pipes, improve flow and conveying efficiency, and reduce conveying pressure loss. Large-diameter coated steel pipes are widely used in tap water, natural gas, petroleum, chemical industry, medicine, communication, electric power, marine and other engineering fields.

中国实用新型专利CN203316338公开了一种新型智能全自动钢管内外涂塑生产线,该生产线由上料装置、预热装置、外抛丸装置、内抛丸装置、内涂塑装置、外涂塑装置、涂塑固化装置、电火花检测装置、喷码装置、成品包装装置、中央控制台组成。利用该生产线对钢管进行内外涂塑时,钢管的内涂工序和外涂工序需要分先后进行,因此需要花费的时间较长。Chinese utility model patent CN203316338 discloses a new intelligent automatic steel pipe inner and outer plastic coating production line, which consists of a feeding device, a preheating device, an outer shot blasting device, an inner shot blasting device, an inner plastic coating device, an outer plastic coating device, It is composed of plastic coating curing device, electric spark detection device, coding device, finished product packaging device and central console. When the production line is used to plastic-coat the steel pipe inside and outside, the inner coating process and the outer coating process of the steel tube need to be carried out successively, so it takes a long time.

发明内容Contents of the invention

本发明所要解决的技术问题是:提供一种大口径钢管涂塑设备,该设备能够对大口径钢管同时进行内外涂塑,涂装速度快,钢管的涂层均匀,粉末回收率高。The technical problem to be solved by the present invention is to provide a plastic coating equipment for large-diameter steel pipes, which can simultaneously perform internal and external plastic coating on large-diameter steel pipes, with fast coating speed, uniform coating of steel pipes, and high powder recovery rate.

为解决上述技术问题,本发明的技术方案是:一种大口径钢管涂塑设备,包括底架,所述底架设置有钢管旋转装置,导轨与所述钢管旋转装置所承托钢管的回转轴线平行设置,所述导轨上设置有由动力装置驱动的行走架,所述行走架设置有外涂塑装置和内涂塑装置,所述内涂塑装置位于所述外涂塑装置的下方。所述外涂塑装置包括粉料槽,所述粉料槽固定于所述行走架,所述粉料槽的下料口处设置有由动力装置驱动的闸板。所述内涂塑装置包括翻料轴,所述翻料轴转动安装于所述行走架,所述翻料轴的一端连接有翻转驱动机构,另一端固定连接有可轴向伸入所述钢管内的翻料斗;所述翻转驱动机构包括齿轮、齿条和气缸,所述齿轮连接于所述翻料轴,所述齿条滑动安装于所述行走架并与所述齿轮啮合,所述气缸连接于所述齿条与所述行走架之间;In order to solve the above technical problems, the technical solution of the present invention is: a large-diameter steel pipe plastic coating equipment, including a bottom frame, the bottom frame is provided with a steel pipe rotation device, the guide rail and the rotation axis of the steel pipe supported by the steel pipe rotation device Arranged in parallel, the guide rail is provided with a walking frame driven by a power device, and the walking frame is provided with an outer plastic coating device and an inner plastic coating device, and the inner plastic coating device is located below the outer plastic coating device. The outer plastic coating device includes a powder trough fixed to the walking frame, and a shutter driven by a power device is provided at the discharge port of the powder trough. The inner plastic coating device includes a material turning shaft, which is rotatably mounted on the walking frame, one end of the material turning shaft is connected with a turning drive mechanism, and the other end is fixedly connected with a steel pipe that can axially extend into the steel pipe The turning hopper inside; the turning drive mechanism includes a gear, a rack and a cylinder, the gear is connected to the turning shaft, the rack is slidably installed on the walking frame and meshed with the gear, and the cylinder connected between the rack and the walking frame;

所述钢管旋转装置有两组,用于承托所述钢管的两端,每一组所述钢管旋转装置包括支撑座,所述支撑座安装于所述底架,所述支撑座转动安装有至少两个并排设置的滚轮,至少一个所述滚轮是由电机驱动的驱动滚轮,所述滚轮的外周面设有轮齿,相邻的轮齿之间设有容纳塑料粉末的槽。The steel pipe rotating device has two groups, which are used to support the two ends of the steel pipe, and each group of the steel pipe rotating device includes a supporting seat, and the supporting seat is installed on the base frame, and the supporting seat is rotatably installed with There are at least two rollers arranged side by side, at least one of which is driven by a motor, gear teeth are provided on the outer peripheral surface of the rollers, and grooves for accommodating plastic powder are arranged between adjacent teeth.

作为一种改进的方式,所述粉料槽的下料口偏离所述钢管的回转轴线所在的铅垂面。As an improved way, the feed opening of the powder trough deviates from the vertical plane where the rotation axis of the steel pipe is located.

作为一种改进的方式,所述翻料斗位于所述粉料槽对应的下方。As an improved manner, the turning hopper is located below the corresponding powder chute.

作为一种改进的方式,所述粉料槽设有振动器。As an improved manner, the powder trough is provided with a vibrator.

作为一种改进的方式,所述钢管旋转装置的两侧分别设置有粉料回收传送带装置,所述粉料回收传送带装置的传送带的上方设置有集料溜板。As an improved way, the two sides of the steel pipe rotating device are respectively provided with a powder recycling conveyor belt device, and a collecting slide is arranged above the conveyor belt of the powder recycling conveyor belt device.

作为一种改进的方式,所述滚轮的外周面为圆锥面。As an improved manner, the outer peripheral surface of the roller is a conical surface.

作为一种改进的方式,所述滚轮有两个,均为驱动滚轮。As an improved manner, there are two rollers, both of which are driving rollers.

作为一种改进的方式,在同一所述导轨上设置有两个所述行走架,两个所述行走架相靠近的一侧为内侧,相远离的一侧为外侧,安装于两个所述行走架的所述内涂塑装置的翻转驱动机构分别设置于相应行走架的外侧。As an improved way, two walking frames are arranged on the same guide rail, the side of the two walking frames close to each other is the inner side, and the side farther away is the outer side, installed on the two The turning drive mechanisms of the inner plastic coating devices of the walking frames are respectively arranged on the outer sides of the corresponding walking frames.

采用上述技术方案所取得的效果为:The effect obtained by adopting the above-mentioned technical scheme is:

采用翻料斗翻转送粉和粉料槽的撒粉对旋转的钢管进行内涂塑和外涂塑,提高了钢管的涂装速度,且使钢管的涂层均匀。The inner plastic coating and outer plastic coating of the rotating steel pipe are carried out by using the turning hopper to turn over the powder feeding and the powder trough to sprinkle the powder, which improves the coating speed of the steel pipe and makes the coating of the steel pipe uniform.

由于所述粉料槽的下料口偏离所述被承托钢管的回转轴线所在的铅垂面,钢管托接塑料粉末侧向上转动,与塑料粉末的下落方向相反,可使涂塑粉料与钢管的外周面充分接触。Since the discharge opening of the powder trough deviates from the vertical plane where the axis of rotation of the supported steel pipe is located, the steel pipe supports the plastic powder and rotates upwards, which is opposite to the falling direction of the plastic powder, so that the plastic-coated powder and The outer peripheral surface of the steel pipe is in full contact.

由于所述翻料斗位于所述粉料槽对应的下方,可通过开启粉料槽下部的闸板向翻料斗内添加涂塑粉末。Since the turning hopper is located below the corresponding powder trough, plastic-coating powder can be added to the turning hopper by opening the shutter at the bottom of the powder trough.

由于设置有粉料回收传送带装置和集料溜板,可对涂塑粉末进行回收,提高涂塑粉末的利用率。Due to the installation of the powder recovery conveyor belt device and the collection slide, the plastic coating powder can be recovered and the utilization rate of the plastic coating powder can be improved.

由于钢管旋转装置的滚轮的外周面设有轮齿,相邻轮齿之间设有容纳塑料粉末的槽,钢管在涂塑时,温度一般在280℃~320℃左右,钢管与所述滚轮接触时,钢管外表面上的塑料粉末非常粘滑,滚轮轮齿之间的槽可以容纳这些塑料粉末,从而起到防滑作用。Since the outer peripheral surface of the roller of the steel pipe rotating device is provided with gear teeth, and there is a groove for containing plastic powder between adjacent teeth, when the steel pipe is coated with plastic, the temperature is generally about 280°C to 320°C, and the steel pipe is in contact with the roller. When rolling, the plastic powder on the outer surface of the steel pipe is very sticky and slippery, and the grooves between the teeth of the roller can accommodate these plastic powders, thereby playing an anti-skid role.

由于钢管旋转装置的滚轮的外周面设置为圆锥面,将钢管放置于圆锥面上,钢管两端所受的轴向力可防止钢管沿轴向窜动,同时,所述滚轮与钢管的接触近似线接触,接触面积小,对钢管上塑料粉末的破坏小,容易修补。Since the outer peripheral surface of the roller of the steel pipe rotating device is set as a conical surface, the steel pipe is placed on the conical surface, the axial force on both ends of the steel pipe can prevent the steel pipe from moving in the axial direction, and at the same time, the contact between the roller and the steel pipe is approximately Line contact, small contact area, little damage to the plastic powder on the steel pipe, easy to repair.

附图说明Description of drawings

图1是本发明的结构示意图;Fig. 1 is a structural representation of the present invention;

图2是本发明的侧面结构示意图;Fig. 2 is a side structure schematic diagram of the present invention;

图3是图2中C部的放大图;Fig. 3 is an enlarged view of part C in Fig. 2;

图4是内凃装置的结构示意图;Fig. 4 is the structural representation of internal coating device;

图5是图4的俯视图;Figure 5 is a top view of Figure 4;

图6是钢管旋转装置的结构示意图;Fig. 6 is a structural schematic diagram of a steel pipe rotating device;

图7是图6的侧视图;Fig. 7 is a side view of Fig. 6;

图8是实施例二未涂塑状态的结构示意图;Fig. 8 is the structural representation of embodiment two uncoated state;

图9是实施例二涂塑状态的结构示意图;Fig. 9 is a schematic structural view of the plastic-coated state of embodiment two;

图中,1-旋转装置,103-滚轮,104-电机,105-支撑座,109-轮齿,2-内涂塑装置,21-翻料轴,22-翻料斗,23-气缸,24-齿条,25-齿轮,40-粉料槽,402-导流板,403-闸板,404-气缸,405-振动器,501-集料溜板,502-输送带,6-爬梯,7-行走架,8-导轨,9-钢管,10-底架。In the figure, 1-rotary device, 103-roller, 104-motor, 105-support seat, 109-gear, 2-inner plastic coating device, 21-turning shaft, 22-turning hopper, 23-cylinder, 24- Rack, 25-gear, 40-powder trough, 402-deflector, 403-gate, 404-cylinder, 405-vibrator, 501-collecting slide, 502-conveyor belt, 6-ladder, 7 -walking frame, 8-guide rail, 9-steel pipe, 10-underframe.

具体实施方式Detailed ways

下面结合附图和实施例对本发明进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

实施例一Embodiment one

结合图1、图2、图6以及图7所示,一种大口径钢管涂塑设备,包括底架10,底架10设置有钢管旋转装置1。钢管旋转装置1设有两组,用于承托钢管9的两端。每一组钢管旋转装置1包括支撑座105,支撑座105安装于底架10,支撑座105转动安装有至少两个并排设置的滚轮103,至少一个滚轮103是由电机104驱动的驱动滚轮。本实施例中,滚轮103有两个,均为驱动滚轮,采用双驱动的方式,可以有效避免在涂塑的过程中钢管9与滚轮103之间的打滑现象。As shown in FIG. 1 , FIG. 2 , FIG. 6 and FIG. 7 , a plastic-coating equipment for large-diameter steel pipes includes an underframe 10 , and the underframe 10 is provided with a steel pipe rotating device 1 . The steel pipe rotating device 1 is provided with two groups for supporting the two ends of the steel pipe 9 . Each group of steel pipe rotating device 1 includes a support base 105, which is installed on the chassis 10, and the support base 105 is rotatably equipped with at least two rollers 103 arranged side by side, and at least one roller 103 is a driving roller driven by a motor 104. In this embodiment, there are two rollers 103, both of which are driving rollers. The dual-drive mode can effectively avoid the slipping phenomenon between the steel pipe 9 and the rollers 103 during the plastic coating process.

滚轮103的外周面设有轮齿109,相邻的轮齿109之间设有容纳塑料粉末的槽。钢管9在涂塑时,温度一般在280℃~320℃左右,钢管9与滚轮103接触时,钢管9外表面上的塑料粉末非常粘滑,滚轮103轮齿109之间的槽可以容纳这些塑料粉末,从而起到防滑作用。Gear teeth 109 are arranged on the outer peripheral surface of the roller 103, and grooves for accommodating plastic powder are arranged between adjacent teeth 109. When the steel pipe 9 is coated with plastic, the temperature is generally about 280°C to 320°C. When the steel pipe 9 is in contact with the roller 103, the plastic powder on the outer surface of the steel pipe 9 is very sticky and slippery. The grooves between the teeth 109 of the roller 103 can accommodate these plastics. Powder, so as to play a non-slip effect.

钢管旋转装置1的滚轮103的外周面设置为圆锥面,将钢管9放置于圆锥面上,钢管9两端所受的轴向分力可防止钢管9沿轴向窜动。同时,滚轮103与钢管9的接触近似线接触,接触面积小,对钢管9上塑料粉末的破坏小,容易修补。The outer peripheral surface of the roller 103 of the steel pipe rotating device 1 is set as a conical surface, and the steel pipe 9 is placed on the conical surface, and the axial component force on both ends of the steel pipe 9 can prevent the steel pipe 9 from moving in the axial direction. Simultaneously, the contact of roller 103 and steel pipe 9 approximates line contact, and the contact area is small, and damage to the plastic powder on steel pipe 9 is little, and is easy to repair.

钢管旋转装置1的两侧分别设置有粉料回收传送带装置,粉料回收传送带装置的传送带的上方设置有集料溜板501,未能附着到钢管9上的涂塑粉末顺着集料溜板501滑落到粉料回收传送带装置,回收传送带装置包括由驱动装置驱动的输送带502,可对涂塑粉末进行回收,提高涂塑粉末的利用率。Both sides of the steel pipe rotating device 1 are respectively provided with a powder recovery conveyor belt device, and a collection slide 501 is provided above the conveyor belt of the powder recovery conveyor belt device. 501 slides to the powder recovery conveyor belt device, and the recovery conveyor belt device includes a conveyor belt 502 driven by a driving device, which can recycle the plastic-coated powder and improve the utilization rate of the plastic-coated powder.

结合图1至图3所示,导轨8与钢管旋转装置1所承托钢管9的回转轴线平行设置,导轨8上设置有由动力装置驱动的行走架7,行走架7的一侧安装有爬梯6。行走架7设置有外涂塑装置和内涂塑装置2。内涂塑装置2位于外涂塑装置的下方。外涂塑装置包括粉料槽40,粉料槽40固定于行走架7,粉料槽40的下料口处设置有由气缸404驱动的闸板403。粉料槽的下料口下方设有导流板402。粉料槽40的下料口偏离被承托钢管9的回转轴线所在的铅垂面,钢管托接塑料粉末的一侧向上转动,与塑料粉末的下落方向相反,可使涂塑粉料与钢管9的外周面充分接触。粉料槽40设有振动器405,振动器405使粉料槽40振动,使涂塑粉末从粉料槽40底部的下料口均匀淋向待涂塑的钢管9。As shown in Figures 1 to 3, the guide rail 8 is set parallel to the axis of rotation of the steel pipe 9 supported by the steel pipe rotating device 1, the guide rail 8 is provided with a walking frame 7 driven by a power device, and a climbing ladder is installed on one side of the walking frame 7 6. The walking frame 7 is provided with an outer plastic coating device and an inner plastic coating device 2 . Inner plastic coating device 2 is located below the outer plastic coating device. The outer plastic coating device includes a powder material tank 40 , which is fixed on the walking frame 7 , and a shutter 403 driven by an air cylinder 404 is arranged at the discharge port of the powder material tank 40 . A deflector 402 is provided below the feeding port of the powder trough. The feed opening of the powder trough 40 deviates from the vertical plane where the axis of rotation of the supported steel pipe 9 is located, and the side of the steel pipe supporting the plastic powder rotates upwards, opposite to the falling direction of the plastic powder, so that the plastic-coated powder and the steel pipe The peripheral surface of 9 fully contacts. The powder trough 40 is provided with a vibrator 405, and the vibrator 405 vibrates the powder trough 40, so that the plastic-coating powder is evenly poured from the discharge opening at the bottom of the powder trough 40 to the steel pipe 9 to be plastic-coated.

结合图4和图5共同所示,内涂塑装置2包括翻料轴21,翻料轴21转动安装于行走架7。翻料轴21的一端连接有翻转驱动机构,翻转驱动机构包括齿轮25,齿轮25连接于翻料轴21,齿条24滑动安装于行走架7并与齿轮25啮合,气缸23连接于齿条24与行走架7之间。翻料轴21的另一端固定连接有可轴向伸入钢管9内的翻料斗22。翻料斗22位于粉料槽40对应的下方,可通过开启粉料槽40下部的闸板403向翻料斗22内添加涂塑粉末。采用翻料斗22翻转送粉和粉料槽40的撒粉对旋转的钢管9进行内外涂塑,提高了钢管9的涂装速度,且使钢管9的涂层均匀。As shown in conjunction with FIG. 4 and FIG. 5 , the inner plastic coating device 2 includes a material turning shaft 21 , and the material turning shaft 21 is rotatably mounted on the walking frame 7 . One end of the turning shaft 21 is connected with a turning drive mechanism, the turning driving mechanism includes a gear 25, the gear 25 is connected to the turning shaft 21, the rack 24 is slidably installed on the walking frame 7 and meshed with the gear 25, and the cylinder 23 is connected to the rack 24 Between the walking frame 7. The other end of the turning shaft 21 is fixedly connected with a turning hopper 22 that can axially extend into the steel pipe 9 . The turning hopper 22 is located below the corresponding powder trough 40 , and plastic-coating powder can be added to the turning hopper 22 by opening the shutter 403 at the bottom of the powder trough 40 . The rotating steel pipe 9 is coated with plastic inside and outside by using the turning hopper 22 to turn over the powder feeding and the powder trough 40 to spread the powder, which improves the coating speed of the steel pipe 9 and makes the coating of the steel pipe 9 uniform.

本发明的涂塑方法为:Plastic coating method of the present invention is:

1)将预热至涂塑温度的钢管9放置于旋转装置1的滚轮103上;1) Place the steel pipe 9 preheated to the plastic coating temperature on the roller 103 of the rotating device 1;

2)通过旋转装置1驱动钢管9转动;2) Drive the steel pipe 9 to rotate through the rotating device 1;

3)将盛装有塑料粉末的粉料槽40送至钢管9外部上方的工作位,将盛装有塑料粉末的翻料斗22沿轴向伸入钢管9内部至工作位;3) Send the powder tank 40 filled with plastic powder to the working position above the outside of the steel pipe 9, and extend the hopper 22 filled with plastic powder into the steel pipe 9 in the axial direction to the working position;

4)打开粉料槽40的闸板403,使塑料粉末从长条形的漏料缝隙淋撒到钢管9外周面。通过控制闸板403的开启时间控制粉料槽40向钢管9淋撒塑料粉末的量。淋撒至规定的量后关闭闸板403,使粉料槽40从钢管9外部的上方移开;4) Open the shutter 403 of the powder material tank 40, so that the plastic powder is sprinkled onto the outer peripheral surface of the steel pipe 9 from the elongated leakage gap. By controlling the opening time of the shutter 403, the amount of plastic powder sprayed from the powder tank 40 to the steel pipe 9 is controlled. After spraying to the specified amount, close the shutter 403, so that the powder tank 40 is removed from the top of the steel pipe 9;

5)使翻料斗22翻转,将翻料斗22内的塑料粉末翻撒到钢管9的内周面,翻撒完成后翻料斗22翻转回位并退回;5) Overturn the turning hopper 22, turn over the plastic powder in the turning hopper 22 to the inner peripheral surface of the steel pipe 9, turn over the turning hopper 22 and return it after the turning is completed;

6)使钢管9持续转动,直至塑料粉末在钢管9的内外周面溜平形成连续的涂层;6) Make the steel pipe 9 continue to rotate until the plastic powder forms a continuous coating on the inner and outer peripheral surfaces of the steel pipe 9;

7)将钢管9送入固化炉中固化或在常温下自然固化。7) The steel pipe 9 is sent into a curing furnace for curing or cured naturally at room temperature.

实施例二Embodiment two

结合图8和图9共同所示,在同一导轨8上设置有两个行走架7,两个行走架7相靠近的一侧为内侧,相远离的一侧为外侧,安装于两个行走架7的内涂塑装置2的翻转驱动机构分别设置于相应行走架7的外侧。两个行走架7沿轨道8相向运动,两个行走架7的粉料槽40和翻料斗22从钢管的两端头部向钢管的中间位置运动。两个行走架7上的内外涂塑装置联合可以对一根长度较长的钢管9完成内外涂塑。As shown in Figure 8 and Figure 9, two walking frames 7 are arranged on the same guide rail 8, the side of the two walking frames 7 close to each other is the inner side, and the side farther away is the outer side, and they are installed on the two walking frames The overturn drive mechanisms of the inner plastic coating device 2 of 7 are respectively arranged on the outsides of the corresponding walking frames 7 . The two walking frames 7 move towards each other along the track 8, and the powder chute 40 and the turning bucket 22 of the two walking frames 7 move from the two ends of the steel pipe to the middle position of the steel pipe. The combination of the inside and outside plastic coating devices on the two walking frames 7 can complete the inside and outside plastic coating to a longer steel pipe 9 .

以上实施例为本发明较佳的实施例,并不用以限制本发明,凡是在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围内。The above embodiments are preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention Inside.

Claims (8)

1.一种大口径钢管涂塑设备,包括:1. A large-diameter steel pipe plastic coating equipment, including: 底架,所述底架设置有钢管旋转装置;An underframe, the underframe is provided with a steel pipe rotating device; 导轨,所述导轨与所述钢管旋转装置所承托钢管的回转轴线平行设置;其特征在于,Guide rail, the guide rail is arranged parallel to the rotation axis of the steel pipe supported by the steel pipe rotating device; it is characterized in that, 所述导轨上设置有由动力装置驱动的行走架,所述行走架设置有外涂塑装置和内涂塑装置,所述内涂塑装置位于所述外涂塑装置的下方;The guide rail is provided with a walking frame driven by a power device, and the walking frame is provided with an outer plastic coating device and an inner plastic coating device, and the inner plastic coating device is located below the outer plastic coating device; 所述外涂塑装置包括粉料槽,所述粉料槽固定于所述行走架,所述粉料槽的下料口处设置有由动力装置驱动的闸板;The outer plastic coating device includes a powder trough fixed to the walking frame, and a shutter driven by a power device is provided at the discharge port of the powder trough; 所述内涂塑装置包括翻料轴,所述翻料轴转动安装于所述行走架,所述翻料轴的一端连接有翻转驱动机构,另一端固定连接有可轴向伸入所述钢管内的翻料斗;所述翻转驱动机构包括齿轮、齿条和气缸,所述齿轮连接于所述翻料轴,所述齿条滑动安装于所述行走架并与所述齿轮啮合,所述气缸连接于所述齿条与所述行走架之间;The inner plastic coating device includes a material turning shaft, which is rotatably mounted on the walking frame, one end of the material turning shaft is connected with a turning drive mechanism, and the other end is fixedly connected with a steel pipe that can axially extend into the steel pipe The turning hopper inside; the turning drive mechanism includes a gear, a rack and a cylinder, the gear is connected to the turning shaft, the rack is slidably installed on the walking frame and meshed with the gear, and the cylinder connected between the rack and the walking frame; 所述钢管旋转装置有两组,用于承托所述钢管的两端,每一组所述钢管旋转装置包括支撑座,所述支撑座安装于所述底架,所述支撑座转动安装有至少两个并排设置的滚轮,至少一个所述滚轮是由电机驱动的驱动滚轮,所述滚轮的外周面设有轮齿,相邻的轮齿之间设有容纳塑料粉末的槽。The steel pipe rotating device has two groups, which are used to support the two ends of the steel pipe, and each group of the steel pipe rotating device includes a supporting seat, and the supporting seat is installed on the base frame, and the supporting seat is rotatably installed with There are at least two rollers arranged side by side, at least one of which is driven by a motor, gear teeth are provided on the outer peripheral surface of the rollers, and grooves for accommodating plastic powder are arranged between adjacent teeth. 2.如权利要求1所述的大口径钢管涂塑设备,其特征在于,所述粉料槽的下料口偏离所述钢管的回转轴线所在的铅垂面。2. The plastic coating equipment for large-diameter steel pipes according to claim 1, characterized in that, the discharge opening of the powder material tank deviates from the vertical plane where the rotation axis of the steel pipe is located. 3.如权利要求1所述的大口径钢管涂塑设备,其特征在于,所述翻料斗位于所述粉料槽对应的下方。3. The plastic coating equipment for large-diameter steel pipes according to claim 1, wherein the hopper is located below the corresponding powder tank. 4.如权利要求1所述的大口径钢管涂塑设备,其特征在于,所述粉料槽设有振动器。4. The plastic-coating equipment for large-diameter steel pipes according to claim 1, characterized in that the powder tank is provided with a vibrator. 5.如权利要求1所述的大口径钢管涂塑设备,其特征在于,所述钢管旋转装置的两侧分别设置有粉料回收传送带装置,所述粉料回收传送带装置的传送带的上方设置有集料溜板。5. The plastic-coating equipment for large-diameter steel pipes as claimed in claim 1, characterized in that powder recovery conveyor belt devices are respectively provided on both sides of the steel pipe rotation device, and a conveyor belt of the powder material recovery conveyor belt device is provided with Aggregating slides. 6.如权利要求1所述的大口径钢管涂塑设备,其特征在于,所述滚轮的外周面为圆锥面。6. The large-diameter steel pipe plastic coating equipment according to claim 1, characterized in that, the outer peripheral surface of the roller is a conical surface. 7.如权利要求1或6所述的大口径钢管涂塑设备,其特征在于,所述滚轮有两个,均为驱动滚轮。7. The plastic-coating equipment for large-diameter steel pipes according to claim 1 or 6, wherein there are two rollers, both of which are driving rollers. 8.如权利要求1所述的大口径钢管涂塑设备,其特征在于,在同一所述导轨上设置有两个所述行走架,两个所述行走架相靠近的一侧为内侧,相远离的一侧为外侧,安装于两个所述行走架的所述内涂塑装置的翻转驱动机构分别设置于相应行走架的外侧。8. The plastic-coating equipment for large-diameter steel pipes as claimed in claim 1, wherein two walking frames are arranged on the same guide rail, and the side where the two walking frames are close to each other is the inner side. The far side is the outer side, and the turning drive mechanisms of the inner plastic coating devices installed on the two walking frames are respectively arranged on the outer sides of the corresponding walking frames.
CN201610651717.1A 2016-08-10 2016-08-10 Large-diameter steel pipe plastic-coated equipment Active CN106113353B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610651717.1A CN106113353B (en) 2016-08-10 2016-08-10 Large-diameter steel pipe plastic-coated equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610651717.1A CN106113353B (en) 2016-08-10 2016-08-10 Large-diameter steel pipe plastic-coated equipment

Publications (2)

Publication Number Publication Date
CN106113353A CN106113353A (en) 2016-11-16
CN106113353B true CN106113353B (en) 2018-06-05

Family

ID=57258624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610651717.1A Active CN106113353B (en) 2016-08-10 2016-08-10 Large-diameter steel pipe plastic-coated equipment

Country Status (1)

Country Link
CN (1) CN106113353B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107538761B (en) * 2017-09-28 2019-04-23 浙江冠宇管业有限公司 A kind of punch forming process and equipment of corrosion-resistant stainless steel seamless steel pipe fitting
CN108057565A (en) * 2018-01-31 2018-05-22 重庆来来来商贸有限公司 Suitable for the spray-painting plant of annular workpieces
CN117101987A (en) * 2023-08-24 2023-11-24 新兴铸管股份有限公司 A pipeline polyolefin powder inner coating coating device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201454809U (en) * 2009-08-28 2010-05-12 李晓明 Production device for internal and external anticorrosive steel-plastic composite pipe
CN203316338U (en) * 2013-07-16 2013-12-04 天津市乾丰防腐保温工程有限公司 Novel intelligent full-automatic steel tube inside and outside plastic coating production line
CN103623978A (en) * 2013-11-26 2014-03-12 天津翔盛粉末涂料有限公司 Special production system for anticorrosion hot roll coating of steel pipe and special roll coating method using special production system
CN203711291U (en) * 2013-12-23 2014-07-16 北京四伟管道科技有限公司 Automatic plastic coating device for internal anticorrosion of steel pipe
CN104148835A (en) * 2014-08-05 2014-11-19 芜湖环球汽车配件有限公司 Clearance type welding feeding mechanism
KR101578519B1 (en) * 2015-06-02 2015-12-17 신이피엔씨(주) Pipe powder coating apparatus and method for coating pipe and pipe coating powder thereof
CN205951118U (en) * 2016-08-10 2017-02-15 高密天一机械科技有限公司 Large -diameter steel pipe plastic -coated equipment

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201454809U (en) * 2009-08-28 2010-05-12 李晓明 Production device for internal and external anticorrosive steel-plastic composite pipe
CN203316338U (en) * 2013-07-16 2013-12-04 天津市乾丰防腐保温工程有限公司 Novel intelligent full-automatic steel tube inside and outside plastic coating production line
CN103623978A (en) * 2013-11-26 2014-03-12 天津翔盛粉末涂料有限公司 Special production system for anticorrosion hot roll coating of steel pipe and special roll coating method using special production system
CN203711291U (en) * 2013-12-23 2014-07-16 北京四伟管道科技有限公司 Automatic plastic coating device for internal anticorrosion of steel pipe
CN104148835A (en) * 2014-08-05 2014-11-19 芜湖环球汽车配件有限公司 Clearance type welding feeding mechanism
KR101578519B1 (en) * 2015-06-02 2015-12-17 신이피엔씨(주) Pipe powder coating apparatus and method for coating pipe and pipe coating powder thereof
CN205951118U (en) * 2016-08-10 2017-02-15 高密天一机械科技有限公司 Large -diameter steel pipe plastic -coated equipment

Also Published As

Publication number Publication date
CN106113353A (en) 2016-11-16

Similar Documents

Publication Publication Date Title
CN105413978B (en) A kind of parallel arrangement of tunnel synchronization spraying and cured processing method
CN1296143C (en) Electric heating type inside and outside spraying equipment and process for steel-plastic composite pipe
CN106113353B (en) Large-diameter steel pipe plastic-coated equipment
CN103691625B (en) Ductile iron pipe coated lining technique
CN203711291U (en) Automatic plastic coating device for internal anticorrosion of steel pipe
KR101267033B1 (en) Inner coating steel pipe with epoxy powder coating and a method of manufacturing the same
CN202962794U (en) Automatic production device of coating plastic steel pipe
CN210507179U (en) Road and bridge crack reinforcing and repairing device
KR100770767B1 (en) Coating method of steel pipe using polyurea resin and its coating device
CN205953066U (en) Large -diameter steel pipe inner plastic coating automatic powder feeder
CN108097515A (en) The outer plastic-coated Powder Recovery integral type spray-painting production line of suspension type steel pipe
CN205361745U (en) Steel pipe inside and outside wall plastic -coated equipment
CN106044259A (en) Automatic powder feeding device for inner surface plastic-coating of large-caliber steel pipe
CN116459992A (en) Anti-oxidation treatment device for manufacturing color steel structure
CN204414367U (en) A kind of concrete-agitating reducing mechanism
CN212441795U (en) Surface treatment device is used in production of roofing extrusion molding polyphenyl heated board
CN205951118U (en) Large -diameter steel pipe plastic -coated equipment
CN209317995U (en) The moving device of prefabricated direct-buried thermal insulation pipe polyurethane coating foaming
CN207839293U (en) The outer plastic-coated Powder Recovery integral type spray-painting production line of suspension type steel pipe
CN201441959U (en) Extruding type starching device
CN204380950U (en) Teflon tank body coating equipment
CN115337857B (en) A kind of asphalt granule manufacturing equipment
CN106238295A (en) The plastic coating method of large-diameter steel pipe
CN209577156U (en) A kind of spray equipment of release agent
CN107761538A (en) A kind of chalker for road construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Luo Feng

Inventor after: Deng Zhichang

Inventor after: Luo Xucheng

Inventor after: Liu Jingdu

Inventor after: Yang Changsong

Inventor before: Luo Feng

Inventor before: He Xiangyou

Inventor before: Deng Zhichang

Inventor before: Luo Xucheng

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Large diameter steel pipe plastic coating equipment

Effective date of registration: 20220509

Granted publication date: 20180605

Pledgee: Shandong Gaomi rural commercial bank Limited by Share Ltd.

Pledgor: Gaomi Tianyi Machinery Technology Co.,Ltd.

Registration number: Y2022980005251

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20180605

Pledgee: Shandong Gaomi rural commercial bank Limited by Share Ltd.

Pledgor: Gaomi Tianyi Machinery Technology Co.,Ltd.

Registration number: Y2022980005251

PC01 Cancellation of the registration of the contract for pledge of patent right