CN106089242A - A kind of duct pieces of shield tunnel universality typesetting type selecting and the method for the most assembled type selecting - Google Patents

A kind of duct pieces of shield tunnel universality typesetting type selecting and the method for the most assembled type selecting Download PDF

Info

Publication number
CN106089242A
CN106089242A CN201610568997.XA CN201610568997A CN106089242A CN 106089242 A CN106089242 A CN 106089242A CN 201610568997 A CN201610568997 A CN 201610568997A CN 106089242 A CN106089242 A CN 106089242A
Authority
CN
China
Prior art keywords
assembled
ring
type selecting
point
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610568997.XA
Other languages
Chinese (zh)
Inventor
王建
史海欧
农兴中
柳宪东
刘鑫
翟利华
刘欣
何冠鸿
谢特赐
杨成
徐文田
许少辉
王睿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Metro Design and Research Institute Co Ltd
Original Assignee
Guangzhou Metro Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Metro Design and Research Institute Co Ltd filed Critical Guangzhou Metro Design and Research Institute Co Ltd
Priority to CN201610568997.XA priority Critical patent/CN106089242A/en
Publication of CN106089242A publication Critical patent/CN106089242A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • E21D11/083Methods or devices for joining adjacent concrete segments

Abstract

The invention discloses a kind of duct pieces of shield tunnel universality typesetting type selecting and the method for the most assembled type selecting, comprise the following steps: S1, segment array type selecting;S11, acquisition Lining Ring parameter;S12, acquisition Tunnel Design axis information;S13, determine tunnel pipelines erection method;S14, limit the position of block of binding;S15, according to Lining Ring parameter, Tunnel Design axis information, determine junction point position;S16, for different types of Lining Ring, repeat step S15, finally determine the Lining Ring type needed for current ring to be assembled and assembled some position;S2, section of jurisdiction assembled type selecting in real time;S21, acquisition construction machinery and the most assembled current Lining Ring relative position information;S22, acquisition the most assembled current Lining Ring assembly finished surface information;S23, repetition step S15, S16, select to meet each limit value and the lining style of comprehensive evaluation index optimum and position put in assembly.

Description

A kind of duct pieces of shield tunnel universality typesetting type selecting and the method for the most assembled type selecting
Technical field
The invention belongs to the technical field that duct pieces of shield tunnel is assembled, be specifically related to a kind of duct pieces of shield tunnel universality row Version type selecting and the method for the most assembled type selecting.
Background technology
In recent years, the tunnel construction in China city just develops rapidly, and in the construction method in tunnel, shield method account for Leading position.Shield construction is fast with its speed of application, little on surrounding enviroment impact, ground adaptability is strong, construction quality is high Advantage.Shield construction relative to one outstanding feature of other construction methods is exactly: assembled looped section of jurisdiction is directly becoming tunnel Final lining cutting.Therefore, pipe sheet assembling quality directly affects Tunnel Engineering civil engineering quality, specifically includes that segment selection, rotation Angle and control of transfiniting, K block position, circumferential weld/longitudinal joint dislocation etc., need based on existing construction tunnel, select section of jurisdiction attitude Excellent installation parameter.Shield-tunneling construction must be the most prudent when pipe sheet assembling parameter selects.
Duct pieces of shield tunnel only according to reasonably order arrangement, can simulate preferable tunnel curve, this pipe The calculating of sheet arrangement is referred to as segment array, the also known as section of jurisdiction the Fitting Calculation to tunnel.Of both segment array actually comprises Content: before construction, makes overall arrangements to section of jurisdiction in advance according to the trend of design axis and the geometric properties of section of jurisdiction, the step for It is referred to as " the design typesetting " of section of jurisdiction;In work progress, also to determine newly according to the shield tendency that scene records and section of jurisdiction attitude Selecting type scheme.
The computational methods still aobvious shortcoming that domestic segment array is relevant to assembly, is suitable for greatly common tube loop, even For concrete Tunnel Engineering, lack versatility, its computing formula has approximate solution, Practical Project is the most also dependent on constructor Rough calculation and the experience of member choose section of jurisdiction, easily cause bigger error.
Summary of the invention
The present invention is to solve that above-mentioned segment array lacks versatility, the technical problem that installation deviation is big with assembled, it is provided that Simple tunnel duct piece universality typesetting type selecting that a kind of highly versatile, installation accuracy are high and assembling method.
In order to solve the problems referred to above, the present invention is achieved by techniques below scheme:
Duct pieces of shield tunnel universality typesetting type selecting of the present invention and the method for the most assembled type selecting, including following step Rapid:
S1, segment array type selecting;
S11, acquisition Lining Ring parameter;
S12, acquisition Tunnel Design axis information;
S13, determine tunnel pipelines erection method;
S14, limit the position of block of binding;
S15, according to Lining Ring parameter, Tunnel Design axis information, determine assembled some position, for the lining cutting of same form Ring, the assembled centre coordinate of finished surface and the position of normal vector, each section of jurisdiction piecemeal are different, and assembled finished surface is the most currently waited to spell The terminal surface of dress ring, in a certain assembled some position, Tunnel Design axis and the intersection point of assembled finished surface are A, assembly finished surface several What center is B, and the distance that A, B are 2 is di, in each assembled some position of i=1~n, choose diMinimum assembled some position;
S16, for different types of Lining Ring, repeat step S15, finally determine the Lining Ring needed for current ring to be assembled Type and assembled some position;
The method of S2, section of jurisdiction assembled type selecting in real time;
S21, acquisition construction machinery and the most assembled current Lining Ring relative position information;
S22, acquisition the most assembled current Lining Ring assembly finished surface information;
S23, repetition step S15, S16, select to meet the limit value of each construction requirement and the lining cutting of comprehensive evaluation index optimum Type and assembled some position.Further, in described step S12, obtain Tunnel Design axis information and include obtaining plane alignment elements, Vertical curve element.
Further, in described step S13, determine tunnel erection method, including staggered joint erection or through seam assembling;
After Lining Ring piecemeal determines, each seam i.e. determines in the angle of Lining Ring local cylindrical coordinate, if certain assembled some position Lower Lining Ring seam is consistent with adjacent ring seam angle, then judge that this assembly point position is through seam assembling, otherwise spells for the fissure of displacement Dress.
Further, described step S14, limit and bind block position, described in bind block central symmetry axis and side straight up Be acute angle to angle so that described in bind the assembly of block position above water.
Further, in described step S15, longitudinal bolt group number N determines to deposit between adjacent two Lining Rings in step s 11 At N kind connection scheme, every kind of connected mode is referred to as an assembled some position.
Further, in described step S15,
The geometric center point of upper ring assembly finished surface is O point, and the geometric center of ring assembly finished surface to be assembled is O1Point, its Upper ring assembly finished surface normal vector is projected as O2Point, ring assembly initial surface to be assembled is O at ring width minimum3Point, spells It is O at ring width minimum on dress ring assembly initial surface4Point, if assembled ring is standard ring, then O4Point is the block that binds on assembled initial surface Outer rim central point, ring width is B, and key groove is α, when position is put in different assembly, O1The possible location track of point is spatially round Curve, is N in assembly point position, when rotational angle is β, and O1The locus of point can calculate according to following mathematical model:
Assess ring assembly finished surface central point O to be assembled by the following method1Deviation size with tunnel axis:
S151, by the mileage L of assembled finished surface0Push ahead ring width B, i.e. L=Lo+ B, selects mileage on tunnel axis Point P for L0As primary iteration point;
S152, objective plane are O1The possible face, track place of point, normal vector in space is OO2(l, m, n), arbitrfary point P0Coordinate be (xp, yp, zp) to the distance of plane be
d = lx p + my p + nz p + D l 2 + m 2 + n 2
Wherein, D=-(lx0+my0+nz0), (x0, y0, z0) it is arbitrfary point in plane;
S153, when d≤10-6Time, objective plane is O1Point in the plane, otherwise, with L-d replace L, return step S152 Again P is solved0, d has vector property herein, when d is more than 0, and P0It is positioned at plane front, otherwise, P0It is positioned at plane rear.
Further, in described step S21,
Obtain construction machinery and current assembled Lining Ring relative position information, including obtaining jack progressive error and shield tail Difference gap.
Further, in described step S22, obtain current assembled Lining Ring assembly finished surface information, including by existing The Geometric center coordinates of the assembled ring finished surface of field measured data digital simulation and normal vector.
Further, after described step S22, before step S23, according to construction requirement, obtain the limit of jack progressive error Value and the limit value of gap of the shield tail difference, and set up the evaluation that comprehensive jack progressive error, gap of the shield tail are poor, design misalignment of axe three Index.
Compared with prior art, the invention has the beneficial effects as follows:
The present invention considers multiple duct pieces of shield tunnel type, it is provided that for different-diameter, section of jurisdiction width, lozenges form, The segment array of wedge shape amount, Lining Ring piecemeal and longitudinal bolt quantity and assembled algorithm.Segment array type selecting can set according to tunnel Meter shaft line provides the segment array scheme of optimal fitting, presets driving path for tunnel duct piece pre-typesetting and shield machine and provides important Foundation.Section of jurisdiction is assembled in real time provides pipe sheet assembling suggestion according to construction actual synchronization, can draw optimum under considering construction factor Lining Ring type selecting and assembled some position, make the more preferable matching in actual assembly tunnel Tunnel Design axis.
Accompanying drawing explanation
Below in conjunction with the accompanying drawings the detailed description of the invention of the present invention is described in further detail, wherein:
Fig. 1 is ring to be assembled and upper ring assembly finished surface relativeness figure;
Fig. 2 is the schematic diagram of Lining Ring end face.
Detailed description of the invention
Below in conjunction with accompanying drawing, the preferred embodiments of the present invention are illustrated, it will be appreciated that preferred reality described herein Execute example be merely to illustrate and explain the present invention, be not intended to limit the present invention.
Duct pieces of shield tunnel universality typesetting type selecting of the present invention and the method for the most assembled type selecting, including following step Rapid:
S1, segment array type selecting;
S11, acquisition Lining Ring parameter;Including obtaining Lining Ring type, wedge surface form, the external diameter of Lining Ring, Lining Ring Internal diameter, section of jurisdiction width, section of jurisdiction ring wedge shape amount, Lining Ring piecemeal quantity, section of jurisdiction piecemeal angle, longitudinal bolt group number.
S12, acquisition Tunnel Design axis information;Including obtaining plane alignment elements, vertical curve element.
S13, determine tunnel pipelines erection method;Including staggered joint erection or through seam assembling;After Lining Ring piecemeal determines, respectively connect The angle being sewn on Lining Ring local cylindrical coordinate i.e. determines, if Lining Ring seam and adjacent ring splice angle under certain assembled some position Degree is consistent, then judge that this assembly point position is through seam assembling, be otherwise staggered joint erection.
S14, limit the position of block of binding;The described block central symmetry axis that binds is acute angle with angular separation straight up, makes Bind the assembly of block position above water described in get.
S15, in step s 11 longitudinal bolt group number N determine to exist between adjacent two Lining Rings N kind connection scheme, every kind Connected mode is referred to as an assembled some position, for the Lining Ring of same form, the centre coordinate of assembled finished surface and normal vector, each The position of section of jurisdiction piecemeal is different, the terminal surface of the assembled the most current ring to be assembled of finished surface, and in a certain assembled some position, tunnel sets Meter shaft line and the intersection point of assembled finished surface are A, the geometric center of assembled finished surface is B, and the distance that A, B are 2 is di, at i=1 ~d is chosen in each assembled some position of niMinimum assembled some position;
The geometric center point of upper ring assembly finished surface is O point, and the geometric center of ring assembly finished surface to be assembled is O1Point, its Upper ring assembly finished surface normal vector is projected as O2Point, ring assembly initial surface to be assembled is O at ring width minimum3Point, spells It is O at ring width minimum on dress ring assembly initial surface4Point, if assembled ring is standard ring, then O4Point is the block that binds on assembled initial surface Outer rim central point, ring width is B, and key groove is α, when position is put in different assembly, O1The possible location track of point is spatially round Curve, is N in assembly point position, when rotational angle is β, and O1The locus of point can calculate according to following mathematical model:
Assess ring assembly finished surface central point O to be assembled by the following method1Deviation size with tunnel axis:
S151, by the mileage L of assembled finished surface0Push ahead ring width B, i.e. L=Lo+ B, selects mileage on tunnel axis Point P for L0As primary iteration point;
S152, objective plane are O1The possible face, track place of point, normal vector in space is OO2(l, m, n), arbitrfary point P0Coordinate be (xp, yp, zp) to the distance of plane be
d = lx p + my p + nz p + D l 2 + m 2 + n 2
Wherein, D=-(lx0+my0+nz0), (x0, y0, z0) it is arbitrfary point in plane;
S153, when d≤10-6Time, objective plane is O1Point in the plane, otherwise, with L-d replace L, return step S152 Again P is solved0, d has vector property herein, when d is more than 0, and P0It is positioned at plane front, otherwise, P0It is positioned at plane rear.
S16, for different types of Lining Ring, repeat step S15, finally determine the Lining Ring needed for current ring to be assembled Type and assembled some position;
The method of S2, section of jurisdiction assembled type selecting in real time;
S21, obtain construction machinery and the most assembled current Lining Ring relative position information, including obtain jack progressive error and Gap of the shield tail is poor.
S22, acquisition the most assembled current Lining Ring assembly finished surface information, including by field measurement data digital simulation The Geometric center coordinates of assembled ring finished surface and normal vector.
According to construction requirement, obtain limit value and the limit value of gap of the shield tail difference of jack progressive error, and set up the most very heavy Top line path difference, gap of the shield tail are poor, the evaluation index of design misalignment of axe three.
S23, repetition step S15, S16, select to meet the limit value of each construction requirement and the lining cutting of comprehensive evaluation index optimum Type and assembled some position.
Other structure of the method for duct pieces of shield tunnel universality typesetting type selecting described in the present embodiment and the most assembled type selecting See prior art.
The above, be only presently preferred embodiments of the present invention, and the present invention not makees any pro forma restriction, therefore Every without departing from technical solution of the present invention content, any amendment of above example being made according to the technical spirit of the present invention, Equivalent variations and modification, all still fall within the range of technical solution of the present invention.

Claims (10)

1. a duct pieces of shield tunnel universality typesetting type selecting and the method for the most assembled type selecting, it is characterised in that: include following Step:
S1, segment array type selecting;
S11, acquisition Lining Ring parameter;
S12, acquisition Tunnel Design axis information;
S13, determine tunnel pipelines erection method;
S14, determine and limit the position range of block of binding;
S15, according to Lining Ring parameter, Tunnel Design axis information, determine assembled some position, the assembled the most current ring to be assembled of finished surface Terminal surface, in a certain assembled some position, Tunnel Design axis and the intersection point of assembled finished surface are A, in the geometry of assembled finished surface The heart is B, and the distance that A, B are 2 is di, in each assembled some position of i=1~n, choose diMinimum assembled some position;
S16, for different types of Lining Ring, repeat step S15, finally determine the Lining Ring type needed for current ring to be assembled With assembly point position;
S2, section of jurisdiction assembled type selecting in real time;
S21, acquisition construction machinery and the most assembled current Lining Ring relative position information;
S22, acquisition the most assembled current Lining Ring assembly finished surface information;
S23, repetition step S15, S16, select to meet the limit value of each construction requirement and the lining style of comprehensive evaluation index and spelling Decorate position.
Duct pieces of shield tunnel universality typesetting type selecting and the method for the most assembled type selecting, its feature the most according to claim 1 It is: in described step S11, obtains Lining Ring parameter, including obtaining Lining Ring type, wedge surface form, the external diameter of Lining Ring, lining Build the internal diameter of ring, section of jurisdiction width, section of jurisdiction ring wedge shape amount, Lining Ring piecemeal quantity, section of jurisdiction piecemeal angle, longitudinal bolt group number.
Duct pieces of shield tunnel universality typesetting type selecting and the method for the most assembled type selecting, its feature the most according to claim 1 It is: in described step S12, obtains Tunnel Design axis information and include obtaining plane alignment elements, vertical curve element.
Duct pieces of shield tunnel universality typesetting type selecting and the method for the most assembled type selecting, its feature the most according to claim 1 It is: in described step S13, determines tunnel erection method, including staggered joint erection or through seam assembling;
After Lining Ring piecemeal determines, each seam i.e. determines in the angle of Lining Ring local cylindrical coordinate, if serving as a contrast under certain assembled some position Build ring seam consistent with adjacent ring seam angle, then judge that this assembly point position is through seam assembling, be otherwise staggered joint erection.
Duct pieces of shield tunnel universality typesetting type selecting and the method for the most assembled type selecting, its feature the most according to claim 1 Be: described step S14, limit and bind block position, described in the block central symmetry axis that binds be acute angle with angular separation straight up.
Duct pieces of shield tunnel universality typesetting type selecting and the method for the most assembled type selecting, its feature the most according to claim 2 Being: in described step S15, longitudinal bolt group number N determines to there is N kind connection side between adjacent two Lining Rings in step s 11 Case, every kind of connected mode is referred to as an assembled some position.
Duct pieces of shield tunnel universality typesetting type selecting and the method for the most assembled type selecting, its feature the most according to claim 6 It is: in described step S15,
The geometric center point of upper ring assembly finished surface is O point, and the geometric center of ring assembly finished surface to be assembled is O1Point, it is upper It is projected as O on ring assembly finished surface normal vector2Point, ring assembly initial surface to be assembled is O at ring width minimum3Point, assembled ring It is O at ring width minimum on assembled initial surface4Point, if assembled ring is standard ring, then O4Point is the block outer rim that binds on assembled initial surface Central point, ring width is B, and key groove is α, when position is put in different assembly, O1The possible location track of point is spatially circular curve, It is N in assembly point position, when rotational angle is β, O1The locus of point calculates according to following mathematical model:
Assess ring assembly finished surface central point O to be assembled by the following method1Deviation size with tunnel axis:
S151, by the mileage L of assembled finished surface0Push ahead ring width B, i.e. L=Lo+ B, selecting mileage on tunnel axis is L's Point P0As primary iteration point;
S152, objective plane are O1The possible face, track place of point, normal vector in space is OO2(l, m, n), arbitrfary point P0's Coordinate is (xp, yp, zp) to the distance of plane be
d = lx p + my p + nz p + D l 2 + m 2 + n 2
Wherein, D=-(lx0+my0+nz0), (x0, y0, z0) it is arbitrfary point in plane;
S153, when d≤10-6Time, objective plane is O1Point in the plane, otherwise, with L-d replace L, return step S152 again Solve P0, d has vector property herein, when d is more than 0, and P0It is positioned at plane front, otherwise, P0It is positioned at plane rear.
Duct pieces of shield tunnel universality typesetting type selecting and the method for the most assembled type selecting, its feature the most according to claim 1 It is: in described step S21,
Obtain construction machinery and current assembled Lining Ring relative position information, including obtaining jack progressive error and gap of the shield tail Difference.
Duct pieces of shield tunnel universality typesetting type selecting and the method for the most assembled type selecting, its feature the most according to claim 8 It is: in described step S22, obtains current assembled Lining Ring assembly finished surface information, including by field measurement data meter Calculate Geometric center coordinates and the normal vector of the assembled ring finished surface of matching.
Duct pieces of shield tunnel universality typesetting type selecting and the method for the most assembled type selecting, its feature the most according to claim 8 It is: after described step S22, before step S23, according to construction requirement, obtains limit value and the gap of the shield tail of jack progressive error The limit value of difference, and set up the evaluation index that comprehensive jack progressive error, gap of the shield tail are poor, design misalignment of axe three.
CN201610568997.XA 2016-07-18 2016-07-18 A kind of duct pieces of shield tunnel universality typesetting type selecting and the method for the most assembled type selecting Pending CN106089242A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610568997.XA CN106089242A (en) 2016-07-18 2016-07-18 A kind of duct pieces of shield tunnel universality typesetting type selecting and the method for the most assembled type selecting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610568997.XA CN106089242A (en) 2016-07-18 2016-07-18 A kind of duct pieces of shield tunnel universality typesetting type selecting and the method for the most assembled type selecting

Publications (1)

Publication Number Publication Date
CN106089242A true CN106089242A (en) 2016-11-09

Family

ID=57220841

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610568997.XA Pending CN106089242A (en) 2016-07-18 2016-07-18 A kind of duct pieces of shield tunnel universality typesetting type selecting and the method for the most assembled type selecting

Country Status (1)

Country Link
CN (1) CN106089242A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106934159A (en) * 2017-03-14 2017-07-07 中交公局厦门工程有限公司 A kind of assembled point bit digitizing type selecting assembling method of duct pieces of shield tunnel
CN108104834A (en) * 2018-01-05 2018-06-01 杭州图溪科技有限公司 Shield duct piece automatic assembling method and system
CN108825262A (en) * 2018-08-28 2018-11-16 中国电建市政建设集团有限公司 The model of pipe sheet assembling point position selection in a kind of shield construction
CN109681232A (en) * 2018-11-26 2019-04-26 上海市基础工程集团有限公司 The assembling method of deep tunnel shield structure domain test section of jurisdiction
CN109779655A (en) * 2019-01-03 2019-05-21 中铁隧道集团二处有限公司 A kind of construction method of shield duct piece staggered joint erection
CN110130931A (en) * 2019-06-28 2019-08-16 西南交通大学 A kind of method of partition of the symmetrical Lining Ring in circular shield tunnel
CN110135047A (en) * 2019-05-10 2019-08-16 上海隧道工程有限公司 Universal segment type selecting method for correcting error
CN111365076A (en) * 2020-03-18 2020-07-03 中铁一局集团有限公司 Shield tunnel linear early warning method
CN111502694A (en) * 2020-04-22 2020-08-07 中国电建集团华东勘测设计研究院有限公司 Segment layout control-based universal ring segment pre-embedded chute optimization structure and method
CN112627848A (en) * 2020-12-07 2021-04-09 中国电建集团华东勘测设计研究院有限公司 Segment typesetting method for intermediate ring with given point position
CN112682064A (en) * 2020-12-22 2021-04-20 湖北省大唐安盛建筑工程有限公司 Pipe piece lofting and steel plate installation process
CN112746856A (en) * 2020-07-22 2021-05-04 中交路桥建设有限公司 Method for judging position relation between shield tail and segment of large-diameter shield
CN114017060A (en) * 2021-09-18 2022-02-08 中铁十局集团第一工程有限公司 Shield segment model selection method
CN114075986A (en) * 2021-03-25 2022-02-22 上海大学 Segment splicing point position selection system and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0718988A (en) * 1993-06-30 1995-01-20 Maeda Corp Method of lining shielded tunnel receiving inner pressure
CN101038605A (en) * 2007-04-26 2007-09-19 上海交通大学 Shield tunnel universal segment dynamic virtual assembling system
CN101446201A (en) * 2008-12-19 2009-06-03 上海隧道工程股份有限公司 Method for rectifying and selecting tunnel segment
CN103758531A (en) * 2013-09-29 2014-04-30 深圳中海建筑有限公司 General method for laying out and assembling wedge-shaped duct pieces

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0718988A (en) * 1993-06-30 1995-01-20 Maeda Corp Method of lining shielded tunnel receiving inner pressure
CN101038605A (en) * 2007-04-26 2007-09-19 上海交通大学 Shield tunnel universal segment dynamic virtual assembling system
CN101446201A (en) * 2008-12-19 2009-06-03 上海隧道工程股份有限公司 Method for rectifying and selecting tunnel segment
CN103758531A (en) * 2013-09-29 2014-04-30 深圳中海建筑有限公司 General method for laying out and assembling wedge-shaped duct pieces

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘凤华: "盾构隧道通用管片拟合排版与管片选型技术研究", 《中国优秀博硕士学位论文全文数据库(硕士)》 *

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106934159A (en) * 2017-03-14 2017-07-07 中交公局厦门工程有限公司 A kind of assembled point bit digitizing type selecting assembling method of duct pieces of shield tunnel
CN108104834A (en) * 2018-01-05 2018-06-01 杭州图溪科技有限公司 Shield duct piece automatic assembling method and system
CN108104834B (en) * 2018-01-05 2019-08-20 杭州图溪科技有限公司 Shield duct piece automatic assembling method and system
CN108825262A (en) * 2018-08-28 2018-11-16 中国电建市政建设集团有限公司 The model of pipe sheet assembling point position selection in a kind of shield construction
CN108825262B (en) * 2018-08-28 2023-09-22 中国电建市政建设集团有限公司 Model for selecting segment assembly point positions in shield construction
CN109681232B (en) * 2018-11-26 2020-06-02 上海市基础工程集团有限公司 Assembling method of deep tunnel shield whole-ring test duct pieces
CN109681232A (en) * 2018-11-26 2019-04-26 上海市基础工程集团有限公司 The assembling method of deep tunnel shield structure domain test section of jurisdiction
CN109779655A (en) * 2019-01-03 2019-05-21 中铁隧道集团二处有限公司 A kind of construction method of shield duct piece staggered joint erection
CN110135047A (en) * 2019-05-10 2019-08-16 上海隧道工程有限公司 Universal segment type selecting method for correcting error
CN110135047B (en) * 2019-05-10 2023-07-25 上海隧道工程有限公司 General segment selection type correction method
CN110130931A (en) * 2019-06-28 2019-08-16 西南交通大学 A kind of method of partition of the symmetrical Lining Ring in circular shield tunnel
CN111365076A (en) * 2020-03-18 2020-07-03 中铁一局集团有限公司 Shield tunnel linear early warning method
CN111365076B (en) * 2020-03-18 2021-05-25 中铁一局集团有限公司 Shield tunnel linear early warning method
CN111502694A (en) * 2020-04-22 2020-08-07 中国电建集团华东勘测设计研究院有限公司 Segment layout control-based universal ring segment pre-embedded chute optimization structure and method
CN111502694B (en) * 2020-04-22 2021-09-14 中国电建集团华东勘测设计研究院有限公司 Segment layout control-based universal ring segment pre-embedded chute optimization structure and method
CN112746856B (en) * 2020-07-22 2022-03-01 中交路桥建设有限公司 Method for judging position relation between shield tail and segment of large-diameter shield
CN112746856A (en) * 2020-07-22 2021-05-04 中交路桥建设有限公司 Method for judging position relation between shield tail and segment of large-diameter shield
CN112627848B (en) * 2020-12-07 2023-02-28 中国电建集团华东勘测设计研究院有限公司 Segment typesetting method for intermediate ring with given point position
CN112627848A (en) * 2020-12-07 2021-04-09 中国电建集团华东勘测设计研究院有限公司 Segment typesetting method for intermediate ring with given point position
CN112682064A (en) * 2020-12-22 2021-04-20 湖北省大唐安盛建筑工程有限公司 Pipe piece lofting and steel plate installation process
CN114075986A (en) * 2021-03-25 2022-02-22 上海大学 Segment splicing point position selection system and method
CN114075986B (en) * 2021-03-25 2024-01-30 上海大学 Segment assembly point position selection system and method
CN114017060A (en) * 2021-09-18 2022-02-08 中铁十局集团第一工程有限公司 Shield segment model selection method
CN114017060B (en) * 2021-09-18 2024-02-09 中铁十局集团第一工程有限公司 Method for selecting shield segment

Similar Documents

Publication Publication Date Title
CN106089242A (en) A kind of duct pieces of shield tunnel universality typesetting type selecting and the method for the most assembled type selecting
CN106522984B (en) A kind of modeling method of duct pieces of shield tunnel three-dimensional fine assembly
CN107100645B (en) Shield tunnel curve section section of jurisdiction preassembling selection designing method based on BIM technology
CN106934159B (en) A kind of duct pieces of shield tunnel assembly point bit digitizing type selecting assembling method
CN105673041B (en) A kind of general ring pipe sheet assembling point position of subway shield tunnel construction determines method
US9733387B2 (en) Geological exploration method for making plan and elevation drawings directly by rotational tin network and non profiling method
CN103084806B (en) Large curve steel box grider manufacture method
CN104866670B (en) Based on road network topology change automatic testing method and the system of GPS space-time track
CN105114059A (en) Three-dimensional directional well trajectory design and control parameter discrimination method
CN107869249B (en) Arcuate structure high-formwork construction method
CN109670005B (en) Position matching method of BIM (building information modeling) model and three-dimensional geographic scene
CN109815561B (en) Revit-based parameterized staggered joint splicing modeling method for general segment model
CN105973141B (en) A kind of duct pieces of shield tunnel faulting of slab ends measuring device
CN109900208B (en) Mine method tunnel excavation and primary support quality detection method
CN108345318A (en) A kind of beam sections free cantilever erection pier top block installation measurement method
CN103983236B (en) Inclined shaft rock core Fracture orientation method
CN105423993A (en) Deformation monitoring coordinate reference establishment method and device based on three dimensional laser scanning
CN110059370B (en) Base load calculation method suitable for tunnel penetrating through composite stratum
CN102661046A (en) Method for manufacturing tubular joint of small-angle fully bent tube
CN110197032A (en) Pipe sheet assembling scheme selection method and system
CN106052553A (en) Civil engineering temporary works design optimization method and device based on three-dimensional laser scanning
CN109211183A (en) Major long tunnel deep shaft corner intersection measurement method
CN107134007A (en) The three-dimensional fast modeling method of traffic infrastructure
CN109669425A (en) A kind of method of urban duct construction site group to control
CN110108262A (en) Holing through of mine combines mapping method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 510010 No. 204 Huanshi West Road, Guangzhou City, Guangdong Province

Applicant after: Guangzhou Metro Design and Research Institute Co., Ltd.

Address before: 510010 No. 204 Huanshi West Road, Guangzhou City, Guangdong Province

Applicant before: Guangzhou Metro Design & Research Institute Co., Ltd.

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20161109

RJ01 Rejection of invention patent application after publication