CN106088214B - 一种电厂循环水系统的扩建方法 - Google Patents
一种电厂循环水系统的扩建方法 Download PDFInfo
- Publication number
- CN106088214B CN106088214B CN201610649011.1A CN201610649011A CN106088214B CN 106088214 B CN106088214 B CN 106088214B CN 201610649011 A CN201610649011 A CN 201610649011A CN 106088214 B CN106088214 B CN 106088214B
- Authority
- CN
- China
- Prior art keywords
- circulating water
- water pool
- water
- pool
- circulating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03B—INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
- E03B1/00—Methods or layout of installations for water supply
- E03B1/02—Methods or layout of installations for water supply for public or like main supply for industrial use
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03B—INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
- E03B5/00—Use of pumping plants or installations; Layouts thereof
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03B—INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
- E03B7/00—Water main or service pipe systems
- E03B7/07—Arrangement of devices, e.g. filters, flow controls, measuring devices, siphons, valves, in the pipe systems
Abstract
本发明公开了一种电厂循环水系统的扩建方法,通过在老循环水池傍边单独修建新循环水池并通过联通管进行联通,将新循环水池与老循环水池并联在母管上,在修建新循环水池的过程中不会对现有的循环水系统的运行有任何影响,保证了原有设备的安全稳定运行,仅在将新循环水池与老循环水池联通的过程中汽轮机组和循环水系统需要停机,本发明所述的方法,大大缩短了停机时间,减小了停机带来的经济损失,同时满足工艺设计要求,新循环水池和老循环水池之间设置联通管解决了新循环水池和老循环水池之间的水位平衡问题,避免了循环水池的溢流和水资源的浪费。
Description
技术领域
本发明涉及循环水系统技术领域,具体涉及一种电厂循环水系统的扩建方法。
背景技术
武钢干熄焦余热发电站一期投运的有两台汽轮发电机组,以及配套的循环冷却水系统(包括老循环冷却水池、四台循环水泵及四台冷却塔风机),用于汽机凝汽器的冷却。现因技术改造,二期项目需在电站原基础上扩建一台汽轮发电机组及配套循环冷却水系统(包括新循环水池、三台循环水泵及两台冷却塔风机),工艺要求新老循环水系统联通成母管制,新、老循环水系统设备可联通、切换运行,且建设过程中不影响原一期机组的运行发电。
干熄焦余热发电站一期循环冷却水池为钢筋混凝土结构,循环水泵出口母管及循环水回水母管管径均为1400mm。若对循环水池直接进行扩容,必将全停原电站两台汽机及循环水系统,并排空循环水池进行扩容建设。此方案建设工期长,且自发电损失大,对公司会造成巨大经济损失。如何在不影响循环水系统互联互通的工艺设计要求下,尽可能的减少机组全停的时间,降低经济损失,成为工艺设计的一个关键点。
通过对新老循环水系统工艺参数要求进行比较分析,发现:
1.新老循环水系统采取何种方式联通能缩短原电站机组全停时间,同时能满足工艺设计要求;
2.二期扩建项目完成后,新老机组及循环水系统同时运行后,如何解决新老循环水池水位平衡问题,不造成水池的溢流及水资源的浪费。
发明内容
本发明要解决的技术问题是,针对现有技术存在的上述缺陷,提供了一种电厂循环水系统的扩建方法,在扩建施工过程中大大缩短了现有设备的停机时间,减小了停机带来的经济损失,保证了系统的运行安全稳定,实现了新循环水池和老循环水池的互联互通,避免了循环水池的溢流和水资源的浪费。
本发明为解决上述技术问题所采用的技术方案是:
一种电厂循环水系统的扩建方法,老循环冷却系统包括老循环水池,老循环水池的入水口和出水口分别设有多个冷却塔上水阀和多个循环泵,多个冷却塔上水阀的一端汇集后通过母管与汽轮发电机组中的凝汽器的出水端连接,多个循环泵的一端汇集后通过母管与汽轮发电机组中的凝汽器的入水端连接,在老循环冷却系统的基础上,进行电厂循环系统的扩建方法,包括以下步骤:
1)在老循环水池的傍边修建新循环水池,同时在新循环水池的池壁上设一个预留孔,在新循环水池的入水口和出水口分别设置冷却塔上水阀和循环泵;
2)将汽轮发电机组停止运行,关闭冷却塔上水阀和循环泵,在老循环水池的池壁上也开一个预留孔;
3)将新循环水池与老循环水池并联在母管上,将新循环水池的入水口处的冷却塔上水阀与凝汽器出水端的母管连接,将新循环水池的出水口处的循环泵与凝汽器入水端的母管连接;
4)用联通管将新循环水池通过预留孔与现有的循环水池连通,在联通管上设置阀门;
5)开启循环泵和冷却塔上水阀,使水回到新循环水池和老循环水池中,通过循环水泵控制回水量,确保新循环水池和老循环水池不会出现溢流的情况;
6)开启汽轮发电机组。
接上述技术方案,在所述步骤5)中,在使水回到新循环水池和老循环池之前,先把联通管上的阀门打开。
接上述技术方案,在所述步骤1)和步骤2)中,预留孔的大小为800mm~1200mm,联通管的大小为DN800~1200mm。
本发明具有以下有益效果:
通过在老循环水池傍边单独修建新循环水池并通过联通管进行联通,将新循环水池与老循环水池并联在母管上,在修建新循环水池的过程中不会对现有的循环水系统的运行有任何影响,保证了原有设备的安全稳定运行,仅在将新循环水池与老循环水池联通的过程中汽轮机组和循环水系统需要停机,本发明所述的方法,大大缩短了停机时间,减小了停机带来的经济损失,同时满足工艺设计要求,新循环水池和老循环水池之间设置联通管解决了新循环水池和老循环水池之间的水位平衡问题,避免了循环水池的溢流和水资源的浪费,实现了新循环水池和老循环水池的互联互通。
附图说明
图1是本发明实施例中依据电厂循环水系统的扩建方法建成后的原理图;
图中,1-老循环水池,2-新循环水池,3-冷却塔上水阀,4-循环水泵,5-汽轮发电机组,6-凝汽器,7-联通管,8-阀门,9-母管。
具体实施方式
下面结合附图和实施例对本发明进行详细说明。
参照图1所示,本发明提供的一个实施例中的电厂循环水系统的扩建方法,老循环冷却系统包括老循环水池1,老循环水池1的入水口和出水口分别设有多个冷却塔上水阀3和多个循环泵,多个冷却塔上水阀3的一端汇集后通过母管9与汽轮发电机组5中的凝汽器6的出水端连接,多个循环泵的一端汇集后通过母管9与汽轮发电机组5中的凝汽器6的入水端连接,其特征在于,在老循环冷却系统的基础上,进行电厂循环系统的扩建方法,包括以下步骤:
1)在老循环水池1的傍边修建新循环水池2,同时在新循环水池2的池壁上设一个预留孔,在新循环水池2的入水口和出水口分别设置冷却塔上水阀3和循环泵;
2)将汽轮发电机组5停止运行,关闭冷却塔上水阀3和循环泵,在老循环水池1的池壁上也开一个预留孔;
3)将新循环水池与老循环水池并联在母管上,将新循环水池2的入水口处的冷却塔上水阀3与凝汽器6出水端的母管9连接,将新循环水池2的出水口处的循环泵与凝汽器6入水端的母管9连接;
4)用联通管7将新循环水池2通过预留孔与现有的循环水池连通,在联通管7上设置阀门8;
5)开启循环泵和冷却塔上水阀3,使水回到新循环水池2和老循环水池1中,通过循环水泵4控制回水量,确保新循环水池2和老循环水池1不会出现溢流的情况;
6)开启汽轮发电机组5。
通过在老循环水池1傍边单独修建新循环水池2并通过联通管7进行联通,将新循环水池2与老循环水池1并联在母管9上,在修建新循环水池2的过程中不会对现有的循环水系统的运行有任何影响,保证了原有设备的安全稳定运行,仅在将新循环水池2与老循环水池1联通的过程中汽轮机组和循环水系统需要停机,本发明所述的方法,大大缩短了停机时间,减小了停机带来的经济损失,又保证了原有系统运行的安全和稳定,同时满足工艺设计要求,新循环水池2和老循环水池1之间设置联通管7解决了新循环水池2和老循环水池1之间的水位平衡问题,避免了循环水池的溢流和水资源的浪费,实现了新循环水池2和老循环水池1的互联互通。
进一步地,本发明所述的方法在整个扩建施工过程影响的停机时间仅需两天时间,大大降低了经济损失。
进一步地,在所述步骤5)中,在使水回到新循环水池2和老循环池之前,先把联通管7上的阀门8打开。
进一步地,在所述步骤1)和步骤2)中,预留孔的大小为1000mm,联通管7的大小为DN1000mm。
进一步地,所述母管9管径均为1400mm。
以上的仅为本发明的较佳实施例而已,当然不能以此来限定本发明之权利范围,因此依本发明申请专利范围所作的等效变化,仍属本发明的保护范围。
Claims (2)
1.一种电厂循环水系统的扩建方法,老循环冷却系统包括老循环水池,老循环水池的入水口和出水口分别设有多个冷却塔上水阀和多个循环泵,多个冷却塔上水阀的一端汇集后通过母管与汽轮发电机组中的凝汽器的出水端连接,多个循环泵的一端汇集后通过母管与汽轮发电机组中的凝汽器的入水端连接,其特征在于,在老循环冷却系统的基础上,进行电厂循环系统的扩建方法,包括以下步骤:
1)在老循环水池的傍边修建新循环水池,同时在新循环水池的池壁上设一个预留孔,在新循环水池的入水口和出水口分别设置冷却塔上水阀和循环泵;
2)将汽轮发电机组停止运行,关闭冷却塔上水阀和循环泵,在老循环水池的池壁上也开一个预留孔;
3)将新循环水池与老循环水池并联在母管上,将新循环水池的入水口处的冷却塔上水阀与凝汽器出水端的母管连接,将新循环水池的出水口处的循环泵与凝汽器入水端的母管连接;
4)用联通管将新循环水池通过预留孔与现有的循环水池连通,在联通管上设置阀门;
5)开启循环泵和冷却塔上水阀,使水回到新循环水池和老循环水池中,通过循环水泵控制回水量,确保新循环水池和老循环水池不会出现溢流的情况;
6)开启汽轮发电机组;
在所述步骤5)中,在使水回到新循环水池和老循环池之前,先把联通管上的阀门打开。
2.根据权利要求1所述的扩建方法,其特征在于,在所述步骤1)和步骤2)中,预留孔的大小为800mm~1200mm,联通管的大小为DN800~1200mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610649011.1A CN106088214B (zh) | 2016-08-09 | 2016-08-09 | 一种电厂循环水系统的扩建方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610649011.1A CN106088214B (zh) | 2016-08-09 | 2016-08-09 | 一种电厂循环水系统的扩建方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106088214A CN106088214A (zh) | 2016-11-09 |
CN106088214B true CN106088214B (zh) | 2019-05-24 |
Family
ID=57455884
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610649011.1A Active CN106088214B (zh) | 2016-08-09 | 2016-08-09 | 一种电厂循环水系统的扩建方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106088214B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107782167A (zh) * | 2017-10-27 | 2018-03-09 | 珠海格力电器股份有限公司 | 一种冷水机系统 |
CN113483272A (zh) * | 2021-07-10 | 2021-10-08 | 湖南华菱湘钢节能发电有限公司 | 发电机与风机联合循环水系统 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1074550A (en) * | 1964-09-04 | 1967-07-05 | English Electric Co Ltd | Water storage systems for closed steam turbine condensate cooling systems |
US4055048A (en) * | 1976-08-20 | 1977-10-25 | Reed Charles W | Apparatus and method for side stream demineralization of condensate in a steam cycle |
CN201917234U (zh) * | 2010-12-31 | 2011-08-03 | 东莞理文造纸厂有限公司 | 加装变频器的循环水泵系统 |
CN203070055U (zh) * | 2012-12-28 | 2013-07-17 | 北京华景天润科技有限公司 | 热电厂循环水系统 |
CN203745866U (zh) * | 2013-12-30 | 2014-07-30 | 中国大唐集团科学技术研究院有限公司 | 热电厂循环水系统 |
-
2016
- 2016-08-09 CN CN201610649011.1A patent/CN106088214B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1074550A (en) * | 1964-09-04 | 1967-07-05 | English Electric Co Ltd | Water storage systems for closed steam turbine condensate cooling systems |
US4055048A (en) * | 1976-08-20 | 1977-10-25 | Reed Charles W | Apparatus and method for side stream demineralization of condensate in a steam cycle |
CN201917234U (zh) * | 2010-12-31 | 2011-08-03 | 东莞理文造纸厂有限公司 | 加装变频器的循环水泵系统 |
CN203070055U (zh) * | 2012-12-28 | 2013-07-17 | 北京华景天润科技有限公司 | 热电厂循环水系统 |
CN203745866U (zh) * | 2013-12-30 | 2014-07-30 | 中国大唐集团科学技术研究院有限公司 | 热电厂循环水系统 |
Non-Patent Citations (1)
Title |
---|
已建成钢筋混凝土水池池壁后开孔加固与防渗措施;何继明,雷智敦;《低碳世界》;20150331;191-192页 |
Also Published As
Publication number | Publication date |
---|---|
CN106088214A (zh) | 2016-11-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107218091B (zh) | 一种火电厂冷端节能热力系统和运行方法 | |
CN105201564A (zh) | 一种基于主蒸汽流量的汽轮机滑压优化的控制方法 | |
CN106088214B (zh) | 一种电厂循环水系统的扩建方法 | |
CN103884037A (zh) | 采暖热网循环水热交换系统 | |
CN107062351B (zh) | 一种利用小汽机的热网分级加热系统及其调节方法 | |
CN106400123B (zh) | 一种经高温蒸煮后二次真空渗透的煮茧方法 | |
CN210237656U (zh) | 一种高炉冲渣水余热回收利用的发电装置 | |
CN104279788A (zh) | 一种高炉冷却水余热余能利用的工艺系统 | |
CN106439987A (zh) | 一种低温余热循环利用系统 | |
CN204730670U (zh) | 一种余热余能综合利用发电装置 | |
CN106338208A (zh) | 一种热网疏水回收系统及方法 | |
CN201903219U (zh) | 热废水再利用系统 | |
CN106321162A (zh) | 一种直流锅炉滑参数停机的方法 | |
CN205744468U (zh) | 一种采用轴流泵的大型雨水泵站 | |
CN203704106U (zh) | 采暖热网循环水热交换系统 | |
CN210662804U (zh) | 一种锅炉炉水循环泵冷却系统管道冲洗装置 | |
CN209801455U (zh) | 600mw机组低加疏水优化结构 | |
CN202928377U (zh) | 烧结余热与高炉煤气余压整合回收工艺系统 | |
CN105423398A (zh) | 一种新型串联热网疏水系统发明 | |
CN104807339A (zh) | 一种轧钢炼钢饱和蒸汽综合利用发电装置及发电方法 | |
CN205604772U (zh) | 一种新型热网首站布置方式 | |
CN110566934A (zh) | 一种锅炉炉水循环泵冷却系统管道冲洗装置和冲洗方法 | |
CN214741513U (zh) | 一种钠冷快堆非核冲转的汽水回收系统 | |
CN105673102B (zh) | 两座焦炉产生蒸汽共用一套发电机组发电的方法 | |
CN104833217B (zh) | 一种余热余能综合利用发电装置及发电方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20170706 Address after: 430083, Gate No. 2, Qingshan District, Hubei, Wuhan Applicant after: Wuhan iron and Steel Company Limited Address before: 430083 Wuhan factory in Hubei Province before the door No. 2 Applicant before: WUHAN IRON AND STEEL CORPORATION |
|
GR01 | Patent grant | ||
GR01 | Patent grant |