CN106088156A - A kind of built-in fitting for fixed beam - Google Patents
A kind of built-in fitting for fixed beam Download PDFInfo
- Publication number
- CN106088156A CN106088156A CN201610651151.2A CN201610651151A CN106088156A CN 106088156 A CN106088156 A CN 106088156A CN 201610651151 A CN201610651151 A CN 201610651151A CN 106088156 A CN106088156 A CN 106088156A
- Authority
- CN
- China
- Prior art keywords
- shoulder
- built
- fitting
- connecting portion
- fixed beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/12—Manhole shafts; Other inspection or access chambers; Accessories therefor
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
本发明涉及机械工程技术领域,尤其涉及一种用于固定杆件的预埋件。其包括肩部、支撑部和固定连接肩部和支撑部的连接部,所述肩部上顶面还设有三组用以连接杆件并对杆件进行固定的金属圆柱。本发明能够保护固定的杆件内部包裹的多种线材,尤其是在遇到积水时,克服了传统的预埋件易损坏线材的缺点。
The invention relates to the technical field of mechanical engineering, in particular to an embedded part for fixing rods. It includes a shoulder, a supporting portion and a connecting portion for fixedly connecting the shoulder and the supporting portion, and the upper surface of the shoulder is provided with three groups of metal cylinders for connecting and fixing the rods. The invention can protect various wires wrapped inside fixed rods, and overcomes the shortcoming that the traditional embedded parts are easy to damage the wires especially when encountering stagnant water.
Description
技术领域technical field
本发明涉及机械工程技术领域,尤其涉及一种用于固定杆件的预埋件。The invention relates to the technical field of mechanical engineering, in particular to an embedded part for fixing rods.
背景技术Background technique
现有的用于固定杆件的预埋件,在与内部含有各种线材的杆件连接后,遇到积水,常常会损坏线材,进一步对线材连接的设备造成破坏,增加维护成本。The existing embedded parts used to fix rods, after being connected to rods containing various wires inside, will often damage the wires when encountering water, which will further damage the equipment connected by the wires and increase maintenance costs.
传统杆体预埋件通过钢筋焊接,组成一个框架式结构,通过混凝土浇筑进行固定,除此之外需要在一个或几个杆体之间砌筑一个圆形或者方型手孔井。通过线管预埋至混凝土内。同时由于手孔井底部采用砖混结构,无排水设施,手孔井底部易造成积水。长期下去会对线缆造成损坏。传统方式极大的浪费土地资源、人力成本,加大了工程周期。The traditional embedded parts of rods are welded by steel bars to form a frame structure, which is fixed by concrete pouring. In addition, a circular or square hand hole well needs to be built between one or several rods. Pre-embedded into the concrete through the line pipe. At the same time, due to the brick-concrete structure at the bottom of the handhole well and no drainage facilities, the bottom of the handhole well is prone to water accumulation. In the long run, it will cause damage to the cable. The traditional method greatly wastes land resources and labor costs, and increases the project cycle.
发明内容Contents of the invention
本发明要解决的技术问题是如何克服现有技术的不足,提供一种用于固定杆件的预埋件。The technical problem to be solved by the present invention is how to overcome the deficiencies of the prior art and provide an embedded part for fixing rods.
本发明为实现上述目的采用的技术方案是:一种用于固定杆件的预埋件,包括肩部、支撑部和固定连接肩部和支撑部的连接部,所述肩部上顶面还设有三组用以连接杆件并对杆件进行固定的金属圆柱。The technical solution adopted by the present invention to achieve the above object is: an embedded part for fixing rods, including a shoulder, a support part and a connection part fixedly connecting the shoulder and the support part, and the top surface of the shoulder part is also There are three sets of metal cylinders used to connect and fix the rods.
进一步,所述肩部为金属圆盘,其中部设有圆形通孔,所述连接部的轴线与所述肩部的轴线重合。Further, the shoulder is a metal disc with a circular through hole in the middle, and the axis of the connecting part coincides with the axis of the shoulder.
进一步,所述连接部为方管,其侧面开设有腰圆形通孔,所述连接部横截面的长度大于所述圆形通孔的直径。Further, the connecting part is a square tube, and a round through hole is opened on the side thereof, and the length of the cross section of the connecting part is greater than the diameter of the circular through hole.
进一步,所述支撑部为四组“L”形钢筋,均匀固定在连接部底部。Further, the supporting part is four sets of "L" shaped steel bars, uniformly fixed on the bottom of the connecting part.
本发明的优点在于能够保护固定的杆件内部包裹的多种线材,尤其是在遇到积水时,克服了传统的预埋件易损坏线材的缺点;The advantage of the present invention is that it can protect various wires wrapped inside the fixed rods, especially when encountering waterlogging, it overcomes the disadvantage that the traditional embedded parts are easy to damage the wires;
本发明通过自身中部空间来进行管线过线、线缆汇聚,保留了传统手工井的功能,中间底部无结构件,解决了传统手孔井易积水并且难以消除的问题,本发明的底部以及整体与混凝土结合固定,顶部与相应的杆体连接固定,解决了传统施工当中重复施工,资源浪费等现象。The invention uses the central space to carry out pipeline passing and cable convergence, retains the function of the traditional manual well, and has no structural parts in the middle bottom, which solves the problem that the traditional hand well is easy to accumulate water and is difficult to eliminate. The bottom and the bottom of the present invention The whole is combined and fixed with concrete, and the top is connected and fixed with the corresponding rod body, which solves the phenomenon of repeated construction and waste of resources in traditional construction.
附图说明Description of drawings
图1本发明整体结构示意图。Fig. 1 is a schematic diagram of the overall structure of the present invention.
具体实施方式detailed description
一种用于固定杆件的预埋件,包括肩部1、支撑部2和固定连接肩部和支撑部的连接部3,所述肩部1上顶面还设有三组用以连接相应地面杆件并对地面杆件进行固定的金属圆柱11。An embedded part for fixing rods, including a shoulder 1, a support part 2 and a connecting part 3 that fixedly connects the shoulder and the support part, and the upper surface of the shoulder 1 is provided with three groups for connecting the corresponding ground pole and a metal cylinder 11 for fixing the pole on the ground.
所述肩部1为金属圆盘,其中部设有圆形通孔12,所述连接部3的轴线与所述肩部1的轴线重合。The shoulder 1 is a metal disc with a circular through hole 12 in the middle, and the axis of the connecting portion 3 coincides with the axis of the shoulder 1 .
所述连接部3为方管,其侧面开设有腰圆形通孔31,所述连接部3横截面的长度大于所述圆形通孔12的直径。The connecting part 3 is a square tube with a waist-shaped through-hole 31 on its side, and the length of the cross-section of the connecting part 3 is greater than the diameter of the circular through-hole 12 .
所述支撑部2为四组“L”形钢筋,均匀固定在连接部3底部。The supporting part 2 is four groups of "L" shaped steel bars, which are evenly fixed on the bottom of the connecting part 3.
本发明在使用时,首先在地面位置挖掘与本发明相应高度和直径的坑洞,进一步通过混凝土与本发明的肩部1和支撑部3结合并固定在坑洞内,需要与地面上的设备连接的管线等直接通过肩部1的圆形通孔和连接部3的本身为方管而存在的通孔进行管线过线和线缆汇聚,使本发明肩部1上的金属圆柱11露出地面,最后将相应的杆件与金属圆柱11相连接。When the present invention is in use, first excavate a pothole corresponding to the height and diameter of the present invention at the ground position, and further combine the shoulder 1 and the support part 3 of the present invention through concrete and fix them in the pothole, which needs to be connected with the equipment on the ground The connected pipelines and the like are directly passed through the circular through-hole of the shoulder 1 and the through-hole of the connecting part 3 which itself is a square tube for pipeline passing and cable convergence, so that the metal cylinder 11 on the shoulder 1 of the present invention is exposed to the ground , and finally connect the corresponding rods with the metal cylinder 11 .
由于本发明避免了采用传统的砖混结构垫底的方式,进而解决了传统的预埋件易积水的问题,避免管线因积水而遭到破坏,采用设置的肩部结构来实现防止预埋件的下沉。Since the present invention avoids the use of the traditional brick-concrete structure as the base, and further solves the problem that the traditional embedded parts are prone to water accumulation, avoids the damage of pipelines due to water accumulation, and adopts the shoulder structure to prevent pre-embedding sinking of the piece.
上述实施例只是为了说明本发明的技术构思及特点,其目的是在于让本领域内的普通技术人员能够了解本发明的内容并据以实施,并不能以此限制本发明的保护范围。凡是根据本发明内容的实质所作出的等效的变化或修饰,都应涵盖在本发明的保护范围内。The above-mentioned embodiments are only to illustrate the technical concept and characteristics of the present invention, and its purpose is to enable those of ordinary skill in the art to understand the content of the present invention and implement it accordingly, and cannot limit the protection scope of the present invention. All equivalent changes or modifications made according to the essence of the present invention shall fall within the protection scope of the present invention.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610651151.2A CN106088156B (en) | 2016-08-10 | 2016-08-10 | A kind of built-in fitting for fixed beam |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610651151.2A CN106088156B (en) | 2016-08-10 | 2016-08-10 | A kind of built-in fitting for fixed beam |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106088156A true CN106088156A (en) | 2016-11-09 |
| CN106088156B CN106088156B (en) | 2018-08-28 |
Family
ID=57456070
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610651151.2A Active CN106088156B (en) | 2016-08-10 | 2016-08-10 | A kind of built-in fitting for fixed beam |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106088156B (en) |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000166070A (en) * | 1998-11-20 | 2000-06-16 | Nippon Tsushin Denzai Kk | Device for connecting body pipe duct sleeve to fixing plate |
| CN202831764U (en) * | 2012-10-25 | 2013-03-27 | 武钢集团昆明钢铁股份有限公司 | Embedded part |
| CN203535747U (en) * | 2013-09-26 | 2014-04-09 | 四川太一新能源开发有限公司 | Solar street lamp storage battery antitheft device |
| CN203549663U (en) * | 2013-11-06 | 2014-04-16 | 韩宏伟 | Solar street lamp system preventing storage battery from being stolen |
| CN204187503U (en) * | 2014-10-30 | 2015-03-04 | 莱芜汇中能源科技有限公司 | A kind of tracing type photovoltaic road lamp device |
| CN205954686U (en) * | 2016-08-10 | 2017-02-15 | 青岛松立软件信息技术股份有限公司 | A built -in fitting for fixing rod piece |
-
2016
- 2016-08-10 CN CN201610651151.2A patent/CN106088156B/en active Active
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000166070A (en) * | 1998-11-20 | 2000-06-16 | Nippon Tsushin Denzai Kk | Device for connecting body pipe duct sleeve to fixing plate |
| CN202831764U (en) * | 2012-10-25 | 2013-03-27 | 武钢集团昆明钢铁股份有限公司 | Embedded part |
| CN203535747U (en) * | 2013-09-26 | 2014-04-09 | 四川太一新能源开发有限公司 | Solar street lamp storage battery antitheft device |
| CN203549663U (en) * | 2013-11-06 | 2014-04-16 | 韩宏伟 | Solar street lamp system preventing storage battery from being stolen |
| CN204187503U (en) * | 2014-10-30 | 2015-03-04 | 莱芜汇中能源科技有限公司 | A kind of tracing type photovoltaic road lamp device |
| CN205954686U (en) * | 2016-08-10 | 2017-02-15 | 青岛松立软件信息技术股份有限公司 | A built -in fitting for fixing rod piece |
Also Published As
| Publication number | Publication date |
|---|---|
| CN106088156B (en) | 2018-08-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105019647A (en) | Telescopic sleeve | |
| CN204326094U (en) | The polygon steel pile foundation of transmission of electricity steel pipe pole | |
| CN106088156B (en) | A kind of built-in fitting for fixed beam | |
| CN204357097U (en) | A reinforced base of building scaffolding that can improve construction safety | |
| CN205636777U (en) | Basis is consolidated to assembled cement pole protection mound stock | |
| CN204754216U (en) | But telescopic tube | |
| CN205954686U (en) | A built -in fitting for fixing rod piece | |
| CN203514337U (en) | Large-scale steel-pipe-inserting-type foundation | |
| CN203361489U (en) | Planting soil roof fan, tuber pipe support | |
| CN207314483U (en) | A kind of anti-deformation antiseep of big flow discharge culvert, which is moved, changes structure | |
| CN107044132B (en) | A kind of construction method of quake-resistant safety ground | |
| CN201835439U (en) | Concrete column with steel pipe | |
| CN208184267U (en) | A kind of newly-increased Cantilever Beams connection structure | |
| CN205557552U (en) | Cement pole stock foundation reinforcement structure | |
| CN204437497U (en) | Built-in type under ground piping lifting device | |
| CN204898683U (en) | Underground structure of high strength | |
| KR20140140838A (en) | Structure of power-transmission tower | |
| CN204282921U (en) | A kind of direct burial single-pipe tower | |
| CN204282850U (en) | Steel work-concrete combined floor reserved opening protective net frame | |
| CN107829428A (en) | A kind of variable diameters bamboo joint type mortar pile | |
| CN204098024U (en) | A kind of secondary grouting concrete pipe pile construction device | |
| CN102162252B (en) | Supporting stand column for foundation pit and construction method of supporting stand column | |
| CN206570852U (en) | A kind of water conservancy dam body foundation-reinforcing device | |
| CN108035736B (en) | Method and structure for rapidly solving collapse of tunnel | |
| CN206495220U (en) | New-type embankment slope protecting device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| CB02 | Change of applicant information | ||
| CB02 | Change of applicant information |
Address after: 266000 11, level 6, software park, 288 Ningxia Road, Shinan District, Qingdao, Shandong. Applicant after: SONGLI HOLDINGS GROUP Co.,Ltd. Address before: 266000 A2, 6 building, 6 tower, 288 Ningxia Road, Shinan District, Qingdao, Shandong. Applicant before: QINGDAO SONLI SOFTWARE INFORMATION TECHNOLOGY Co.,Ltd. |
|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Pre-embedded piece used for fixing rod piece Effective date of registration: 20200710 Granted publication date: 20180828 Pledgee: Qingdao financing guarantee Centre Ltd. Pledgor: SONGLI HOLDINGS GROUP Co.,Ltd. Registration number: Y2020370010028 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20210820 Granted publication date: 20180828 Pledgee: Qingdao financing guarantee Centre Ltd. Pledgor: SONGLI HOLDINGS GROUP Co.,Ltd. Registration number: Y2020370010028 |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20250714 Address after: 266000 Shandong Province Qingdao City Shinan District Ningxia Road 288 Building 6 6th Floor Area A Patentee after: Yibo Video (Shandong) Technology Co.,Ltd. Country or region after: China Address before: 266000 11, level 6, software park, 288 Ningxia Road, Shinan District, Qingdao, Shandong. Patentee before: SONGLI HOLDINGS GROUP Co.,Ltd. Country or region before: China |