CN106050214B - The recovery method of combustible ice - Google Patents

The recovery method of combustible ice Download PDF

Info

Publication number
CN106050214B
CN106050214B CN201610430858.0A CN201610430858A CN106050214B CN 106050214 B CN106050214 B CN 106050214B CN 201610430858 A CN201610430858 A CN 201610430858A CN 106050214 B CN106050214 B CN 106050214B
Authority
CN
China
Prior art keywords
well
air
ice sheet
flammable
casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610430858.0A
Other languages
Chinese (zh)
Other versions
CN106050214A (en
Inventor
伍丕庆
伍丕济
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610430858.0A priority Critical patent/CN106050214B/en
Publication of CN106050214A publication Critical patent/CN106050214A/en
Application granted granted Critical
Publication of CN106050214B publication Critical patent/CN106050214B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/295Gasification of minerals, e.g. for producing mixtures of combustible gases
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/0099Equipment or details not covered by groups E21B15/00 - E21B40/00 specially adapted for drilling for or production of natural hydrate or clathrate gas reservoirs; Drilling through or monitoring of formations containing gas hydrates or clathrates
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/01Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • E21B43/243Combustion in situ
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimising the spacing of wells
    • E21B43/305Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The present invention discloses a kind of recovery method of combustible ice, comprising the following steps: step 1, drilling well bores the first well from top to bottom extended at the top of flammable ice sheet, the second well being connected to first well that few a bite extends transversely is drilled into the flammable ice sheet;Step 2, it cements the well, conduit is set in first and second well, then concreting forms concrete layer between the outside wall surface of the conduit and the inner wall of first and second well;Step 3, the side wall of perforation, concrete layer, casing at least in second well corresponding to flammable ice sheet is connected to the inner hole of the casing and the hole of flammable ice sheet using perforating gun setting;Step 4, it exploits.It can prevent flammable ice sheet from collapsing and boring more second wells, and explore, exploit that the period is short, and working security is good, and production cost is low, good economy performance.

Description

The recovery method of combustible ice
Technical field
The present invention relates to natural gas extraction technologies, and in particular to the recovery method of combustible ice.
Background technique
After 20-30, the whole world will will appear energy famine.Show to send out in ocean according to research and investigation exploration Show combustible ice (gas hydrates), it can be mankind's use about 1000.Combustible ice is had found in China Qinghai-Tibet Platean, is stored About 35,000,000,000 tons, available 35 years of amount.
Aforementioned combustible ice, the gas hydrates (Natural being distributed across in the permafrost of halmeic deposit or land-based area Gas Hydrate, abbreviation Gas Hydrate), by the crystal for the class ice-like that natural gas and water are formed under the conditions of high pressure low temperature Matter.Because of its appearance as ice and also meet fire be incendivity, so be referred to as " combustible ice ", " solid gas " or " gas ice ".
How these combustible ices are exploited, and the whole world has all carried out the research of this respect, but never preferable method.It is existing It is for example, may cause flammable ice sheet in recovery process and collapse, and to cause tsunami, made to the mankind the problem of being primarily present At very big threat, combustible ice is evaporate into air, causes greenhouse effects, is made global warming, therefore is hesitated to exploit.
For this reason, it may be desirable to seek a kind of technical solution, at least to mitigate the above problem.
Summary of the invention
The technical problem to be solved by the present invention is to providing a kind of can prevent flammable ice sheet from collapsing and that cost of winning is low is flammable The recovery method of ice sheet.
In order to solve the above technical problems, the present invention adopts the following technical solutions.
A kind of recovery method of combustible ice, comprising the following steps:
Step 1, drilling well is bored the first well from top to bottom extended at the top of flammable ice sheet, is bored in the flammable ice sheet The second well being connected to first well at least extended transversely flatly;
Step 2, cement the well, casing is set in first and second well, then the outside wall surface of the casing and this first and second Concreting forms concrete layer between the inner wall of well;
Step 3, the side wall of perforation, concrete layer, casing at least in second well corresponding to flammable ice sheet is adopted The hole of the inner hole and flammable ice sheet that are connected to the casing is set with perforating gun;
Step 4, it exploits, by injection temperature in first well thereto the second well of a bite more than or equal to 200 DEG C Pressure is greater than or equal to the air of 10 megapascal, is continuously injected into a month rear enclosed of 1-3 the second well well head;When the well head of second well When increasing 10-20 megapascal on the basis of well head pressure of the pressure when closing second well, start to be injected before discharge outward Air and measure the content of natural gas in discharged air, when the content of natural gas in the air discharged is greater than or equal to Light a fire when 50% emptying, igniting emptying until when the content of natural gas is greater than or equal to 80% in the air that is discharged, by this The gas that two wells are discharged inputs gas transmission equipmen, alternatively, the temperature and air injection by adjusting injected air continue Time, when single port the second well gas production being made to be no less than annual 1 billion cubic meter, the gas which is discharged inputs gas transmission Equipment.
Further include the steps that exploiting flammable ice sheet corresponding to remaining second well according to the step 4.
In the step 1, second well from top to bottom layered arrangement.
Every layer of 1-10 mouthfuls of setting second well.
The distance of top surface of the top layer away from flammable ice sheet is the one third of flammable ice layer thickness to half.
Second well radial arrangement centered on first well.
In the step 4, the temperature of the air injected is 200-2000 DEG C.
In the step 4, every 30-60 minutes measures the content of natural gas in the air once discharged.
In the step 4, air is injected to second well using the air compressor for being installed on mobile drilling platforms.
A kind of recovery method of combustible ice, comprising the following steps:
Step 1, drilling well is bored the first well from top to bottom extended at the top of flammable ice sheet, is bored in the flammable ice sheet The second well being connected to first well at least extended transversely flatly;
Step 2, cement the well, casing is set in first and second well, then the outside wall surface of the casing and this first and second Concreting forms concrete layer between the inner wall of well;
Step 3, the side wall of perforation, concrete layer, casing at least in second well corresponding to flammable ice sheet is adopted The hole of the inner hole and flammable ice sheet that are connected to the casing is set with perforating gun;
Step 4, it exploits, 10 megapascal is greater than or equal to by injection pressure in first well thereto the second well of a bite Air is continuously injected into a month rear enclosed of 1-3 the second well well head;Then the air that electric heating is injected makes air and flammable ice sheet Combustion of natural gas and heat flammable ice sheet corresponding to second well, when the well head pressure of second well is in initial well head pressure On the basis of the air that is injected and measured natural in discharged air when increasing 10-20 megapascal, before starting discharge outward The content of gas, the igniting emptying when the content of natural gas in the air discharged is greater than or equal to 50%, igniting emptying is until institute When the content of natural gas is greater than or equal to 80% in the air of discharge, the gas which is discharged inputs gas transmission equipmen.
The present invention has following advantageous effects.
The present invention is boring the first well from top to bottom extended at the top of flammable ice sheet, and few a bite is drilled into flammable ice sheet The second well being connected to the first well extended transversely;Casing is set in the first and second well, then the outside wall surface of the casing with Concreting forms concrete layer between the inner wall of first and second well;At least in the second well corresponding to flammable ice sheet Concrete, casing side wall setting be connected to the casing inner hole and flammable ice sheet hole;It is right that wherein one second well institute is exploited again The flammable ice sheet answered, and then obtain natural gas.By adopting the above technical scheme, it can prevent flammable ice sheet from collapsing and boring more Two wells, and explore, exploit that the period is short, and working security is good, and production cost is low, good economy performance.
Specific embodiment
The contents of the present invention are described in further details below with reference to embodiment, but the embodiment of the present invention is not limited to This.
Embodiment 1
A kind of recovery method of combustible ice of the invention, comprising the following steps:
Step 1, drilling well bores the first well from top to bottom extended at the top of flammable ice sheet, bores 1 in the flammable ice sheet The second well being connected to first well that opening's edge is laterally extended;
Step 2, cement the well, casing is set in first and second well, then the outside wall surface of the casing and this first and second Concreting forms concrete layer between the inner wall of well;
Step 3, the side wall of perforation, concrete layer, casing at least in second well corresponding to flammable ice sheet is adopted The hole of the inner hole and flammable ice sheet that are connected to the casing is set with perforating gun;
Step 4, it exploits, is 10 by the pressure that injection temperature in first well thereto the second well of a bite is 200 DEG C The air of megapascal is continuously injected into 1 month rear enclosed the second well well head;When the well head pressure of second well is closing second well When well head pressure on the basis of when increasing by 10 megapascal, start the air injected before discharge outward and measure discharged sky The content of natural gas in gas, the igniting emptying when the content of natural gas in the air discharged is 50%, igniting emptying is until institute When the content of natural gas is 80% in the air of discharge, the gas which is discharged inputs gas transmission equipmen, alternatively, passing through The temperature of injected air and the duration of air injection are adjusted, makes single port the second well gas production up to annual 100000000 cubes Meter Shi, the gas which is discharged input gas transmission equipmen.
Embodiment 2
A kind of recovery method of combustible ice of the invention, comprising the following steps:
Step 1, drilling well bores the first well from top to bottom extended at the top of flammable ice sheet, bores 5 in the flammable ice sheet The second well being connected to first well that opening's edge is laterally extended;
Step 2, cement the well, casing is set in first and second well, then the outside wall surface of the casing and this first and second Concreting forms concrete layer between the inner wall of well;
Step 3, the side wall of perforation, concrete layer, casing at least in second well corresponding to flammable ice sheet is adopted The hole of the inner hole and flammable ice sheet that are connected to the casing is set with perforating gun;
Step 4, it exploits, is 20 by the pressure that injection temperature in first well thereto the second well of a bite is 1000 DEG C The air of megapascal is continuously injected into 2 months rear enclosed the second well well heads;When the well head pressure of second well is closing second well When well head pressure on the basis of when increasing by 15 megapascal, start the air injected before discharge outward and measure discharged sky The content of natural gas in gas, the igniting emptying when the content of natural gas in the air discharged is 65%, igniting emptying is until institute When the content of natural gas is 85% in the air of discharge, the gas which is discharged inputs gas transmission equipmen, alternatively, passing through The temperature of injected air and the duration of air injection are adjusted, makes annual 1.1 hundred million cubes of the second well gas production of single port Meter Shi, the gas which is discharged input gas transmission equipmen.
Embodiment 3
A kind of recovery method of combustible ice of the invention, comprising the following steps:
Step 1, drilling well is bored the first well from top to bottom extended at the top of flammable ice sheet, is bored in the flammable ice sheet The second well being connected to first well that 10 opening's edges are laterally extended;
Step 2, cement the well, casing is set in first and second well, then the outside wall surface of the casing and this first and second Concreting forms concrete layer between the inner wall of well;
Step 3, the side wall of perforation, concrete layer, casing at least in second well corresponding to flammable ice sheet is adopted The hole of the inner hole and flammable ice sheet that are connected to the casing is set with perforating gun;
Step 4, it exploits, is 30 by the pressure that injection temperature in first well thereto the second well of a bite is 2000 DEG C The air of megapascal is continuously injected into 3 months rear enclosed the second well well heads;When the well head pressure of second well is closing second well When well head pressure on the basis of when increasing by 20 megapascal, start the air injected before discharge outward and measure discharged sky The content of natural gas in gas, the igniting emptying when the content of natural gas in the air discharged is 70%, igniting emptying is until institute When the content of natural gas is 90% in the air of discharge, the gas which is discharged inputs gas transmission equipmen, alternatively, passing through The temperature of injected air and the duration of air injection are adjusted, keeps single port the second well gas production annual 1.5 hundred million vertical When square rice, the gas which is discharged inputs gas transmission equipmen.
Embodiment 4
A kind of recovery method of combustible ice of the invention, comprising the following steps:
Step 1, drilling well bores the first well from top to bottom extended at the top of flammable ice sheet, bores 1 in the flammable ice sheet The second well being connected to first well that opening's edge is laterally extended;
Step 2, cement the well, casing is set in first and second well, then the outside wall surface of the casing and this first and second Concreting forms concrete layer between the inner wall of well;
Step 3, the side wall of perforation, concrete layer, casing at least in second well corresponding to flammable ice sheet is adopted The hole of the inner hole and flammable ice sheet that are connected to the casing is set with perforating gun;
Step 4, it exploits, is the air of 10 megapascal by injection pressure in first well thereto the second well of a bite, even The rear enclosed of continuous injection 1 month the second well well head;Then the air that electric heating is injected makes the natural gas of air Yu flammable ice sheet It burns and heats flammable ice sheet corresponding to second well, when the well head pressure of second well is on the basis of initial well head pressure When increasing by 20 megapascal, the content for starting the air injected before discharge outward and measuring natural gas in discharged air, when Igniting emptying when the content of natural gas is 50% in the air discharged, igniting emptying is up to natural gas in the air discharged When content is 80%, the gas which is discharged inputs gas transmission equipmen.
Embodiment 5
A kind of recovery method of combustible ice of the invention, comprising the following steps:
Step 1, drilling well bores the first well from top to bottom extended at the top of flammable ice sheet, bores 5 in the flammable ice sheet The second well being connected to first well that opening's edge is laterally extended;
Step 2, cement the well, casing is set in first and second well, then the outside wall surface of the casing and this first and second Concreting forms concrete layer between the inner wall of well;
Step 3, the side wall of perforation, concrete layer, casing at least in second well corresponding to flammable ice sheet is adopted The hole of the inner hole and flammable ice sheet that are connected to the casing is set with perforating gun;
Step 4, it exploits, is the air of 20 megapascal by injection pressure in first well thereto the second well of a bite, even The rear enclosed of continuous injection 2 months the second well well head;Then the air that electric heating is injected makes the natural gas of air Yu flammable ice sheet It burns and heats flammable ice sheet corresponding to second well, when the well head pressure of second well is on the basis of initial well head pressure When increasing by 15 megapascal, the content for starting the air injected before discharge outward and measuring natural gas in discharged air, when Igniting emptying when the content of natural gas is 65% in the air discharged, igniting emptying is up to natural gas in the air discharged When content is 85%, the gas which is discharged inputs gas transmission equipmen.
Embodiment 6
A kind of recovery method of combustible ice of the invention, comprising the following steps:
Step 1, drilling well is bored the first well from top to bottom extended at the top of flammable ice sheet, is bored in the flammable ice sheet The second well being connected to first well that 10 opening's edges are laterally extended;
Step 2, cement the well, casing is set in first and second well, then the outside wall surface of the casing and this first and second Concreting forms concrete layer between the inner wall of well;
Step 3, the side wall of perforation, concrete layer, casing at least in second well corresponding to flammable ice sheet is adopted The hole of the inner hole and flammable ice sheet that are connected to the casing is set with perforating gun;
Step 4, it exploits, is the air of 30 megapascal by injection pressure in first well thereto the second well of a bite, even The rear enclosed of continuous injection 3 months the second well well head;Then the air that electric heating is injected makes the natural gas of air Yu flammable ice sheet It burns and heats flammable ice sheet corresponding to second well, when the well head pressure of second well is on the basis of initial well head pressure When increasing by 20 megapascal, the content for starting the air injected before discharge outward and measuring natural gas in discharged air, when Igniting emptying when the content of natural gas is 70% in the air discharged, igniting emptying is up to natural gas in the air discharged When content is 90%, the gas which is discharged inputs gas transmission equipmen.
Embodiment 7
The present embodiment and previous embodiment the difference is that, in step 1, the second well from top to bottom layered arrangement, to mention High security and yield, in addition to this, other are same as the previously described embodiments.
Embodiment 8
The present embodiment and previous embodiment 7 the difference is that, every layer of setting 1-10 second well of mouth, using appropriate quantity Second well can prevent flammable ice sheet from collapsing to improve yield, improve the efficiency of exploitation, reduce cost, and in addition to this, other are It is identical as previous embodiment 7.
Embodiment 9
The present embodiment and previous embodiment 7,8 the difference is that, the distance of top surface of the top layer away from flammable ice sheet is can The one third of ice layer thickness is fired to half, it is not easy to be caused flammable ice sheet to collapse, is conducive to bore the second well, except this it Outside, other are identical as previous embodiment 7,8.
Embodiment 10
The present embodiment and previous embodiment the difference is that, further include exploiting remaining second well institute according to the step 4 The step of corresponding flammable ice sheet, reduces production cost, in addition to this, other are identical as previous embodiment to improve yield.
Embodiment 11
The present embodiment and previous embodiment the difference is that, second well is radial centered on first well Arrangement, can more reasonably bore the second well and prevent from collapsing, circumferentially uniformly distributed preferable along the first well, in addition to this, other with it is aforementioned Embodiment is identical.
In step 4, the temperature of the air injected selects preferably between 200-2000 DEG C, and temperature is excessively high, easily causes to cover Tube swelling causes gas leakage.
In step 4, the every 30-60 minutes content for measuring natural gas in the air once discharged is preferable.
In step 4, it can be, but not limited to inject air to second well using air compressor, air compressor is installed on Mobile drilling platforms is preferable.
In step 4, air is injected to the second well, the gas input that second well is discharged after meeting above-mentioned requirements is defeated Gas equipment, the gas that the second well is constantly discharged can cause the second well to be unsatisfactory for above-mentioned requirements, can be again when there is such case Air is injected to second well, the gas that second well is discharged after meeting above-mentioned requirements again inputs gas transmission equipmen, such as This alternately, sufficiently to exploit flammable ice sheet corresponding to second well.
Concrete can be, but not limited to using cement production systD.
Casing can be, but not limited to using petroleum casing pipe.
The quantity of first and second well is not particular value, according to actual needs, can also be other quantity.
It should be noted that each particular technique feature described in above-mentioned specific embodiment, in reconcilable feelings Under condition, it can be combined by any suitable mode.Each particular technique described in different specific embodiments is special Sign, in the case of no contradiction, can also be combined by any suitable mode each other.In order to avoid unnecessary It repeats, the present invention is not described various combinations of possible ways.
Above with reference to embodiment to the present invention have been described in detail, be it is illustrative rather than restrictive, do not taking off It is within the scope of the present invention from the variation and/or modification under present general inventive concept.

Claims (8)

1. a kind of recovery method of combustible ice, which comprises the following steps:
Step 1, the first well from top to bottom extended is bored in drilling well at the top of flammable ice sheet, is drilled into the flammable ice sheet few The second well being connected to first well extended transversely flatly;
Step 2, it cements the well, casing is set in first and second well, then in the outside wall surface of the casing and first and second well Concreting forms concrete layer between inner wall;
Step 3, perforation, the side wall of concrete layer, casing at least in second well corresponding to flammable ice sheet, which uses, to be penetrated Rifle setting in hole is connected to the inner hole of the casing and the hole of flammable ice sheet;
Step 4, it exploits, 200 DEG C of pressure is greater than or equal to by injection temperature in first well thereto the second well of a bite More than or equal to the air of 10 megapascal, it is continuously injected into a month rear enclosed of 1-3 the second well well head;When the well head pressure of second well When increasing 10-20 megapascal on the basis of well head pressure when closing second well, start the sky injected before discharge outward Gas and the content for measuring natural gas in discharged air, when the content of natural gas in the air discharged is greater than or equal to 50% When igniting emptying, igniting emptying is until when the content of natural gas is greater than or equal to 80% in the air that is discharged, by second well The gas input gas transmission equipmen being discharged, alternatively, the duration of temperature and air injection by adjusting injected air, When single port the second well gas production being made to be no less than annual 1 billion cubic meter, the gas which is discharged inputs gas transmission equipmen;
In the step 1, from top to bottom layered arrangement, the distance of top surface of the top layer away from flammable ice sheet are flammable to second well The one third of ice layer thickness is to half.
2. the recovery method of combustible ice according to claim 1, which is characterized in that further include being exploited according to the step 4 The step of flammable ice sheet corresponding to remaining second well.
3. the recovery method of combustible ice according to claim 1, which is characterized in that every layer 1-10 mouthfuls described second of setting Well.
4. the recovery method of combustible ice according to claim 1, which is characterized in that second well is with first well The radial arrangement in center.
5. the recovery method of combustible ice according to claim 1, which is characterized in that in the step 4, the air that is injected Temperature be 200-2000 DEG C.
6. the recovery method of combustible ice according to claim 1, which is characterized in that 30-60 minutes every in the step 4 Measure the content of natural gas in the air once discharged.
7. the recovery method of combustible ice according to any one of claims 1 to 6, which is characterized in that in the step 4, adopt Air is injected to second well with the air compressor for being installed on mobile drilling platforms.
8. a kind of recovery method of combustible ice, which comprises the following steps:
Step 1, the first well from top to bottom extended is bored in drilling well at the top of flammable ice sheet, is drilled into the flammable ice sheet few The second well being connected to first well extended transversely flatly;
Step 2, it cements the well, casing is set in first and second well, then in the outside wall surface of the casing and first and second well Concreting forms concrete layer between inner wall;
Step 3, perforation, the side wall of concrete layer, casing at least in second well corresponding to flammable ice sheet, which uses, to be penetrated Rifle setting in hole is connected to the inner hole of the casing and the hole of flammable ice sheet;
Step 4, it exploits, the sky of 10 megapascal is greater than or equal to by injection pressure in first well thereto the second well of a bite Gas is continuously injected into a month rear enclosed of 1-3 the second well well head;Then the air that electric heating is injected makes air and flammable ice sheet Combustion of natural gas and heat flammable ice sheet corresponding to second well, when the well head pressure of second well is in initial well head pressure On the basis of the air that is injected and measure natural gas in discharged air when increasing 10-20 megapascal, before starting discharge outward Content, the igniting emptying when the content of natural gas in the air discharged is greater than or equal to 50%, igniting emptying is until arranged When the content of natural gas is greater than or equal to 80% in the air put, the gas which is discharged inputs gas transmission equipmen;
In the step 1, from top to bottom layered arrangement, the distance of top surface of the top layer away from flammable ice sheet are flammable to second well The one third of ice layer thickness is to half.
CN201610430858.0A 2016-06-17 2016-06-17 The recovery method of combustible ice Expired - Fee Related CN106050214B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610430858.0A CN106050214B (en) 2016-06-17 2016-06-17 The recovery method of combustible ice

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610430858.0A CN106050214B (en) 2016-06-17 2016-06-17 The recovery method of combustible ice

Publications (2)

Publication Number Publication Date
CN106050214A CN106050214A (en) 2016-10-26
CN106050214B true CN106050214B (en) 2019-03-29

Family

ID=57168266

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610430858.0A Expired - Fee Related CN106050214B (en) 2016-06-17 2016-06-17 The recovery method of combustible ice

Country Status (1)

Country Link
CN (1) CN106050214B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108071369A (en) * 2016-11-15 2018-05-25 梁嘉麟 The simple type recovery scheme of common seabed combustible ice mineral reserve
CN108071370A (en) * 2016-11-15 2018-05-25 梁嘉麟 The planning of common seabed combustible ice mineral reserve is exploited using decompression method
CN107313752B (en) * 2017-06-20 2019-10-15 天津大学 Combustible ice based on super lubrication gas transport interface fells and transports device and fells and transports method
CN108194055B (en) * 2018-01-03 2019-12-10 伍丕济 method for exploiting combustible ice

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4266609A (en) * 1978-11-30 1981-05-12 Technion Research & Development Foundation Ltd. Method of extracting liquid and gaseous fuel from oil shale and tar sand
CN102213090A (en) * 2011-06-03 2011-10-12 中国科学院广州能源研究所 Method and device for exploiting natural gas hydrate in permafrost region
CN103498652A (en) * 2013-10-18 2014-01-08 辽宁石油化工大学 Method and device for exploiting natural gas hydrate in frozen soil area through injection of high-temperature steam
CN104533367A (en) * 2014-11-13 2015-04-22 中国石油天然气股份有限公司 Method for exploiting natural gas hydrate by fireflooding
CN104632163A (en) * 2015-01-20 2015-05-20 辽宁石油化工大学 Natural gas hydrate mining method capable of preventing accidents such as blowout, mine collapse and subsidence
CN105545270A (en) * 2015-12-15 2016-05-04 大连理工大学 Natural gas hydrate exploitation method and device adopting in-situ combustion method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4266609A (en) * 1978-11-30 1981-05-12 Technion Research & Development Foundation Ltd. Method of extracting liquid and gaseous fuel from oil shale and tar sand
CN102213090A (en) * 2011-06-03 2011-10-12 中国科学院广州能源研究所 Method and device for exploiting natural gas hydrate in permafrost region
CN103498652A (en) * 2013-10-18 2014-01-08 辽宁石油化工大学 Method and device for exploiting natural gas hydrate in frozen soil area through injection of high-temperature steam
CN104533367A (en) * 2014-11-13 2015-04-22 中国石油天然气股份有限公司 Method for exploiting natural gas hydrate by fireflooding
CN104632163A (en) * 2015-01-20 2015-05-20 辽宁石油化工大学 Natural gas hydrate mining method capable of preventing accidents such as blowout, mine collapse and subsidence
CN105545270A (en) * 2015-12-15 2016-05-04 大连理工大学 Natural gas hydrate exploitation method and device adopting in-situ combustion method

Also Published As

Publication number Publication date
CN106050214A (en) 2016-10-26

Similar Documents

Publication Publication Date Title
CN106050214B (en) The recovery method of combustible ice
CN109026128A (en) Multistage combustion shock wave fracturing coal body and heat injection alternation strengthen gas pumping method
CN112523735B (en) Fracturing method for shale reservoir transformation
CN104481467B (en) A kind of method and apparatus exploiting seabed combustible ice
CN103306660B (en) A kind of method of shale gas reservoir fracturing volume increase
CN102080524B (en) Layered electric ignition method for multilayer gas injection of fire flood
CN106437669B (en) A kind of thermal cracking seam method and system for deep hot dry rock formation production
WO2021128933A1 (en) Fluidized mining method for in-situ pyrolysis gas of high gas coal seam
CN101864938B (en) Underground ignition technology of combustion drive oil layer by injecting steam
CN202338305U (en) Layered fireflood ignition gas injection pipe column
CN103244096B (en) The closed pulse of coal gas layer loads the device and method of pressure break loosely stress
CN103216219A (en) Method for extracting natural gas hydrate through CO2/N2 underground replacement
Liang et al. Propagation and control of fire front in the combustion assisted gravity drainage using horizontal wells
CN107120097B (en) Thermal excitation method exploitation device for exploiting natural gas hydrate in marine sediments
CN104632271A (en) Method for increasing permeability in drilling holes in cold expansion and heat driving mode
CN102493795A (en) Method for gasification fracturing of liquid nitrogen in hydrocarbon reservoirs
US7537058B2 (en) Method for gas production from gas hydrate reservoirs
CN103510926A (en) Method and system for exploiting seabed flammable ice
CN101215964A (en) Coal seam depth deflagration method
CN108729886A (en) A kind of the seabed combustible ice mining system and method for cooling pressurization
CN109882133A (en) A kind of device and method using discarded high temperature and pressure gas reservoir exploitation gas hydrates
CN104196507A (en) Fireflooding huff and puff and fireflooding linkage thickened oil exploitation method
CN203335050U (en) Steam generating device for seabed natural gas hydrate exploitation
CN114718539B (en) In-situ combustion explosion fracturing method in multi-round methane layer
CN110017125A (en) A kind of recovery method and system of shale gas

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190329