CN106050167A - Pulling type workover drill floor - Google Patents
Pulling type workover drill floor Download PDFInfo
- Publication number
- CN106050167A CN106050167A CN201610409023.7A CN201610409023A CN106050167A CN 106050167 A CN106050167 A CN 106050167A CN 201610409023 A CN201610409023 A CN 201610409023A CN 106050167 A CN106050167 A CN 106050167A
- Authority
- CN
- China
- Prior art keywords
- rig floor
- workover
- drill floor
- seat
- pull
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/14—Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole
- E21B19/146—Carousel systems, i.e. rotating rack systems
Abstract
The invention discloses a pulling type workover drill floor which is used for mounting a rotary disc, bearing the weight of underground pipes and tubular tools, storing tools, storing three-joint units, mounting a well mouth blowout preventer and providing work space for operation during work. The workover drill floor is of a front-back split type pulling structure. Stand columns are made from round tubes, inner tubes are sleeved with outer tubes, the upper floor surface is fixed to the outer tubes, and the lower floor surface is fixed to the inner tubes. The workover drill floor is pulled out to increase the height during work, and retracted to decrease the height during transportation, and the problem of conflict between work and transportation is solved. The workover drill floor is mainly composed of a boat-shaped base, a derrick foundation, a rotary disc base, a three-joint unit base, a floating driller platform, supporting rods, a ramp, a blowout preventer assembling and transferring device, a climbing chain box, an escaping slide way and the like. A workover drill floor body is composed of the rotary disc base and the three-joint unit base, and the rotary disc base and the three-joint unit base are pulled and retracted through a lifting system of a workover rig and fixed through pin shafts after being pulled and retracted. The pulling type workover drill floor is compact in structure, fully equipped, good in using stability and convenient to mount, does not exceed the limit when transported and does not need to be mounted in cooperation with a crane.
Description
Technical field
The invention belongs to petroleum works equipment technical field, relate to a kind of drawing and pulling type well workover rig floor for workover rig.
Background technology
There are the following problems for existing workover treatment equipment and workover process: workover treatment needs shaft mouth operation platform, is used for
Install rotating disk, bear downhole tubular tool weight, storing tools, put thribble, when operation for operation provide work space, its table top
Lower space is used for installing wellhead blowout preventer.Workover platform is frame structure, is limited by working space and wellhead assembly, rig floor
Overall dimensions relatively big, limit beyond transport, it is difficult to realize the resettlement between well site.Prior art is designed as parallelogram
Revolve and rise structure or case stacked structure, but combination installation difficulty is big, rig floor poor stability, and be required for crane cooperation installation, warp
Help of poor benefits.
Summary of the invention
For solving the defect that prior art exists, invent a kind of drawing and pulling type well workover rig floor.
The technical solution used in the present invention: split type drawing structure before and after the employing of described rig floor, column pipe makes, outward
Pipe box inner tube, upper table surface and outer tube are fixed, and following table and inner tube are fixed, and extracting out during operation increases height, retract and reduce during transport
Highly, operation and the contradiction of transport are solved.
The well workover rig floor that the present invention relates to mainly is waftd platform, support by boat shaped base, derrick footing, rotary disk basement, thribble seat, driller
Bar, ramp, preventer assemble board migration device, the climbing composition such as chain box, escaping slideway.Described rig floor body be divided into rotary disk basement and
Thribble seat, pull rises and puts respectively, hoists and falls in vertical displacement, fixing with bearing pin respectively after extracting out and retracting.Described fixing
Bearing pin is mutually perpendicular to, and during by shearing force, maintains rig floor stable.Described rotary disk basement is connected with thribble seat connecting rod, derrick footing
And strut is set between the rotating disk seat of honour, increase the stability of rig floor.Described configuration boat shaped base, increases the ground plane of workover rig
Long-pending, strengthen equipment availability stability.
The technical characteristic of the present invention also has: configuration ramp is easy to pipe and is had the guiding of upper and lower rig floor.Configuration escaping slideway is easy to
In emergency circumstances personnel quickly flee from well head.
Rig floor rotary table seat is provided with climbing chain box, transfers power to rotating disk, upright post sleeve by climbing chain box
Multiple fixing hole, the movement between general well site are set between pipe, chain box can not be pulled down and directly transport.
Enough spaces are had for installing well head four-way and a whole set of blowout preventer set, equipped with well head go-cart etc., side under rig floor
Just wellhead equipment installation, dismantle and migrate.
Utilize the lifting system of workover rig, the pull of rig floor can be realized smoothly and rise and put.
Compared with prior art, present configuration is compact, comprehensive, and stability in use is good, does not transfinites during transport, installs
Convenient, it is not required to crane and coordinates installation.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention.
Described above is only presently preferred embodiments of the present invention, and above-mentioned specific embodiment is not limitation of the present invention,
Retouching that all those of ordinary skill in the art are made as described above, revise, increase and decrease or equivalent, belong to the present invention
Protection domain.
Claims (5)
1. a drawing and pulling type well workover rig floor, it is characterised in that: split type drawing structure before and after rig floor employing, column pipe system
Making, outer tube sleeve inner tube, upper table surface and outer tube are fixed, and following table and inner tube are fixed, and extracting out during operation increases height, retracts during transport
Reduce height.Described rig floor is mainly waftd platform, strut, ramp, anti-by boat shaped base, derrick footing, rotary disk basement, thribble seat, driller
Spray apparatus assembles board migration device, the climbing composition such as chain box, escaping slideway.Described rig floor body is divided into rotary disk basement and thribble seat, point
Other pull rises to be put, and hoists and falls in vertical displacement, fixing with bearing pin respectively after extracting out and retracting, and bearing pin is mutually perpendicular to, and is cut
During shear force, maintain rig floor stable, utilize the lifting system of workover rig, the pull of rig floor can be realized smoothly and rise and put.Described rotating disk
Seat is connected with thribble seat connecting rod, arranges strut between derrick footing and the rotating disk seat of honour, increases the stability of rig floor.Described join
Put boat shaped base, increase the contact area of workover rig, strengthen equipment availability stability.Described configuration ramp be easy to pipe tool bore up and down
The guiding of platform.Described configuration escaping slideway is easy in emergency circumstances personnel and is quickly fled from well head.Described peace on rig floor rotary table seat
Equipped with climbing chain box, transfer power to rotating disk by climbing chain box, multiple fixing hole, general well are set between column sleeve pipe
Movement between Chang, can not pull down chain box and directly transport.Have under described rig floor enough spaces for install well head four-way and
A whole set of blowout preventer set, equipped with well head go-cart etc., facilitates the installation of wellhead equipment, dismantles and migrate.
2. as claimed in claim 1 configuration escaping slideway is easy in emergency circumstances personnel and is quickly fled from well head.
3. between vertical column expanding sleeve pipe as claimed in claim 1, multiple fixing hole, the movement between general well site are set, can not pull down
Chain box directly transports.
4. rotary disk basement and thribble seat pull respectively rise and put as claimed in claim 1, hoist and fall in vertical displacement, utilizing well workover
The lifting system of machine, can realize the pull of rig floor smoothly and rise and put.
5. fixed pin shaft is mutually perpendicular to as claimed in claim 1, during by shearing force, maintains rig floor stable.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610409023.7A CN106050167A (en) | 2016-05-31 | 2016-05-31 | Pulling type workover drill floor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610409023.7A CN106050167A (en) | 2016-05-31 | 2016-05-31 | Pulling type workover drill floor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106050167A true CN106050167A (en) | 2016-10-26 |
Family
ID=57170754
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610409023.7A Pending CN106050167A (en) | 2016-05-31 | 2016-05-31 | Pulling type workover drill floor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106050167A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108331557A (en) * | 2018-02-12 | 2018-07-27 | 新疆石油管理局有限公司准东勘探开发分公司 | Environment-friendly type operation wellhead liquid collecting operating platform and its application method |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1999040260A1 (en) * | 1998-02-03 | 1999-08-12 | Moss Maritime As | A jack-up, movable drilling platform |
CN2746112Y (en) * | 2004-06-18 | 2005-12-14 | 宝鸡石油机械有限责任公司 | Vertical lifting integral moving type driller base |
CN200952354Y (en) * | 2006-09-27 | 2007-09-26 | 王政权 | Petroleum workover rig drill block |
CN200975216Y (en) * | 2006-11-01 | 2007-11-14 | 宝鸡石油机械有限责任公司 | Integral semi-pull-hang transporting type drilling machine foundation |
CN201013247Y (en) * | 2007-02-11 | 2008-01-30 | 辽河石油勘探局 | Drilling rig foundation capable of carrying out parallelogram or vertical folding rising |
CN201635663U (en) * | 2009-08-02 | 2010-11-17 | 中原特种车辆有限公司 | Drilling platform of workover rig |
CN201666120U (en) * | 2010-04-06 | 2010-12-08 | 海城市石油机械制造有限公司 | Novel small oil-well repair work platform |
CN201902170U (en) * | 2010-11-23 | 2011-07-20 | 宝鸡石油机械有限责任公司 | Modularized drilling machine base |
CN102926667A (en) * | 2012-11-28 | 2013-02-13 | 天津市东方先科石油机械有限公司 | Drill floor towing device |
CN204299482U (en) * | 2014-10-31 | 2015-04-29 | 南阳二机石油装备(集团)有限公司 | Drilling-production equipment diversification rig floor |
CN105317383A (en) * | 2014-07-28 | 2016-02-10 | 陕西胜慧源信息科技有限公司 | Petroleum drilling device |
-
2016
- 2016-05-31 CN CN201610409023.7A patent/CN106050167A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1999040260A1 (en) * | 1998-02-03 | 1999-08-12 | Moss Maritime As | A jack-up, movable drilling platform |
CN2746112Y (en) * | 2004-06-18 | 2005-12-14 | 宝鸡石油机械有限责任公司 | Vertical lifting integral moving type driller base |
CN200952354Y (en) * | 2006-09-27 | 2007-09-26 | 王政权 | Petroleum workover rig drill block |
CN200975216Y (en) * | 2006-11-01 | 2007-11-14 | 宝鸡石油机械有限责任公司 | Integral semi-pull-hang transporting type drilling machine foundation |
CN201013247Y (en) * | 2007-02-11 | 2008-01-30 | 辽河石油勘探局 | Drilling rig foundation capable of carrying out parallelogram or vertical folding rising |
CN201635663U (en) * | 2009-08-02 | 2010-11-17 | 中原特种车辆有限公司 | Drilling platform of workover rig |
CN201666120U (en) * | 2010-04-06 | 2010-12-08 | 海城市石油机械制造有限公司 | Novel small oil-well repair work platform |
CN201902170U (en) * | 2010-11-23 | 2011-07-20 | 宝鸡石油机械有限责任公司 | Modularized drilling machine base |
CN102926667A (en) * | 2012-11-28 | 2013-02-13 | 天津市东方先科石油机械有限公司 | Drill floor towing device |
CN105317383A (en) * | 2014-07-28 | 2016-02-10 | 陕西胜慧源信息科技有限公司 | Petroleum drilling device |
CN204299482U (en) * | 2014-10-31 | 2015-04-29 | 南阳二机石油装备(集团)有限公司 | Drilling-production equipment diversification rig floor |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108331557A (en) * | 2018-02-12 | 2018-07-27 | 新疆石油管理局有限公司准东勘探开发分公司 | Environment-friendly type operation wellhead liquid collecting operating platform and its application method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9133643B2 (en) | Drilling rig assembly method and apparatus | |
US11661800B1 (en) | Support apparatus for supporting down hole rotary tools | |
US8959874B2 (en) | Portable drilling rig apparatus and assembly method | |
CA2783675C (en) | Multi-function multi-hole drilling rig | |
US20150315861A1 (en) | Well operation method and a well operation equipment system for handling a continuous elongate device to be insertable into a well | |
US8353132B1 (en) | Method and apparatus for erection and disassembly of a sectional mast assembly | |
US9217297B2 (en) | Method and support apparatus for supporting down hole rotary tools | |
US20080298898A1 (en) | Offshore Platform with Movable Cantilever Extending Beyond the Deck | |
US20120048535A1 (en) | Method and apparatus for cutting and removing pipe from a well | |
US10196860B2 (en) | Telescopic mini-rig | |
CA3009407C (en) | Slingshot side saddle substructure | |
EP1751390B1 (en) | Apparatus and method for modified horizontal directional drilling assembly | |
KR200492496Y1 (en) | A handling system for drill pipe | |
CN103993849A (en) | Wellhead stabilizer | |
CN106050167A (en) | Pulling type workover drill floor | |
US9745804B2 (en) | Cylinder assembly for snubbing and drilling applications | |
US11248420B1 (en) | Swivel stand apparatus and associated equipment | |
CN214879842U (en) | Lifting system of hydraulic workover rig | |
KR20130138503A (en) | Fixing apparatus for elevating tubular | |
US20150315851A1 (en) | Centering control type drill system for offshore structure | |
CN105317383A (en) | Petroleum drilling device | |
CN205297360U (en) | Derrick and derrick unit | |
Newman et al. | Hybrid Coiled Tubing/Snubbing Drilling and Completion System | |
Lee et al. | Portable hydraulic rig for performing workover, drilling and other operations on a well | |
Thomson | Recent Developments to Coiled Tubing Equipment Design Improves Efficiency and Safety |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20161026 |