CN106049858B - A kind of production method of the material distributing machine support platform based on climb formwork platform - Google Patents

A kind of production method of the material distributing machine support platform based on climb formwork platform Download PDF

Info

Publication number
CN106049858B
CN106049858B CN201610614249.0A CN201610614249A CN106049858B CN 106049858 B CN106049858 B CN 106049858B CN 201610614249 A CN201610614249 A CN 201610614249A CN 106049858 B CN106049858 B CN 106049858B
Authority
CN
China
Prior art keywords
steel
platform
steel structure
structure platform
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610614249.0A
Other languages
Chinese (zh)
Other versions
CN106049858A (en
Inventor
郑志辉
何涛
刘应洪
杨宏
石立国
李冉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201610614249.0A priority Critical patent/CN106049858B/en
Publication of CN106049858A publication Critical patent/CN106049858A/en
Application granted granted Critical
Publication of CN106049858B publication Critical patent/CN106049858B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/28Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast

Abstract

A kind of production method of material distributing machine support platform based on climb formwork platform provided by the invention,Including cloth machine base,Steel structure platform and multiple creeping formwork hoisting frames,Cloth machine base is fixed at the top of steel structure platform,Multiple creeping formwork hoisting frames are fixed at the lower part of steel structure platform,Steel structure platform includes checkered steel plate and six roots of sensation I-steel,Six roots of sensation I-steel side-by-side parallel is arranged,Every two I-steel are fixedly connected composition supporting beam by more channel steels disposed in parallel,The skeleton to form steel structure platform is fixedly connected between two adjacent supporting beams by more fixed beams disposed in parallel,Checkered steel plate is fixed at the top of skeleton,This method is easy to operate,It is easy for construction,Safety,Reliable in quality,It is at low cost,It is reusable,Suitable for the material distributing machine arrangement on climb formwork platform,Solve the two fold problem of construction safety and cost.

Description

A kind of production method of the material distributing machine support platform based on climb formwork platform
Technical field
The present invention relates to a kind of production method of construction special equipment, especially a kind of cloth based on climb formwork platform The production method of material machine support platform.
Background technology
With the continuous expansion of domestic construction construction scale, high-rise building is more and more, general high-rise building core Cylinder all uses mould crawling process, for convenience of Core Walls Structure concrete construction, is poured using material distributing machine auxiliary in concreting.Therefore Material distributing machine arrangement in climb formwork platform then influences the concrete construction of entire core tube region.
Common material distributing machine method for arranging one is to be hung to construction floor in each casting concrete using tower crane, waits for floor Concreting completion is hung to vacant lot again and waits for pouring next time.Improved material distributing machine method for arranging two is pre- in climb formwork platform It boxes out hole, fluid pressure type self-crawling type material distributing machine is installed in substructure, allow material distributing machine as structure is from climbing.
Traditional above-mentioned way is completely separable with climb formwork platform by material distributing machine, and method one increases a large amount of tower crane Rigger It measures, and with the promotion of structure construction height, there is also security risks for multiple lifting material distributing machine.Improved method two Each floor produces reserved opening, and a large amount of reserved opening will generate a large amount of security risk, while polishing is reserved again Hole will also increase labour cost.
Invention content
In order to solve the above-mentioned technical problem, a kind of making side of the material distributing machine support platform based on climb formwork platform is provided Method fixes material distributing machine, the lower part of steel structure platform by the increased steel structure platform on creeping formwork hoisting frame on steel structure platform Building structure is delivered load to by creeping formwork hoisting frame, creeping formwork hoisting frame is combined with what steel structure platform was unified, is solved The Layout Problem for material distributing machine of having determined makes material distributing machine be promoted together with creeping formwork hoisting frame simultaneously, reduces construction workload, reduce Security risk, and cost is relatively low, solves the two fold problem of construction safety and cost, this method is easy to operate, easy for construction, peace Entirely, reliable in quality, at low cost, reusable, the material distributing machine arrangement being suitable on climb formwork platform, meanwhile, using such mode Cloth is carried out, the problem of each layer is both needed to hoisting cloth machine is avoided and solves the safety there are reserved opening on the wall simultaneously Hidden danger.
A kind of production method of material distributing machine support platform based on climb formwork platform provided by the invention, including material distributing machine bottom Seat, steel structure platform and multiple creeping formwork hoisting frames, the cloth machine base is fixed at the top of the steel structure platform, more A creeping formwork hoisting frame is fixed at the lower part of the steel structure platform, the steel structure platform include checkered steel plate and Six roots of sensation I-steel, the setting of I-steel side-by-side parallel, every two I-steel described in the six roots of sensation pass through more slots disposed in parallel Steel is fixedly connected composition supporting beam, is carried out by more fixed beams disposed in parallel between adjacent two supporting beams It is fixedly connected to form the skeleton of the steel structure platform, the checkered steel plate is fixed at the top of the skeleton;
Multiple creeping formwork hoisting frames are fixed at the lower part of the steel structure platform by crossbeam, and affiliated crossbeam is logical It crosses the first bolt to be fixedly connected with the steel structure platform, the model M24 of first bolt, and the two of first bolt End is both provided with screw thread, and the length of first bolt is 640mm, and the reach at both ends is 120mm;
The production method includes the following steps:
S1, making is processed to steel structure platform, by six roots of sensation I-steel, more channel steels and Duo Gen fixed beams be welded by Power skeleton, checkered steel plate is welded on skeleton, formed steel structure platform, after the completion of welding, each I-steel there is not allowed that Downwarp phenomenon;
S2, processing the first bolt and the second bolt after first processing bolt bar, process mantle fiber;
S3, arrangement steel structure platform, and creeping formwork hoisting frame, each steel structure platform arrangement 8 are arranged according to steel structure platform A creeping formwork hoisting frame, per 4, side;
After S4, installation creeping formwork hoisting frame crossbeam, steel structure platform is installed, with the first bolt by creeping formwork hoisting frame crossbeam and steel Structure platform is fixed, and the installation of creeping formwork hoisting frame and steel structure platform is completed;
S5, installation material distributing machine, cloth machine base and steel structure platform are fixed, complete material distributing machine and steel knot with the second bolt The installation of structure platform;
S6, inspection and each connection bolt of examination.
The cloth machine base is fixed at the top of steel structure platform, the type of second bolt by the second bolt Number it is M24, and the both ends of second bolt are both provided with screw thread, the length of second bolt is 750mm, the screw thread at both ends Length is 135mm.
Further, the outline border of the steel structure platform is rectangular.
Further, the more I-steel are all made of 128 model I-steel.
Further, the more fixed beams are all made of the channel steel of model 14.
In conclusion a kind of material distributing machine support platform of climb formwork platform provided by the invention compared with prior art its have Have the beneficial effect that, by the increased steel structure platform on creeping formwork hoisting frame, material distributing machine, steel construction are fixed on steel structure platform The lower part of platform delivers load to building structure by creeping formwork hoisting frame, by creeping formwork hoisting frame and the unified knot of steel structure platform Altogether, the Layout Problem for solving material distributing machine makes material distributing machine be promoted together with creeping formwork hoisting frame simultaneously, reduces construction working Amount, reduces security risk, and cost is relatively low, solves the two fold problem of construction safety and cost, and this method is easy to operate, construction Convenient, safety, reliable in quality is at low cost, reusable, the material distributing machine arrangement being suitable on climb formwork platform, meanwhile, using this Kind of mode carries out cloth, avoids the problem of each layer is both needed to hoisting cloth machine and solves on the wall that there are reserved openings simultaneously Security risk;It is all made of safety coefficient steel up to standard in work progress, ensures overall structure safety and stability.
Description of the drawings
Fig. 1 is a kind of overlooking structure diagram of the material distributing machine support platform of climb formwork platform provided by the invention;
Fig. 2 is a kind of A-A of the material distributing machine support platform of climb formwork platform provided by the invention to diagrammatic cross-section;
Fig. 3 is a kind of schematic diagram of first bolt of the material distributing machine support platform of climb formwork platform provided by the invention;
In figure:
1, steel structure platform;2, cloth machine base;3, creeping formwork hoisting frame;4, crossbeam;
5, the first bolt;11, I-steel;12, checkered steel plate;13, channel steel;
14, fixed beam.
Specific implementation mode
The present invention is described in further details in the following with reference to the drawings and specific embodiments:
As shown in Figure 1 to Figure 3, the material distributing machine support platform of a kind of climb formwork platform provided by the invention, including material distributing machine bottom Seat 2, steel structure platform 1 and multiple creeping formwork hoisting frames 3, cloth machine base 2 is fixed at the top of steel structure platform 1, multiple Creeping formwork hoisting frame 3 is fixed at the lower part of steel structure platform 1, and steel platform is higher by operation layer 2.5m, does not influence operation layer and applies Work, steel structure platform 1 include checkered steel plate 12 and six roots of sensation I-steel 11, the setting of 11 side-by-side parallel of six roots of sensation I-steel, every two works Word steel 11 is fixedly connected composition supporting beam by more channel steels 13 disposed in parallel, leads between adjacent two supporting beams It crosses more fixed beams 14 disposed in parallel and is fixedly connected the skeleton to form steel structure platform 1, checkered steel plate 12 is fixedly installed On the top of skeleton, by the increased steel structure platform 1 on creeping formwork hoisting frame 3, material distributing machine, steel are fixed on steel structure platform 1 The lower part of structure platform 1 delivers load to building structure by creeping formwork hoisting frame 3, by creeping formwork hoisting frame 3 and steel structure platform 1 Unified combines, and solves the Layout Problem of material distributing machine, and material distributing machine is made to be promoted together with creeping formwork hoisting frame 3 simultaneously, reduces Construction workload, reduces security risk, and cost is relatively low, solves the two fold problem of construction safety and cost, this method behaviour To make simply, easy for construction, safety, reliable in quality is at low cost, reusable, the material distributing machine arrangement being suitable on climb formwork platform, Meanwhile cloth is carried out using such mode, avoid the problem of each layer is both needed to hoisting cloth machine and is solved simultaneously on the wall There are the security risks of reserved opening.
In a preferred embodiment, multiple creeping formwork hoisting frames 3 are fixed at steel structure platform 1 by crossbeam 4 Lower part, affiliated crossbeam 4 is fixedly connected by the first bolt 5 with steel structure platform 1, the model M24 of the first bolt 5, and The both ends of one bolt 5 are both provided with screw thread, and the length of the first bolt 5 is 640mm, and the reach at both ends is 120mm, cloth Machine base 2 is fixed at the top of steel structure platform 1, the model M24 of the second bolt, and the second bolt by the second bolt Both ends be both provided with screw thread, the length of the second bolt is 750mm, and the reach at both ends is 135mm, steel structure platform 1 Outline border it is rectangular, more I-steel 11 are all made of 128 model I-steel 11, and more fixed beams 14 are all made of model 14 Channel steel 13 selects coefficient steel up to standard safe to use, ensures overall structure safety and stability.
A kind of production method of the material distributing machine support platform of climb formwork platform provided by the invention, includes the following steps:
S1, making is processed to steel structure platform 1, by six roots of sensation I-steel 11, more channel steels 13 and Duo Gen fixed beams 14 It is welded into stress frame, checkered steel plate 12 is welded on skeleton, forms steel structure platform 1, after the completion of welding, each I-steel 11 there is not allowed that downwarp phenomenon;
S2, processing the first bolt 5 and the second bolt after first processing bolt bar, process mantle fiber;
S3, arrangement steel structure platform 1, and creeping formwork hoisting frame 3,1 cloth of each steel structure platform are arranged according to steel structure platform 1 8 creeping formwork hoisting frames 3 are set, per 4, side;
After S4, installation 3 crossbeam 4 of creeping formwork hoisting frame, steel structure platform 1 is installed, it is with the first bolt 5 that creeping formwork hoisting frame 3 is horizontal Beam 4 is fixed with steel structure platform 1, completes the installation of creeping formwork hoisting frame 3 and steel structure platform 1;
S5, installation material distributing machine, cloth machine base 2 and steel structure platform 1 are fixed, complete material distributing machine and steel with the second bolt The installation of structure platform 1;
S6, inspection and each connection bolt of examination.
The above, only presently preferred embodiments of the present invention, are not intended to limit the invention, every skill according to the present invention Art essence should be included in technical solution of the present invention to any trickle amendment, equivalent replacement and improvement made by above example Protection domain within.

Claims (4)

1. a kind of production method of the material distributing machine support platform based on climb formwork platform, including cloth machine base (2), steel structure platform (1) and multiple creeping formwork hoisting frames (3), the cloth machine base (2) is fixed at the top of the steel structure platform (1), more A creeping formwork hoisting frame (3) is fixed at the lower part of the steel structure platform (1), the steel construction by crossbeam (4) Platform (1) includes checkered steel plate (12) and six roots of sensation I-steel (11), I-steel (11) side-by-side parallel setting described in the six roots of sensation, every two The I-steel (11) is fixedly connected composition supporting beam, adjacent two institutes by more channel steels (13) disposed in parallel It states and is fixedly connected the bone to form the steel structure platform (1) by more fixed beams (14) disposed in parallel between supporting beam Frame, the checkered steel plate (12) are fixed at the top of the skeleton;
Multiple creeping formwork hoisting frames (3) are fixed at the lower part of the steel structure platform (1) by crossbeam (4), described Crossbeam (4) is fixedly connected by the first bolt (5) with the steel structure platform (1), the model M24 of first bolt (5), And the both ends of first bolt (5) are both provided with screw thread, the length of first bolt (5) is 640mm, and the screw thread at both ends is long Degree is 120mm;
The cloth machine base (2) is fixed at the top of steel structure platform (1) by the second bolt, second bolt Model M24, and the both ends of second bolt are both provided with screw thread, the length of second bolt is 750mm, the spiral shell at both ends Line length is 135mm;
It is characterized by comprising the following steps:
S1, making is processed to steel structure platform (1), by six roots of sensation I-steel (11), more channel steels (13) and more fixed beams (14) it is welded into stress frame, checkered steel plate (12) is welded on skeleton, forms steel structure platform (1), after the completion of welding, Each I-steel (11) is there is not allowed that downwarp phenomenon;
S2, the first bolt of processing (5) and the second bolt, after first processing bolt bar, processing mantle fiber;
S3, arrangement steel structure platform (1), and creeping formwork hoisting frame (3), each steel structure platform are arranged according to steel structure platform (1) (1) 8 creeping formwork hoisting frames (3) are arranged, per 4, side;
After S4, installation creeping formwork hoisting frame (3) crossbeam (4), steel structure platform (1) is installed, with the first bolt (5) by creeping formwork hoisting frame (3) crossbeam (4) is fixed with steel structure platform (1), completes the installation of creeping formwork hoisting frame (3) and steel structure platform (1);
S5, installation material distributing machine, it is with the second bolt that cloth machine base (2) and steel structure platform (1) is fixed, complete material distributing machine and steel The installation of structure platform (1);
S6, inspection and each connection bolt of examination.
2. a kind of production method of material distributing machine support platform based on climb formwork platform according to claim 1, feature exist In the outline border of the steel structure platform (1) is rectangular.
3. a kind of production method of material distributing machine support platform based on climb formwork platform according to claim 1, feature exist In the more I-steel (11) in step S1 are all made of 128 model I-steel.
4. a kind of production method of material distributing machine support platform based on climb formwork platform according to claim 1, feature exist In the more fixed beams (14) in step S1 are all made of the channel steel (13) of model 14.
CN201610614249.0A 2016-07-29 2016-07-29 A kind of production method of the material distributing machine support platform based on climb formwork platform Active CN106049858B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610614249.0A CN106049858B (en) 2016-07-29 2016-07-29 A kind of production method of the material distributing machine support platform based on climb formwork platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610614249.0A CN106049858B (en) 2016-07-29 2016-07-29 A kind of production method of the material distributing machine support platform based on climb formwork platform

Publications (2)

Publication Number Publication Date
CN106049858A CN106049858A (en) 2016-10-26
CN106049858B true CN106049858B (en) 2018-08-17

Family

ID=57195904

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610614249.0A Active CN106049858B (en) 2016-07-29 2016-07-29 A kind of production method of the material distributing machine support platform based on climb formwork platform

Country Status (1)

Country Link
CN (1) CN106049858B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106641600B (en) * 2017-02-23 2018-08-21 武汉科技大学 A kind of stage apparatus for desulfurization station rotary column
CN107503511B (en) * 2017-08-17 2022-09-02 浙江乔兴建设集团有限公司 Steel frame platform

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3117409C2 (en) * 1981-05-02 1983-12-29 Josef 7611 Steinach Maier Climbing formwork
CN202401769U (en) * 2011-12-13 2012-08-29 广东浩和建筑股份有限公司 Detachable concrete cloth machine for self-elevating creeping formwork system
CN203320964U (en) * 2013-06-27 2013-12-04 中建五局第三建设有限公司 Connecting device for ultrahigh-rise climbing formwork platform and material distribution rod base
CN203824914U (en) * 2014-04-17 2014-09-10 苏州大学 Double-constant -potential excited electrochemical luminescence analysis device
CN203947780U (en) * 2014-06-04 2014-11-19 中国建筑第二工程局有限公司 Hydraulic climbing formwork jacking type hydraulic concrete spreader

Also Published As

Publication number Publication date
CN106049858A (en) 2016-10-26

Similar Documents

Publication Publication Date Title
CN203891443U (en) Shear wall elevator shaftway assembly type operation platform
CN106049858B (en) A kind of production method of the material distributing machine support platform based on climb formwork platform
CN103669655A (en) Construction technology for pouring concrete of walls on two sides of deformation joint
CN107989447A (en) A kind of large-scale earthing concrete tank dome steel support structure and installation method
CN202954552U (en) Steel tube concrete column high-altitude construction safety protection system
CN102912996A (en) Steel tube concrete column high-altitude construction safety protection system
CN105863253A (en) Integral formwork-supporting type asynchronous casting stairwell wall column formwork supporting system and construction method
CN104213728B (en) Oblique beam for grandstand of stadium and construction process for oblique beam
CN202090578U (en) Shaped elevator shaft construction operating platform device
CN106284845A (en) A kind of post-cast strip reinforced concrete structural column independence support system construction method
CN100489256C (en) Construction method and construction technique for wide cross section beam formwork supporting system
CN102767282B (en) Assembly-type high-formwork construction method for cantilever of oversized special-shaped conversion layer
CN106320183A (en) Assembly type bent cap formwork system
CN106013450A (en) Core tube skip-floor construction method
CN110512719B (en) Construction method of large-span interval corridor high-altitude formwork steel platform for high-rise residence
CN203701549U (en) High-altitude large-span cantilever formwork
CN209243916U (en) A kind of high-strength anti-seismic wall and integral cast-in-situ formula building
CN208734045U (en) Monoblock type mould bases for Super High fission conjoined composite structure
CN104018607B (en) Spliced space truss interlayer floor
CN208201663U (en) Continuous rigid frame bridge box beam 0# block is overlapped beam without bracket cast-in-place support
CN206971735U (en) Basic platform for cantilevered structure formwork
CN206873494U (en) A kind of operating platform for narrow space on the outside of barricade
CN102587649B (en) Template profiled bar supporting system of high and large cantilever structure
CN106907022B (en) A kind of high-altitude cable-stayed type fashioned iron operating platform form bracing system construction technology
CN206902913U (en) A kind of high-altitude long-span overhung structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant