CN106049753A - Steel support structure - Google Patents
Steel support structure Download PDFInfo
- Publication number
- CN106049753A CN106049753A CN201610081369.9A CN201610081369A CN106049753A CN 106049753 A CN106049753 A CN 106049753A CN 201610081369 A CN201610081369 A CN 201610081369A CN 106049753 A CN106049753 A CN 106049753A
- Authority
- CN
- China
- Prior art keywords
- tube
- tube wall
- tank
- hole
- steel structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 94
- 239000010959 steel Substances 0.000 title claims abstract description 94
- 210000002421 cell wall Anatomy 0.000 claims description 28
- 238000003780 insertion Methods 0.000 claims description 14
- 230000037431 insertion Effects 0.000 claims description 14
- 238000010276 construction Methods 0.000 abstract description 40
- 239000004567 concrete Substances 0.000 abstract description 7
- 238000003466 welding Methods 0.000 abstract description 6
- 230000000149 penetrating effect Effects 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 9
- 238000009434 installation Methods 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 239000007787 solid Substances 0.000 description 4
- 238000005266 casting Methods 0.000 description 2
- 238000005520 cutting process Methods 0.000 description 2
- 230000035515 penetration Effects 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 241000283690 Bos taurus Species 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 210000003141 lower extremity Anatomy 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/30—Columns; Pillars; Struts
- E04C3/32—Columns; Pillars; Struts of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/58—Connections for building structures in general of bar-shaped building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The invention discloses a steel support structure. The steel support structure is characterized in that the steel support structure comprises a column and a bracket structure; the column has a column cavity; the bracket structure comprises a casing pipe; the casing pipe has a casing pipe wall which is enclosed to form a casing pipe cavity; the casing pipe wall is provided with a first through hole penetrating the casing pipe wall; and the first through hole is communicated with the casing pipe cavity, and the casing pipe wall is connected with the column. The steel support structure can overcome problems in continuation of beams, fixation of structures and strength of nodes of steel structures and ingeniously carrying out welding in virtue of concrete pouring grooves on beam tops; so problems in construction of steel structures are thoroughly overcomes.
Description
Technical field
Present invention relates particularly to a kind of steel structure support structure.
Background technology
Steel construction is used in modern house construction in a large number.In steel house, its structure includes column and beam.Upright supports beam.
Requiring difference according to bearing capacity, beam is divided into again girder and secondary beam.Beam leans on upright supports.In prior art, column and the company of beam
Connect employing sun bracket structure to realize.Sun bracket is arranged on column outer surface.The end of beam is connected with sun bracket.Such structure
Arranging and bring many restrictions to the enforcement of steel construction, one is that outward appearance is numerous and diverse, and sun bracket is arranged on column outer surface so that it is seem
In a jumble, outward appearance disunity;Two is the length of restraint beam, owing to the structure of sun bracket limits so that the length of beam it may be only configured to
Length between two root posts, the two ends of the beam of the length limitation exceeded will be unable to be arranged on the positive bracket of two root posts.Three are
Limit the structure of steel construction product, such as, need to arrange one in the position of some height and choose platform, due to existing structure
Beam end be required to be supported on column, if only there is column one end, then beam cannot be set, the most just cannot arrange and choose platform.
Arranging and choose platform, the two ends of beam must be supported on could realizing on column or by means of additionally arranging girth member.
Summary of the invention
The invention aims to overcome deficiency of the prior art, it is provided that a kind of use more flexible steel structure support structure.
For realizing object above, the present invention is achieved through the following technical solutions:
Steel structure support structure, it is characterised in that include column and bracket structure;Described column has column tube chamber;Described cattle
Lower limb structure includes sleeve pipe;Described sleeve pipe has set tube wall, and described set tube wall surrounds sleeve pipe tube chamber;Set on described set tube wall
It is equipped with the first through hole running through described set tube wall;Described first through hole connects with described sleeve pipe tube chamber, described set tube wall and institute
State column to connect.
According to one embodiment of present invention, also include that connector, described connector are arranged in described sleeve pipe tube chamber, described company
Fitting is connected with described set tube wall
According to one embodiment of present invention, described connector includes one or more base plate, described base plate one end or multiterminal and institute
State set tube wall to connect;Described polylith base plate interval is arranged.
According to one embodiment of present invention, described connector also includes one or more sidewall paneling, described sidewall paneling and the described end
Plate connects and/or is connected with described set tube wall, and described polylith sidewall paneling interval is arranged.
According to one embodiment of present invention, described connector also includes that top board, described top board and described base plate interval are arranged;Institute
Stating top board to be connected with described sidewall paneling, described top board is connected with described set tube wall.
According to one embodiment of present invention, described top board is provided with through slot, or described top board number be more than two pieces and
Every setting.
According to one embodiment of present invention, described connector number is two or more, arranged in a crossed manner or height along described sleeve pipe
Interval, direction is arranged.
According to one embodiment of present invention, described connector is welded to connect with described set tube wall.
According to one embodiment of present invention, described sleeve pipe is tetragon pipe, described first through hole be arranged at two sides, three or four
On the set tube wall in face.
Steel construction bracket, it is characterised in that include sleeve pipe;Described sleeve pipe has set tube wall, and described set tube wall surrounds sleeve pipe
Tube chamber, described set tube wall is provided through the first through hole of described set tube wall, and described first number of through-holes is one or many
Individual.
According to one embodiment of present invention, also including that connector, described connector include the first connecting tube, described first connects
Pipe has the first tube wall, and described first tube wall surrounds the first tube chamber;Described first connecting tube is arranged in described sleeve pipe tube chamber, institute
State the first connecting tube two ends to be connected with described set tube wall;At least one described first through hole is managed with the first of described first connecting tube
Position, chamber makes the structural member inserted from described first through hole be inserted in described first tube chamber relatively.
According to one embodiment of present invention, the first tube wall of described first connecting tube being provided with the first groove, described first leads to
Groove runs through the first tube wall of described first connecting tube, and described first groove extends selected along the length direction of described first connecting tube
Length.
According to one embodiment of present invention, described first connecting tube is provided with one or more first connecting plate, described first
Connecting plate is connected with the first tube wall of described first groove both sides;Described polylith the first connecting plate is along the length of described first connecting tube
Direction is spaced apart.
According to one embodiment of present invention, one end of the first tube wall of described first connecting tube leads to around one of them described first
Hole is connected with described set tube wall.
According to one embodiment of present invention, described connector also includes that the second connecting tube, described second connecting tube have the second pipe
Wall, described second tube wall surrounds the second tube chamber;Described second connecting tube is arranged in described sleeve pipe tube chamber, described second connecting tube
Two ends are connected with described set tube wall, and at least one described first through hole is relative with described second tube chamber position so that from described first
The structural member that through hole inserts is inserted in described second tube chamber.
According to one embodiment of present invention, the second tube wall of described second connecting tube being provided with the second groove, described second leads to
Groove runs through the tube wall of described second connecting tube, and described second groove extends selected length along the length direction of described second connecting tube.
According to one embodiment of present invention, described second connecting tube is provided with one or more second connecting plate, described second
Connecting plate is connected with the second tube wall of described second groove both sides;Described polylith the second connecting plate is along the length of described second connecting tube
Direction is spaced apart.
According to one embodiment of present invention, one end of the second tube wall of described second connecting tube leads to around one of them described first
Overlap tube wall described in Kong Bingyu to connect.
According to one embodiment of present invention, described first connecting tube runs through described second connecting tube, described first connecting tube length
Direction is vertical with described second connecting tube length direction;Or described second connecting tube runs through described first connecting tube, described first
Connecting tube length direction is vertical with described second connecting tube length direction.
According to one embodiment of present invention, the first tube wall of described first connecting tube offers the second through hole;Described first even
Adapter two ends are connected with set tube wall respectively;Described second connecting tube number is one or more, each second connecting tube one end with
Set tube wall connects, and the other end and the first tube wall connect;Described second tube chamber one end is relative with the first lead to the hole site and connects, separately
One end is relative with the second lead to the hole site and connects.
According to one embodiment of present invention, described sleeve pipe is tetragon pipe, and described first through hole each two is one group, at least one
Organize described first through hole relative with described first tube chamber position from described first sleeve two ends respectively and communicate;Described in least one set
One through hole is relative with described second tube chamber position from described second sleeve pipe two ends respectively and communicates.
According to one embodiment of present invention, described first connecting tube and/or described second connecting tube are welded with described set tube wall even
Connect.
Steel construction bracket, it is characterised in that include sleeve pipe;Described sleeve pipe has set tube wall, and described set tube wall surrounds sleeve pipe
Tube chamber, described set tube wall is provided through the first through hole of described set tube wall.
According to one embodiment of present invention, being also connected with part, described connector includes the first tank-type connecting component, described first grooved
Connector has the first cell wall, and described first cell wall surrounds the first groove;Described first tank-type connecting component is arranged at described sleeve pipe pipe
Intracavity, described first tank-type connecting component two ends are connected with described set tube wall;At least one described first through hole and described first groove
First groove location of type connector makes the structural member inserted from described first through hole be inserted in described first groove relatively.
According to one embodiment of present invention, described first tank-type connecting component is provided with one or more the 3rd connecting plate, described
3rd connecting plate is connected with described first cell wall;Described polylith the 3rd connecting plate is spaced apart along the length direction of described first groove.
According to one embodiment of present invention, the first cell wall of described first tank-type connecting component is around described first through hole and described set
Tube wall connects.
According to one embodiment of present invention, described connector includes that the second tank-type connecting component, described second tank-type connecting component have
Second cell wall, described second cell wall surrounds the second groove;Described second tank-type connecting component is arranged in described sleeve pipe tube chamber, described
Second tank-type connecting component two ends are connected with described set tube wall;At least one described first through hole and described second tank-type connecting component
Second groove location makes the structural member inserted from described first through hole be inserted in described second groove relatively.
According to one embodiment of present invention, described second tank-type connecting component is provided with one or more the 4th connecting plate, described
4th connecting plate is connected with described second cell wall;Described polylith the 4th connecting plate is spaced apart along the length direction of described second groove.
According to one embodiment of present invention, the second cell wall of described second tank-type connecting component is around described first through hole and with described
Set tube wall connects.
According to one embodiment of present invention, described first tank-type connecting component runs through described second tank-type connecting component, described first groove
Type connector length direction is vertical with described second tank-type connecting component length direction;Or described second tank-type connecting component runs through described
First tank-type connecting component, described first tank-type connecting component length direction is vertical with described second tank-type connecting component length direction.
According to one embodiment of present invention, the first cell wall of described first tank-type connecting component offers breach, described first groove
Type connector two ends are connected with set tube wall respectively;Described second tank-type connecting component number is one or more, each second grooved
Connector one end is connected with set tube wall, and the other end and the first cell wall connect;Described second groove one end and the first lead to the hole site phase
Right, the other end is relative with described gap position.
According to one embodiment of present invention, described sleeve pipe is tetragon pipe, and described first through hole each two is one group, at least one
Organize described first through hole relative with described first groove location from described first tank-type connecting component two ends respectively and communicate;Least one set
Described first through hole is relative with described second groove location from described second tank-type connecting component two ends respectively and communicates.
According to one embodiment of present invention, described first tank-type connecting component and/or described second tank-type connecting component and described sleeve pipe pipe
Wall is welded to connect.
According to one embodiment of present invention, described set tube wall includes casing main body and insertion pipe;Described insertion pipe is inserted in institute
Stating column tube intracavity, described casing main body outer wall aligns with described column outer wall.
Steel structure support structure in the present invention, its bracket structure uses cloudy bracket structure, cloudy bracket can keep with column in appearance
Unanimously, outward appearance is neatly unified, the most in a jumble.Bracket structure in the present invention uses offers the first through hole on sleeve pipe, connector is arranged
In the tube chamber of sleeve pipe, both can support structural member, the such as beam inserted from the first through hole, it is also possible to supply because sleeve pipe offers the
One through hole and cause bearing capacity loss.Base plate is set so that present configuration is simple, it is easy to produce.Cavity bracket is holding
When loading capability is problematic, base plate arranges sidewall paneling so that bearing capacity of the present invention strengthens.Connector is set to tubulose, pipe
Shape connector is welded on set tube wall around the first through hole, and set tube wall is connected as one by connector, further enhances sleeve pipe
Bearing capacity, make up cause because the first through hole offered by sleeve pipe bearing capacity loss so that the present invention is more firm.This
Bracket structure in bright can be produced as independent parts respectively with column, beam and be welded to connect so that the present invention can be at factory's car
Between process, assemble the most at the construction field (site), can be that the production of scale provides standard component, efficiency is high.Is arranged on first tube wall
One groove, facilitates welder will stretch into the first intraluminal structural member in stretching into the first tube chamber and the first tube wall is welded to connect.If
Put the first connecting plate to be connected by the first tube wall of the first groove both sides, can avoid offering the bearing capacity reduction problem that groove brings, make
First connecting tube is more solid and reliable.After welding completes, it is also possible to by the first groove penetration concrete, make steel construction more
Firmly.Second groove is set on the second tube wall, facilitates welder will stretch into the second intraluminal structural member in stretching into the second tube chamber
It is welded to connect with the second tube wall.Arrange the second connecting plate to be connected by the second tube wall of the second groove both sides, can avoid offering groove band
The bearing capacity come reduces problem, makes the first connecting tube more solid and reliable.After welding completes, it is also possible to filled by the second groove
Enter concrete, make steel construction more firm.Use the steel construction bracket in the present invention so that column and beam can do according to standard
Standard component is become to construct the most easily.And the length of beam is without according still further to the distance cutting between two root posts, Liang Ke
With through steel construction bracket, multistage is sequentially connected with use with upper beam.Use the steel construction bracket in the present invention, so that steel knot
Structure room has and more changes structure, such as to arrange one and unsettled choose platform, as long as beam is through the steel construction bracket in the present invention,
Prominent certain length.
Existing steel building, it is necessary first to design then factory process of publishing picture, requires by figure manufacture different component according to design,
For in-site installation.Use the steel structure support structure in the present invention, first each building block can be made as standard element,
Carry out different building and Demand Design.Each building block in steel construction in the present invention can meet current any of steel reinforced concrete system and set
Meter demand, and the cost of labor of construction and installation can be reduced.The structural principle of the present invention, be used in steel structure can solve beam continuous,
The problem of the intensity of fixing, the node of structure, utilizes the condition of back concrete casting groove to weld cleverly, is fully solved
A steel structure difficult problem.
Relative to sun bracket structure of the prior art, the bracket structure in the present invention can save steel using amount more than 30%.And this
Bracket structure in invention can be processed as standard component at factory floor, then assembles, during site operation with column or beam at the construction field (site)
Between short, at least can save on-site construction time more than 60%.
Accompanying drawing explanation
The structural representation of the steel structure support structure that Fig. 1 show in the present invention.
Fig. 2 is the column partial structurtes schematic diagram in the present invention.
Fig. 3 is the steel construction bracket structure schematic diagram in the embodiment of the present invention 1.
Fig. 4 is the steel construction bracket structure schematic diagram in the embodiment of the present invention 1, the not shown insertion pipe of Fig. 4.
Fig. 5 is the connecting-piece structure schematic diagram in the embodiment of the present invention 1.
Fig. 6 is the first connecting pipe structure schematic diagram in the embodiment of the present invention 1.
Fig. 7 is the second connecting pipe structure schematic diagram in the embodiment of the present invention 1.
Fig. 8 is the connecting-piece structure schematic diagram in the embodiment of the present invention 2.
Fig. 9 is the first tank-type connecting component structural representation in the embodiment of the present invention 2.
Figure 10 is the second tank-type connecting component structural representation in the embodiment of the present invention 2.
Figure 11 is the bracket structure partial structurtes schematic diagram in the embodiment of the present invention 3.
Figure 12 is the bracket structure partial structurtes schematic diagram in the embodiment of the present invention 4.
The use view of the steel structure support structure that Figure 13 show in the present invention.
Detailed description of the invention
Below in conjunction with the accompanying drawings the present invention is described in detail:
Embodiment 1
As shown in Figure 1 and Figure 2, steel structure support structure, including column 200 and bracket structure 100.Column 200 is tied for tubulose
Structure, it includes column tube chamber 210.
As shown in Fig. 3, Fig. 4, Fig. 5 and Fig. 6, steel construction bracket 100 includes sleeve pipe 10 and connector 20.Described sleeve pipe 10
Having set tube wall 11, described set tube wall 11 surrounds sleeve pipe tube chamber 12.Set tube wall includes casing main body 111 and insertion pipe
112.Casing main body 111 two ends are respectively arranged with an insertion pipe 112.Insertion pipe 112 is tied for integral type with casing main body 111
Structure.Insertion pipe 112 overall dimensions is less than described casing main body 111.Insertion pipe 112 is inserted in column tube chamber 210.Sleeve pipe
Main body 111 outer wall aligns with column 200 outer wall.The first of described set tube wall 11 it is provided through on described set tube wall 11
Through hole 13.The shape of set tube wall 11 and the shape of sleeve pipe tube chamber 12 can be tetragon or circle, also can be according to actual need
It is chosen as other shape.Described tetragon both can be rectangle, it is also possible to be square or other available shapes.?
In example as depicted, set tube wall 11 is rectangle, and sleeve pipe tube chamber 12 is also rectangle.First through hole 13 can be according to actual need
Select its position and quantity.In the present embodiment, four faces of the set tube wall 11 of tetragon offer four first respectively and leads to
Hole 13.Each two is one group, and aligned in position two-by-two is equivalently-sized.
Described connector 20 includes the first connecting tube 30.Described first connecting tube 30 has the first tube wall 31, described first tube wall
31 surround the first tube chamber 32.Described first connecting tube 30 is arranged in described sleeve pipe tube chamber 12, described first connecting tube 30 liang
End is connected with described set tube wall 11.At least one described first through hole 13 and first tube chamber 32 of described first connecting tube 30
Position is relative so that the structural member inserted from described first through hole 13 is inserted in described first tube chamber 32.First through hole 13
Size both can equivalently-sized with the first tube chamber 32, it is also possible to mutual difference, the size of the such as first through hole 13 is more than the
The size of one tube chamber 32, it is also possible to the size of the first tube chamber 32 is more than the size of the first through hole 13.Chi such as the first through hole 13
The very little size being more than the first tube chamber 32, then the first tube chamber 32 and the first through hole 13 stagger setting, so that the first tube wall 31 can
Contact with set tube wall 11 and be welded to connect, the structural member inserted from described first through hole 13 can be made again to be inserted into described the
In one tube chamber 32.In the present embodiment as depicted, the size of the first tube chamber 32 is equal to or slightly greater than the chi of the first through hole 13
Very little, the first connecting tube 30 is arranged around the first through hole 13.First connecting tube 30 contacts with set tube wall 11 and utilizes welding even
Meet both.First connecting tube 30 two ends are centered around around two the first through holes 13 respectively so that the first tube chamber 32 two ends respectively with
Two the first through holes 13 connect.
Being provided with the first groove 33 on first tube wall 31 of described first connecting tube 30, described first groove 33 runs through described
First tube wall 31 of one connecting tube, described first groove 33 extends selected along the length L1 direction of described first connecting tube 30
Length.One or more the first connecting plate 34 it is provided with, described first connecting plate 34 and described the in described first connecting tube 30
First tube wall 31 of one groove 33 both sides connects.Described polylith the first connecting plate 34 is along the length side of described first connecting tube 30
To spaced apart.First connecting plate 34 both may be located at the outer wall of the first connecting tube 30, it is also possible to is positioned at the first tube chamber 32,
May be located in the first groove 33, two ends are all connected with the first tube wall 31.In preferred exemplary as depicted, described
A plate 34 is positioned at the first groove 33.It is further opened with the second through hole 35 on first tube wall 31 of described first connecting tube 30.
It will be appreciated that the first groove 33 and the second through hole 35 are opened on the not coplanar of the first tube wall 31.In example as depicted,
Second through hole 35 number is two, and aligned in position is arranged.
As shown in Fig. 3, Fig. 4, Fig. 5 and Fig. 7, described connector 20 also includes the second connecting tube 40.Described second connects
Pipe 40 has the second tube wall 41, and described second tube wall 41 surrounds the second tube chamber 42;Described second connecting tube 40 is arranged at described
In sleeve pipe tube chamber 12, described second connecting tube 40 two ends are connected with described set tube wall 11, at least one described first through hole
13 is relative with described second tube chamber 42 position so that being inserted into described second tube chamber from the structural member of described first through hole 13 insertion
In 42.The size of the first through hole 13 both can equivalently-sized with the second tube chamber 42, it is also possible to mutual difference, such as first leads to
The size in hole 13 is more than the size of the second tube chamber 42, it is also possible to the size of the second tube chamber 42 is more than the size of the first through hole 13.
If the size of the first through hole 13 is more than the size of the second tube chamber 42, then the second tube chamber 42 and the first through hole 13 stagger setting, with
Make the second tube wall 41 can contact with set tube wall 11 and be welded to connect, the structure inserted from described first through hole 13 can be made again
Part is inserted in described first tube chamber 32.In the present embodiment as depicted, the size of the second tube chamber 42 is equal to or slightly larger
In the size of the first through hole 13, the second connecting tube 40 is arranged around the first through hole 13.Second connecting tube 40 and set tube wall 11
Contact and utilize and be welded to connect both.
Being provided with the second groove 44 on second tube wall 41 of described second connecting tube 40, described second groove 44 runs through described
Second tube wall 41 of two connecting tubes 40, described second groove 44 extends selected along the length direction L2 of described second connecting tube 40
Length.Being provided with one or more the second connecting plate 44 in described second connecting tube 40, described second connecting plate 44 is with described
Second tube wall 41 of the second groove 44 both sides connects;Described polylith the second connecting plate 44 is along the length of described second connecting tube 40
L2 direction is spaced apart.Second connecting plate 44 both may be located at the outer wall of the second connecting tube 40, it is also possible to is positioned at the second tube chamber 42
In, it is also possible to it is positioned at the second groove 44.In preferred exemplary as depicted, described second connecting plate 44 is positioned at second and leads to
In groove 44, two ends are all connected with the second tube wall 41.
In example as depicted, in sleeve pipe tube chamber 12, it is provided with a first sleeve 30 and two the second sleeve pipes 40.First
Sleeve pipe 30 two ends are welded to connect with set tube wall 11.First tube wall 31 is arranged around the first through hole 13.Two the first through holes 13
Relative with the first tube chamber 12 position from two ends respectively and connection.Each second sleeve pipe 40 one end is welded to connect with set tube wall 11,
The other end and the first tube wall 31 are welded to connect.Second tube wall 41 one end is around the first through hole 13, and the other end is around the second through hole 35.
Second tube chamber 32 one end is relative with the first through hole 13 position and connection, the other end and the second through hole 35 position relatively and connect.This
Described in invention around, both can be from two sides around, it is also possible to be three around or four sides around.
The structural member inserted from one of them first through hole 13 stretches out the from another first through hole 32 after may pass through the first tube chamber 32
Outside one tube chamber 32 and sleeve pipe 10.The structural member inserted from one of them first through hole 13 may pass through two the second connecting tubes 40
The second tube chamber 42 after outside another first through hole 32 stretches out the second tube chamber 42 and sleeve pipe 10.
In the present embodiment, two the second connecting tubes 40 can be one, and two ends are connected to overlap on tube wall 11.Second even
Adapter 40 runs through the first connecting tube 30 from the second through hole 35.
Embodiment 2
As shown in Figure 8, the bracket structure in the present embodiment is different from embodiment 1.Bracket structure 100 includes sleeve pipe 10 and connects
Part 20.Sleeve pipe 10 structure is as shown in Figure 3.Described sleeve pipe 10 has set tube wall 11, and described set tube wall 11 surrounds sleeve pipe
Tube chamber 12, described set tube wall 11 is provided through the first through hole 13 of described set tube wall 11.The shape of set tube wall 11
The shape of shape and sleeve pipe tube chamber 12 can be tetragon or circle, also can be chosen as other shape according to actual needs.Described
Tetragon both can be rectangle, it is also possible to be square or other available shapes.In example as depicted, sleeve pipe pipe
Wall 11 is rectangle, and sleeve pipe tube chamber 12 is also rectangle.First through hole 13 can select its position and quantity according to actual needs.This reality
Execute in example, four faces of the set tube wall 11 of rectangle offer four the first through holes 13 respectively.Each two is one group, two-by-two
Aligned in position, equivalently-sized.
As shown in Figure 8, Figure 9, described connector 20 includes the first tank-type connecting component 50.Described first tank-type connecting component 50 has
The first cell wall 51, described first cell wall 51 is had to surround the first groove 52.Described first tank-type connecting component 50 is arranged at described sleeve pipe
In tube chamber 12, described first tank-type connecting component 50 two ends are welded to connect with described set tube wall 11.At least one described first lead to
Hole 13 structure that make from described first through hole 13 insert relative with the first groove 52 position of described first tank-type connecting component 50
Part is inserted in described first groove 52.The size of the first through hole 13 both can equivalently-sized with the first groove 52, it is possible to
With mutual difference, the size of the such as first through hole 13 is more than the size of the first groove 52, it is also possible to the size of the first groove 52 is big
Size in the first through hole 13.If the size of the first through hole 13 is more than the size of the first groove 52, then the first groove 52 and the
One through hole 13 staggers setting, so that the first tube wall 51 can contact with set tube wall 11 and be welded to connect, can make again from described
The structural member that first through hole 13 inserts is inserted in described first groove 52.In the present embodiment as depicted, first is recessed
The size of groove 52 equal to or slightly greater than the size of the first through hole 13, the first tank-type connecting component 50 from three around the first through hole 13
Arrange.First tank-type connecting component 50 contacts with set tube wall 11 and utilizes and is welded to connect both.First tank-type connecting component 50 two ends
Respectively around two the first through holes 13 so that the first groove 52 two ends connect with two the first through holes 13 respectively.
Breach 54 is offered on first cell wall 51 of described first tank-type connecting component 50.In example as depicted, described scarce
Mouth 54 numbers are two, are oppositely arranged.It is provided with one or more the 3rd connecting plate 55 on described first tank-type connecting component 50,
Described 3rd connecting plate 55 is connected with described first cell wall 51;Described polylith the 3rd connecting plate 55 is along described first groove 52
Length L3 direction is spaced apart.
As shown in Fig. 8, Figure 10, described connector 20 also includes the second tank-type connecting component 60.Described second tank-type connecting component 60
Having the second cell wall 61, described second cell wall 61 surrounds the second groove 62.Described second tank-type connecting component 60 is arranged at described set
In pipe tube chamber 12, described second tank-type connecting component 60 two ends are welded to connect with described set tube wall 11.At least one is described first years old
Through hole 13 knot that make from described first through hole 13 insert relative with the second groove 62 position of described second tank-type connecting component 60
Component is inserted in described second groove 62.The size of the first through hole 13 both can equivalently-sized, also with the second groove 62
Can be with mutual difference, the size of the such as first through hole 13 is more than the size of the second groove 62, it is also possible to the size of the second groove 62
Size more than the first through hole 13.If the size of the first through hole 13 is more than the size of the second groove 62, then the second groove 62 with
First through hole 13 staggers setting, so that the second tube wall 61 can contact with set tube wall 11 and be welded to connect, can make again from institute
The structural member stating the first through hole 13 insertion is inserted in described second groove 62.In the present embodiment as depicted, second
The size of groove 62 equal to or slightly greater than the size of the first through hole 13, the second tank-type connecting component 60 from three around the first through hole
13 are arranged.Second tank-type connecting component 60 contacts with set tube wall 11 and utilizes and is welded to connect both.Second tank-type connecting component 60
Two ends are centered around around two the first through holes 13 respectively so that the second groove 62 two ends connect with two the first through holes 13 respectively.
Being provided with one or more the 4th connecting plate 64 on described second tank-type connecting component 60, described 4th connecting plate 64 is with described
Second cell wall 61 connects.Described polylith the 4th connecting plate 64 is along the interval point, length L4 direction of described second groove 62
In example as depicted, described sleeve pipe 10 is rectangular tube, and described first through hole 13 each two is one group, the most right
Neat and equivalently-sized.Described first tank-type connecting component 50 two ends are connected with set tube wall 11 respectively;Described second tank-type connecting component
60 numbers are two, and each second tank-type connecting component 60 one end is connected with set tube wall 11, and the other end and the first cell wall 51 are even
Connect.Each described second groove 62 one end is relative with the first through hole 13 position, and the other end is relative with described breach 54 position.Its
In the first through hole 13 described in a group is relative with described first groove 51 position from described first tank-type connecting component 50 two ends respectively and phase
Logical;It is relative with described second groove 62 position from described second tank-type connecting component 60 two ends respectively that another organizes described first through hole 13
And communicate.
Embodiment 3
Figure 11 shows the sleeve pipe tube chamber internal structure in the present embodiment.The present embodiment is bracket with the difference of embodiment 1
Structure is different.As shown in figure 11, described steel construction bracket includes sleeve pipe 10 and connector 20.Sleeve pipe 10 structure such as Fig. 1 institute
Show.Described sleeve pipe 10 has set tube wall 11, and described set tube wall 11 surrounds sleeve pipe tube chamber 12.On described set tube wall 11
It is provided through the first through hole 13 of described set tube wall 11.The shape of set tube wall 11 and the shape of sleeve pipe tube chamber 12 are permissible
It is tetragon or circle, also can be chosen as other shape according to actual needs.Described tetragon can be both rectangle, also may be used
To be square or other available shapes.In example as depicted, set tube wall 11 is rectangle, sleeve pipe tube chamber 12
Also it is rectangle.First through hole 13 can select its position and quantity according to actual needs.In the present embodiment, the set tube wall of tetragon
Four the first through holes 13 are offered respectively on four faces of 11.Each two is one group, and aligned in position two-by-two is equivalently-sized.Described
Connector 20 includes that one or more base plate 70, described base plate 70 are used for holding and inserts described tube chamber 12 from described through hole 131
Interior structural member.Along sleeve pipe 10 axially, described base plate 70 is positioned at below described through hole 13.Described base plate 70 both can be with
Described tube chamber 12 shape of cross section, equivalently-sized, edge contacts with set tube wall 11 and welds on four sides, it is also possible to be shape and/
Or size is different, only edge, two sides or three edges contact with set tube wall 11 and weld.
Structure in various embodiments above can also use other combination, such as uses the second through hole 35 in embodiment 1 to replace
Breach 54 in embodiment 2.
Embodiment 4
Figure 12 shows sleeve pipe tube chamber internal structure.As it is shown in figure 9, the present embodiment is on the basis of embodiment 3, increase by two pieces
Sidewall paneling 71, two pieces of sidewall panelings 71 are welded on base plate 70, and interval is arranged.Two pieces of sidewall paneling 71 two ends are also welded on sleeve pipe
On tube wall 11.70, two pieces of sidewall panelings 71 of base plate are arranged around the first through hole 13.
It is the use view of steel structure support structure in the present invention as shown in figure 13.As shown in figure 13, in the present invention
Steel construction bracket 100 be arranged on column 200.Beam 300 is inserted through steel construction bracket 100 from the first through hole 13.Vertical
Post 200 and steel construction bracket 100 support beam 300.Use the steel construction bracket 100 in the present invention so that beam 300 right-hand member can prolong
Stretching and protrude from the length that column 200 is certain, the right-hand member of beam 300 is not provided with column 200 and supports.Therefore, use in the present invention
Steel construction bracket 100, the structure that can make steel house is more various, setting of can the most freely arranging in pairs or groups.
Steel structure support structure in the present invention, its bracket structure uses cloudy bracket structure, cloudy bracket can keep with column in appearance
Unanimously, outward appearance is neatly unified, the most in a jumble.Bracket structure in the present invention uses offers the first through hole on sleeve pipe, connector is arranged
In the tube chamber of sleeve pipe, both can support structural member, the such as beam inserted from the first through hole, it is also possible to supply because sleeve pipe offers the
One through hole and cause bearing capacity loss.Base plate is set so that present configuration is simple, it is easy to produce.Cavity bracket is holding
When loading capability is problematic, base plate arranges sidewall paneling so that bearing capacity of the present invention strengthens.Connector is set to tubulose, pipe
Shape connector is welded on set tube wall around the first through hole, and set tube wall is connected as one by connector, further enhances sleeve pipe
Bearing capacity, make up cause because the first through hole offered by sleeve pipe bearing capacity loss so that the present invention is more firm.This
Bracket structure in bright can be produced as independent parts respectively with column, beam and be welded to connect so that the present invention can be at factory's car
Between process, assemble the most at the construction field (site), can be that the production of scale provides standard component, efficiency is high.Is arranged on first tube wall
One groove, facilitates welder will stretch into the first intraluminal structural member in stretching into the first tube chamber and the first tube wall is welded to connect.If
Put the first connecting plate to be connected by the first tube wall of the first groove both sides, can avoid offering the bearing capacity reduction problem that groove brings, make
First connecting tube is more solid and reliable.After welding completes, it is also possible to by the first groove penetration concrete, make steel construction more
Firmly.Second groove is set on the second tube wall, facilitates welder will stretch into the second intraluminal structural member in stretching into the second tube chamber
It is welded to connect with the second tube wall.Arrange the second connecting plate to be connected by the second tube wall of the second groove both sides, can avoid offering groove band
The bearing capacity come reduces problem, makes the first connecting tube more solid and reliable.After welding completes, it is also possible to filled by the second groove
Enter concrete, make steel construction more firm.Use the steel construction bracket in the present invention so that column and beam can do according to standard
Standard component is become to construct the most easily.Even if the length of beam is also not required to cutting beyond the distance between two root posts,
Beam can pass steel construction bracket, still can use.Use the steel construction bracket in the present invention, so that steel construction room has
More change structure, a unsettled platform is such as set, as long as beam is through the steel construction bracket in the present invention, prominent one
Fixed length.
Existing steel building, it is necessary first to design then factory process of publishing picture, requires by figure manufacture different component according to design,
For in-site installation.Use the steel construction bracket in the present invention, can first be made as standard element, carry out different building and need
Ask design.Steel construction bracket in the present invention can meet any design requirement of current steel reinforced concrete system, and can reduce construction and installation
Cost of labor.The structural principle of the present invention, is used in continuous, structure fixing, the node of the solved beam of steel structure in steel structure
The problem of intensity, utilizes the condition of back concrete casting groove to weld cleverly, completely solves a steel structure difficult problem.
Relative to sun bracket structure of the prior art, the bracket structure in the present invention can save steel using amount more than 30%.And this
Bracket structure in invention can be processed as standard component at factory floor, then assembles, during site operation with column or beam at the construction field (site)
Between short, at least can save on-site construction time more than 60%.
Embodiment in the present invention is only used for that the present invention will be described, is not intended that the restriction to right, this area
Interior technical staff it is contemplated that other replacements being substantially equal to, all in scope.
Claims (32)
1. steel structure support structure, it is characterised in that include column and bracket structure;Described column has column tube chamber;Described bracket
Structure includes sleeve pipe;Described sleeve pipe has set tube wall, and described set tube wall surrounds sleeve pipe tube chamber;Set on described set tube wall
It is equipped with the first through hole running through described set tube wall;Described first through hole connects with described sleeve pipe tube chamber, described set tube wall with
Described column connects.
Steel structure support structure the most according to claim 1, it is characterised in that also include that connector, described connector are arranged at
In described sleeve pipe tube chamber, described connector is connected with described set tube wall.
Steel structure support structure the most according to claim 2, it is characterised in that described connector includes one or more base plate,
Described base plate one end or multiterminal are connected with described set tube wall;Described polylith base plate interval is arranged.
Steel structure support structure the most according to claim 3, it is characterised in that described connector also includes one or more sidewall
Plate, described sidewall paneling is connected with described base plate and/or is connected with described set tube wall, and described polylith sidewall paneling interval is arranged.
Steel structure support structure the most according to claim 4, it is characterised in that described connector also includes top board, described top board
And described base plate interval is arranged;Described top board is connected with described sidewall paneling, and described top board is connected with described set tube wall.
Steel structure support structure the most according to claim 5, it is characterised in that described top board is provided with through slot, or described
Top board number is more than two pieces and interval setting.
Steel structure support structure the most according to claim 1, it is characterised in that described connector number is two or more, intersects
Setting or the short transverse along described sleeve pipe are spaced and arrange.
Steel structure support structure the most according to claim 1, it is characterised in that described connector welds with described set tube wall even
Connect.
Steel structure support structure the most according to claim 1, it is characterised in that described sleeve pipe is tetragon pipe, described first leads to
Hole is arranged on the set tube wall at two sides, three or four sides.
Steel structure support structure the most according to claim 2, it is characterised in that described connector includes the first connecting tube, institute
Stating the first connecting tube and have the first tube wall, described first tube wall surrounds the first tube chamber;Described first connecting tube is arranged at described set
In pipe tube chamber, described first connecting tube two ends are connected with described set tube wall;At least one described first through hole and described first
First tube chamber position of connecting tube makes the structural member inserted from described first through hole be inserted in described first tube chamber relatively.
11. steel structure support structures according to claim 10, it is characterised in that set on the first tube wall of described first connecting tube
Being equipped with the first groove, described first groove runs through the first tube wall of described first connecting tube, and described first groove is along described first
The length direction of connecting tube extends selected length.
12. steel structure support structures according to claim 11, it is characterised in that be provided with in described first connecting tube one piece or
Polylith the first connecting plate, described first connecting plate is connected with the first tube wall of described first groove both sides;Described polylith first is even
Fishplate bar is spaced apart along the length direction of described first connecting tube.
13. steel structure support structures according to claim 10, it is characterised in that the one of the first tube wall of described first connecting tube
End is connected around the first through hole one of them described with described set tube wall.
14. steel structure support structures according to claim 10, it is characterised in that described connector also includes the second connecting tube,
Described second connecting tube has the second tube wall, and described second tube wall surrounds the second tube chamber;Described second connecting tube is arranged at described
In sleeve pipe tube chamber, described second connecting tube two ends are connected with described set tube wall, at least one described first through hole and described the
Two tube chamber positions are relatively so that being inserted in described second tube chamber from the structural member of described first through hole insertion.
15. steel structure support structures according to claim 14, it is characterised in that set on the second tube wall of described second connecting tube
Being equipped with the second groove, described second groove runs through the tube wall of described second connecting tube, and described second groove connects along described second
The length direction of pipe extends selected length.
16. steel structure support structures according to claim 15, it is characterised in that be provided with in described second connecting tube one piece or
Polylith the second connecting plate, described second connecting plate is connected with the second tube wall of described second groove both sides;Described polylith second is even
Fishplate bar is spaced apart along the length direction of described second connecting tube.
17. steel structure support structures according to claim 14, it is characterised in that the one of the second tube wall of described second connecting tube
End is connected around the first through hole one of them described and with described set tube wall.
18. steel structure support structures according to claim 10, it is characterised in that described first connecting tube runs through described second even
Adapter, described first connecting tube length direction is vertical with described second connecting tube length direction;Or described second connecting tube is passed through
Wearing described first connecting tube, described first connecting tube length direction is vertical with described second connecting tube length direction.
19. steel structure support structures according to claim 14, it is characterised in that open on the first tube wall of described first connecting tube
It is provided with the second through hole;Described first connecting tube two ends are connected with set tube wall respectively;Described second connecting tube number be one or
Multiple, each second connecting tube one end is connected with set tube wall, and the other end and the first tube wall connect;Described second tube chamber one end
Relative with the first lead to the hole site and connect, the other end and the second lead to the hole site relatively and connect.
20. steel structure support structures according to claim 14, it is characterised in that described sleeve pipe is tetragon pipe, described first
Through hole each two is one group, and the first through hole described in least one set is respectively from described first sleeve two ends and described first tube chamber position
Relatively and communicate;First through hole described in least one set is relative also with described second tube chamber position from described second sleeve pipe two ends respectively
Communicate.
21. steel structure support structures according to claim 14, it is characterised in that described first connecting tube and/or described second
Connecting tube is welded to connect with described set tube wall.
22. steel structure support structures according to claim 2, it is characterised in that described connector includes the first tank-type connecting component,
Described first tank-type connecting component has the first cell wall, and described first cell wall surrounds the first groove;Described first tank-type connecting component sets
Being placed in described sleeve pipe tube chamber, described first tank-type connecting component two ends are connected with described set tube wall;At least one is described first years old
The through hole structural member that make from described first through hole insertion relative with the first groove location of described first tank-type connecting component can
Insert in described first groove.
23. steel structure support structures according to claim 22, it is characterised in that be provided with one on described first tank-type connecting component
Block or polylith the 3rd connecting plate, described 3rd connecting plate is connected with described first cell wall;Described polylith the 3rd connecting plate is along described
The length direction of the first groove is spaced apart.
24. steel structure support structures according to claim 22, it is characterised in that the first cell wall of described first tank-type connecting component
It is connected around described first through hole with described set tube wall.
25. steel structure support structures according to claim 22, it is characterised in that described connector includes the second tank-type connecting component,
Described second tank-type connecting component has the second cell wall, and described second cell wall surrounds the second groove;Described second tank-type connecting component sets
Being placed in described sleeve pipe tube chamber, described second tank-type connecting component two ends are connected with described set tube wall;At least one is described first years old
The through hole structural member that make from described first through hole insertion relative with the second groove location of described second tank-type connecting component can
Insert in described second groove.
26. steel structure support structures according to claim 25, it is characterised in that be provided with one on described second tank-type connecting component
Block or polylith the 4th connecting plate, described 4th connecting plate is connected with described second cell wall;Described polylith the 4th connecting plate is along described
The length direction of the second groove is spaced apart.
27. steel structure support structures according to claim 25, it is characterised in that the second cell wall of described second tank-type connecting component
It is connected around described first through hole and with described set tube wall.
28. steel structure support structures according to claim 25, it is characterised in that described first tank-type connecting component runs through described
Two tank-type connecting components, described first tank-type connecting component length direction is vertical with described second tank-type connecting component length direction;Or
Described second tank-type connecting component runs through described first tank-type connecting component, described first tank-type connecting component length direction and described second
Tank-type connecting component length direction is vertical.
29. steel structure support structures according to claim 28, it is characterised in that the first cell wall of described first tank-type connecting component
On offer breach, described first tank-type connecting component two ends respectively with set tube wall be connected;Described second tank-type connecting component number
For one or more, each second tank-type connecting component one end is connected with set tube wall, and the other end and the first cell wall connect;Described
Second groove one end is relative with the first lead to the hole site, and the other end is relative with described gap position.
30. steel structure support structures according to claim 25, it is characterised in that described sleeve pipe is tetragon pipe, described first
Through hole each two is one group, and the first through hole described in least one set is first recessed with described from described first tank-type connecting component two ends respectively
Groove location relatively and communicates;First through hole described in least one set is second recessed with described from described second tank-type connecting component two ends respectively
Groove location relatively and communicates.
31. steel structure support structures according to claim 25, it is characterised in that described first tank-type connecting component and/or described
Second tank-type connecting component is welded to connect with described set tube wall.
32. steel structure support structures according to claim 1, it is characterised in that described set tube wall includes casing main body and inserts
Adapter;Described insertion pipe is inserted in described column tube intracavity, and described casing main body outer wall aligns with described stud end outer wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610081369.9A CN106049753B (en) | 2016-02-04 | 2016-02-04 | Steel structure support structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610081369.9A CN106049753B (en) | 2016-02-04 | 2016-02-04 | Steel structure support structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106049753A true CN106049753A (en) | 2016-10-26 |
CN106049753B CN106049753B (en) | 2019-03-19 |
Family
ID=57484290
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610081369.9A Active CN106049753B (en) | 2016-02-04 | 2016-02-04 | Steel structure support structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106049753B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110387973A (en) * | 2019-08-09 | 2019-10-29 | 重庆渝建实业集团股份有限公司 | A kind of U-shaped solid model beams of concrete crossover node and its method of concreting |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR1587018A (en) * | 1968-10-17 | 1970-03-06 | ||
JPH08333807A (en) * | 1995-06-08 | 1996-12-17 | Nippon Steel Corp | Joint structure of composite material structural members |
CN202899296U (en) * | 2012-09-24 | 2013-04-24 | 北京门窗发展有限公司 | B type beam column fixing component used for interlayer ring beam or contact beam |
CN203347106U (en) * | 2013-07-19 | 2013-12-18 | 浙江恒誉建设有限公司 | Square steel column for buildings |
CN103669579A (en) * | 2012-08-30 | 2014-03-26 | 昆山华英博五金建材有限公司 | Connector |
CN204626639U (en) * | 2015-04-14 | 2015-09-09 | 北京恒通创新赛木科技股份有限公司 | The syndeton of house column and brace summer and for its linkage |
CN205476071U (en) * | 2016-02-04 | 2016-08-17 | 李新华 | Steel structure support structure |
-
2016
- 2016-02-04 CN CN201610081369.9A patent/CN106049753B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR1587018A (en) * | 1968-10-17 | 1970-03-06 | ||
JPH08333807A (en) * | 1995-06-08 | 1996-12-17 | Nippon Steel Corp | Joint structure of composite material structural members |
CN103669579A (en) * | 2012-08-30 | 2014-03-26 | 昆山华英博五金建材有限公司 | Connector |
CN202899296U (en) * | 2012-09-24 | 2013-04-24 | 北京门窗发展有限公司 | B type beam column fixing component used for interlayer ring beam or contact beam |
CN203347106U (en) * | 2013-07-19 | 2013-12-18 | 浙江恒誉建设有限公司 | Square steel column for buildings |
CN204626639U (en) * | 2015-04-14 | 2015-09-09 | 北京恒通创新赛木科技股份有限公司 | The syndeton of house column and brace summer and for its linkage |
CN205476071U (en) * | 2016-02-04 | 2016-08-17 | 李新华 | Steel structure support structure |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110387973A (en) * | 2019-08-09 | 2019-10-29 | 重庆渝建实业集团股份有限公司 | A kind of U-shaped solid model beams of concrete crossover node and its method of concreting |
Also Published As
Publication number | Publication date |
---|---|
CN106049753B (en) | 2019-03-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104847020A (en) | Limb type circular tube node transferring structure and manufacturing method thereof | |
CN106013441A (en) | Connecting casing with steel structure | |
CN106049677A (en) | Steel structure | |
CN106049753A (en) | Steel support structure | |
CN106049676A (en) | Steel structure bracket | |
CN205476071U (en) | Steel structure support structure | |
CN205475731U (en) | Integrated house combination mosaic structure's building node | |
CN109881779A (en) | House frame connection structure | |
CN206971472U (en) | Light gauge cold-formed steel shape steel plate shear force wall | |
CN201467606U (en) | Machine cabinet frame convenient for assembly | |
CN209817104U (en) | House frame connection structure | |
CN205530685U (en) | Steel construction | |
CN205399659U (en) | Steel construction bracket | |
CN216340234U (en) | Anti-leakage external wall panel with window in fabricated building | |
CN218540988U (en) | Steel structure vertical column connecting node and modular building | |
CN203878762U (en) | Connecting joint of lintel and wall | |
CN107630509A (en) | A kind of compound orthogonal-diagonal lattice space steel lattice boxlike tube-in-tube structure of assembled | |
CN207211491U (en) | A kind of high-efficiency heat-insulation building block | |
CN205557825U (en) | Novel steel construction bracket and steel structure support structure | |
CN209603390U (en) | A kind of precast shear wall conversion layer embedded bar locating rack | |
CN106836480B (en) | Steel structure bracket and steel structure supporting structure | |
CN208309827U (en) | One plants case room pillar connecting angle pieces | |
CN207633513U (en) | A kind of combined steel-frame structure of the load-bearing of high-rise building | |
CN205935399U (en) | Building house PC heat preservation roof beam steel frame construction with sleeve | |
CN206986927U (en) | A kind of non-contact attachment structure of the prefabricated piping lane of split-type |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |