CN106049614A - Air-bag-based dual-cavity supercharging steady-flow tank - Google Patents

Air-bag-based dual-cavity supercharging steady-flow tank Download PDF

Info

Publication number
CN106049614A
CN106049614A CN201610573947.0A CN201610573947A CN106049614A CN 106049614 A CN106049614 A CN 106049614A CN 201610573947 A CN201610573947 A CN 201610573947A CN 106049614 A CN106049614 A CN 106049614A
Authority
CN
China
Prior art keywords
air bag
high pressure
pressure chest
flow tank
chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610573947.0A
Other languages
Chinese (zh)
Inventor
朱建阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wilo China Water Pump System Co Ltd
Original Assignee
Wilo China Water Pump System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wilo China Water Pump System Co Ltd filed Critical Wilo China Water Pump System Co Ltd
Priority to CN201610573947.0A priority Critical patent/CN106049614A/en
Publication of CN106049614A publication Critical patent/CN106049614A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B11/00Arrangements or adaptations of tanks for water supply
    • E03B11/02Arrangements or adaptations of tanks for water supply for domestic or like local water supply
    • E03B11/06Arrangements or adaptations of tanks for water supply for domestic or like local water supply with air regulators
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B11/00Arrangements or adaptations of tanks for water supply
    • E03B11/02Arrangements or adaptations of tanks for water supply for domestic or like local water supply
    • E03B11/06Arrangements or adaptations of tanks for water supply for domestic or like local water supply with air regulators
    • E03B11/08Air regulators

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Control Of Fluid Pressure (AREA)

Abstract

The embodiment of the invention relates to an air-bag-based dual-cavity supercharging steady-flow tank comprising an atmospheric-pressure cavity and a high-pressure cavity. The atmospheric-pressure cavity is provided with a water inlet, a water outlet, and a low-liquid-level electrode. An air bag is arranged inside the high-pressure cavity; a bottom opening is formed in the bottom; a water outlet is formed in the bottom of the air bag; the bottom of the air bag is connected with the bottom opening of the high-pressure cavity; and the inside of the air bag is communicated with the external side of the high-pressure cavity through the water outlet of the air bag. The space between the high-pressure cavity and the air bag is filled with gas.

Description

Air bag two-chamber supercharging steady-flow tank
Technical field
The present invention relates to building supply equipment technical field, particularly relate to a kind of air bag two-chamber supercharging steady-flow tank.
Background technology
Along with economic quick growth, the continuous quickening of Process of Urbanization Construction, Land Demand growing tension, construction level is caused to go out The poorest.For meeting the requirement to the water yield, hydraulic pressure and water quality of the building interior water spot, it is necessary to use secondary water-supply equipment.
In current non-negative pressure water-supply installation, in order to preferably prevent negative pressure appearance, non-negative pressure water-supply installation is arranged Cavity-separating compensating tank, is divided into compensating tank normal pressure water cavity and high pressure air cavity, and is filled with a certain amount of air in high pressure air cavity, and Form back pressure.The purpose compensated is reached by the change of the pressure of city planting ductwork Yu back pressure.Above equipment yet suffers from more asking Inscribing and not enough, especially high pressure air cavity air is supplementary, it is possible to compensation water secondary pollution, and in the air meeting of compensating tank Confuse compensation water and enter user's pipe network together, make user's pipe network job insecurity.
Summary of the invention
It is an object of the invention to provide a kind of air bag two-chamber supercharging steady-flow tank, by air bag, aqueous vapor is isolated, it is to avoid gas The body secondary pollution to water, and guarantee the stability of user's pipe network water.
For achieving the above object, the invention provides a kind of air bag two-chamber supercharging steady-flow tank, including:
Common pressure chamber, described common pressure chamber is provided with water inlet, outlet and low level electrode;
High pressure chest, the inside of described high pressure chest is provided with air bag, and bottom has bottom opening, and the bottom of described air bag is provided with out The mouth of a river, the bottom of described air bag is connected with the bottom opening of described high pressure chest, and described inside air bag is gone out by described air bag The mouth of a river and the ft connection of described high pressure chest;Insufflation gas between described high pressure chest and described air bag.
Preferably, described high pressure chest is additionally provided with aerating device;
Described aerating device is insufflation gas in described high pressure chest.
It is further preferred that the gas in described high pressure chest is noble gas.
Preferably, the top of described high pressure chest is provided with access hole, and the top of described air bag is suspended at described access hole.
Preferably, the bottom of described high pressure chest is provided with leakage electrode.
Preferably, the outlet of described air bag is arranged on the bottom opening of described high pressure chest by flange.
Preferably, described common pressure chamber and high pressure chest are respectively equipped with Pressure gauge.
Preferably, described common pressure chamber and high pressure chest are respectively equipped with drain valve.
The air bag two-chamber supercharging steady-flow tank that the embodiment of the present invention provides, is isolated aqueous vapor by air bag, it is to avoid gas pair The secondary pollution of compensation water, and guarantee the stability of user's pipe network water.
Accompanying drawing explanation
The cross-sectional view of the air bag two-chamber supercharging steady-flow tank that Fig. 1 provides for the embodiment of the present invention.
Detailed description of the invention
Below by drawings and Examples, technical scheme is described in further detail.
The air bag two-chamber supercharging steady-flow tank that the embodiment of the present invention provides, is applied to the end of city planting ductwork water system, connects Between city planting ductwork to user's pipe network, as the water storage apparatus of water facilities.
The cross-sectional view of the air bag two-chamber supercharging steady-flow tank that Fig. 1 provides for the embodiment of the present invention.As it is shown in figure 1, Including: common pressure chamber 1 and high pressure chest 2.
The top of common pressure chamber 1 is provided with water inlet 11, bottom is provided with outlet 12 and low level electrode 13.Low level electrode 13 Water level in common pressure chamber 1 is detected, generates corresponding water level detecting signal.
The water inlet 11 of common pressure chamber 1 is connected on city planting ductwork supply channel, and city planting ductwork water source injects in common pressure chamber 1.
When city planting ductwork is cut off the water, the water level in common pressure chamber 1 is less than designated water level, and low level electrode 13 produces low water level inspection Survey signal, be sent to water facilities control system (not shown) and make water facilities enter mode of operation of cutting off the water.
When city planting ductwork resumes water supply, when the water level in common pressure chamber 1 returns to or is higher than designated water level, low liquid level electricity Pole 13 produces ordinary water level detection signal, is sent to water facilities control system, makes water facilities recover normal work.
The inside of high pressure chest 2 is provided with air bag 3, to user's pipe network when air bag 3 is used for being stored in water use peak water-supply shortages The compensation water provided.It is filled with gas in high pressure chest 2, is specifically as follows noble gas.
The bottom of air bag 3 is provided with outlet 31, and the bottom that the outlet 31 of air bag 3 is arranged on high pressure chest 2 by flange is opened On mouth, the internal ft connection by outlet 31 with high pressure chest 2 of air bag 3.In high pressure chest 2, compensation water and gas pass through gas Capsule 3 is isolated, it is to avoid compensation water is polluted by gas, avoids the impact phenomenon that gas-vapor mix produces simultaneously, it is ensured that use The stability of family pipe network water.
Be additionally provided with aerating device 4 on high pressure chest 2, by aerating device 4 can in high pressure chest 2 insufflation gas.
The top of high pressure chest 2 is additionally provided with access hole 21, and the top of air bag 3 is suspended at access hole 21 so that air bag 3 is at height Pressure consolidates in deployed configuration in chamber 2, in order to compensation water flows in air bag 3 and stores.When air bag 3 damages or needs to change, work Make personnel in being insinuated into high pressure chest 2 by access hole 21, air bag 3 to be overhauled and be changed.
When city planting ductwork normal water supply, and when being in normal condition by discharge of user's pipe network, city planting ductwork flows out Municipal administration water flows into water inlet manifold (not shown) through common pressure chamber 1, and the water part in water inlet manifold flows into outfall sewer (in figure Not shown), another part stores in flowing into air bag 3.
When with discharge peak, the municipal water that city planting ductwork flows out, after common pressure chamber 1 flows into water inlet manifold, flows into water outlet House steward supplies water for user;Water in air bag 3 flows into water inlet manifold simultaneously, makes up the deficiency of inflow, suppression user side negative pressure Produce.
When user's pipe network discharge is less, such as, during night 0-5 point, the compensation water in air bag 3 can be only had User's pipe network is supplied water, meets the demand of low discharge water.
The gas pressure of high pressure chest 2 can on-demand be adjusted, and when user's pipe network water pressure deficiency, can be added by regulation The gas pressure of big high pressure chest 2 so that the compensation water in air bag 3 flows out to user's pipe network with bigger flow velocity, meets user's pipe network Use water requirement.
In the particular embodiment, the cavity bottom of high pressure chest 2 be additionally provided with leakage electrode 5, with prevent air bag 3 aging, damage Evil idea etc. causes the liquid leakage in air bag 3.When the liquid in air bag 3 leaks, leakage electrode 5 generates leakage signal, overhauls people According to the leakage signal received, member just can learn that air bag 3 leaks, thus overhaul steady-flow tank in time.
The top of common pressure chamber 1 and the top of high pressure chest 2 are respectively equipped with Pressure gauge 6, are monitored the pressure of intracavity.Work as pressure When the pressure that power table 6 monitors is beyond the scope set, producing warning signal, prompting maintainer carries out equipment regulation.
The bottom of common pressure chamber 1 and the bottom of high pressure chest 2 further respectively have drain valve 7.When the water body in common pressure chamber 1 is by dirt During dye, drain valve 7 can be opened the water in common pressure chamber 1 is discharged, or when high pressure chest 2 has leakage liquid, can open Leakage liquid in high pressure chest 2 is discharged by drain valve 7.
The air bag two-chamber supercharging steady-flow tank that the embodiment of the present invention provides, by air bag by compensation water and gas barrier, it is to avoid The gas secondary pollution to compensation water, and guarantee the stability of user's pipe network water.
Above-described detailed description of the invention, has been carried out the purpose of the present invention, technical scheme and beneficial effect further Describe in detail, be it should be understood that the detailed description of the invention that the foregoing is only the present invention, be not intended to limit the present invention Protection domain, all within the spirit and principles in the present invention, any modification, equivalent substitution and improvement etc. done, all should comprise Within protection scope of the present invention.

Claims (8)

1. an air bag two-chamber supercharging steady-flow tank, it is characterised in that described steady-flow tank includes:
Common pressure chamber, described common pressure chamber is provided with water inlet, outlet and low level electrode;
High pressure chest, the inside of described high pressure chest is provided with air bag, and bottom has bottom opening, and the bottom of described air bag is provided with water outlet Mouthful, the bottom of described air bag is connected with the bottom opening of described high pressure chest, and described inside air bag is by the water outlet of described air bag Mouthful with the ft connection of described high pressure chest;Insufflation gas between described high pressure chest and described air bag.
Air bag two-chamber supercharging steady-flow tank the most according to claim 1, it is characterised in that be additionally provided with inflation on described high pressure chest Device;
Described aerating device is insufflation gas in described high pressure chest.
Air bag two-chamber supercharging steady-flow tank the most according to claim 2, it is characterised in that the gas in described high pressure chest is lazy Property gas.
Air bag two-chamber supercharging steady-flow tank the most according to claim 1, it is characterised in that the top of described high pressure chest is provided with inspection Repairing mouth, the top of described air bag is suspended at described access hole.
Air bag two-chamber supercharging steady-flow tank the most according to claim 1, it is characterised in that the bottom of described high pressure chest is provided with lets out Dew electrode.
Air bag two-chamber supercharging steady-flow tank the most according to claim 1, it is characterised in that the outlet of described air bag passes through method Orchid is arranged on the bottom opening of described high pressure chest.
Air bag two-chamber supercharging steady-flow tank the most according to claim 1, it is characterised in that described common pressure chamber and high pressure chest are respectively It is provided with Pressure gauge.
Air bag two-chamber supercharging steady-flow tank the most according to claim 1, it is characterised in that described common pressure chamber and high pressure chest are respectively It is provided with drain valve.
CN201610573947.0A 2016-07-20 2016-07-20 Air-bag-based dual-cavity supercharging steady-flow tank Pending CN106049614A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610573947.0A CN106049614A (en) 2016-07-20 2016-07-20 Air-bag-based dual-cavity supercharging steady-flow tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610573947.0A CN106049614A (en) 2016-07-20 2016-07-20 Air-bag-based dual-cavity supercharging steady-flow tank

Publications (1)

Publication Number Publication Date
CN106049614A true CN106049614A (en) 2016-10-26

Family

ID=57187425

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610573947.0A Pending CN106049614A (en) 2016-07-20 2016-07-20 Air-bag-based dual-cavity supercharging steady-flow tank

Country Status (1)

Country Link
CN (1) CN106049614A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110173020A (en) * 2019-06-17 2019-08-27 上海威派格智慧水务股份有限公司 A kind of box type negative-pressure-free special high-pressure tank body energy storage equipment
CN111504579A (en) * 2020-04-25 2020-08-07 上海南汇压力容器厂有限公司 Diaphragm air pressure tank and safety detection method thereof
CN113431146A (en) * 2021-07-26 2021-09-24 安徽蓝博供水设备有限公司 Tank type non-negative pressure water supply equipment
CN114775736A (en) * 2022-05-21 2022-07-22 董亚 Intelligent frequency conversion tank pump integrated water supply system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3865512A (en) * 1973-11-19 1975-02-11 Weil Mclain Co Inc Control apparatus for a water supply system
CN201826347U (en) * 2010-10-26 2011-05-11 张明亮 Direct-type negative pressure-free current-stabilizing water supply device
CN204023698U (en) * 2014-08-29 2014-12-17 天津泛华清源水务科技发展有限公司 A kind of secondary water-supply steady flow compensation system
CN204023702U (en) * 2014-08-29 2014-12-17 天津泛华清源水务科技发展有限公司 A kind of fully automatic secondary water supply steady flow compensation system
CN104846932A (en) * 2014-10-25 2015-08-19 青岛万力科技有限公司 Intelligent direct connection water supply device
CN205804501U (en) * 2016-07-20 2016-12-14 威乐(中国)水泵系统有限公司 Air bag two-chamber supercharging steady-flow tank

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3865512A (en) * 1973-11-19 1975-02-11 Weil Mclain Co Inc Control apparatus for a water supply system
CN201826347U (en) * 2010-10-26 2011-05-11 张明亮 Direct-type negative pressure-free current-stabilizing water supply device
CN204023698U (en) * 2014-08-29 2014-12-17 天津泛华清源水务科技发展有限公司 A kind of secondary water-supply steady flow compensation system
CN204023702U (en) * 2014-08-29 2014-12-17 天津泛华清源水务科技发展有限公司 A kind of fully automatic secondary water supply steady flow compensation system
CN104846932A (en) * 2014-10-25 2015-08-19 青岛万力科技有限公司 Intelligent direct connection water supply device
CN205804501U (en) * 2016-07-20 2016-12-14 威乐(中国)水泵系统有限公司 Air bag two-chamber supercharging steady-flow tank

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110173020A (en) * 2019-06-17 2019-08-27 上海威派格智慧水务股份有限公司 A kind of box type negative-pressure-free special high-pressure tank body energy storage equipment
CN111504579A (en) * 2020-04-25 2020-08-07 上海南汇压力容器厂有限公司 Diaphragm air pressure tank and safety detection method thereof
CN113431146A (en) * 2021-07-26 2021-09-24 安徽蓝博供水设备有限公司 Tank type non-negative pressure water supply equipment
CN114775736A (en) * 2022-05-21 2022-07-22 董亚 Intelligent frequency conversion tank pump integrated water supply system
CN114775736B (en) * 2022-05-21 2024-09-27 深圳市千贝科技有限公司 Intelligent frequency conversion box pump integrated water supply system

Similar Documents

Publication Publication Date Title
CN106049614A (en) Air-bag-based dual-cavity supercharging steady-flow tank
CN101774681B (en) Micropore aeration system
CN205296298U (en) Automatically cleaning pot -type does not have negative pressure water supply equipment
CN205636900U (en) No negative pressure of intelligence is folded and is pressed clean water supply equipment
CN106223407A (en) Air bag two-chamber supercharging pipe network Pressure-superposed water supply equipment
CN106215356A (en) Novel removable Fire Hose and method of work thereof
CN104846952A (en) Dual-mode intelligent secondary water supply equipment
CN205804501U (en) Air bag two-chamber supercharging steady-flow tank
CN205917777U (en) Gasbag two -chamber pressure boost pipe network pressure -superposed water supply equipment
CN110258727A (en) More compensation are without the pipe network pressure-superposed secondary water-supply complete set of equipments of negative pressure
CN103510577A (en) Flow stabilizing tank
CN203846563U (en) Pressure stabilizing compensation-type non-negative pressure water supply equipment
CN204875937U (en) Pot -type pressure -superposed water supply device's gas - water separation stationary flow compensation jar
CN207633433U (en) A kind of pressure water supply system
CN205296299U (en) Steady voltage pot -type does not have negative pressure water supply equipment
CN205224151U (en) Utilize municipal pipe network pressure to carry out pressure -superposed water supply's pipe network pressure -superposed water supply equipment
WO2015107707A1 (en) Water leakage search device and water leakage search method
CN205776547U (en) Mute non-vacuum pressure pipe network Pressure-superposed water supply equipment
CN210014881U (en) Fuel filter leakproofness check out test set
CN207608956U (en) A kind of laminating water supply equipment applied to high-rise building
CN207794206U (en) A kind of novel water system
CN205387735U (en) Take purification performance's energy -saving no negative pressure water supply equipment
CN201245862Y (en) Assembling type high position environment protection enclosed water supply tank
CN2482561Y (en) Non-tank pipe type automatic supplying water equipment
CN104846931A (en) Intelligent pipe network pressure-superposed non-negative pressure variable frequency water supply device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161026

RJ01 Rejection of invention patent application after publication