CN106049410A - Underground soil layer reinforcing method of building construction - Google Patents

Underground soil layer reinforcing method of building construction Download PDF

Info

Publication number
CN106049410A
CN106049410A CN201610423407.4A CN201610423407A CN106049410A CN 106049410 A CN106049410 A CN 106049410A CN 201610423407 A CN201610423407 A CN 201610423407A CN 106049410 A CN106049410 A CN 106049410A
Authority
CN
China
Prior art keywords
construction
support ring
reinforcing bar
reinforcement cage
concrete column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610423407.4A
Other languages
Chinese (zh)
Inventor
王烨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Zemst Machinery Co Ltd
Original Assignee
Suzhou Zemst Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Zemst Machinery Co Ltd filed Critical Suzhou Zemst Machinery Co Ltd
Priority to CN201610423407.4A priority Critical patent/CN106049410A/en
Publication of CN106049410A publication Critical patent/CN106049410A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/08Improving by compacting by inserting stones or lost bodies, e.g. compaction piles

Abstract

The invention discloses an underground soil layer reinforcing method of building construction. By the adoption of a reinforcement cage structure, the better anti-shearing force effect can be achieved. By the adoption of a membrane structure, gas or liquid between underground soil layers between adjacent concrete columns can flow relatively, the pressure reduction effect is achieved, and the structure stability is improved easily.

Description

A kind of construction sub-surface reinforcement means
Technical field
The present invention relates to a kind of construction sub-surface reinforcement means.
Background technology
In building construction process, during underground space instability, building structure can be caused unstable, the antidetonation of impact building Property.Gas or the situation of liquid flowing, supporting construction meeting in work progress that underground reinforces generally is had due to the underground space Affect the flowing of gas or liquid, can cause under long term damaging for the structure partial of ground prop and affecting its intensity.
Summary of the invention
It is an object of the invention to provide a kind of construction sub-surface reinforcement means, it is possible to improve prior art and exist Problem, by use reinforcement cage structure, it is possible to there is more preferable anti-shearing force effect, use membrane configuration, it is possible to make simultaneously The adjacent gas between the sub-surface between concrete column or liquid phase are to flowing, it is achieved the effect of decompression, contribute to Improve the stability of structure.
The present invention is achieved through the following technical solutions:
A kind of construction sub-surface reinforcement means, it is characterised in that: comprise the following steps:
S1: arrange counter bore structure in construction surface, makes to arrange several equidistant cylindrical bore in construction surface so that it is even depth Arrange;
S2: install steel reinforcement cage, by wait height reinforcement cage structure be placed in counter bore structure, make steel reinforcement cage external diameter be equal to counterbore Internal diameter;
S3: cast concrete column, pours into a mould concrete column inside steel reinforcement cage, and in casting process, installation settings has barrier film Stainless steel tube structure, make the height of the concrete column height more than steel reinforcement cage;
S4: install beam structure, be fixed on above concrete column by arranging reeded beam structure, make concrete column position In the middle part of groove structure, steel reinforcement cage is made to be positioned at groove.
Further, for the present invention is better achieved, every reinforcing bar of described steel reinforcement cage is provided with in hollow Ring-type support ring, described support ring one end is fixedly connected on described reinforcing bar upper end, described support ring other end end face It is positioned at below described groove inner top side face.
Further, for the present invention is better achieved, described support ring is that reinforcing bar is bent to form circulus, described Support ring be provided with cross bar away from described reinforcing bar one end end face, the axis of described cross bar is perpendicular to described reinforcing bar, Described cross bar lower surface is welded on described support ring upper surface, and described cross bar upper surface is fitted in described groove On upper surface, side.
Further, for the present invention is better achieved, described crossbeam is that corrosion resistant plate is made.
The present invention compared with prior art, has the advantages that
The present invention is by arranging reinforcement cage structure, it is possible to increase overall structure bears the effect of cross shear, uses mixed simultaneously Solidifying soil column structure, is favorably improved integrally-built compressive property, when there is gas or liquid stream in underground construction face, permissible Flowed by the barrier film being arranged in concrete column body, it is to avoid concrete column one side is affected and affects its life-span, meanwhile, Present invention employs stainless steel tube structure as supporting construction, it is to avoid impaired for installing the breather of barrier film in casting process, Meanwhile, when by External Force Acting, it is possible to increase its compressive property.
Accompanying drawing explanation
In order to be illustrated more clearly that the technical scheme of the embodiment of the present invention, below by embodiment required use attached Figure is briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, and it is right to be therefore not construed as The restriction of scope, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to according to this A little accompanying drawings obtain other relevant accompanying drawings.
Fig. 1 is overall structure schematic diagram of the present invention.
Wherein: 101. counter bore structures, 102. steel reinforcement cages, 103. concrete columns, 104. crossbeams, 105. grooves, 106. lead to Hole, 107. stainless steel tubes, 108. breather pipe structures, 109. barrier films, 110. support rings, 111. cross bars.
Detailed description of the invention
Below in conjunction with specific embodiment, the present invention is described in further detail, but embodiments of the present invention are not limited to This.
Embodiment 1:
As it is shown in figure 1, a kind of construction sub-surface reinforcement means, it is characterised in that: comprise the following steps:
S1: arrange counter bore structure in construction surface, makes to arrange several equidistant cylindrical bore in construction surface so that it is even depth Arrange;
S2: install steel reinforcement cage, by wait height reinforcement cage structure be placed in counter bore structure, make steel reinforcement cage external diameter be equal to counterbore Internal diameter;
S3: cast concrete column, pours into a mould concrete column inside steel reinforcement cage, and in casting process, installation settings has barrier film Stainless steel tube structure, make the height of the concrete column height more than steel reinforcement cage;
S4: install beam structure, be fixed on above concrete column by arranging reeded beam structure, make concrete column position In the middle part of groove structure, steel reinforcement cage is made to be positioned at groove.
Further, for the present invention is better achieved, every reinforcing bar of described steel reinforcement cage is provided with in hollow Ring-type support ring, described support ring one end is fixedly connected on described reinforcing bar upper end, described support ring other end end face It is positioned at below described groove inner top side face.
Further, for the present invention is better achieved, described support ring is that reinforcing bar is bent to form circulus, described Support ring be provided with cross bar away from described reinforcing bar one end end face, the axis of described cross bar is perpendicular to described reinforcing bar, Described cross bar lower surface is welded on described support ring upper surface, and described cross bar upper surface is fitted in described groove On upper surface, side.
Further, for the present invention is better achieved, described crossbeam is that corrosion resistant plate is made.
The present invention is by arranging reinforcement cage structure, it is possible to increase overall structure bears the effect of cross shear, adopts simultaneously Use concrete column structure, be favorably improved integrally-built compressive property, when there is gas or liquid stream in underground construction face, Can be flowed by the barrier film being arranged in concrete column body, it is to avoid concrete column one side is affected and affects its life-span, Meanwhile, present invention employs stainless steel tube structure as supporting construction, it is to avoid for installing the breather of barrier film in casting process Impaired, meanwhile, when by External Force Acting, it is possible to increase its compressive property.
In order to avoid, under external forces, the reinforcing bar upper end of steel reinforcement cage acts directly on groove inner wall, the present embodiment In, it is preferable that it is provided with the structure of cushioning effect power, every reinforcing bar of described steel reinforcement cage 102 is provided with in hollow Ring-type support ring 110, described support ring 110 one end is fixedly connected on described reinforcing bar upper end, and described support ring 110 is another One end end face is positioned at below described groove 105 inner top side face.
Processing for convenience, in the present embodiment, described support ring 110 is bent to form circulus for reinforcing bar, described Support ring 110 away from being provided with cross bar 111 on described reinforcing bar one end end face, the axis of described cross bar 111 is perpendicular to institute The reinforcing bar stated, described cross bar 111 lower surface is welded on described support ring 110 upper surface, described cross bar 111 upper surface It is fitted on described groove 105 inner top side face.By using supporting ring structure, it is possible to when crossbeam is by active force, logical Cross ring-type supporting ring structure to be deformed, applied external force is buffered, it is possible to be effectively improved integrally-built shock resistance Energy.
Install for convenience, in the present embodiment, it is preferable that described crossbeam 104 is made for corrosion resistant plate.Earth pillar body can be coagulated It is positioned in the middle part of groove structure, makes steel reinforcement cage be positioned at groove.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.All within the spirit and principles in the present invention, that is made any repaiies Change, equivalent, improvement etc., should be included within the scope of the present invention.

Claims (8)

1. a construction sub-surface reinforcement means, it is characterised in that: comprise the following steps:
S1: arrange counter bore structure in construction surface, makes to arrange several equidistant cylindrical bore in construction surface so that it is even depth Arrange;
S2: install steel reinforcement cage, by wait height reinforcement cage structure be placed in counter bore structure, make steel reinforcement cage external diameter be equal to counterbore Internal diameter;
S3: cast concrete column, pours into a mould concrete column inside steel reinforcement cage, and in casting process, installation settings has barrier film Stainless steel tube structure, make the height of the concrete column height more than steel reinforcement cage;
S4: install beam structure, be fixed on above concrete column by arranging reeded beam structure, make concrete column position In the middle part of groove structure, steel reinforcement cage is made to be positioned at groove.
A kind of construction sub-surface reinforcement means the most according to claim 1, it is characterised in that: at described reinforcing bar The support ring (110) in hollow and annular it is provided with on every reinforcing bar of cage (102).
A kind of construction sub-surface reinforcement means the most according to claim 1, it is characterised in that: described support ring (110) one end is fixedly connected on described reinforcing bar upper end.
A kind of construction sub-surface reinforcement means the most according to claim 1, it is characterised in that: described support ring (110) other end end face is positioned at below described groove (105) inner top side face.
A kind of construction sub-surface ruggedized construction the most according to claim 2, it is characterised in that: described support ring (110) it is that reinforcing bar is bent to form circulus.
A kind of construction sub-surface reinforcement means the most according to claim 1, it is characterised in that: in described support Ring (110) is away from being provided with cross bar (111) on described reinforcing bar one end end face, the axis of described cross bar (111) is perpendicular to institute The reinforcing bar stated.
A kind of construction sub-surface reinforcement means the most according to claim 1, it is characterised in that: described cross bar (111) lower surface is welded on described support ring (110) upper surface, and described cross bar (111) upper surface is fitted in described On groove (105) inner top side face.
A kind of construction sub-surface ruggedized construction the most according to claim 1, it is characterised in that: described crossbeam (104) it is that corrosion resistant plate is made.
CN201610423407.4A 2016-06-16 2016-06-16 Underground soil layer reinforcing method of building construction Pending CN106049410A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610423407.4A CN106049410A (en) 2016-06-16 2016-06-16 Underground soil layer reinforcing method of building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610423407.4A CN106049410A (en) 2016-06-16 2016-06-16 Underground soil layer reinforcing method of building construction

Publications (1)

Publication Number Publication Date
CN106049410A true CN106049410A (en) 2016-10-26

Family

ID=57169260

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610423407.4A Pending CN106049410A (en) 2016-06-16 2016-06-16 Underground soil layer reinforcing method of building construction

Country Status (1)

Country Link
CN (1) CN106049410A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62260919A (en) * 1986-05-07 1987-11-13 Tokyu Constr Co Ltd Small pile for reinforcing foundation ground to earthquake
JP3247652B2 (en) * 1998-05-19 2002-01-21 株式会社さとうベネック Structure settlement control method
CN204456058U (en) * 2015-02-03 2015-07-08 中冶集团武汉勘察研究院有限公司 A kind of constructing structure reducing building base subsidence speed
CN105544822A (en) * 2016-01-19 2016-05-04 吴倩倩 Anti-corrosion ventilating outer hanging plate structure and installation method thereof
CN105544821A (en) * 2016-01-19 2016-05-04 吴倩倩 Anti-seismic outer wall hanging plate and installing method thereof
CN105672352A (en) * 2016-01-19 2016-06-15 吴倩倩 Pre-reinforcing structure and pre-reinforcing method for underground space construction

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62260919A (en) * 1986-05-07 1987-11-13 Tokyu Constr Co Ltd Small pile for reinforcing foundation ground to earthquake
JP3247652B2 (en) * 1998-05-19 2002-01-21 株式会社さとうベネック Structure settlement control method
CN204456058U (en) * 2015-02-03 2015-07-08 中冶集团武汉勘察研究院有限公司 A kind of constructing structure reducing building base subsidence speed
CN105544822A (en) * 2016-01-19 2016-05-04 吴倩倩 Anti-corrosion ventilating outer hanging plate structure and installation method thereof
CN105544821A (en) * 2016-01-19 2016-05-04 吴倩倩 Anti-seismic outer wall hanging plate and installing method thereof
CN105672352A (en) * 2016-01-19 2016-06-15 吴倩倩 Pre-reinforcing structure and pre-reinforcing method for underground space construction

Similar Documents

Publication Publication Date Title
US20210340750A1 (en) Concrete-Filled Steel Tubular Column-Steel Plate Concrete Ring Beam Joint and Construction Method Thereof
CN203145194U (en) Internal diaphragm joint of variable flange steel I-beam and square concrete filled steel tubular column
CN103938616A (en) Underground diaphragm wall steel bar cage structure and construction method thereof
CN101503879B (en) Pre-control method for preventing inclination of sinking well
CN104099934B (en) A kind of supporting and protection structure of Large Foundation Pit
CN105220697A (en) Shaped steel and prestressed reinforced concrete combining structure support and construction method
CN201686972U (en) Variable arc steel moulding plate for arch crown of dam gallery
CN104372967A (en) Raking prop structure used for natural draft cooling tower and construction method thereof
CN204001428U (en) A kind of Large-diameter Steel tubing string suspension column is installed pre-buried location structure and suspension column structure thereof
CN205676882U (en) A kind of novel supporting construction
CN106049410A (en) Underground soil layer reinforcing method of building construction
CN103334584B (en) Template regulating system for sliding form system
CN208981823U (en) A kind of reinforced column enlarging section reinforces vertical muscle in the connection for meeting Liang Chu
KR101164659B1 (en) Shear force reinforcing apparatus of spiral type steel bar for reinforcing of micro-pile
CN206917353U (en) A kind of cooling stack concrete filled steel tube inclined strut structure
CN105970899A (en) Foundation reinforcement method for building construction
CN106284331B (en) Method for improving vertical bearing capacity of large-diameter rock-socketed cast-in-place pile
CN106149743A (en) A kind of construction sub-surface ruggedized construction
CN205154183U (en) Weak surrounding rock tunnel warp reinforcing apparatus
CN110904986B (en) Precast pile-bearing platform assembly type foundation tenon type flange connection structure and construction method
CN204001427U (en) A kind of steel pipe column suspension column is installed the pre-buried positioning supports structure with location ring flat-plate
JP2013221369A (en) Cast-in-place steel pipe concrete pile and steel pipe therefor
CN209099408U (en) A kind of stratum consolidation system for reinforcing existing tunnel
CN106149682A (en) A kind of double reinforcement cage structure of poured pile base
CN105297759A (en) Framework structure of pile and pillar bearing platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161026