CN106049283A - Bridge rectangular pier hanging die construction method - Google Patents

Bridge rectangular pier hanging die construction method Download PDF

Info

Publication number
CN106049283A
CN106049283A CN201610391420.6A CN201610391420A CN106049283A CN 106049283 A CN106049283 A CN 106049283A CN 201610391420 A CN201610391420 A CN 201610391420A CN 106049283 A CN106049283 A CN 106049283A
Authority
CN
China
Prior art keywords
pier
die shoe
frame
shoe frame
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610391420.6A
Other languages
Chinese (zh)
Inventor
钱江
王俊伟
杜景余
候兆隆
唐刚祥
宁武超
吴建英
张铮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
China Communications Road and Bridge North China Engineering Co Ltd
Original Assignee
Road and Bridge International Co Ltd
China Communications Road and Bridge North China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, China Communications Road and Bridge North China Engineering Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN201610391420.6A priority Critical patent/CN106049283A/en
Publication of CN106049283A publication Critical patent/CN106049283A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides a bridge rectangular pier hanging die construction method. Four hanging die brackets are manufactured in advance according to the size of a pier body, each hanging die bracket comprises at least two triangular supports, crossbeams are arranged at the upper portions of all the triangular supports, platform panels are laid on the crossbeams, and climbing cone holes are preformed in the triangular supports. Starting from concrete pouring of the first section of a rectangular pier, climbing cones are embedded in all sections of the pier body, a formwork is detached after the first section of the pier body is poured, the four hanging die brackets are installed on the four walls of the rectangular pier, the formwork is supported on the hanging die brackets, concrete of the second section is poured, after pouring is finished, the formwork and the hanging die brackets are detached, the whole hanging die brackets are hung to the second section of the pier body, the formwork is installed on the hanging die brackets, concrete of the third section is poured, and construction is cycled up till pouring of the whole pier body is finished.

Description

A kind of bridge rectangle pier mould suspension construction method
Technical field
The invention belongs to science of bridge building field, relate to a kind of mould suspension construction method merging overmolded and climbing formwork for construction technique, For bridge rectangle pier pouring construction.
Background technology
In more employing rectangle pier in middle high type Bridge Design, especially Bridges in Mountainous Areas design, most Pier Design is square Shape pier.At present, rectangle pier pours general employing overmolded or climbing formwork for construction, and for the rectangle pier that 30-60 rice is high, over-form construction is deposited Between certain unsafe factor, pier shaft sections, it is also easy to that faulting of slab ends occurs, affects bridge pier outward appearance, and climbing formwork for construction cost is relatively High, it may be said that traditional overmolded or climbing formwork for construction, there is respective advantage, but all there is certain drawback.
Summary of the invention
It is an object of the invention to provide a kind of construction method merging creeping formwork and overmolded advantage, rectangle pier can be effectively ensured Safe construction, it is to avoid the faulting of slab ends between pier shaft sections, simultaneously can save construction cost to the full extent.
For achieving the above object, the present invention is by the following technical solutions:
A kind of bridge rectangle pier mould suspension construction method, it is characterised in that:
(1) prefabricated extension die shoe frame: making 4 in advance and hang die shoe frame, described extension die shoe frame includes at least two A-frame, Each A-frame includes a vertical supporting bar being vertically arranged, and one is horizontally disposed with and the upper end of one end and described vertical supporting bar The horizontal support bar being welded to connect, one is welded to connect with the lower end of the other end of described horizontal support bar and described vertical supporting bar Hound, described vertical supporting bar is provided with parallel longitudinal with described horizontal support bar climbs taper hole;Each A-frame upper Portion, be provided with many across the crossbeam of each A-frame horizontal support bar, described crossbeam is equipped with flat surface plate;
(2) first joint pier construction: first joint pier construction uses conventional construction technique, but before installation form, colligation head saves During pier shaft reinforcing bar, preset in 4 sides of pier shaft climb cone according to the taper hole position of climbing hung on die shoe frame;Pattern board supporting is in cushion cap Top, starts casting concrete after using pull bar fixing, after casting concrete each preset climb front end of cone expose pier shaft side it Outward, it is simple to install and hang die shoe frame;
(3) extension die shoe frame is installed: after first joint pier construction completes, by form removable, be respectively mounted extension in 4 sides of pier shaft Die shoe frame;Default cone of climbing is inserted to hang and climbs taper hole on die shoe frame vertical supporting bar, fixes with bolt;
(4) second section pier construction: colligation second section pier shaft reinforcing bar, simultaneously by head save pier shaft mode preset climb cone;Will The formwork hoisting of the every side of pier shaft is fixing to hanging installation on die shoe frame, pours second section pier shaft concrete;
(5), after second section pier construction completes, template and extension die shoe frame are removed, the extension die shoe frame of every for pier shaft side is hung Install on second section pier shaft fixing by climbing cone installation, construct Section three by the form of construction work of second section pier shaft;Follow in this way The follow-up sections of circulating application work, until whole pier construction completes.
Mould suspension construction method provided by the present invention, fully combines the advantage of overmolded and creeping formwork, can be cost-effective, again Can guarantee that construction safety, construction period, between overmolded and creeping formwork, is particularly well-suited to the small rectangular high pier construction in mountain area.
Falsework is supported on extension die shoe frame by the present invention, compares over-form construction and can use a set of template less, reduces into This, and can effectively control faulting of slab ends, divide into repairing Hanging Basket hanging die shoe frame, can in time external quality of pier defect be repaired, can It is further ensured that external quality of pier quality;Hang die shoe frame operation platform firm stable, have sufficiently large operation platform space, to safety Construction can play effective guarantee;The present invention compares climbing formwork for construction, it is thus only necessary to climb cone and a set of homemade bracket, equipment needed thereby Greatly reducing, working procedure simplifies, and cost greatly reduces.
Accompanying drawing explanation
Fig. 1 is the construction process figure of the present invention;
Fig. 2 is the side view hanging die shoe frame;
Fig. 3 is the top view hanging die shoe frame;
Fig. 4 is the elevation hanging mould form of construction work;
Fig. 5 is the plane graph hanging mould form of construction work.
Detailed description of the invention
Fig. 1 is the form of construction work flow chart of the present invention, specifically comprises the following steps that
(1) prefabricated extension die shoe frame: in advance make 4 hang die shoe framves, as shown in Figure 2 and Figure 3, described extension die shoe frame include to Few two A-frames, each A-frame includes a vertical supporting bar 1 being vertically arranged, and one is horizontally disposed with and one end is with vertical The horizontal support bar 2 that the upper end of support bar is welded to connect, one welds with the other end of horizontal support bar and the lower end of vertical supporting bar The hound 3 connect in succession, vertical supporting bar is provided with parallel longitudinal with horizontal support bar climbs taper hole 4;Each A-frame upper Portion, be provided with many across the crossbeam 5 of each A-frame horizontal support bar, described crossbeam is equipped with flat surface plate 6.
During prefabricated extension die shoe frame, also can be connected end at each three-legged support hound 3 with horizontal support bar 2, welding one is erected Straight fender rod 7, will be welded to connect by reinforcing bar 8 between the fender rod on each three-legged support.
During prefabricated extension die shoe frame, also can be by between the vertical supporting bar of each A-frame, and the diagonal brace of each A-frame Between bar, all it is welded to connect by angle steel 9.
During prefabricated extension die shoe frame, can arrange a repairing Hanging Basket 10 hanging below die shoe frame, described repairing Hanging Basket 10 is by even Extension bar is connected with the vertical supporting bar 1 hanging die shoe frame and horizontal support bar 2.Repairing Hanging Basket is easy to workmen and is being watered lower section The pier shaft sections built carries out outward appearance repair operation.
(2) first joint pier construction: first joint pier construction uses conventional construction technique, but before installation form, colligation head saves During pier shaft reinforcing bar, preset in 4 sides of pier shaft climb cone according to the taper hole position of climbing hung on die shoe frame;Pattern board supporting is in cushion cap Top, starts casting concrete after using pull bar fixing, after casting concrete each preset climb front end of cone expose pier shaft side it Outward, it is simple to install and hang die shoe frame.
(3) extension die shoe frame is installed: after first joint pier construction completes, by form removable, be respectively mounted extension in 4 sides of pier shaft Die shoe frame;Default cone of climbing is inserted to hang and climbs taper hole on die shoe frame vertical supporting bar, fixes with nut.
(4) second section pier construction: colligation second section pier shaft reinforcing bar, simultaneously by head save pier shaft mode preset climb cone;Will The formwork hoisting of the every side of pier shaft is fixing to hanging installation on die shoe frame, pours second section pier shaft concrete.
(5), after second section pier construction completes, template and extension die shoe frame are removed, the extension die shoe frame of every for pier shaft side is hung Install on second section pier shaft fixing by climbing cone installation, construct Section three by the form of construction work of second section pier shaft;Follow in this way The follow-up sections of circulating application work, until whole pier construction completes.
Specifically apply specific embodiment below by way of a present invention, the inventive method is further illustrated.
In the present embodiment, the bridge of construction is positioned at integral subgrade section, sets for crossing over large-scale coombe.The transition of bridge Pier pier is high 56 meters, rectangular configuration, long × wide=6.5 meters × 2.6 meters, intends using the mould suspension construction method of the present invention.
First make and hang die shoe frame.According to pier shaft size, two brackets being arranged on pier shaft width use 2 triangles Support, two brackets of pier shaft length direction use 3 A-frames, two A-frame spacing 2 meters that each bracket is adjacent.
A-frame is welded by No. 14 channel-section steels, and vertical supporting bar is high 1.5 meters, and horizontal support bar length 1.5 meters, level is propped up Crossbeam on strut uses I 16 I-steel, and crossbeam upper berth steel plate is as operation platform.Fender rod uses 1.2 meters of high steel pipes, By reinforcing bar lateral connection.Hang and below die shoe frame, set a repairing Hanging Basket, repair Hanging Basket and use common hanging basket, with angle steel and triangle The vertical supporting bar of support and horizontal support bar are bolted.
As shown in Figure 4, Figure 5, from the beginning of pouring rectangle pier 11 first joint concrete, the most pre-buried in pier shaft climb cone 12 often saving, Climb cone and use 10.9 grades of M36 high-strength bolts.Climb the position of cone 12 according to hang on die shoe frame climb taper hole depending on, dash forward in the end climbing cone For rectangle pier side wall surface.After first joint pier shaft has poured, form removal, hang die shoe frame by 4, be separately mounted to rectangle pier four Wall, is climbed cone and inserts to hang and climb taper hole on die shoe frame vertical supporting bar 1, and fixed by nut.Colligation second section pier shaft reinforcing bar, pre- If after climbing cone, template 13 being supported on extension die shoe frame, template 13 is installed to fix and is started afterwards to pour second section concrete construction. After having poured, template and extension die shoe frame are pulled down, then by extension die shoe frame integral hoisting to second section pier shaft, template is installed again To hanging on die shoe frame, pouring Section three, such circulation is upwards constructed, until whole pier shaft has poured.In above-mentioned work progress, When pouring sections above, the outward appearance matter that the pier shaft sections that lower section can have been poured on Hanging Basket 10 by workmen exists Amount defect is repaired in time.

Claims (4)

1. a bridge rectangle pier mould suspension construction method, it is characterised in that:
(1) prefabricated extension die shoe frame: making 4 in advance and hang die shoe frame, described extension die shoe frame includes at least two A-frame, each A-frame includes a vertical supporting bar being vertically arranged, and one is horizontally disposed with and one end is welded with the upper end of described vertical supporting bar The horizontal support bar connected, one is oblique with what the lower end of the other end of described horizontal support bar and described vertical supporting bar was welded to connect Strut, described vertical supporting bar is provided with parallel longitudinal with described horizontal support bar climbs taper hole;The top of each A-frame, if There are the many crossbeams across each A-frame horizontal support bar, described crossbeam is equipped with flat surface plate;
(2) first joint pier construction: first joint pier construction uses conventional construction technique, but before installation form, colligation head saves pier shaft During reinforcing bar, preset in 4 sides of pier shaft climb cone according to the taper hole position of climbing hung on die shoe frame;Pattern board supporting, in cushion cap top, is adopted Starting casting concrete with pull bar after fixing, after casting concrete, each default front end climbing cone is exposed outside pier shaft side, just Die shoe frame is hung in installing;
(3) extension die shoe frame is installed: after first joint pier construction completes, by form removable, be respectively mounted extension die shoe in 4 sides of pier shaft Frame;Default cone of climbing is inserted to hang and climbs taper hole on die shoe frame vertical supporting bar, fixes with bolt;
(4) second section pier construction: colligation second section pier shaft reinforcing bar, simultaneously by head save pier shaft mode preset climb cone;By pier shaft The formwork hoisting of every side is fixing to hanging installation on die shoe frame, pours second section pier shaft concrete;
(5), after second section pier construction completes, template and extension die shoe frame are removed, the extension die shoe frame of every for pier shaft side is lifted into Pass through to climb cone on second section pier shaft and install fixing, construct Section three by the form of construction work of second section pier shaft;Circulation is executed in this way The follow-up sections of work, until whole pier construction completes.
Bridge rectangle pier mould suspension construction method the most according to claim 1, it is characterised in that: below described extension die shoe frame Arranging a repairing Hanging Basket, described repairing Hanging Basket is connected with the vertical supporting bar hanging die shoe frame and horizontal support bar by connecting rod; Construct a upper joint pier shaft time, workmen carries out outward appearance repair behaviour by repairing the pier shaft sections that poured lower section of Hanging Basket Make.
Bridge rectangle pier mould suspension construction method the most according to claim 1, it is characterised in that: during prefabricated extension die shoe frame, Each three-legged support hound is connected end with horizontal support bar, welds a vertical fender rod, by the protection on each three-legged support Connected by reinforcement welding between bar.
Bridge rectangle pier mould suspension construction method the most according to claim 1, it is characterised in that: during prefabricated extension die shoe frame, will Between the vertical supporting bar of each A-frame, and between the hound of each A-frame, all it is welded to connect by angle steel.
CN201610391420.6A 2016-06-05 2016-06-05 Bridge rectangular pier hanging die construction method Pending CN106049283A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610391420.6A CN106049283A (en) 2016-06-05 2016-06-05 Bridge rectangular pier hanging die construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610391420.6A CN106049283A (en) 2016-06-05 2016-06-05 Bridge rectangular pier hanging die construction method

Publications (1)

Publication Number Publication Date
CN106049283A true CN106049283A (en) 2016-10-26

Family

ID=57170203

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610391420.6A Pending CN106049283A (en) 2016-06-05 2016-06-05 Bridge rectangular pier hanging die construction method

Country Status (1)

Country Link
CN (1) CN106049283A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109267494A (en) * 2018-11-16 2019-01-25 中交路桥建设有限公司 A kind of hood type hydraulic climbing formwork system and construction method for cylinder pier construction
CN114016439A (en) * 2021-11-12 2022-02-08 中铁三局集团第五工程有限公司 Construction method for upper pier body and No. 0 block bracket of rotating bridge in high pier

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008208594A (en) * 2007-02-26 2008-09-11 Ps Mitsubishi Construction Co Ltd Method for constructing upper section of bridge pier by cantilever erection method
CN102493341A (en) * 2011-11-14 2012-06-13 中交一航局第四工程有限公司 Construction method for hollow thin-walled high pier non-bracket formwork turnover of railway
CN103046473A (en) * 2013-01-15 2013-04-17 中国土木工程集团有限公司 Construction method for constructing double-limb hollow high-pier mould side hydraulic jacking creeping formwork and double-limb hollow high-pier
CN103306208A (en) * 2013-07-05 2013-09-18 中南大学 Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier
CN104695337A (en) * 2015-01-26 2015-06-10 中交一公局厦门工程有限公司 Self-lifting sliding and turnover construction system and construction method
CN104963289A (en) * 2015-06-09 2015-10-07 沈阳市政集团有限公司 Integral one-time pouring construction method of large-volume concrete for special-shaped pier stud

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008208594A (en) * 2007-02-26 2008-09-11 Ps Mitsubishi Construction Co Ltd Method for constructing upper section of bridge pier by cantilever erection method
CN102493341A (en) * 2011-11-14 2012-06-13 中交一航局第四工程有限公司 Construction method for hollow thin-walled high pier non-bracket formwork turnover of railway
CN103046473A (en) * 2013-01-15 2013-04-17 中国土木工程集团有限公司 Construction method for constructing double-limb hollow high-pier mould side hydraulic jacking creeping formwork and double-limb hollow high-pier
CN103306208A (en) * 2013-07-05 2013-09-18 中南大学 Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier
CN104695337A (en) * 2015-01-26 2015-06-10 中交一公局厦门工程有限公司 Self-lifting sliding and turnover construction system and construction method
CN104963289A (en) * 2015-06-09 2015-10-07 沈阳市政集团有限公司 Integral one-time pouring construction method of large-volume concrete for special-shaped pier stud

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
韩战涛: "悬臂挂模在复杂地形高墩施工中的应用", 《科技创新导报》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109267494A (en) * 2018-11-16 2019-01-25 中交路桥建设有限公司 A kind of hood type hydraulic climbing formwork system and construction method for cylinder pier construction
CN109267494B (en) * 2018-11-16 2023-10-03 中交路桥建设有限公司 Hoop type hydraulic climbing formwork system for cylindrical pier construction and construction method
CN114016439A (en) * 2021-11-12 2022-02-08 中铁三局集团第五工程有限公司 Construction method for upper pier body and No. 0 block bracket of rotating bridge in high pier
CN114016439B (en) * 2021-11-12 2024-06-04 中铁三局集团有限公司 Construction method for upper pier body and No. 0 block support of middle-rotation body bridge of high pier

Similar Documents

Publication Publication Date Title
CN104074358B (en) The construction method of prefabricated building
CN103898836B (en) Cable stayed bridge H type Sarasota height top rail steel battered leg prestress stent construction method
CN203188121U (en) Cast-in-place bridge floor suspending mold of half-through or through arch bridge
CN105350454B (en) Steel arch rib outer wrapped concrete construction method for steel trussed arch bridge
CN203904851U (en) Continuous beam side span straight section hanger support system
CN105951610A (en) Support structure assisting in cantilever beam construction and construction method
CN102912996B (en) Steel tube concrete column high-altitude construction safety protection system
CN101781878A (en) Integral lifting template of main pylon of single-pylon cable-stayed bridge without dorsal cables and lifting construction method thereof
CN109594479A (en) A kind of parallel overpass center anticollision barrier of double width while construct mould bases and method
CN108360380A (en) A kind of bridge pier column construction operation platform and its construction method
CN107806019A (en) Large-span suspension bridge gate Sarasota construction method
CN107012889A (en) The construction method and piping lane construction template component of piping lane
CN105780922A (en) Construction method for segmental formwork hoisting system of large-span steel reinforced concrete transfer truss
CN103306206A (en) Reinforcing steel formwork supporting rack for thin-walled hollow high pier and construction method
CN105649213A (en) Construction method for large steel structural embedded part in dense reinforcement distribution region
CN103321155B (en) Viaduct pier operation platform system and build this system and pour into a mould the method for bridge pier
CN105780661A (en) High pier sliding and turning integrated construction formwork system
CN105442453A (en) Construction method for suspension bridge tower crossbeam combination support
CN106049283A (en) Bridge rectangular pier hanging die construction method
CN112160247B (en) Construction method of asynchronous hydraulic creeping formwork for hollow high pier of limited space pier group
CN203200664U (en) Slip-form construction device for variable cross-section hollow high pier
CN106284989B (en) The sliding form bracing system of double track and complete construction method
CN106284097B (en) The installation method that pier K is supportted on a kind of tubular arch bridge arch
CN205741886U (en) A kind of extension die shoe frame for the construction of bridge rectangle pier
CN106958233A (en) Hydraulic self-lifting formula cantilever form construction method for pouring Arch Dam Concrete

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161026