CN106044650B - A kind of electric power tower maintenance equipment and application method - Google Patents

A kind of electric power tower maintenance equipment and application method Download PDF

Info

Publication number
CN106044650B
CN106044650B CN201610439065.5A CN201610439065A CN106044650B CN 106044650 B CN106044650 B CN 106044650B CN 201610439065 A CN201610439065 A CN 201610439065A CN 106044650 B CN106044650 B CN 106044650B
Authority
CN
China
Prior art keywords
shell
clamp ring
shackle
cylinder
electric power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610439065.5A
Other languages
Chinese (zh)
Other versions
CN106044650A (en
Inventor
李洋
Original Assignee
郭婷婷
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 郭婷婷 filed Critical 郭婷婷
Priority to CN201610439065.5A priority Critical patent/CN106044650B/en
Publication of CN106044650A publication Critical patent/CN106044650A/en
Application granted granted Critical
Publication of CN106044650B publication Critical patent/CN106044650B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F11/00Lifting devices specially adapted for particular uses not otherwise provided for

Abstract

The electric power tower maintenance equipment with alarm that the invention discloses a kind of, apparatus body includes shell and mobile strut, it is equipped with clamp ring at the both ends of mobile strut, clamp ring is clamped on vertical guide post, shell is equipped with shackle, the cavity of top surface opening is equipped on the bottom end clamp ring of mobile strut, cylinder is equipped in cavity, it is equipped in clamp ring and compresses location hole, column is compressed compressing to be equipped in location hole, control-rod is equipped in cavity, right-angled trapezium fixture block is equipped on control-rod, it is equipped with vertical cylinder at the top of mobile strut, it is equipped with eccentric wheel on the rotary shaft, object placing cavity is equipped in shell, it is equipped with alarm in the outside of shell.The structure of the present invention is simple, and simple operation, stability in use is good, strong applicability and practicability is good.Simultaneously the invention also discloses the application method of the electric power tower maintenance equipment with alarm, operating method disclosed by the invention is easy, and substantially increases stability in use, strong applicability and applied widely.

Description

A kind of electric power tower maintenance equipment and application method
Technical field
The invention belongs to electric power transmission steel tower technical fields, and in particular to a kind of electric power tower dimension with voice guard Shield equipment and application method.
Background technology
With the maturation of China's electric power network technology, various electric power towers are quickly grown, in order to ensure making for electric power tower With safety, instruction device generally can be all installed on electric power tower, however since the prior art is needed when installing instruction device It manually to climb and be installed, although the installation that instruction device may be implemented is fixed, be climbed when instruction device is heavier It is manually more difficult promotion, artificial labour is climbed due to considerably increasing, so the risk fallen is also considerably increased, therefore And applicability and practicability are restricted.
Invention content
In order to solve the above-mentioned technical problem, the present invention be to provide a kind of electric power tower maintenance equipment with attention device and Application method.
It realizes that the technical solution of the object of the invention is a kind of electric power tower maintenance equipment with attention device, including is used for The apparatus body that vertical guide post moves up and down along electric power tower, the apparatus body includes shell and mobile strut, in institute The both ends for stating mobile strut are equipped with clamp ring, and the clamp ring is clamped on the vertical guide post, and the shell is equipped with locking clamp Ring, through-hole is equipped on the connecting plate between the shackle and the shell, and the mobile strut passes through the through-hole, institute State that shackle is clamped on the vertical guide post and the shackle is between the clamp ring at mobile strut both ends, described The bottom end clamp ring of mobile strut is equipped with the cavity of top surface opening, and cylinder, the piston shaft of the cylinder are equipped in the cavity It is pressed on the bottom surface of the shell, is equipped in the clamp ring and compresses location hole, be equipped with and compress in the compression location hole Column is equipped with cavity in the mobile strut, and the cavity is connected with the compression location hole, and control is equipped in the cavity Bar processed is equipped with right-angled trapezium fixture block on the control-rod and the right-angled trapezium fixture block short side is arranged below, described to compress Column is pressed in the trapezoidal faces of the right-angled trapezium fixture block, and vertical cylinder, the control are equipped at the top of the mobile strut The top of bar stretches out the mobile strut and is equipped with transverse plate at the top of the control-rod, and the bottom surface of the transverse plate is fixed on It on the piston shaft of the vertical cylinder, is equipped on the inner wall of the shackle and fixes chamber, rotation is equipped in the fixing intracavitary Shaft is equipped with eccentric wheel in the rotary shaft, and the shell is stretched out and on the top of the rotary shaft in the top of the rotary shaft Portion is equipped with rotation journal stirrup, and the wheel side activity of the eccentric wheel, which is stretched into the shackle and is pressed on vertical guide post, realizes shell The fixation of body is equipped with object placing cavity in the shell, is equipped with voice guard in the outside of the shell, the object placing cavity contains First-aid medicine.
Buffer spring is equipped between column and the compression location hole in described compress.
It is equipped between the bottom surface of the shell and the clamp ring of mobile strut bottom end and compresses forced spring.
Buffering compression spring is equipped between the top surface of the shell and the clamp ring on mobile strut top.
The application method of electric power tower maintenance equipment with attention device, including following operating procedure:
Clamp ring and shackle are clamped on the vertical guide post of electric power tower by step A respectively, first by rotating journal stirrup So that eccentric wheel is rotated and the surface for being pressed on vertical guide post makes shackle locking be scheduled on vertical guide post;
Step B makes vertical cylinder be in tensional state, and the right-angled trapezium fixture block disengaging on control-rod at this time compresses column, to Upper pulling makes the clamp ring at mobile strut both ends be moved on vertical guide post, and cylinder is in contraction state at this time, when mobile strut When being moved to certain altitude, the bottom surface of shackle is made to be pressed on the piston shaft of cylinder;
Step C starts vertical cylinder, control-rod is made to move down, make the inclined surface of right-angled trapezium fixture block be pressed down against to Compression leg, make clamp ring pass through compress column be fixed on be oriented to guide post on, then adjust rotation journal stirrup, make shackle be in unclamp shape State;
Step D starts cylinder, cylinder is made to extend upwards, to push up shell, repeats step A.
The present invention has the effect of positive:The structure of the present invention is simple, and simple operation can effectively and quickly realize shell Elevating control, and substantially increase stability in use and safety in utilization, for being carried compared to artificial climbing, can carry Heavier article, and will not increase the burden of climbing personnel, stability in use is good, strong applicability and practicability is good, object placing cavity It helps meet an urgent need for high-altitude containing first-aid medicine.Operating method disclosed by the invention is easy, and substantially increases stability in use, fits It is strong and applied widely with property.
Description of the drawings
In order to make the content of the present invention more clearly understood, right below according to specific embodiment and in conjunction with attached drawing The present invention is described in further detail, wherein:
Fig. 1 is the structural diagram of the present invention.
Specific implementation mode
(embodiment 1)
Fig. 1 shows a kind of specific implementation mode of the present invention, wherein Fig. 1 is the structural diagram of the present invention.
See Fig. 1, a kind of electric power tower maintenance equipment with attention device, including is used for the vertical guide post along electric power tower 1 apparatus body moved up and down, the apparatus body includes shell 2 and mobile strut 3, at the both ends of the mobile strut 3 It is equipped with clamp ring 4, the clamp ring 4 is clamped on the vertical guide post 1, and the shell 2 is equipped with shackle 5, in the lock Tightly the connecting plate between snap ring 5 and the shell 2 is equipped with through-hole 6, and the mobile strut 3 passes through the through-hole 6, the locking Snap ring 5 is clamped on the vertical guide post 1 and the shackle 5 is between the clamp ring 4 at 3 both ends of mobile strut, described The bottom end clamp ring 4 of mobile strut 3 is equipped with the cavity 7 of top surface opening, and cylinder 8 is equipped in the cavity 7, the cylinder 8 Piston shaft 9 is pressed on the bottom surface of the shell 2, is equipped in the clamp ring 4 and is compressed location hole 10, in the compression location hole It is equipped in 10 and compresses column 11, cavity 12 is equipped in the mobile strut 3, the cavity 12 is connected with the compression location hole 10 It is logical, it is equipped with control-rod 13 in the cavity 12, right-angled trapezium fixture block 14 and right angle ladder are equipped on the control-rod 13 14 short side of shape fixture block is arranged below, and the column 11 that compresses is pressed in the trapezoidal faces of the right-angled trapezium fixture block 14, described The top of mobile strut 3 is equipped with vertical cylinder 15, and the mobile strut 3 is stretched out and in the control in the top of the control-rod 13 The top of bar 13 is equipped with transverse plate 16, and the bottom surface of the transverse plate 16 is fixed on the piston shaft of the vertical cylinder 15, in institute The inner wall for stating shackle 5 is equipped with fixing chamber 17, rotary shaft 18 is equipped in the fixing chamber 17, in the rotary shaft 18 Equipped with eccentric wheel 19, the top of the rotary shaft 18 stretches out the shell 2 and is equipped with rotation branch at the top of the rotary shaft 18 The fixation that shell is realized on vertical guide post is stretched into the shackle and is pressed in the wheel side activity of ear 20, the eccentric wheel, It is equipped with object placing cavity 21 in the shell, is equipped with voice guard 22 in the outside of the shell, the object placing cavity 21 is containing anxious Cure product.
Buffer spring 23 is equipped between column 11 and the compression location hole 10 in described compress.
It is equipped between the clamp ring 4 of 3 bottom end of the bottom surface of the shell 2 and mobile strut and compresses forced spring 24.
Buffering compression spring 25 is equipped between the clamp ring 4 on 3 top of the top surface of the shell 2 and mobile strut.
The structure of the present invention is simple, and simple operation can effectively and quickly realize the elevating control of shell, and carry significantly High stability in use and safety in utilization can carry heavier article, and will not increase for being carried compared to artificial climbing Add the burden of climbing personnel, stability in use is good, strong applicability and practicability is good.
The application method for the electric power tower maintenance equipment with attention device that the invention also discloses a kind of simultaneously, including such as Lower operating procedure:
Clamp ring and shackle are clamped on the vertical guide post of electric power tower by step A respectively, first by rotating journal stirrup So that eccentric wheel is rotated and the surface for being pressed on vertical guide post makes shackle locking be scheduled on vertical guide post;
Step B makes vertical cylinder be in tensional state, and the right-angled trapezium fixture block disengaging on control-rod at this time compresses column, to Upper pulling makes the clamp ring at mobile strut both ends be moved on vertical guide post, and cylinder is in contraction state at this time, when mobile strut When being moved to certain altitude, the bottom surface of shackle is made to be pressed on the piston shaft of cylinder;
Step C starts vertical cylinder, control-rod is made to move down, make the inclined surface of right-angled trapezium fixture block be pressed down against to Compression leg, make clamp ring pass through compress column be fixed on be oriented to guide post on, then adjust rotation journal stirrup, make shackle be in unclamp shape State;
Step D starts cylinder, cylinder is made to extend upwards, to push up shell, repeats step A.
Operating method disclosed by the invention is easy, and substantially increases stability in use, strong applicability and the scope of application Extensively.
Obviously, the above embodiment of the present invention be only to clearly illustrate example of the present invention, and not be pair The restriction of embodiments of the present invention.For those of ordinary skill in the art, may be used also on the basis of the above description To make other variations or changes in different ways.There is no necessity and possibility to exhaust all the enbodiments.And these The obvious changes or variations that the connotation for belonging to of the invention is extended out still fall within protection scope of the present invention.

Claims (5)

  1. Include for vertical guide post moves up and down along electric power tower equipment sheet 1. a kind of electric power tower maintenance equipment Body, it is characterised in that:The apparatus body includes shell and mobile strut, and clamp ring is equipped at the both ends of the mobile strut, The clamp ring is clamped on the vertical guide post, and the shell is equipped with shackle, in the shackle and the shell Between connecting plate be equipped with through-hole, the mobile strut passes through the through-hole, and the shackle, which is clamped in, described vertically leads On column and the shackle is between the clamp ring at mobile strut both ends, and top is equipped on the bottom end clamp ring of the mobile strut The cavity of face opening, is equipped with cylinder, the piston shaft of the cylinder is pressed on the bottom surface of the shell, in institute in the cavity It states to be equipped in clamp ring and compresses location hole, be equipped in the compression location hole and compress column, cavity is equipped in the mobile strut, The cavity is connected with the compression location hole, and control-rod is equipped in the cavity, and right angle is equipped on the control-rod The trapezoidal fixture block and right-angled trapezium fixture block short side is arranged below, the ladder for compressing column and being pressed on the right-angled trapezium fixture block On shape face, vertical cylinder is equipped at the top of the mobile strut, the top of the control-rod stretch out the mobile strut and The top of the control-rod is equipped with transverse plate, and the bottom surface of the transverse plate is fixed on the piston shaft of the vertical cylinder, in institute The inner wall for stating shackle is equipped with fixing chamber, is equipped with rotary shaft in the fixing intracavitary, bias is equipped in the rotary shaft The top of wheel, the rotary shaft stretches out the shell and is equipped with rotation journal stirrup at the top of the rotary shaft, the eccentric wheel Wheel side activity is stretched into the shackle and is pressed on the fixation for realizing shell on vertical guide post, is equipped with and sets in the shell Object chamber is equipped with voice guard in the outside of the shell, and the object placing cavity contains first-aid medicine.
  2. 2. electric power tower maintenance equipment according to claim 1, it is characterised in that:Determine with described compress in the column that compresses Position is equipped with buffer spring between hole.
  3. 3. electric power tower maintenance equipment according to claim 2, it is characterised in that:In the bottom surface of the shell and mobile branch It is equipped between the clamp ring of bar bottom end and compresses forced spring.
  4. 4. electric power tower maintenance equipment according to claim 3, it is characterised in that:In the top surface of the shell and mobile branch Buffering compression spring is equipped between the clamp ring on bar top.
  5. 5. the application method of electric power tower maintenance equipment according to claim 1, it is characterised in that:Including operating step as follows Suddenly:
    Clamp ring and shackle are clamped on the vertical guide post of electric power tower by step A respectively, are made partially by rotating journal stirrup first Heart wheel rotate and be pressed on vertical guide post surface make shackle locking be scheduled on vertical guide post;
    Step B makes vertical cylinder be in tensional state, and the right-angled trapezium fixture block disengaging on control-rod at this time compresses column, pulls up The dynamic clamp ring for making mobile strut both ends moves on vertical guide post, and cylinder is in contraction state at this time, when mobile strut movement When to certain altitude, the bottom surface of shackle is made to be pressed on the piston shaft of cylinder;
    Step C starts vertical cylinder, control-rod is made to move down, and so that the inclined surface of right-angled trapezium fixture block is pressed down against and compresses column, Make clamp ring pass through compress column be fixed on be oriented to guide post on, then adjust rotation journal stirrup, so that shackle is in releasing orientation;
    Step D starts cylinder, cylinder is made to extend upwards, to push up shell, repeats step A.
CN201610439065.5A 2016-06-19 2016-06-19 A kind of electric power tower maintenance equipment and application method Active CN106044650B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610439065.5A CN106044650B (en) 2016-06-19 2016-06-19 A kind of electric power tower maintenance equipment and application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610439065.5A CN106044650B (en) 2016-06-19 2016-06-19 A kind of electric power tower maintenance equipment and application method

Publications (2)

Publication Number Publication Date
CN106044650A CN106044650A (en) 2016-10-26
CN106044650B true CN106044650B (en) 2018-08-14

Family

ID=57168409

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610439065.5A Active CN106044650B (en) 2016-06-19 2016-06-19 A kind of electric power tower maintenance equipment and application method

Country Status (1)

Country Link
CN (1) CN106044650B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102068768A (en) * 2011-01-27 2011-05-25 鞍山拜尔自控有限公司 Follow-up clamp type climbing fire fighting rescue capsule
CN202028122U (en) * 2011-03-04 2011-11-09 浙江工业大学 Mechanical automatic tree-climbing machine
CN102407004A (en) * 2011-10-21 2012-04-11 沈阳建筑大学 Multifunctional automatic climbing device
CN105271010A (en) * 2015-10-13 2016-01-27 纽科伦(新乡)起重机有限公司 Self-climbing crane

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100001123U (en) * 2008-07-24 2010-02-03 이병영 Self-standing auto climbing apparatus and system using the same

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102068768A (en) * 2011-01-27 2011-05-25 鞍山拜尔自控有限公司 Follow-up clamp type climbing fire fighting rescue capsule
CN202028122U (en) * 2011-03-04 2011-11-09 浙江工业大学 Mechanical automatic tree-climbing machine
CN102407004A (en) * 2011-10-21 2012-04-11 沈阳建筑大学 Multifunctional automatic climbing device
CN105271010A (en) * 2015-10-13 2016-01-27 纽科伦(新乡)起重机有限公司 Self-climbing crane

Also Published As

Publication number Publication date
CN106044650A (en) 2016-10-26

Similar Documents

Publication Publication Date Title
RU2693960C1 (en) Method of preventing person from falling when rising and lowering on supports of overhead transmission lines and device therefor
CN105870839B (en) A kind of electric wire pole anchor ear
WO2016100847A3 (en) Polymer metal-organic framework composites
CN201220050Y (en) Device for tying and hanging safety belt rope for examine and repair operation of large-sized transformer
CN202590203U (en) Anti-falling pole-winding assistant belt and anti-falling safety belt
CN205759484U (en) Novel climbing rod grappler
CN204230769U (en) Climb type steel cable ladder
WO2013149437A1 (en) Pylon ladder provided with detachable rest platform
CN107086352A (en) A kind of adjustable communication pole of aerial angle
CN105536172A (en) Falling prevention device for pole tower and safe construction method for electric pole tower
CN107989361A (en) A kind of construction hydraulic formwork climbing device
CN210342857U (en) Railway communication tower base
CN108054636A (en) A kind of portable stretchable lightning protection electric installation
CN105162039A (en) Portable grounding wire transmitter and using method
CN202876157U (en) Auxiliary device for hook mounting band
CN208570984U (en) A kind of novel short circuit grounding wire device
CN208521742U (en) A kind of device for fixing transformer
CN105119172B (en) A kind of switch cubicle is special to aid in equipment of ascending a height
CN202924590U (en) Novel crane hook anti-drop device
CN204684490U (en) Arrester maintenance safety band hook support
CN207609232U (en) A kind of holding pole structure and lamp stand communication tower
CN108033338B (en) A kind of building construction hoist rope broken protector
CN207003981U (en) A kind of movable altitude operation protective frame with safety supports
CN207429603U (en) A kind of multi-functional upper limbs rehabilitation training equipment
CN203488086U (en) Insulating ladder for high-hung and low-used type fixed safety belt

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180704

Address after: 362100 Huian, Fujian Province, Hui County, Bai village, Chun Chun Tian Yin 135

Applicant after: Guo Tingting

Address before: 211224 Huajing pharmaceutical company, No. 1, industrial zone, Crystal Bridge Town, Lishui District, Nanjing, Jiangsu

Applicant before: The wide informational inquiry centre of Nanjing China

Effective date of registration: 20180704

Address after: 362100 Huian, Fujian Province, Hui County, Bai village, Chun Chun Tian Yin 135

Applicant after: Guo Tingting

Address before: 211224 Huajing pharmaceutical company, No. 1, industrial zone, Crystal Bridge Town, Lishui District, Nanjing, Jiangsu

Applicant before: The wide informational inquiry centre of Nanjing China

GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: No. 188, Baima Industrial Park, Gaogang District, Taizhou City, Jiangsu Province

Patentee after: Guo Tingting

Address before: 362100 Huian, Fujian Province, Hui County, Bai village, Chun Chun Tian Yin 135

Patentee before: Guo Tingting

Address after: No. 188, Baima Industrial Park, Gaogang District, Taizhou City, Jiangsu Province

Patentee after: Guo Tingting

Address before: 362100 Huian, Fujian Province, Hui County, Bai village, Chun Chun Tian Yin 135

Patentee before: Guo Tingting

CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: No. 16, Tongjiang Avenue, Chengguan Town, Nandan county, Hechi City, Guangxi Zhuang Autonomous Region

Patentee after: Guo Tingting

Address before: No. 188, Baima Industrial Park, Gaogang District, Taizhou City, Jiangsu Province

Patentee before: Guo Tingting