CN106025927A - Insulator replacement assisting fixture - Google Patents
Insulator replacement assisting fixture Download PDFInfo
- Publication number
- CN106025927A CN106025927A CN201610559133.1A CN201610559133A CN106025927A CN 106025927 A CN106025927 A CN 106025927A CN 201610559133 A CN201610559133 A CN 201610559133A CN 106025927 A CN106025927 A CN 106025927A
- Authority
- CN
- China
- Prior art keywords
- limiting member
- fixing hole
- limit part
- clamping part
- limiter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
Landscapes
- Electric Cable Installation (AREA)
Abstract
Description
技术领域technical field
本发明涉及电力领域领域,特指一种更换绝缘子辅助夹具。The invention relates to the field of electric power, in particular to an auxiliary clamp for replacing insulators.
背景技术Background technique
输电线路检修作业均为需要登塔的高空作业,而且检修作业中以更换线路绝缘子所占的比重最大。在更换绝缘子的作业过程中,绝缘子的起吊、传递是作业过程中必不可少的重要环节。Transmission line maintenance operations are high-altitude operations that require climbing towers, and the replacement of line insulators accounts for the largest proportion of maintenance operations. In the operation process of replacing insulators, the lifting and transfer of insulators are indispensable and important links in the operation process.
传统的(玻璃)绝缘子更换作业方式是:地面用绳索将绝缘子捆绑好,通过绳索传递至铁塔横担处,高空作业人员在高空解开绳索,再进行绝缘子的安装。The traditional (glass) insulator replacement operation method is: bind the insulators with ropes on the ground, pass them to the cross arm of the iron tower through the ropes, and the high-altitude workers untie the ropes at high altitude, and then install the insulators.
但是以上方式存在以下几个问题:But the above method has the following problems:
绳结打法不一致、拆解绳索费时费力;The knots are inconsistent, and it takes time and effort to dismantle the ropes;
绳索捆绑不牢固,(玻璃)绝缘子存在脱落的可能;The rope binding is not firm, and the (glass) insulator may fall off;
起吊过程中,(玻璃)绝缘子容易发生损毁。(Glass) insulators are prone to damage during lifting.
因此,本发明人对此做进一步研究,研发出一种更换绝缘子辅助夹具,本案由此产生。Therefore, the inventor made further research on this, and developed an auxiliary clamp for replacing insulators, and this case arose from this.
发明内容Contents of the invention
本发明的目的在于提供一种更换绝缘子辅助夹具,拆装灵活,效率高。The object of the present invention is to provide an auxiliary fixture for replacing insulators, which is flexible in assembly and disassembly and high in efficiency.
为了实现上述目的,本发明的技术方案如下:In order to achieve the above object, the technical scheme of the present invention is as follows:
一种更换绝缘子辅助夹具,包括左限位件、右限位件,所述左限位件包括半圆环状的夹持部,夹持部两侧向外延伸形成固定部,所述固定部的端部开设有固定孔,所述右限位件与左限位件对称设置。An auxiliary fixture for replacing insulators, including a left limiter and a right limiter, the left limiter includes a semi-circular clamping part, the two sides of the clamping part extend outward to form a fixed part, and the fixed part A fixing hole is opened at the end, and the right limiter and the left limiter are arranged symmetrically.
进一步,所述左限位件的固定部与右限位件的固定部的固定孔能重叠在一起。Further, the fixing holes of the fixing part of the left limiting part and the fixing part of the right limiting part can overlap together.
进一步,所述左限位件与右限位件的固定孔能通过螺栓固定,所述螺栓上设置有拉环。Further, the fixing holes of the left limiter and the right limiter can be fixed by bolts, and pull rings are arranged on the bolts.
采用上述方案后,本发明与现有技术相比,具有以下优点:After adopting the above scheme, the present invention has the following advantages compared with the prior art:
可以做到垂直起吊绝缘子串,起吊过程中绝缘子串磕碰杆塔的现象明显减少,降低了发生绝缘子串因磕碰杆塔而引起破损的可能性;避免了找绳结的情况,直接拧开螺丝松开绝缘子串,大幅降低了解绳时间;减少了绑扎时间,不会发生因绝缘绳绑扎不牢固引起的绝缘子串脱落现象。The insulator string can be lifted vertically, and the phenomenon of the insulator string colliding with the tower during the lifting process is significantly reduced, reducing the possibility of damage caused by the insulator string colliding with the tower; avoiding the situation of finding a knot, directly unscrew the screw to loosen the insulator string, which greatly reduces the time for understanding the rope; reduces the binding time, and will not cause the insulator string to fall off due to loose binding of the insulating rope.
附图说明Description of drawings
图1是本发明的示意图;Fig. 1 is a schematic diagram of the present invention;
标号说明Label description
左限位件1,右限位件2,夹持部3,固定部4,固定孔5,Left limiter 1, right limiter 2, clamping part 3, fixing part 4, fixing hole 5,
螺栓6。Bolt 6.
具体实施方式detailed description
下面结合附图和具体实施例对本发明作进一步的说明。The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
如图所示,一种更换绝缘子辅助夹具,包括左限位件1、右限位件2,左限位件1与右限位件2结构对称,皆包括半圆环状的夹持部3,夹持部3两侧向外延伸形成固定部4,固定部4的端部开设有固定孔5,左限位件1的固定部4与右限位件2的固定部4的固定孔5能重叠在一起,通过在固定孔5穿设螺栓6,能将左限位件1、右限位件2固定在一起,两者的半圆环状的夹持部3形成一个圆孔,该圆孔用于卡合绝缘子,在穿设固定孔5的螺栓6上设置拉环,再通过链条,能将该辅助夹具很平稳的吊起。As shown in the figure, an auxiliary fixture for replacing an insulator includes a left limiter 1 and a right limiter 2. The left limiter 1 and the right limiter 2 are symmetrical in structure, and both include a semicircular clamping part 3. Both sides of the clamping part 3 extend outward to form a fixed part 4, and the end of the fixed part 4 is provided with a fixed hole 5, and the fixed part 4 of the left limiter 1 and the fixed hole 5 of the fixed part 4 of the right limiter 2 can Overlap together, by passing through the bolt 6 in the fixing hole 5, the left limiter 1 and the right limiter 2 can be fixed together, and the semicircular clamping part 3 of the two forms a circular hole, and the circular hole For engaging the insulator, a pull ring is provided on the bolt 6 passing through the fixing hole 5, and then the auxiliary fixture can be lifted smoothly through the chain.
上述仅为本发明的具体实施例,但本发明的设计构思并不局限于此,凡利用此构思对本发明进行非实质性的改动,均应属于侵犯本发明保护范围的行为。The above is only a specific embodiment of the present invention, but the design concept of the present invention is not limited thereto, any non-substantial changes to the present invention by using this concept should be an act of violating the protection scope of the present invention.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610559133.1A CN106025927A (en) | 2016-07-14 | 2016-07-14 | Insulator replacement assisting fixture |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610559133.1A CN106025927A (en) | 2016-07-14 | 2016-07-14 | Insulator replacement assisting fixture |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN106025927A true CN106025927A (en) | 2016-10-12 |
Family
ID=57118129
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610559133.1A Pending CN106025927A (en) | 2016-07-14 | 2016-07-14 | Insulator replacement assisting fixture |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106025927A (en) |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2009005540A (en) * | 2007-06-25 | 2009-01-08 | Chugoku Electric Power Co Inc:The | Indirect live line tool and indirect live line tool component |
| CN201898298U (en) * | 2010-11-26 | 2011-07-13 | 江苏省电力公司连云港供电公司 | Insulating device for replacing conducting wire at lower end of insulator |
| CN203813331U (en) * | 2014-05-13 | 2014-09-03 | 国家电网公司 | Bottle lifting device special for insulator chain |
| CN205846580U (en) * | 2016-07-14 | 2016-12-28 | 国网浙江临安市供电公司 | A kind of replacing insulator auxiliary clamp |
-
2016
- 2016-07-14 CN CN201610559133.1A patent/CN106025927A/en active Pending
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2009005540A (en) * | 2007-06-25 | 2009-01-08 | Chugoku Electric Power Co Inc:The | Indirect live line tool and indirect live line tool component |
| CN201898298U (en) * | 2010-11-26 | 2011-07-13 | 江苏省电力公司连云港供电公司 | Insulating device for replacing conducting wire at lower end of insulator |
| CN203813331U (en) * | 2014-05-13 | 2014-09-03 | 国家电网公司 | Bottle lifting device special for insulator chain |
| CN205846580U (en) * | 2016-07-14 | 2016-12-28 | 国网浙江临安市供电公司 | A kind of replacing insulator auxiliary clamp |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203456796U (en) | Broadsword fixture for replacing single insulator of duplex insulator string during power failure | |
| CN203456797U (en) | Broadsword fixture for replacing entire string of insulator of duplex insulator string during power failure | |
| CN104003291B (en) | A kind of power plant boiler equipment installation single track is walked suspender | |
| CN103979403B (en) | Cable terminations head is used to promote the method for jig lifting cable | |
| CN102661057B (en) | Power angle tower pull leg main material changing method and special main material clamp | |
| CN104242153B (en) | Change UHVDC Transmission Lines anchor support monolithic 550kN glass insulator construction technologies | |
| CN104362544A (en) | Pulley type tower head clamp | |
| CN203312700U (en) | Tension tower wire end LF-type yoke plate fixing clamp | |
| CN205846580U (en) | A kind of replacing insulator auxiliary clamp | |
| CN205114816U (en) | Compound rigging that promotes of sewage pump | |
| CN203806962U (en) | Cable terminal head lifting fixture | |
| CN202197048U (en) | Double angle steel hanging point lifting and connecting tool for tower use | |
| CN203965695U (en) | Protection type optical fiber down lead clip | |
| CN105384089A (en) | Tower crane cargo boom pull rod structure | |
| CN204131004U (en) | Four loop straight line steel tube tower circle cross-arm jigs | |
| CN204326677U (en) | Novel power transmission power line steel tuble pole | |
| CN207926066U (en) | A kind of simple replacement gold utensil string devices | |
| CN204858403U (en) | Change V -arrangement insulator hangs some fixing device to transmission line temporarily with electricity | |
| CN204030507U (en) | A kind of steel pipe pole cross-arm escape way device | |
| CN202627464U (en) | Steel pipe rod connection hoop | |
| CN102664370A (en) | Wire hanging hook | |
| CN202616658U (en) | Suspension string insulator replacement device of 220kV circuit | |
| CN106058725B (en) | Tension joint plate gripper and its working method | |
| CN107706815A (en) | A kind of charged for replacement 35kV strain insulator string specific purpose tools | |
| CN204174621U (en) | A chain-type pile clamping box |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161012 |
|
| RJ01 | Rejection of invention patent application after publication |