CN106017526A - Suspension and fine-tuning device for horizontal bar and suspension device with randomly adjustable spatial position - Google Patents
Suspension and fine-tuning device for horizontal bar and suspension device with randomly adjustable spatial position Download PDFInfo
- Publication number
- CN106017526A CN106017526A CN201610503821.6A CN201610503821A CN106017526A CN 106017526 A CN106017526 A CN 106017526A CN 201610503821 A CN201610503821 A CN 201610503821A CN 106017526 A CN106017526 A CN 106017526A
- Authority
- CN
- China
- Prior art keywords
- suspension
- guide rail
- rod
- horizon bar
- suspension rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01D—MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
- G01D11/00—Component parts of measuring arrangements not specially adapted for a specific variable
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Machines For Laying And Maintaining Railways (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
本发明涉及一种水平杆悬吊及微调装置,包括导轨、吊杆组件;吊杆组件包括同轴设置且从上之下依次螺纹连接的第一吊杆、调节筒和第二吊杆;本发明还涉及一种采用该悬吊及微调装置的空间位置任意可调的悬挂装置,包括固定部、调节单元、悬挂部,固定部上端与安装基础连接;悬挂部下端与被悬挂物连接;调节单元包括水平杆以及至少两组用于悬吊水平杆的调节单元;调节单元采用上述水平杆悬吊及微调装置。本发明解决了现有技术中的悬挂装置无法根据需要调节待测物体在空间的位置的技术问题,通过调节单元可以调节待测物体在空间的位置。
The invention relates to a horizontal rod suspension and fine-tuning device, which includes a guide rail and a suspension rod assembly; the suspension rod assembly includes a first suspension rod, an adjustment cylinder and a second suspension rod which are coaxially arranged and screw-connected sequentially from top to bottom; The invention also relates to a suspension device with arbitrarily adjustable spatial position using the suspension and fine-tuning device, which includes a fixing part, an adjustment unit, and a hanging part. The upper end of the fixing part is connected to the installation foundation; The unit includes a horizontal rod and at least two sets of adjustment units for suspending the horizontal rod; the adjustment unit adopts the above-mentioned horizontal rod suspension and fine-tuning device. The invention solves the technical problem that the suspension device in the prior art cannot adjust the position of the object to be measured in space as required, and the position of the object to be measured in space can be adjusted through the adjustment unit.
Description
技术领域technical field
本发明涉及实验设备领域,具体而言,涉及一种位置任意可调的悬挂装置。The invention relates to the field of experimental equipment, in particular to a suspension device whose position can be adjusted arbitrarily.
背景技术Background technique
在实验室有些实验需要将待测物体悬挂,现有的悬挂装置一般为固定式,无法根据需要调节待测物体在空间的位置,从而对实验造成了严重的影响。In some experiments in the laboratory, the object to be measured needs to be suspended. The existing suspension device is generally fixed, and the position of the object to be measured in space cannot be adjusted according to the needs, which has seriously affected the experiment.
针对现有技术中的悬挂装置无法根据需要调节待测物体在空间位置的技术问题,目前尚未提出有效的解决方案。Aiming at the technical problem that the suspension device in the prior art cannot adjust the spatial position of the object to be measured as required, no effective solution has been proposed so far.
发明内容Contents of the invention
本发明目的是提供一种水平杆悬吊及微调装置以及一种空间位置任意可调的悬挂装置,其解决了现有技术中的悬挂装置无法根据需要调节待测物体在空间的位置的技术问题。The object of the present invention is to provide a horizontal bar suspension and fine-tuning device and a suspension device with any adjustable spatial position, which solves the technical problem that the suspension device in the prior art cannot adjust the position of the object to be measured in space according to the needs .
本发明的技术解决方案是:Technical solution of the present invention is:
一种水平杆悬吊及微调装置,其特殊之处是,包括调节单元;所述调节单元包括导轨、吊杆组件;所述吊杆组件包括同轴设置且从上之下依次螺纹连接的第一吊杆、调节筒和第二吊杆;所述调节筒通过螺纹连接调节第一吊杆和第二吊杆之间的距离;所述导轨、吊杆组件和水平杆两两相互垂直;所述导轨为方形柱状结构,其上下表面设置有轨道;所述固定部下端与导轨上表面的轨道连接,所述第一吊杆的上端与导轨下表面的轨道连接;所述第二吊杆的下端与水平杆连接。A horizontal rod suspension and fine-tuning device, which is special in that it includes an adjustment unit; the adjustment unit includes a guide rail and a boom assembly; A suspension rod, an adjustment cylinder and a second suspension rod; the adjustment cylinder adjusts the distance between the first suspension rod and the second suspension rod through threaded connection; the guide rails, the suspension rod assembly and the horizontal rod are perpendicular to each other; The guide rail is a square columnar structure, and its upper and lower surfaces are provided with rails; the lower end of the fixed part is connected to the rail on the upper surface of the guide rail, and the upper end of the first suspension rod is connected to the rail on the lower surface of the guide rail; The lower end is connected with a horizontal rod.
上述吊杆组件还包括微调架;所述水平杆上设置有与调节单元数量一致的下连接孔;所述下连接孔上下贯通水平杆;所述微调架包括上平台、下平台、设置在上平台和下平台之间的两个连接柱;所述上平台上设置有腰形孔;所述下平台上设置有上连接孔;所述第二吊杆的下端穿过腰形孔并与其连接;螺栓或螺杆穿过上连接孔和下连接孔将所述下平台和水平杆固连。The above-mentioned boom assembly also includes a fine-tuning frame; the horizontal rod is provided with lower connecting holes consistent with the number of adjustment units; the lower connecting holes pass through the horizontal rod up and down; the fine-tuning frame includes an upper platform, a lower platform, and a Two connecting columns between the platform and the lower platform; the upper platform is provided with a waist-shaped hole; the lower platform is provided with an upper connection hole; the lower end of the second suspension rod passes through the waist-shaped hole and is connected to it ; Bolts or screw rods pass through the upper connecting hole and the lower connecting hole to securely connect the lower platform and the horizontal bar.
一种空间位置任意可调的悬挂装置,包括固定部、悬挂部,所述固定部上端与安装基础连接;所述悬挂部下端与被悬挂物连接;其特殊之处是:还包括调节单元;所述调节单元包括水平杆以及至少两组用于悬吊水平杆的调节单元;所述调节单元包括导轨、吊杆组件;所述吊杆组件包括同轴设置且从上之下依次螺纹连接的第一吊杆、调节筒和第二吊杆;所述调节筒通过螺纹连接调节第一吊杆和第二吊杆之间的距离;所述导轨、吊杆组件和水平杆两两相互垂直;所述导轨为方形柱状结构,其上下表面设置有轨道;所述固定部下端与导轨上表面的轨道连接,所述第一吊杆的上端与导轨下表面的轨道连接;所述第二吊杆的下端与水平杆连接;所述悬挂部的上端与水平杆连接。A suspension device with adjustable spatial position, comprising a fixing part and a hanging part, the upper end of the fixing part is connected to the installation foundation; the lower end of the hanging part is connected to the object to be hung; the special feature is that it also includes an adjustment unit; The adjustment unit includes a horizontal rod and at least two groups of adjustment units for suspending the horizontal rod; the adjustment unit includes a guide rail and a boom assembly; The first suspension rod, the adjustment cylinder and the second suspension rod; the adjustment cylinder adjusts the distance between the first suspension rod and the second suspension rod through threaded connection; the guide rails, the suspension rod assembly and the horizontal rod are perpendicular to each other; The guide rail is a square columnar structure with tracks on the upper and lower surfaces; the lower end of the fixing part is connected to the track on the upper surface of the guide rail, and the upper end of the first suspender is connected to the track on the lower surface of the guide rail; the second suspender The lower end of the hanging part is connected with the horizontal bar; the upper end of the suspension part is connected with the horizontal bar.
为了保证吊杆组件和水平杆之间的严格垂直关系,上述吊杆组件还包括微调架;所述水平杆上设置有与调节单元数量一致的下连接孔;所述下连接孔上下贯通水平杆;所述微调架包括上平台、下平台、设置在上平台和下平台之间的两个连接柱;所述上平台上设置有腰形孔;所述下平台上设置有上连接孔;所述第二吊杆的下端穿过腰形孔并与其连接;螺栓或螺杆穿过上连接孔和下连接孔将所述下平台和水平杆固连。In order to ensure a strict vertical relationship between the boom assembly and the horizontal bar, the above-mentioned boom assembly also includes a fine-tuning frame; the horizontal bar is provided with lower connecting holes consistent with the number of adjustment units; the lower connecting holes run through the horizontal bar up and down ; The fine-tuning frame includes an upper platform, a lower platform, and two connecting columns arranged between the upper platform and the lower platform; the upper platform is provided with a waist-shaped hole; the lower platform is provided with an upper connection hole; The lower end of the second suspension rod passes through the waist-shaped hole and is connected thereto; the bolt or screw rod passes through the upper connecting hole and the lower connecting hole to securely connect the lower platform and the horizontal bar.
为实现悬挂部可沿水平杆自由滑动且不受吊杆组件的影响,上述悬挂部包括Y形架、悬挂杆以及两个滚轮,所述两个滚轮分别设置在Y形架的左端和右端的顶部且分别从左上方和右上方与水平杆相接触;所述Y形架下端与悬挂杆连接。In order to realize that the suspension part can slide freely along the horizontal bar without being affected by the suspension rod assembly, the above-mentioned suspension part includes a Y-shaped frame, a suspension rod and two rollers, and the two rollers are respectively arranged on the left end and the right end of the Y-shaped frame. The top is in contact with the horizontal bar from the upper left and the upper right respectively; the lower end of the Y-shaped frame is connected with the suspension bar.
为保证悬挂部与水平面严格垂直,上述Y形架下端与悬挂杆直径通过铰接方式连接。In order to ensure that the suspension part is strictly perpendicular to the horizontal plane, the lower end of the above-mentioned Y-shaped frame is connected to the diameter of the suspension rod through hinges.
为了能卡在安装基础的横梁上,上述固定部包括与调节单元数量一致的固定单元;所述固定单元包括两个C形架;两个C形架的上架体与安装基础连接,其下架体与导轨上表面轨道的两端部连接。In order to be able to be stuck on the beam of the installation foundation, the above-mentioned fixed part includes a fixed unit consistent with the number of adjustment units; the fixed unit includes two C-shaped frames; the upper frames of the two C-shaped frames are connected to the installation foundation, and the lower frame The body is connected with both ends of the track on the upper surface of the guide rail.
为方便固定部与悬挂部的快速连接,上述轨道为燕尾槽结构;所述固定部下端与导轨上表面的轨道通过螺栓连接,所述第一吊杆的上端与导轨下表面的轨道通过螺栓连接;所述螺栓头部可在轨道的燕尾槽结构内沿导轨方向移动。In order to facilitate the quick connection between the fixed part and the hanging part, the above-mentioned track is a dovetail groove structure; the lower end of the fixed part is connected to the track on the upper surface of the guide rail by bolts, and the upper end of the first suspender is connected to the track on the lower surface of the guide rail by bolts ; The head of the bolt can move along the direction of the guide rail in the dovetail groove structure of the track.
本发明优点:Advantages of the present invention:
本发明装置,通过设置与安装基础连接的固定部,固定部上设置有位置可调的调节单元,调节单元上设置有悬挂部,从而将待测物体悬挂连接在悬挂部上,通过调节单元可以调节待测物体在空间的位置。The device of the present invention is provided with a fixed part connected to the installation base, a position-adjustable adjustment unit is arranged on the fixed part, and a suspension part is arranged on the adjustment unit, so that the object to be measured is suspended and connected to the suspension part, and the adjustment unit can Adjust the position of the object to be measured in space.
附图说明Description of drawings
图1是本发明水平杆悬吊及微调装置、空间位置任意可调的悬挂装置的结构示意图;Fig. 1 is the structure schematic diagram of horizontal bar suspension and fine-tuning device of the present invention, the suspension device that space position can be adjusted arbitrarily;
图2是本发明C形架与导轨的连接结构示意图;Fig. 2 is the connection structure schematic diagram of C-shaped frame and guide rail of the present invention;
图3是本发明吊杆组件的结构示意图;Fig. 3 is a schematic structural view of the boom assembly of the present invention;
图4是本发明微调架的结构示意图;Fig. 4 is the structural representation of trimming frame of the present invention;
图5是本发明悬挂部的结构示意图;Fig. 5 is a schematic structural view of the suspension part of the present invention;
图中:1-固定部,11-C形架,12-锁紧螺栓,13-定位螺栓,21-导轨,211-滑槽,212-凸棱,22-第一吊杆,221-调节筒,23-水平杆,231-微调架,232-腰形孔,24-第二吊杆,3-悬挂部,311-第一栓耳,312-第二栓耳,313-第一滚轮,314-第二滚轮,32-悬挂杆。In the figure: 1-fixed part, 11-C-shaped frame, 12-locking bolt, 13-positioning bolt, 21-guide rail, 211-chute, 212-convex rib, 22-first suspender, 221-adjusting cylinder , 23-horizontal rod, 231-fine-tuning frame, 232-waist hole, 24-second suspension rod, 3-suspension part, 311-first bolt ear, 312-second bolt ear, 313-first roller, 314 - second roller, 32 - suspension rod.
具体实施方式detailed description
本发明水平杆悬吊及微调装置如图1所示,包括调节单元;调节单元包括导轨、吊杆组件;其具体结构参见悬挂装置相关部分。The horizontal bar suspension and fine-tuning device of the present invention is shown in Figure 1, and includes an adjustment unit; the adjustment unit includes a guide rail and a boom assembly; see the relevant parts of the suspension device for its specific structure.
采用本发明水平杆悬吊及微调装置的悬挂装置,如图1所示,通过设置与安装基础连接的固定部1,固定部1上设置有位置可调的调节单元,调节单元下方设置有水平杆23,从而将待测物体悬挂连接在水平杆23上的悬挂部3上,通过调节单元可以调节待测物体在空间的位置。The suspension device using the horizontal bar suspension and fine-tuning device of the present invention, as shown in Figure 1, is provided with a fixed part 1 connected to the installation base, a position-adjustable adjustment unit is arranged on the fixed part 1, and a horizontal adjustment unit is arranged below the adjustment unit. rod 23, so that the object to be measured is suspended and connected to the suspension part 3 on the horizontal rod 23, and the position of the object to be measured in space can be adjusted through the adjustment unit.
具体实施时,调节单元包括导轨21、吊杆组件、微调架;吊杆组件包括第一吊杆22、调节筒221和第二吊杆24;导轨21沿水平的第一方向设置,如图2所示,导轨21为方形柱体,在导轨21的四个侧面上分别设置有沿导轨21长度方向延伸的滑槽211,滑槽211的槽口处具有两条相对设置的凸棱212,两条凸棱212之间的宽度小于滑槽211内部的两个侧壁之间的宽度。固定部1上具有朝向侧方开设的C形架11,C形架11的上部设置有锁紧螺栓12,C形架11可以卡在安装基础的横梁上,通过锁紧螺栓12与横梁锁紧。C形架11的下部设置有定位螺栓13,定位螺栓13设置有两个,两个定位螺栓13的下部可滑动地卡设在导轨21上侧面的滑槽211中,从而使导轨21能够相对于固定部1沿导轨21的长度方向滑动。第一吊杆22的上端可滑动地卡设在导轨21的下侧面的滑槽211中且能够沿导轨21的长度方向滑动;水平杆23与第二吊杆24的下端连接,悬挂部3可滑动地设置在水平杆23上。第一吊杆22和第二吊杆24之间设置有调节筒221,如图3所示,调节筒221包括筒体和连接在筒体上下两端的两根螺旋线相反的丝杆,筒体的上下两端具有与两根丝杆匹配的螺孔,两个丝杆连接在筒体两端可以调节第一吊杆22和第二吊杆24之间的距离,从而调节悬挂部3的高度。During specific implementation, the adjustment unit includes a guide rail 21, a boom assembly, and a fine-tuning frame; the boom assembly includes a first boom 22, an adjustment cylinder 221, and a second boom 24; the guide rail 21 is arranged along a horizontal first direction, as shown in Figure 2 As shown, the guide rail 21 is a square cylinder, and the four sides of the guide rail 21 are respectively provided with chute 211 extending along the length direction of the guide rail 21. The notch of the chute 211 has two oppositely arranged ribs 212. The width between the ribs 212 is smaller than the width between the two side walls inside the slide groove 211 . The fixed part 1 has a C-shaped frame 11 opened towards the side. The upper part of the C-shaped frame 11 is provided with a locking bolt 12. The C-shaped frame 11 can be stuck on the beam of the installation foundation and locked with the beam through the locking bolt 12. . The bottom of C-shaped frame 11 is provided with positioning bolt 13, and positioning bolt 13 is provided with two, and the bottom of two positioning bolts 13 is slidably clamped in the chute 211 of guide rail 21 upper side, thereby guide rail 21 can be relative to The fixing part 1 slides along the length direction of the guide rail 21 . The upper end of the first suspension rod 22 is slidably clamped in the chute 211 of the lower side of the guide rail 21 and can slide along the length direction of the guide rail 21; the horizontal bar 23 is connected with the lower end of the second suspension rod 24, and the suspension part 3 can Slidingly arranged on the horizontal bar 23. An adjustment cylinder 221 is arranged between the first suspension rod 22 and the second suspension rod 24. As shown in FIG. The upper and lower ends of the upper and lower ends have screw holes matching the two screw rods, and the two screw rods are connected to the two ends of the cylinder to adjust the distance between the first suspender 22 and the second suspender 24, thereby adjusting the height of the suspension part 3 .
为了使水平杆23相对于第二吊杆24能够调节位置,第二吊杆24与水平杆23之间设置有微调架231,如图4所示,微调架231上设置有腰形孔232,第二吊杆24可滑动设置于条形滑孔中232中,能够沿水平杆23的长度方向在腰形孔232中滑动,从而微调第二吊杆24沿水平杆23的长度的方向的连接位置。In order to enable the horizontal rod 23 to adjust its position relative to the second suspension rod 24, a fine-tuning frame 231 is provided between the second suspension rod 24 and the horizontal rod 23, as shown in Figure 4, the fine-tuning frame 231 is provided with a waist-shaped hole 232, The second suspension rod 24 is slidably arranged in the strip-shaped sliding hole 232, and can slide in the waist-shaped hole 232 along the length direction of the horizontal rod 23, thereby fine-tuning the connection of the second suspension rod 24 along the length direction of the horizontal rod 23 Location.
为了使悬挂部3能够沿三维方向自由调节在空间的位置,可选地,第一吊杆22与导轨21相互垂直,水平杆23与第一吊杆22和导轨21分别垂直。设定导轨21沿固定部1滑动的方向,即导轨21的长度方向以及第一吊杆22沿导轨21滑动的方向为X轴,第一吊杆22沿水平杆23的滑动方向,即水平杆23的长度方向为Y轴,调节筒221调节第一吊杆22和第二吊杆24的长度的方向,即第一吊杆22的长度方向为Z轴,通过各个方向的调节,能够根据需要调节悬挂部3在空间的三维位置。In order to enable the hanging part 3 to freely adjust its position in space along the three-dimensional direction, optionally, the first suspender 22 and the guide rail 21 are perpendicular to each other, and the horizontal bar 23 is perpendicular to the first suspender 22 and the guide rail 21 respectively. Set the direction in which the guide rail 21 slides along the fixed part 1, that is, the length direction of the guide rail 21 and the direction in which the first suspender 22 slides along the guide rail 21 is the X axis, and the sliding direction of the first suspender 22 along the horizontal bar 23, that is, the horizontal bar The length direction of 23 is the Y axis, and the adjusting cylinder 221 adjusts the length direction of the first boom 22 and the second boom 24, that is, the length direction of the first boom 22 is the Z axis. Adjust the three-dimensional position of the suspension part 3 in space.
悬挂部3包括Y型架和悬挂杆32,待测物体直接与悬挂杆32连接,水平杆23为圆柱形杆体,如图5所示,Y型架的左端顶部具有第一栓耳311,右端顶部具有第二栓耳312,第一栓耳311上设置有第一滚轮313,第二栓耳312上设置有第二滚轮314,第一滚轮313和第二滚轮314之间具有预设夹角,第一栓耳311和第二栓耳312之间形成可容纳水平杆23的空隙,Y型架通过空隙环绕套设在水平杆23上使第一滚轮313和第二滚轮314沿水平杆23的上侧表面滚动。悬挂杆32位于Y型架的下方并与Y型架铰接,悬挂杆32与第一栓耳311和第二栓耳312构成“Y”字形,从而具有更好的稳定性。Suspension part 3 comprises Y-type frame and suspension rod 32, and object to be measured is directly connected with suspension rod 32, and horizontal rod 23 is a cylindrical rod body, and as shown in Figure 5, the left end top of Y-type frame has first bolt ear 311, the right end The top has a second lug 312, the first lug 311 is provided with a first roller 313, the second lug 312 is provided with a second roller 314, and there is a preset angle between the first roller 313 and the second roller 314 , A gap that can accommodate the horizontal rod 23 is formed between the first bolt ear 311 and the second bolt ear 312, and the Y-shaped frame is sleeved on the horizontal rod 23 through the gap to make the first roller 313 and the second roller 314 move along the horizontal rod 23. The upper surface of the roll is rolled. The suspension rod 32 is located below the Y-shaped frame and is hinged with the Y-shaped frame. The suspension rod 32 and the first bolt ear 311 and the second bolt ear 312 form a "Y" shape, thereby having better stability.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610503821.6A CN106017526B (en) | 2016-06-29 | 2016-06-29 | Horizon bar suspends in midair and the arbitrarily adjustable suspension arrangement in micromatic setting, spatial position |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610503821.6A CN106017526B (en) | 2016-06-29 | 2016-06-29 | Horizon bar suspends in midair and the arbitrarily adjustable suspension arrangement in micromatic setting, spatial position |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106017526A true CN106017526A (en) | 2016-10-12 |
| CN106017526B CN106017526B (en) | 2018-07-20 |
Family
ID=57104765
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610503821.6A Active CN106017526B (en) | 2016-06-29 | 2016-06-29 | Horizon bar suspends in midair and the arbitrarily adjustable suspension arrangement in micromatic setting, spatial position |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106017526B (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108119840A (en) * | 2016-11-29 | 2018-06-05 | 天津华彩信和电子科技集团股份有限公司 | For the device of bright fitted tube lamp fine adjustment |
| CN113752055A (en) * | 2021-09-01 | 2021-12-07 | 上海复合材料科技有限公司 | Clamping tool and method for vertical suspension machining of planar frame |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201509036U (en) * | 2009-09-02 | 2010-06-16 | 昆山沪光汽车电器有限公司 | Hanging hook |
| CN202024741U (en) * | 2011-03-08 | 2011-11-02 | 武汉理工大学 | Numerical control sample plate |
| CN102738746A (en) * | 2012-06-25 | 2012-10-17 | 山西省电力公司晋中供电分公司 | A flying car device across the spacer bars of high-voltage transmission lines |
| CN103954313A (en) * | 2014-04-09 | 2014-07-30 | 中国海洋大学 | A three-dimensional coordinate frame for wind and wave tanks |
| CN104096997A (en) * | 2013-04-12 | 2014-10-15 | 吴水鱼 | LED (Light Emitting Diode) lamp strip welding machine |
| CN104326368A (en) * | 2014-08-29 | 2015-02-04 | 北京卫星制造厂 | Gravity compensation device for solar wing low temperature unfolding experiment |
| CN204800626U (en) * | 2015-07-21 | 2015-11-25 | 大连瑞翔机电设备有限公司 | Three -dimensional walking robot |
| CN205785264U (en) * | 2016-06-29 | 2016-12-07 | 西安汾阳钢结构有限公司 | Any adjustable suspension arrangement in locus |
| CN205879207U (en) * | 2016-06-29 | 2017-01-11 | 西安汾阳钢结构有限公司 | Horizon bar suspends in midair and micromatic setting |
-
2016
- 2016-06-29 CN CN201610503821.6A patent/CN106017526B/en active Active
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201509036U (en) * | 2009-09-02 | 2010-06-16 | 昆山沪光汽车电器有限公司 | Hanging hook |
| CN202024741U (en) * | 2011-03-08 | 2011-11-02 | 武汉理工大学 | Numerical control sample plate |
| CN102738746A (en) * | 2012-06-25 | 2012-10-17 | 山西省电力公司晋中供电分公司 | A flying car device across the spacer bars of high-voltage transmission lines |
| CN104096997A (en) * | 2013-04-12 | 2014-10-15 | 吴水鱼 | LED (Light Emitting Diode) lamp strip welding machine |
| CN103954313A (en) * | 2014-04-09 | 2014-07-30 | 中国海洋大学 | A three-dimensional coordinate frame for wind and wave tanks |
| CN104326368A (en) * | 2014-08-29 | 2015-02-04 | 北京卫星制造厂 | Gravity compensation device for solar wing low temperature unfolding experiment |
| CN204800626U (en) * | 2015-07-21 | 2015-11-25 | 大连瑞翔机电设备有限公司 | Three -dimensional walking robot |
| CN205785264U (en) * | 2016-06-29 | 2016-12-07 | 西安汾阳钢结构有限公司 | Any adjustable suspension arrangement in locus |
| CN205879207U (en) * | 2016-06-29 | 2017-01-11 | 西安汾阳钢结构有限公司 | Horizon bar suspends in midair and micromatic setting |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108119840A (en) * | 2016-11-29 | 2018-06-05 | 天津华彩信和电子科技集团股份有限公司 | For the device of bright fitted tube lamp fine adjustment |
| CN113752055A (en) * | 2021-09-01 | 2021-12-07 | 上海复合材料科技有限公司 | Clamping tool and method for vertical suspension machining of planar frame |
Also Published As
| Publication number | Publication date |
|---|---|
| CN106017526B (en) | 2018-07-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| BR102014028251B1 (en) | Apparatus and Method for Aligning an Elevator Guide Rail | |
| CN106017526B (en) | Horizon bar suspends in midair and the arbitrarily adjustable suspension arrangement in micromatic setting, spatial position | |
| CN106320809A (en) | Adjustable spacing fence | |
| EA024346B1 (en) | Device and gantry for suspending a component | |
| CN108039676A (en) | A kind of transformer installing mechanism | |
| KR101426703B1 (en) | Height Adjustable Bogie | |
| CN214575558U (en) | Work platform is used in steel construction | |
| CN205785264U (en) | Any adjustable suspension arrangement in locus | |
| CN104120657A (en) | Servo-type beam surface stay cable pulling-into-hole guide device and construction method thereof | |
| CN203953868U (en) | A kind of for zooperal universal fixing bracket | |
| CN108217453A (en) | The trolley of bridge crane | |
| CN208996267U (en) | Unitized Curtain Wall Mounting Structure | |
| CN105040587B (en) | Track walking hanging pieces for bridge inspection car and supporting assembly composed of hanging pieces | |
| DE102012015708A1 (en) | System for supporting permanent magnets, has ferromagnetic metal strips that are provided at upper side between carrier rail and permanent magnet, so as to maintain linear displacement of load on permanent magnet | |
| CN205879207U (en) | Horizon bar suspends in midair and micromatic setting | |
| CN206552285U (en) | A kind of radial suspension arrangement of multilayer | |
| CN219265975U (en) | pendulum hanging device | |
| CN208995924U (en) | A kind of box girder construction hanger | |
| JP3199184U (en) | Bulky gate | |
| CN116742496A (en) | A hanging installation structure for a power distribution cabinet | |
| BR102014014065A2 (en) | vehicle storage box for external mounting on a vehicle, method for mounting and / or dismounting the vehicle and vehicle | |
| CN213065171U (en) | Lower margin connecting plate of adjustable lower margin section bar support body | |
| NL8420236A (en) | RUNNING BOARD SYSTEM. | |
| KR100377091B1 (en) | Height-adjusted structure of moving roller for use in suspension type doors | |
| BR102015018655B1 (en) | balcony leveling system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: 710026 Room 21402, Unit 14, Unit 2, 18 Blocks, No.7 Road, Fengcheng District, Xi'an Economic and Technological Development Zone, Shaanxi Province Patentee after: Xi'an Sanshi Aerospace Technology Co.,Ltd. Address before: 710026 Room 20702, Unit 2, Building 4, No. 158, Fengcheng Eighth Road, Xi'an Economic and Technological Development Zone, Shaanxi Province Patentee before: XI'AN FENYANG STEEL STRUCTURE Co.,Ltd. |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20250611 Address after: No. 150, Weiqu West Street, Chang'an District, Xi'an, Shaanxi 710000 Patentee after: XI'AN HUAQIANG AEROSPACE ELECTRONIC Co.,Ltd. Country or region after: China Address before: Room 21402, 14 / F, unit 2, building 18, Changhe shangshangshangjun, Fengcheng seventh Road, economic and Technological Development Zone, Xi'an City, Shaanxi Province, 710026 Patentee before: Xi'an Sanshi Aerospace Technology Co.,Ltd. Country or region before: China |