- CN106013621A CN106013621A CN201610462637.1A CN201610462637A CN106013621A CN 106013621 A CN106013621 A CN 106013621A CN 201610462637 A CN201610462637 A CN 201610462637A CN 106013621 A CN106013621 A CN 106013621A
- Authority
- CN
- China
- Prior art keywords
- roofing
- roof
- base plate
- heat
- insulation layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000012423 maintenance Methods 0.000 title claims abstract 7
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 78
- 239000010959 steel Substances 0.000 claims abstract description 78
- 239000010410 layer Substances 0.000 claims description 56
- 238000009413 insulation Methods 0.000 claims description 46
- 238000010276 construction Methods 0.000 claims description 38
- 239000011241 protective layer Substances 0.000 claims description 12
- 229910001335 Galvanized steel Inorganic materials 0.000 claims description 11
- 239000008397 galvanized steel Substances 0.000 claims description 11
- 239000011521 glass Substances 0.000 claims description 8
- 239000000463 material Substances 0.000 claims description 6
- 238000004321 preservation Methods 0.000 claims description 5
- 239000011435 rock Substances 0.000 claims description 5
- HCHKCACWOHOZIP-UHFFFAOYSA-N Zinc Chemical compound [Zn] HCHKCACWOHOZIP-UHFFFAOYSA-N 0.000 claims description 4
- 239000011888 foil Substances 0.000 claims description 4
- 239000002356 single layer Substances 0.000 claims description 4
- 239000011701 zinc Substances 0.000 claims description 4
- 229910052725 zinc Inorganic materials 0.000 claims description 4
- 239000004567 concrete Substances 0.000 claims description 3
- 238000005246 galvanizing Methods 0.000 claims description 3
- 239000004615 ingredient Substances 0.000 claims description 3
- 229910001220 stainless steel Inorganic materials 0.000 abstract 1
- 239000010935 stainless steel Substances 0.000 abstract 1
- 238000000465 moulding Methods 0.000 description 7
- 238000009434 installation Methods 0.000 description 2
- 230000003647 oxidation Effects 0.000 description 2
- 238000007254 oxidation reaction Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000005299 abrasion Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000033764 rhythmic process Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D3/00—Roof covering by making use of flat or curved slabs or stiff sheets
- E04D3/35—Roofing slabs or stiff sheets comprising two or more layers, e.g. for insulation
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D11/00—Roof covering, as far as not restricted to features covered by only one of groups E04D1/00 - E04D9/00; Roof covering in ways not provided for by groups E04D1/00 - E04D9/00, e.g. built-up roofs, elevated load-supporting roof coverings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D11/00—Roof covering, as far as not restricted to features covered by only one of groups E04D1/00 - E04D9/00; Roof covering in ways not provided for by groups E04D1/00 - E04D9/00, e.g. built-up roofs, elevated load-supporting roof coverings
- E04D11/005—Supports for elevated load-supporting roof coverings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D3/00—Roof covering by making use of flat or curved slabs or stiff sheets
- E04D3/35—Roofing slabs or stiff sheets comprising two or more layers, e.g. for insulation
- E04D3/351—Roofing slabs or stiff sheets comprising two or more layers, e.g. for insulation at least one of the layers being composed of insulating material, e.g. fibre or foam material
- E04D3/352—Roofing slabs or stiff sheets comprising two or more layers, e.g. for insulation at least one of the layers being composed of insulating material, e.g. fibre or foam material at least one insulating layer being located between non-insulating layers, e.g. double skin slabs or sheets
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D3/00—Roof covering by making use of flat or curved slabs or stiff sheets
- E04D3/36—Connecting; Fastening
- E04D3/3607—Connecting; Fastening the fastening means comprising spacer means adapted to the shape of the profiled roof covering
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D3/00—Roof covering by making use of flat or curved slabs or stiff sheets
- E04D3/36—Connecting; Fastening
- E04D3/361—Connecting; Fastening by specially-profiled marginal portions of the slabs or sheets
- E04D3/362—Connecting; Fastening by specially-profiled marginal portions of the slabs or sheets by locking the edge of one slab or sheet within the profiled marginal portion of the adjacent slab or sheet, e.g. using separate connecting elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
Abstract
The invention discloses a roof maintenance system. The roof maintenance system comprises a main steel structure, a thermal-insulating layer, a main purline, a roof and fasteners, wherein the thermal-insulating layer is arranged on the main steel structure; the lower side of the main purline is connected with the main steel structure through purline adaptors, the top of the main purline is connected with the roof through connecting pieces, and roof purlines are transversely arranged on the main purline; the roof comprises roof bottom plates and a standing lockrand roof plate, the meshed parts of the two roof bottom plates are fixed on the roof purlines through the fasteners, and the standing lockrand roof plate is arranged above the roof bottom plates. According to the roof maintenance system, the two roof bottom plates are meshed and connected through the stainless steel fasteners, the meshed roof plate layers are integrated, the mounting method is simple and convenient, the force bearing capacity of the roof system is improved, besides, the adaptability of the roof maintenance system is greatly improved, the roof maintenance system can meet requirements of more and more various roof models, and demands of developers are met better.
Description
Technical field
The invention belongs to building field, safeguard system and mounting process thereof particularly to a kind of roofing.
Background technology
Along with socioeconomic fast development, the rhythm of the live and work of people is all constantly being accelerated, and is also such for building field.Traditional building is the most all to use reinforced concrete to build, and needs to expend substantial amounts of human and material resources, and the duration of construction is longer, and, the requirement to weather is higher.For the venue that some are large-scale the most impracticable, thus existing a lot of building is gradually replaced by steel construction, owing to its construction of steel building is simple, the man power and material expended is few, and, it is the highest for the requirement of weather, thus is paid close attention to the most widely.
Along with Al-Mg-Mn standing seam roof slabs on airport, railway station, the extensive application of the building roof such as large-scale museum, roofing moulding gets more and more template, the multiformity of roofing base plate is the most increasingly paid close attention to by owner, designing institute, existing roofing base plate mostly is zinc-plated die mould steel sole plate, at base plate, lap-joint does not has fixed form, its stress is unstable, and, steel sole plate cannot adapt to the most multifarious roofing moulding, thus give to construct and bring many troubles, thus existing Roof system needs to be improved.
Summary of the invention
Goal of the invention: in order to overcome above deficiency, it is an object of the invention to provide a kind of roofing and safeguards system, and its simple in construction is reasonable in design, it is easy to install, and be greatly improved the stress performance of roofing.
Technical scheme: to achieve these goals, the invention provides a kind of roofing and safeguard system, including: main body steel construction, heat-insulation layer, main purlin, roofing and fastener, wherein, described heat-insulation layer is located on main body steel construction, by purlin adaptor and main body steel structure connection below described main purlin, and, its top is connected with roofing by connector, described main purlin be transversely provided with roof purline;
Described roofing is made up of roofing base plate and standing seam roof slabs, and wherein, the roofing base plate described in two passes through to be connected, and, it being fixed on roof purline by fastener at the occlusion of two roofing base plates, described standing seam roof slabs is located at the top of roofing base plate.
System safeguarded by heretofore described a kind of roofing, it is by being connected two roofing base plates by rustless steel fastener, the roofing flaggy after being engaged is allowed to form an entirety, its installation method letter is answered, convenient, improves the stress-bearing capability of this Roof system, simultaneously, also it is greatly improved its adaptability, allows it better meet more and more diversified roofing moulding, and then allow it better meet the demand of developer.
One end of heretofore described roofing base plate is interior button-type, one end is male type, in described roofing base plate, one end of button-type is L-shaped, and one end of its male type is provided with inverted " u " font groove, and described roofing base plate is that one end of interior button-type is connected with one end that another roofing base plate is male type, and, match between the two, the particular design that described roofing base plate two ends use, facilitate its occlusion in installation process, meanwhile, compactness and the stability of connection of its occlusion are also improved.
Heretofore described fastener at right angles " Z " font, its one end is provided with inverted " u " font groove, and, described fastener is located at the occlusion of two roofing base plates, match in one end that its roofing base plate that is simultaneously connected with two is one end of interior button-type and another roofing base plate is male type, improve its stability being connected with roofing base plate and compactness, thus effectively raise safety and the fastness that this Roof system uses.
It is provided with rotary glass silk flosssilk wadding and hold-down support between heretofore described roofing base plate and standing seam roof slabs, described hold-down support both sides laying water-proof coiled material, described waterproof roll be arranged over waterproof layer, and, one side patch it is provided with between described fastener and waterproof roll, it is provided with heat insulating mattress between described hold-down support and roofing base plate, described waterproof roll and the setting of waterproof layer, it is greatly improved the water resistance of roofing, improve the construction quality of whole roofing, simultaneously, the setting of heat insulating mattress, while playing effect of heat insulation, the most effectively alleviate the abrasion between hold-down support and roofing base plate.
Heretofore described heat-insulation layer is provided with heat-insulation layer steel plate and protective layer; described heat-insulation layer steel plate is connected by Zinc-coated angle steel with main body steel construction; it is provided with heat preservation rock between described heat-insulation layer steel plate and protective layer, and, described heat-insulation layer steel plate is additionally provided with waterproof vapour-binding film; the setting of described heat preservation rock; the heat-insulating property of steel building, meanwhile, the setting of waterproof vapour-binding film can be greatly improved; allow it while ensureing water resistance, it is also possible to ensure that it is breathed freely normally.
Heretofore described roofing base plate uses short stile roof boarding, it is possible to allow it adapt to more multifarious roofing moulding.
Heretofore described fastener uses rustless steel fastener, improves the intensity of fastener, increases its safety and stability connected.
Heretofore described protective layer uses monolayer protection foil layer, improves the performances such as its corrosion resistant, it is ensured that the quality of its construction.
Heretofore described roof purline the shortest hypotenuse length is more than or equal to 100mm, improves its stability installed and safety.
In the present invention, the mounting process of system safeguarded by a kind of roofing, and concrete mounting process is as follows:
(1): first measure according to drawing;
(2): then galvanized steel plain sheet is pressed into short stile roof boarding i.e. roofing base plate;
(3): during previous step galvanized steel plain sheet is suppressed, main body steel construction is installed by workmen, and on the heat-insulation layer steel plate main body steel construction in heat-insulation layer;
(4): then other each ingredients in heat-insulation layer are installed on heat-insulation layer steel plate successively;
(5): after heat-insulation layer installs, main purlin and roof purline are installed, and, during roof purline is installed, realize roof purline by galvanizing continuous fishplate bar and connection side leads to connect;
(6): after main purlin and roof purline install, start roofing is installed;
(7): during roofing is installed, first the galvanized steel plain sheet i.e. roofing base plate through compacting is put well according to the position preset in construction drawing;
(8) two roofing base plates: then rustless steel fastener is put into the position specified, then is combined with previous roofing base plate by another roofing base plate, are allowed to realize being engaged with rustless steel fastener;
(9): in previous step, can according to construction need the position of three is adjusted, then after adjusting correct position, then by fixture, rustless steel fastener is fixed with roofing base plate, allows roofing base plate one entirety of formation;
: after rustless steel fastener fixes, then heat insulating mattress, hold-down support, waterproof roll and waterproof layer are located on roofing base plate, according to construction drawing successively (10);
(11): then rotary glass silk flosssilk wadding is located in previous step on mounted roof structure;
(12): finally standing seam roof slabs is installed.
The mounting process of system safeguarded by heretofore described a kind of roofing, it by becoming short stile roofing tabular by galvanized steel plain sheet die mould, and by rustless steel fastener, two roof boardings are connected, whole roofing is allowed to form an entirety, it is greatly improved the enabling capabilities of roofing, it is more conducive to roofing entirety force-bearing situation, improve the construction quality of whole roofing, simultaneously, also its adaptability it is greatly improved, allow it adapt to the roofing moulding of more and more oxidation, and then allow it better meet the demand of developer.
Technique scheme is it can be seen that there is advantages that
1, system safeguarded by heretofore described a kind of roofing, it is by being connected two roofing base plates by rustless steel fastener, the roofing flaggy after being engaged is allowed to form an entirety, its installation method letter is answered, convenient, improves the stress-bearing capability of this Roof system, simultaneously, also it is greatly improved its adaptability, allows it better meet more and more diversified roofing moulding, and then allow it better meet the demand of developer.
2, the mounting process of system safeguarded by heretofore described a kind of roofing, it by becoming short stile roofing tabular by galvanized steel plain sheet die mould, and by rustless steel fastener, two roof boardings are connected, whole roofing is allowed to form an entirety, it is greatly improved the enabling capabilities of roofing, it is more conducive to roofing entirety force-bearing situation, improve the construction quality of whole roofing, simultaneously, also its adaptability it is greatly improved, allow it adapt to the roofing moulding of more and more oxidation, and then allow it better meet the demand of developer.
Accompanying drawing explanation
Fig. 1 is the structural representation that system safeguarded by roofing of the present invention;
Fig. 2 is fastener and the connection diagram of roof boarding in the present invention;
In figure: main body steel construction-1, heat-insulation layer-2, heat-insulation layer steel plate-21, protective layer-22, main purlin-3, roofing-4, fastener-5, roof purline-6, roofing base plate-41, standing seam roof slabs-42, rotary glass silk flosssilk wadding-43, hold-down support-44.
Detailed description of the invention
Below in conjunction with the accompanying drawings and specific embodiment, it is further elucidated with the present invention.
Embodiment
System safeguarded by a kind of roofing as depicted, including: main body steel construction 1, heat-insulation layer 2, main purlin 3, roofing 4 and fastener 5, described roofing 4 is made up of roofing base plate 41 and standing seam roof slabs 42;
The relation of above-mentioned each parts is as follows:
Wherein, described roofing base plate 41 uses short stile roof boarding, described heat-insulation layer 2 is located on main body steel construction 1, it is connected with main body steel construction 1 by purlin adaptor below described main purlin 3, and, its top is connected with roofing 4 by connector, described main purlin 3 be transversely provided with roof purline 6;Described fastener 5 uses rustless steel fastener, and the roofing base plate 41 described in two passes through to be connected, and, it being fixed on roof purline 6 by fastener 5 at the occlusion of two roofing base plates 41, described standing seam roof slabs 42 is located at the top of roofing base plate 41;Rotary glass silk flosssilk wadding 43 and hold-down support 44 it is provided with between described roofing base plate 41 and standing seam roof slabs 42, described hold-down support 44 both sides laying water-proof coiled material, described waterproof roll be arranged over waterproof layer, and, be provided with heat insulating mattress between described hold-down support 44 and roofing base plate 41.
One end of roofing base plate 41 described in the present embodiment is interior button-type, one end is male type, in described roofing base plate 41, one end of button-type is L-shaped, one end of its male type is provided with inverted " u " font groove, described roofing base plate 41 one end in interior button-type is connected with another roofing base plate 41 one end in male type, and, match between the two.
Rectangular " Z " font of fastener 5 described in the present embodiment, its one end is provided with inverted " u " font groove, and, described fastener 5 is located at the occlusion of two roofing base plates 41, and it is connected roofing base plate 41 one end in interior button-type with two simultaneously and matches in another roofing base plate 41 one end in male type.
Heat-insulation layer 2 described in the present embodiment is provided with heat-insulation layer steel plate 21 and protective layer 22; described heat-insulation layer steel plate 21 is connected by Zinc-coated angle steel with main body steel construction 1; it is provided with heat preservation rock between described heat-insulation layer steel plate 21 and protective layer 22; and, described heat-insulation layer steel plate 21 is additionally provided with waterproof vapour-binding film.
Protective layer 22 described in the present embodiment uses monolayer protection foil layer.
Roof purline 6 the shortest hypotenuse length described in the present embodiment is more than or equal to 100mm.
Embodiment 2
A kind of roofing described in the present embodiment safeguards that the roofing in the mounting process of system safeguards that system is identical with structure in embodiment 1.
System safeguarded by a kind of roofing as depicted, including: main body steel construction 1, heat-insulation layer 2, main purlin 3, roofing 4 and fastener 5, described roofing 4 is made up of roofing base plate 41 and standing seam roof slabs 42;
The relation of above-mentioned each parts is as follows:
Wherein, described roofing base plate 41 uses short stile roof boarding, described heat-insulation layer 2 is located on main body steel construction 1, it is connected with main body steel construction 1 by purlin adaptor below described main purlin 3, and, its top is connected with roofing 4 by connector, described main purlin 3 be transversely provided with roof purline 6;Described fastener 5 uses rustless steel fastener, and the roofing base plate 41 described in two passes through to be connected, and, it being fixed on roof purline 6 by fastener 5 at the occlusion of two roofing base plates 41, described standing seam roof slabs 42 is located at the top of roofing base plate 41;Rotary glass silk flosssilk wadding 43 and hold-down support 44 it is provided with between described roofing base plate 41 and standing seam roof slabs 42, described hold-down support 44 both sides laying water-proof coiled material, described waterproof roll be arranged over waterproof layer, and, be provided with heat insulating mattress between described hold-down support 44 and roofing base plate 41.
One end of roofing base plate 41 described in the present embodiment is interior button-type, one end is male type, in described roofing base plate 41, one end of button-type is L-shaped, one end of its male type is provided with inverted " u " font groove, described roofing base plate 41 one end in interior button-type is connected with another roofing base plate 41 one end in male type, and, match between the two.
Rectangular " Z " font of fastener 5 described in the present embodiment, its one end is provided with inverted " u " font groove, and, described fastener 5 is located at the occlusion of two roofing base plates 41, and it is connected roofing base plate 41 one end in interior button-type with two simultaneously and matches in another roofing base plate 41 one end in male type.
Heat-insulation layer 2 described in the present embodiment is provided with heat-insulation layer steel plate 21 and protective layer 22; described heat-insulation layer steel plate 21 is connected by Zinc-coated angle steel with main body steel construction 1; it is provided with heat preservation rock between described heat-insulation layer steel plate 21 and protective layer 22; and, described heat-insulation layer steel plate 21 is additionally provided with waterproof vapour-binding film.
Protective layer 22 described in the present embodiment uses monolayer protection foil layer.
Roof purline 6 the shortest hypotenuse length described in the present embodiment is more than or equal to 100mm.
The mounting process of system safeguarded by a kind of roofing described in the present embodiment, and concrete mounting process is as follows:
(1): first measure according to drawing;
(2): then galvanized steel plain sheet is pressed into short stile roof boarding i.e. roofing base plate 41;
(3): during previous step galvanized steel plain sheet is suppressed, main body steel construction 1 is installed by workmen, and on the heat-insulation layer steel plate 21 main body steel construction 1 in heat-insulation layer 2;
(4): then other each ingredients in heat-insulation layer 2 are installed on heat-insulation layer steel plate 21 successively;
(5): after heat-insulation layer 2 installs, main purlin 3 and roof purline 6 are installed, and, during roof purline 6 is installed, realize roof purline 6 by galvanizing continuous fishplate bar and connection side leads to connect;
(6): after main purlin 3 and roof purline 6 install, start roofing 4 is installed;
(7): during roofing 4 is installed, first the galvanized steel plain sheet i.e. roofing base plate 41 through compacting is put well according to the position preset in construction drawing;
(8) two roofing base plates 41: then rustless steel fastener 5 is put into the position specified, then is combined with previous roofing base plate 41 by another roofing base plate 41, are allowed to realize being engaged with rustless steel fastener 5;
(9): in previous step, can according to construction need the position of three is adjusted, then after adjusting correct position, then by fixture, rustless steel fastener 5 is fixed with roofing base plate 41, allows roofing base plate 41 form an entirety;
: after rustless steel fastener 5 fixes, then heat insulating mattress, hold-down support 44, waterproof roll and waterproof layer are located on roofing base plate 41, according to construction drawing successively (10);
(11): then rotary glass silk flosssilk wadding 43 is located in previous step on mounted roof structure;
(12): finally standing seam roof slabs 42 is installed.
The above is only the preferred embodiment of the present invention, it is noted that for those skilled in the art, under the premise without departing from the principles of the invention, it is also possible to make some improvement, and these improvement also should be regarded as protection scope of the present invention.
Claims (10)
1. system safeguarded by a roofing, it is characterized in that: including: main body steel construction (1), heat-insulation layer (2), main purlin (3), roofing (4) and fastener (5), wherein, described heat-insulation layer (2) is located on main body steel construction (1), described main purlin (3) lower section is connected with main body steel construction (1) by purlin adaptor, and, its top is connected with roofing (4) by connector, described main purlin (3) be transversely provided with roof purline (6);
Described roofing (4) is made up of roofing base plate (41) and standing seam roof slabs (42), wherein, roofing base plate (41) described in two is by being connected, and, being fixed on roof purline (6) by fastener (5) at the occlusion of two roofing base plates (41), described standing seam roof slabs (42) is located at the top of roofing base plate (41).
System safeguarded by roofing the most according to claim 1, it is characterized in that: one end of described roofing base plate (41) is interior button-type, one end is male type, one end of the interior button-type of described roofing base plate (41) is L-shaped, one end of its male type is provided with inverted " u " font groove, described roofing base plate (41) one end in interior button-type is connected with another roofing base plate (41) one end in male type, and, match between the two.
System safeguarded by roofing the most according to claim 1, it is characterized in that: described fastener (5) at right angles " Z " font, its one end is provided with inverted " u " font groove, and, described fastener (5) is located at the occlusion of two roofing base plates (41), and it is connected roofing base plate (41) one end in interior button-type with two simultaneously and matches in another roofing base plate (41) one end in male type.
System safeguarded by roofing the most according to claim 1, it is characterized in that: between described roofing base plate (41) and standing seam roof slabs (42), be provided with rotary glass silk flosssilk wadding (43) and hold-down support (44), described hold-down support (44) both sides laying water-proof coiled material, described waterproof roll be arranged over waterproof layer, and, it is provided with one side patch between described fastener (5) and waterproof roll, between described hold-down support (44) and roofing base plate (41), is provided with heat insulating mattress.
System safeguarded by roofing the most according to claim 1; it is characterized in that: described heat-insulation layer (2) is provided with heat-insulation layer steel plate (21) and protective layer (22); described heat-insulation layer steel plate (21) is connected by Zinc-coated angle steel with main body steel construction (1); it is provided with heat preservation rock between described heat-insulation layer steel plate (21) and protective layer (22); and, described heat-insulation layer steel plate (21) is additionally provided with waterproof vapour-binding film.
System safeguarded by roofing the most according to claim 1, it is characterised in that: described roofing base plate (41) uses short stile roof boarding.
System safeguarded by roofing the most according to claim 1, it is characterised in that: described fastener (5) uses rustless steel fastener.
System safeguarded by roofing the most according to claim 5, it is characterised in that: described protective layer (22) uses monolayer protection foil layer.
System safeguarded by roofing the most according to claim 1, it is characterised in that: described roof purline (6) the shortest hypotenuse length is more than or equal to 100mm.
10. the mounting process of a roofing maintenance system, it is characterised in that concrete mounting process is as follows:
(1): first measure according to drawing;
(2): then galvanized steel plain sheet is pressed into short stile roof boarding i.e. roofing base plate (41);
(3): during previous step galvanized steel plain sheet is suppressed, main body steel construction (1) is installed by workmen, and on heat-insulation layer steel plate (21) the main body steel construction (1) in heat-insulation layer (2);
(4): then other each ingredients in heat-insulation layer (2) are installed on heat-insulation layer steel plate (21) successively;
(5): after heat-insulation layer (2) installs, main purlin (3) and roof purline (6) are installed, and, during roof purline (6) is installed, realize roof purline (6) by galvanizing continuous fishplate bar and connection side leads to connect;
(6): after main purlin (3) and roof purline (6) install, start roofing (4) is installed;
(7): during roofing (4) is installed, first the galvanized steel plain sheet i.e. roofing base plate (41) through compacting is put well according to the position preset in construction drawing;
(8) two roofing base plates (41): rustless steel fastener (5) is then put into the position specified, then is combined with previous roofing base plate (41) by another roofing base plate (41), are allowed to realize being engaged with rustless steel fastener (5);
(9): in previous step, can according to construction need the position of three is adjusted, then after adjusting correct position, then by fixture, rustless steel fastener (5) is fixed with roofing base plate (41), allows roofing base plate (41) form an entirety;
: after rustless steel fastener (5) fixes, then heat insulating mattress, hold-down support (44), waterproof roll and waterproof layer are located on roofing base plate (41), according to construction drawing successively (10);
(11): then rotary glass silk flosssilk wadding (43) is located in previous step on mounted roof structure;
(12): finally standing seam roof slabs (42) is installed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610462637.1A CN106013621B (en) | 2016-06-23 | 2016-06-23 | A kind of roofing maintenance system mounting process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610462637.1A CN106013621B (en) | 2016-06-23 | 2016-06-23 | A kind of roofing maintenance system mounting process |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106013621A true CN106013621A (en) | 2016-10-12 |
CN106013621B CN106013621B (en) | 2019-04-05 |
Family
ID=57086896
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610462637.1A Expired - Fee Related CN106013621B (en) | 2016-06-23 | 2016-06-23 | A kind of roofing maintenance system mounting process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106013621B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106917464A (en) * | 2017-01-25 | 2017-07-04 | 上海建工五建集团有限公司 | Roof structure and its application construction method |
CN107869218A (en) * | 2017-11-30 | 2018-04-03 | 上海宝冶集团有限公司 | The sound insulation processing method of IMAX movie theatre multilayer material built-up roofings |
CN112282220A (en) * | 2020-09-24 | 2021-01-29 | 中国建筑第八工程局有限公司 | Upright lockrand roof system and construction method thereof |
CN112455025A (en) * | 2020-11-02 | 2021-03-09 | 左麦斯建筑科技(南京)有限公司 | Processing technology and production system of multifunctional polymer coiled material metal composite plate |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0821039A (en) * | 1994-07-08 | 1996-01-23 | Hokkai Koki Kk | Steel plate roof |
CN201095833Y (en) * | 2007-09-07 | 2008-08-06 | 李天生 | Composite roof board |
CN102587590A (en) * | 2012-03-14 | 2012-07-18 | 哈尔滨工业大学空间钢结构幕墙有限公司 | Waterproof heat-insulating fireproof metal roof system |
CN203977720U (en) * | 2014-07-29 | 2014-12-03 | 山东雅百特金属结构系统有限公司 | Classic button type Roof system |
CN204081299U (en) * | 2014-09-12 | 2015-01-07 | 浙江百安固金属屋面有限公司 | Standing seam roof system |
CN205804781U (en) * | 2016-06-23 | 2016-12-14 | 山东雅百特科技有限公司 | System safeguarded by a kind of roofing |
-
2016
- 2016-06-23 CN CN201610462637.1A patent/CN106013621B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0821039A (en) * | 1994-07-08 | 1996-01-23 | Hokkai Koki Kk | Steel plate roof |
CN201095833Y (en) * | 2007-09-07 | 2008-08-06 | 李天生 | Composite roof board |
CN102587590A (en) * | 2012-03-14 | 2012-07-18 | 哈尔滨工业大学空间钢结构幕墙有限公司 | Waterproof heat-insulating fireproof metal roof system |
CN203977720U (en) * | 2014-07-29 | 2014-12-03 | 山东雅百特金属结构系统有限公司 | Classic button type Roof system |
CN204081299U (en) * | 2014-09-12 | 2015-01-07 | 浙江百安固金属屋面有限公司 | Standing seam roof system |
CN205804781U (en) * | 2016-06-23 | 2016-12-14 | 山东雅百特科技有限公司 | System safeguarded by a kind of roofing |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106917464A (en) * | 2017-01-25 | 2017-07-04 | 上海建工五建集团有限公司 | Roof structure and its application construction method |
CN107869218A (en) * | 2017-11-30 | 2018-04-03 | 上海宝冶集团有限公司 | The sound insulation processing method of IMAX movie theatre multilayer material built-up roofings |
CN112282220A (en) * | 2020-09-24 | 2021-01-29 | 中国建筑第八工程局有限公司 | Upright lockrand roof system and construction method thereof |
CN112455025A (en) * | 2020-11-02 | 2021-03-09 | 左麦斯建筑科技(南京)有限公司 | Processing technology and production system of multifunctional polymer coiled material metal composite plate |
Also Published As
Publication number | Publication date |
---|---|
CN106013621B (en) | 2019-04-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106930413B (en) | Buckling structure of aluminum alloy wallboard, roof panel and corner connecting material | |
CN106013621A (en) | Roof maintenance system and mounting process thereof | |
CN106677439A (en) | Hidden button type super-long metal roof standing seam and construction method thereof | |
CN105908910A (en) | Metal roof plate and plane tile combined roof system and construction method thereof | |
CN206060091U (en) | A kind of cable testing bridge | |
CN104631703A (en) | Bamboo structure building roof system and construction process thereof | |
CN104631650B (en) | Screen plate outer wall with heat insulation layer and construction method | |
CN205804791U (en) | People's safe-guard system on a kind of upright double occlusion roofings | |
CN106149986A (en) | A kind of cold bending thin wall steel construction steel tile roofing system | |
CN205804781U (en) | System safeguarded by a kind of roofing | |
CN202073225U (en) | Anti-leakage colored steel tile roof with local structure | |
CN201883613U (en) | Double-pitch roof ridge tile | |
CN204691088U (en) | A kind of cold bending thin wall steel work steel tiled roof system | |
CN115288374B (en) | Drainage system in metal roof and construction method of drainage device | |
CN207700557U (en) | A kind of safe and stable type is used for roofing slidingtype accessory structure | |
CN207063610U (en) | Transformer substation building spliced by prefabricated parts | |
CN206495424U (en) | A kind of concealed fastener type overlength metal Roof standing-seam | |
CN214364032U (en) | Light-steel light-concrete house with near-zero energy consumption | |
CN205677080U (en) | A kind of universal purlin regulation attachment means | |
CN205153246U (en) | Multiple waterproof metal roofing structure | |
CN214034890U (en) | Large-span steel structure roof reforming structure | |
CN212104755U (en) | A new type of aluminum-magnesium-manganese roof panel structure system | |
CN209011405U (en) | Keep the temperature floor support plate and floor system | |
CN211114446U (en) | 360-degree sliding vertical serging support | |
CN210439635U (en) | EPS material prefabricated indoor decoration line |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190405 Termination date: 20190623 |
|
CF01 | Termination of patent right due to non-payment of annual fee |