CN106013568B - 基于可拆卸式定位控制件现浇楼板结构及施工方法 - Google Patents
基于可拆卸式定位控制件现浇楼板结构及施工方法 Download PDFInfo
- Publication number
- CN106013568B CN106013568B CN201610546882.0A CN201610546882A CN106013568B CN 106013568 B CN106013568 B CN 106013568B CN 201610546882 A CN201610546882 A CN 201610546882A CN 106013568 B CN106013568 B CN 106013568B
- Authority
- CN
- China
- Prior art keywords
- control
- rod
- band
- reinforcement
- floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
- E04G11/38—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for plane ceilings of concrete
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/32—Floor structures wholly cast in situ with or without form units or reinforcements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
- E04C5/20—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups of material other than metal or with only additional metal parts, e.g. concrete or plastics spacers with metal binding wires
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/06—Tying means; Spacers ; Devices for extracting or inserting wall ties
- E04G17/065—Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
- E04G17/0655—Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts
- E04G17/0657—Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts fully recoverable
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610546882.0A CN106013568B (zh) | 2016-07-08 | 2016-07-08 | 基于可拆卸式定位控制件现浇楼板结构及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610546882.0A CN106013568B (zh) | 2016-07-08 | 2016-07-08 | 基于可拆卸式定位控制件现浇楼板结构及施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106013568A CN106013568A (zh) | 2016-10-12 |
CN106013568B true CN106013568B (zh) | 2018-04-27 |
Family
ID=57109640
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610546882.0A Active CN106013568B (zh) | 2016-07-08 | 2016-07-08 | 基于可拆卸式定位控制件现浇楼板结构及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106013568B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107143137A (zh) * | 2017-05-31 | 2017-09-08 | 中建科技成都有限公司 | 一种装配式混凝土结构夹心外墙丁字墙处现浇模板结构及施工方法 |
CN112609901A (zh) * | 2020-12-09 | 2021-04-06 | 中建四局第六建设有限公司 | 一种控制楼板钢筋间距及板厚度的装置 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6240688B1 (en) * | 1997-12-12 | 2001-06-05 | Bradley S. Dressler | Holder for adjustable positioning of reinforcing rods |
CN103122696B (zh) * | 2013-02-06 | 2015-09-09 | 上海中锦建设集团股份有限公司 | 现浇混凝土楼板厚度控制器及其方法 |
CN203320971U (zh) * | 2013-06-21 | 2013-12-04 | 张新垛 | 一种可周转浇注楼板用马凳 |
CN204186004U (zh) * | 2014-10-22 | 2015-03-04 | 中国建筑第二工程局有限公司 | 多功能混凝土马凳 |
CN205976167U (zh) * | 2016-07-08 | 2017-02-22 | 杭州江润科技有限公司 | 基于可拆卸式定位控制件现浇楼板结构 |
-
2016
- 2016-07-08 CN CN201610546882.0A patent/CN106013568B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN106013568A (zh) | 2016-10-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104847014B (zh) | 装配式混凝土剪力墙竖向连接构造及施工方法 | |
CN110439137A (zh) | 预制墙板、墙体及预制墙板生产方法、预制墙体施工方法 | |
CN107605177A (zh) | 高效预制楼板的施工方法及其独立支撑架 | |
CN106555453A (zh) | 一种预应力预制叠合空心板及其施工方法 | |
CN104947719A (zh) | 地下室顶板后浇带吊支模结构及其后浇带施工方法 | |
CN205976167U (zh) | 基于可拆卸式定位控制件现浇楼板结构 | |
CN206174120U (zh) | 一种预制构造柱及其结构 | |
CN204590240U (zh) | 装配式混凝土框架-剪力墙预制结构 | |
CN114150766A (zh) | 一种预制钢筋混凝土柱连接节点及其施工方法 | |
CN106013568B (zh) | 基于可拆卸式定位控制件现浇楼板结构及施工方法 | |
CN206233560U (zh) | 墙体支模结构 | |
CN209293197U (zh) | 墙体与楼板连接结构及装配式建筑结构体系 | |
CN204690801U (zh) | 地下室顶板后浇带吊支模结构 | |
CN207436503U (zh) | 高效预制楼板施工的吊模组件 | |
CN108316513A (zh) | 一种快速施工装配式剪力墙结构及其施工方法 | |
CN206769199U (zh) | 后穿式后张法竖向预应力现浇混凝土柱结构 | |
CN107100322B (zh) | 后张法竖向预应力现浇混凝土柱结构及施工方法 | |
CN107023078A (zh) | 装配现浇组合式叠合箱网梁楼盖及施工方法 | |
KR101120588B1 (ko) | 콘크리트 일체성을 향상시키는 수직조인트 부재 | |
CN102433992A (zh) | 一种预制梁板接头的施工工艺 | |
CN207277679U (zh) | 加气混凝土砌块与钢筋混凝土外框整体墙板 | |
CN206873924U (zh) | 装配式混凝土框架梁后浇区用工具式模板 | |
CN110424410A (zh) | 一种临时支撑格构柱与地下室结构板连接处的施工方法 | |
CN216664766U (zh) | 一种装配式挑檐女儿墙 | |
CN110344553A (zh) | 一种楼梯吊装施工拼缝后浇带的支模结构及支模工艺 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Shen Guofang Inventor after: Li Qiang Inventor after: Yan Dong Inventor after: Zheng Rongfang Inventor after: Liu Fangfang Inventor after: Gao Lianggen Inventor before: Wang Xinquan Inventor before: Huo Qiqian Inventor before: Zhu Kai |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180504 Address after: 313200 room 1701, Wulipai Road, Wu Kang Street, Deqing County, Huzhou, Zhejiang, 1701 Patentee after: Heng De Construction Company Limited Address before: 310015 room 1901, unit 3, 3 Wanda Commercial Center, Gongshu District, Hangzhou, Zhejiang. Patentee before: Hangzhou Jiang Run Science and Technology Ltd. |