CN106013164A - 一种基坑的多功能栈桥施工的方法 - Google Patents
一种基坑的多功能栈桥施工的方法 Download PDFInfo
- Publication number
- CN106013164A CN106013164A CN201610472445.9A CN201610472445A CN106013164A CN 106013164 A CN106013164 A CN 106013164A CN 201610472445 A CN201610472445 A CN 201610472445A CN 106013164 A CN106013164 A CN 106013164A
- Authority
- CN
- China
- Prior art keywords
- trestle
- inner support
- foundation pit
- construction
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G27/00—Temporary arrangements for giving access from one level to another for men or vehicles, e.g. steps, ramps
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Mechanical Engineering (AREA)
- Foundations (AREA)
Abstract
本发明提出了一种基坑的多功能栈桥施工的方法,在基坑范围内立柱桩或基础桩上设置多组钢格构柱,在钢格构柱上若干个层面上纵、横设置钢筋混凝土梁,钢筋混凝土梁交错形成自上而下的第一层内支撑、第二层内支撑、第三层内支撑……第N层内支撑,各层内支撑分别与连续墙连接一体成型,在所述第一层内支撑上浇注成型混凝土栈桥平台。本发明采用了将水平的第一层内支撑兼做栈桥的先进方法,不仅解决了场地狭小施工平面无法布置、材料堆放、加工、车辆冲洗等所有难题,并且出土车辆在栈桥上排队、冲洗,做到了文明施工,同时有了栈桥,白天可取土堆放在栈桥上,晚上出土,提高了深基坑出土效率两倍。
Description
技术领域
本发明涉及建筑施工领域,更具体地说是涉及一种基坑的多功能栈桥施工的方法。
背景技术
新世界发展(武汉)有限公司拟建的武汉新世界中心三期写字楼项目,是由一栋37层塔楼和层高6—8米的五层裙楼组成的综合写字楼。建筑面积15.8万㎡,地面以下设四层地下室,基坑开挖面积13240㎡,基坑开挖深度21m—27m(“坑中坑”27m)。
基坑周边环境十分严峻、复杂:北侧位于解放大道闹市区,紧邻航空路立交桥(且基坑边分布有各种管网设施和箱涵);紧邻基坑南侧和西侧有多栋5—8层天然基础、年代久远的危房;深基坑地层上部分布有厚度较大、强度低的流塑状淤泥层及淤泥质粘土软土层,中部为砂层和卵石层,下伏岩层深度达55米以上。而且该基坑的地下水量丰富,与长江相通,本基坑基底进入了砂层,必须采取止水及深井排水、降水处理措施。
基坑施工时,由于本项目在闹市区,深基坑周边环境严峻,场地狭小,无法实施平面布置的情况下,必须解决基坑施工单位及地下室结构施工单位平面布置,解决临时设施、材料、设备堆放、加工并避免出土车辆在闹市区排长队及解决出土车辆洗车槽等问题。挖机在基坑内驳运,水平距离长效率低,所需的机械数量多,无法应用于本项目场地小的深基坑,因此在基坑出土时很不方便。
发明内容
为了解决上述问题,本发明提出一种基坑的多功能栈桥施工的方法,采用了将水平的第一层内支撑兼做栈桥的先进方法,不仅解决了上述所有难题,并且出土车辆在栈桥上排队、冲洗,做到了文明施工,同时有了栈桥,白天可取土堆放在栈桥上,晚上出土,提高了深基坑出土效率两倍。
本发明的技术方案是这样实现的:
一种基坑的多功能栈桥施工的方法,在基坑范围内立柱桩或基础桩上设置多组钢格构柱,在钢格构柱上若干个层面上纵、横设置钢筋混凝土梁,钢筋混凝土梁交错形成自上而下的第一层内支撑、第二层内支撑、第三层内支撑……第N层内支撑,各层内支撑分别与连续墙连接一体成型,在所述第一层内支撑上浇注成型混凝土栈桥平台。
进一步地,所述第一层内支撑、第二层内支撑之间的相邻的钢格构柱设有交叉的剪力撑。
本发明产生的有益效果为:本发明设计合理,符合超深基坑且周边环境严峻,场地狭小,无法实施平面布置的情况,而且施工效率高。
附图说明
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。
图1为本发明的俯视示意图;
图2为本发明内支撑的剖视示意图。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
如图1、2所示一种基坑的多功能栈桥施工的方法,在基坑范围内立柱桩或基础桩上设置多组钢格构柱2,在钢格构柱2上若干个层面上纵、横设置钢筋混凝土梁3,钢筋混凝土梁3交错形成自上而下的第一层内支撑、第二层内支撑、第三层内支撑……第N层内支撑,各层内支撑分别与连续墙1连接一体成型,在所述第一层内支撑上浇注成型混凝土栈桥平台4,第一层内支撑、第二层内支撑之间的相邻的钢格构柱设有交叉的剪力5。
本发明中将第一道水平内支撑兼做栈桥的先进方法不仅解决了上述所有难题,并且出土车辆在栈桥上排队、冲洗,做到了文明施工,同时有了栈桥,白天可取土堆放在栈桥上,晚上出土,提高了深基坑出土效率两倍。
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (2)
1.一种基坑的多功能栈桥施工的方法,其特征在于,在基坑范围内立柱桩或基础桩上设置多组钢格构柱,在钢格构柱上若干个层面上纵、横设置钢筋混凝土梁,钢筋混凝土梁交错形成自上而下的第一层内支撑、第二层内支撑、第三层内支撑……第N层内支撑,各层内支撑分别与连续墙连接一体成型,在所述第一层内支撑上浇注成型混凝土栈桥平台。
2.如权利要求1所述的一种基坑的多功能栈桥施工的方法,其特征在于,所述第一层内支撑、第二层内支撑之间的相邻的钢格构柱设有交叉的剪力撑。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610472445.9A CN106013164A (zh) | 2016-06-23 | 2016-06-23 | 一种基坑的多功能栈桥施工的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610472445.9A CN106013164A (zh) | 2016-06-23 | 2016-06-23 | 一种基坑的多功能栈桥施工的方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106013164A true CN106013164A (zh) | 2016-10-12 |
Family
ID=57085166
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610472445.9A Pending CN106013164A (zh) | 2016-06-23 | 2016-06-23 | 一种基坑的多功能栈桥施工的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106013164A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106968256A (zh) * | 2017-03-22 | 2017-07-21 | 深圳市福田建安建设集团有限公司 | 基坑装配式钢栈桥施工方法 |
CN109537434A (zh) * | 2018-11-29 | 2019-03-29 | 上海市机械施工集团有限公司 | 基坑上钢栈桥及其施工方法 |
CN113322964A (zh) * | 2021-06-04 | 2021-08-31 | 中国建筑第八工程局有限公司 | 一种结合基坑内支撑的便捷钢栈桥及施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08158367A (ja) * | 1994-12-08 | 1996-06-18 | Ohbayashi Corp | 山留工法 |
CN102995659A (zh) * | 2012-12-03 | 2013-03-27 | 杭州南联地基基础工程有限公司 | 超大型地下工程的先中心区结合周边的施工方法 |
CN203768788U (zh) * | 2014-03-13 | 2014-08-13 | 上海强劲地基工程股份有限公司 | 一种工具式基坑出土栈桥 |
CN104912098A (zh) * | 2015-06-01 | 2015-09-16 | 中建四局第六建筑工程有限公司 | 一种深基坑支撑梁板与结构板结合施工方法 |
CN204780933U (zh) * | 2015-06-01 | 2015-11-18 | 中国建筑第八工程局有限公司 | 基坑支撑栈桥体系 |
-
2016
- 2016-06-23 CN CN201610472445.9A patent/CN106013164A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08158367A (ja) * | 1994-12-08 | 1996-06-18 | Ohbayashi Corp | 山留工法 |
CN102995659A (zh) * | 2012-12-03 | 2013-03-27 | 杭州南联地基基础工程有限公司 | 超大型地下工程的先中心区结合周边的施工方法 |
CN203768788U (zh) * | 2014-03-13 | 2014-08-13 | 上海强劲地基工程股份有限公司 | 一种工具式基坑出土栈桥 |
CN104912098A (zh) * | 2015-06-01 | 2015-09-16 | 中建四局第六建筑工程有限公司 | 一种深基坑支撑梁板与结构板结合施工方法 |
CN204780933U (zh) * | 2015-06-01 | 2015-11-18 | 中国建筑第八工程局有限公司 | 基坑支撑栈桥体系 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106968256A (zh) * | 2017-03-22 | 2017-07-21 | 深圳市福田建安建设集团有限公司 | 基坑装配式钢栈桥施工方法 |
CN106968256B (zh) * | 2017-03-22 | 2019-02-22 | 深圳市福田建安建设集团有限公司 | 基坑装配式钢栈桥施工方法 |
CN109537434A (zh) * | 2018-11-29 | 2019-03-29 | 上海市机械施工集团有限公司 | 基坑上钢栈桥及其施工方法 |
CN113322964A (zh) * | 2021-06-04 | 2021-08-31 | 中国建筑第八工程局有限公司 | 一种结合基坑内支撑的便捷钢栈桥及施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102691294B (zh) | 一种地下连续墙的施工方法 | |
CN105862910B (zh) | 一种装配式立体地下车库的逆作式建造方法 | |
CN105464134B (zh) | 既有设施下多层地下空间顺逆结合施工方法及支护结构 | |
CN204370431U (zh) | 一种咬合长短桩围护结构 | |
US20140154012A1 (en) | Assembled mud-rock flow debris dam and construction method thereof | |
CN102296961A (zh) | 一种岩溶隧道大规模溶腔处理方法 | |
CN103422510B (zh) | 钢管框架式围堰结构及施工方法 | |
CN101634143A (zh) | 含软弱粘土地层中的螺旋挤土灌注桩复合地基处理方法 | |
CN106758623B (zh) | 一种无筋轻质土台背的填筑方法 | |
CN106013086A (zh) | 利用凸台型工字钢接头箱处理地下连续墙接头施工的方法 | |
CN105421464B (zh) | 小型基坑土方开挖方法 | |
CN105735354A (zh) | 一种城市地下工程盖挖全逆作施工方法 | |
CN106013164A (zh) | 一种基坑的多功能栈桥施工的方法 | |
CN106351331A (zh) | 多层地下室逆顺结合施工工艺 | |
CN109750571A (zh) | 一种道路塌方应急与永久支挡一体化结构及施工方法 | |
CN101949226B (zh) | 大型池体的交叉施工方法 | |
CN101638898B (zh) | 顶管竖井悬挂式施工方法 | |
CN106120805A (zh) | 危房环境下的超深基坑支护的施工方法 | |
CN104894926A (zh) | 既有铁路高路堤上支挡结构及其施工方法 | |
CN204753262U (zh) | 一种既有铁路高路堤上支挡结构 | |
CN113235613A (zh) | 利用邻近既有围护桩的新建基坑开挖支护方法 | |
CN110939139B (zh) | 基于桩后异型挡墙刚性接触的桩板墙结构及其构建方法 | |
CN105839653B (zh) | 一种沉管隧道重建围堰防渗体系的施工方法 | |
CN115162345B (zh) | 一种长江漫滩超大深基坑土方开挖组织及施工方法 | |
CN105926668A (zh) | 一种超深基坑和邻近危房之间的隔断墙施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161012 |
|
RJ01 | Rejection of invention patent application after publication |