CN106013003A - Self-locking type pull rod used for lifting gate - Google Patents

Self-locking type pull rod used for lifting gate Download PDF

Info

Publication number
CN106013003A
CN106013003A CN201610563596.5A CN201610563596A CN106013003A CN 106013003 A CN106013003 A CN 106013003A CN 201610563596 A CN201610563596 A CN 201610563596A CN 106013003 A CN106013003 A CN 106013003A
Authority
CN
China
Prior art keywords
rod
lifting
pull bar
pull rod
self
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610563596.5A
Other languages
Chinese (zh)
Other versions
CN106013003B (en
Inventor
杨立
张豫徽
刘争胜
张小辉
崔长勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Engineering Consulting Co Ltd
Original Assignee
Yellow River Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Engineering Consulting Co Ltd filed Critical Yellow River Engineering Consulting Co Ltd
Priority to CN201610563596.5A priority Critical patent/CN106013003B/en
Publication of CN106013003A publication Critical patent/CN106013003A/en
Application granted granted Critical
Publication of CN106013003B publication Critical patent/CN106013003B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02B—HYDRAULIC ENGINEERING
    • E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/20—Movable barrages; Lock or dry-dock gates
    • E02B7/26—Vertical-lift gates
    • E02B7/36—Elevating mechanisms for vertical-lift gates

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention discloses a self-locking type pull rod used for lifting a gate. The self-locking type pull rod comprises a rod body, and an upper lifting lug and a lower lifting lug which are fixedly connected to the upper end and the lower end of the rod body, wherein the upper lifting lug and the lower lifting lug are both of a double-lifting-lug structure; a lifting hole of the upper lifting lug is of a long hole structure formed along the longitudinal direction of the rob body; a locking shoulder is arranged on the rod body positioned below the upper lifting lug; the locking shoulder is formed by an upper support platform and a lower support platform which are fixed on the rod body at an interval up and down; and the upper support platform and the lower support platform are respectively arranged by extending to two sides of the rod body along the axial direction of the lifting hole of the upper lifting lug. The self-locking type pull rod has the advantage of being capable of keeping a vertical state all the time without assistance of external force by utilizing the plugging locking function of the pull rod, thus being convenient for pin-penetrating connection of the pull rod and being especially applicable to occasions of lifting of gates by match of the pull rod with a large-tonnage mobile gate hoist.

Description

For lifting by crane the self-locking pull bar of gate
Technical field
The present invention relates to the gate used in hydraulic engineering, be especially for lifting by crane the self-locking pull bar of gate.
Background technology
Using pull bar to coordinate rolling open and close machine lifting gate to be method conventional in hydraulic engineering, pull bar opens and closes as elevator Effectively supplementing of machine lift, greatly reduces the impulse stroke of rolling open and close machine, reduces size and the weight of rolling open and close machine, joint Save equipment investment.At present, when coordinating rolling open and close machine lifting gate with pull bar, pull rod device hangs Tou Hezha at rolling open and close machine Between gantry crane ear, each parts use bearing pin to connect, and pull bar chain one end of more piece pull bar composition is hung head with rolling open and close machine and is connected, and one End is connected on gate lifting eye, and the connection of pull bar, dismounting are all completed by manual operation on inspection platform.Above-mentioned use pull bar is joined Closing rolling open and close machine lifting gate and be only applicable to gate vertical lift operating mode, under such conditions, rolling open and close machine hangs head, gate Hanger and pull bar chain are the most perpendicular to the ground, and pull bar is long thin rod shape, hang mounting or dismounting between head and gate lifting eye at rolling open and close machine and draw During bar, only pull bar vertically placed the docking being just easy to hanger hole each other and wear axle.Drawing of Large Copacity rolling open and close machine Bar is heavier, when cylinder lever connecting rod, generally uses interim lifting appliance that pull bar vertically hangs in inspection platform, for ensureing pull bar Vertically state, the suspender of interim lifting appliance can not depart from pull bar all the time, hangs head with rolling open and close machine at pull bar and wears axle and be connected Time, rolling open and close machine hangs the suspender of head and interim lifting appliance and will interfere, cause rolling open and close machine hang head cannot with draw Bar connects smoothly.If during it addition, interim lifting appliance is in same work surface with rolling open and close machine, the two can not carry out work simultaneously Make, if carried out the work simultaneously, also can interfere with each other.Only when inspection platform called in by pull bar by interim lifting appliance and moves After walking, rolling open and close machine just has the space of operation.For ensureing that pull bar can be worn axle smoothly and connect, when interim lifting appliance is removed After, how to keep the vertical state of pull bar, be the problem needing to solve.
Summary of the invention
Present invention aim at providing a kind of self-locking pull bar for lifting by crane gate.
For achieving the above object, the present invention takes following technical proposals:
Self-locking pull bar for lifting by crane gate of the present invention, including the body of rod, is connected in the upper hanger of described body of rod upper and lower end With lower hanger, described upper and lower hanger is double shackle structure;The lifting hole(eyelet) of described upper hanger is the elongated hole knot longitudinally offered along the body of rod Structure, be positioned on the body of rod below hanger be provided with locking shoulder, described locking shoulder by upper and lower interval be fixed on the body of rod upper Support platform and lower support platform are constituted, and described upper and lower support platform axially extends to body of rod both sides along the lifting hole(eyelet) of upper hanger respectively Arrange.
The transverse section of the described body of rod is i-beam structure, and the bottom of the body of rod is box-structure.
The invention has the advantages that described pull bar utilizes the locking latch function of self, being not required to can be all the time by external strength Keeping vertical state, the pin of wearing facilitating pull bar connects, and is particularly suited for pull bar and coordinates large-tonnage travelling hoist to play port-cullis The occasion of door.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention.
Fig. 2 is the right TV structure schematic diagram of Fig. 1.
Fig. 3 is that the A-A of Fig. 1 is to section structure schematic diagram.
Fig. 4 is that the B-B of Fig. 1 is to section structure schematic diagram.
Fig. 5 is pull bar waiting of the present invention and has connect pull bar connection status schematic diagram.
Fig. 6 is that pull bar waiting of the present invention hangs a connection status schematic diagram with headstock gear.
Fig. 7 is the Draw bar lock waiting of the present invention view on inspection platform.
Detailed description of the invention
As Figure 1-4, the self-locking pull bar for lifting by crane gate of the present invention, including the body of rod 1, the described body of rod 1 Transverse section is i-beam structure (as shown in Figure 3), and the bottom of the body of rod 1 is box-structure (as shown in Figure 4);Upper and lower at the body of rod 1 End has been respectively fixedly connected with hanger 2 and lower hanger 3, and described upper and lower hanger 2,3 is double shackle structure;For making pull bar after sleeve The axle of wearing that can carry out hanger connects, and the lifting hole(eyelet) 4 of upper hanger 2 is the long pore structure longitudinally offered along the body of rod 1, is positioned at hanger 2 Be provided with locking shoulder on the body of rod 1 of lower section, upper support platform 5 that described locking shoulder is fixed on the body of rod 1 by upper and lower interval and under Support platform 6 is constituted, and along the lifting hole(eyelet) 4 of upper hanger 2, axially to the body of rod 1 both sides, extension sets described upper and lower support platform 5,6 respectively Put.Upper support platform 5, for supporting another joint pull bar being connected with upper hanger 2, keeps pull bar to be in vertical state;Lower support Platform 6 locks with gate for the pull bar chain of pull bar or more piece pull bar composition on inspection platform.When the present invention uses, Ren Heyi The upper hanger 2 of joint pull bar all can vertically sleeve under another pull bar being attached thereto in hanger 3.
When headstock gear uses the present invention to lift by crane gate, pull bar attended operation order following (as a example by gate declines):
The first step: vertically sling by pull bar 7 waiting with interim lifting appliance, draws lower hanger 3 sleeve of pull bar 7 waiting connecing On the upper hanger 2 of bar 8 (as shown in Figure 5), remove interim lifting appliance, and keep pull bar 7 waiting to carry out vertically upward wearing axle even Connect operation;
A second step: headstock gear hangs 9 and falls, and is connected (as shown in Figure 6) with wearing pin after hanger 2 para-position on pull bar 7 waiting, treats this moment Connect pull bar 7 to have connected.
3rd step: headstock gear 10 does enhancing action and releases the locking of gate 11, then by pull bar 7 waiting, connect pull bar 8 And gate 11 is together sling and transfers along gate slot, after transferring certain distance, pull bar 7 waiting is locked the lower support platform 6 of shoulder with Locking beam 12 is locked on inspection platform 13 jointly, disconnects headstock gear and hangs the connection between 9 and pull bar chain, under carrying out the most again The access of one joint pull bar, the connection of next joint pull bar repeats the first two steps (as shown in Figure 7).

Claims (2)

1. for lifting by crane the self-locking pull bar of gate, including the body of rod, be connected in described body of rod upper and lower end upper hanger and under Hanger, described upper and lower hanger is double shackle structure;It is characterized in that: the lifting hole(eyelet) of described upper hanger is for longitudinally offering along the body of rod Long pore structure, be positioned on the body of rod below hanger be provided with locking shoulder, described locking shoulder be fixed on the body of rod by upper and lower interval On upper support platform and lower support platform constitute, described upper and lower support platform respectively along the lifting hole(eyelet) of upper hanger axially to the body of rod Both sides are extended.
The most according to claim 1 for lifting by crane the self-locking pull bar of gate, it is characterised in that: the transverse section of the described body of rod is I-beam structure, the bottom of the body of rod is box-structure.
CN201610563596.5A 2016-07-18 2016-07-18 For lifting by crane the self-locking pull rod of gate Active CN106013003B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610563596.5A CN106013003B (en) 2016-07-18 2016-07-18 For lifting by crane the self-locking pull rod of gate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610563596.5A CN106013003B (en) 2016-07-18 2016-07-18 For lifting by crane the self-locking pull rod of gate

Publications (2)

Publication Number Publication Date
CN106013003A true CN106013003A (en) 2016-10-12
CN106013003B CN106013003B (en) 2018-05-11

Family

ID=57119261

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610563596.5A Active CN106013003B (en) 2016-07-18 2016-07-18 For lifting by crane the self-locking pull rod of gate

Country Status (1)

Country Link
CN (1) CN106013003B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086258A (en) * 2017-12-05 2018-05-29 中国电建集团贵阳勘测设计研究院有限公司 Pull rod for single-cylinder vertical hydraulic hoist
CN108502697A (en) * 2018-07-20 2018-09-07 中国电建集团贵阳勘测设计研究院有限公司 Connecting structure of lifting lug and hoist lifting head of plane gate
CN109183728A (en) * 2018-10-17 2019-01-11 中国电建集团贵阳勘测设计研究院有限公司 Improvement method and structure of pull rod of gate and trash rack

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102261055A (en) * 2011-06-14 2011-11-30 黄河勘测规划设计有限公司 Pull rod moving method of hydraulic hoist for gate
KR20140127058A (en) * 2013-04-24 2014-11-03 광희엔지니어링 주식회사 All-in-one floodgate system
CN204282337U (en) * 2014-10-30 2015-04-22 徐工集团工程机械股份有限公司 Dynamic compaction machinery and changing-breadth system thereof
CN205804290U (en) * 2016-07-18 2016-12-14 黄河勘测规划设计有限公司 For lifting by crane the self-locking pull bar of gate

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102261055A (en) * 2011-06-14 2011-11-30 黄河勘测规划设计有限公司 Pull rod moving method of hydraulic hoist for gate
KR20140127058A (en) * 2013-04-24 2014-11-03 광희엔지니어링 주식회사 All-in-one floodgate system
CN204282337U (en) * 2014-10-30 2015-04-22 徐工集团工程机械股份有限公司 Dynamic compaction machinery and changing-breadth system thereof
CN205804290U (en) * 2016-07-18 2016-12-14 黄河勘测规划设计有限公司 For lifting by crane the self-locking pull bar of gate

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张明松等: "《三峡大坝电源电站尾水闸门启闭方案的论证研究》", 《机械研究与应用》 *
水电站机电设计手册编写组: "《水电站机电设计手册》", 31 May 1988 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086258A (en) * 2017-12-05 2018-05-29 中国电建集团贵阳勘测设计研究院有限公司 Pull rod for single-cylinder vertical hydraulic hoist
CN108086258B (en) * 2017-12-05 2024-09-24 中国电建集团贵阳勘测设计研究院有限公司 Pull rod for single-cylinder vertical hydraulic hoist
CN108502697A (en) * 2018-07-20 2018-09-07 中国电建集团贵阳勘测设计研究院有限公司 Connecting structure of lifting lug and hoist lifting head of plane gate
CN109183728A (en) * 2018-10-17 2019-01-11 中国电建集团贵阳勘测设计研究院有限公司 Improvement method and structure of pull rod of gate and trash rack

Also Published As

Publication number Publication date
CN106013003B (en) 2018-05-11

Similar Documents

Publication Publication Date Title
CN205804290U (en) For lifting by crane the self-locking pull bar of gate
CN106013003B (en) For lifting by crane the self-locking pull rod of gate
CN201580891U (en) Lifting appliance for assisting overturn of centrifugal mold
CN205170176U (en) Hoist device that body assembly carried
CN106744275A (en) One kind pulls de- frame reversal hanger
CN205500554U (en) Concrete pipe pile's hoisting accessory
CN206987750U (en) Oil field operation hoisting tool special
CN201923780U (en) Automatic detaching and attaching device for main hooks and jibs of large hoisting tool crane
CA2658711A1 (en) Apparatus and method for use in suspending loads in wellbore operations
CN104671062B (en) A kind of novel PCCP steel cylinder suspender and PCCP steel cylinder hanging method
CN104477757B (en) The manual special hanger of the part of large-scale box type without hanger
CN204038857U (en) Low-floor light rail vehicle body Universal hanger
CN106013001A (en) Method for operating multi-hole diversion tunnel sealing and blocking gate through trolley
CN207330129U (en) A kind of suspender of steel structure member with holes
CN207511691U (en) A kind of sling for steel column detacher
CN205397850U (en) A hoist for heavy fork truck portal is transported
CN206047025U (en) A kind of mud core drying device
CN204281029U (en) A kind of stressed clear and definite and adjustable operation platform suspender of suspension centre
CN211733622U (en) Adjustable lifting clamp
CN203568669U (en) Sling for lifting anode assembly of electrolytic cell
CN208265593U (en) Connecting structure of lifting lug and hoist lifting head of plane gate
CN106702911B (en) Secondary transverse moving hoisting construction method for arch rib segment of basket arch bridge
CN106219394A (en) A kind of travelling crane hook
CN213202072U (en) A lifting device for forgings
CN204851105U (en) Drilling rod is from oil -well rig cat way that promotes

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 450003 Zhengzhou Jinshui Road, Henan, No. 109

Patentee after: Yellow River Survey Planning and Design Research Institute Co., Ltd.

Address before: 450003 Zhengzhou Jinshui Road, Henan, No. 109

Patentee before: Yellow River Engineering Consulting Co., Ltd.

CP01 Change in the name or title of a patent holder