Pulling type ecology caravan
Technical field
The present invention relates to moveable house facility technology field more particularly to a kind of pulling type ecology caravans.
Background technique
Building in the prior art is mostly real estate, completely irremovable.Which has limited the places to use in house can only
Then being confined to a fixed position many times can only create the building demolition when needing to move the building, at high cost,
Time is long.In addition building mobile technology in the prior art, much by jack, track girder etc. passes through mobile original building
Basis and main body reach mobile original building, have a defect that cost is high, and movement is not convenient.Section is mobile in the prior art
Caravan structure be mostly miscellaneous automobile, be mainly characterized by automobile, insulation, energy conservation and common build
It builds to compare and have a certain gap.
Summary of the invention
For solving the above-mentioned problems of the prior art, it is an object of the present invention to provide a kind of pulling type ecology caravans;
This caravan trailer is that novel building is installed on automobile chassis.Pulling type ecology caravan of the invention on road surface or can specify
Position, it is arbitrarily mobile, drafting tool either automobile, tractor can also use manpower or animal power, be particularly suitable for park,
Holiday resort, tourist district or excursion are used;Structure is divided into a few part compositions such as left and right sides wall, front and back side wall body, roof system, left
It is respectively equipped with window opening, door opening on right side, front and back side wall body, meets routine building dwelling habits, while using modular construction, just
It is combined in dismounting, work efficiency is high, at low cost.
The technical solution of present invention solution technical problem are as follows:
A kind of pulling type ecology caravan, trailer, the house of tractor, rear portion including front, the house are set to trailer
On, the trailer includes trailer chassis, tire, and the trailer chassis passes through the draw hook on rear side of coupling unit and tractor
Connection, the tire are connect with tire spindle, and trailer chassis includes crossbeam, stringer, plugging plate, and the crossbeam and stringer pass through weldering
It connects in succession, the plugging plate and crossbeam are by being welded to connect, and the tire spindle and plugging plate are by being welded to connect, crossbeam bottom
It is connect with elastic shock attenuation structure;The house part includes left side wall, right side wall, front side wall, rear side wall, roof system,
The left side wall, right side wall body structure are identical, and the left side wall, right side wall middle and upper part are equipped with window opening, the back side wall
Be equipped with window opening among body, the front side wall is equipped with door opening, the left side wall, right side wall, front side wall, rear side wall,
Roof system is made of heat-insulating bridge-cut-off modularization thermal insulation composite wall material.
The heat-insulating bridge-cut-off modularization thermal insulation composite wall material include two sides be connected fashioned iron keel framework, steel wire one,
Steel wire two, heat insulating mattress, styrofoam, cement sand pulp, wherein the inner surface of one side keel framework covers layer of steel wire net one,
The steel wire one is connect with keel contact position spot welding, and the end of all steel wires one should at least extend through the center of section steel flange
Line;Between the steel wire one and the inside of another side keel framework be equipped with PVC material heat insulating mattress, two sides keel framework, every
Heat pad is connected by screw to, and screw is evenly arranged at a certain distance;In the outside of two sides keel framework, filling is equipped with polyphenyl respectively
Plate is equipped with steel wire two in the covering of styrofoam outer surface, and the steel wire two is connect with keel contact position spot welding, Suo Yougang
The end of silk screen two should at least extend through the center line of section steel flange, smear certain thickness water in upper and lower two net surface of two sides steel wire
Cement mortar.
The keel framework includes vertical main joist, lateral main joist, and the vertical main joist is from hole or door opening two
It is lateral outer, there is no the position of window opening and door opening, from intermediate symmetrically placed outward to house roof system, is set between vertical main joist
There are vertical encryption keel, lateral encryption keel, vertical encryption keel and vertical main dragon are equipped between lateral main joist
Bone is arranged in parallel, and lateral encryption keel and lateral main joist row are arranged and encrypt keel, vertical main joist with vertical respectively
Square crossing, the vertical main joist, vertical encryption keel are handed over lateral main joist, lateral encryption keel vertical respectively
Vent, which is set, forms keel framework by being welded to connect.
The vertical main joist, lateral main joist, encryption main joist, auxiliary keel are all made of the c-type of same cross-sectional size
Steel profile, the fashioned iron use C-type steel, and wherein using one is long and the other is short, formula constructs the flange plate of C-type steel.
The vertical encryption keel, lateral encryption keel, vertical main joist, lateral main joist are all made of same section type
Number keel;Center between each parallel adjacent keel is away from being size L;Door-window opening planar dimension is also size simultaneously
Several integral multiples of L.
The elastic shock attenuation structure includes latch plate, and latch plate is sequentially placed according to the short mode in upper minister, lower part, whole
Several anchor plates are placed according to a fixed spacing in latch plate direction, and latch plate is connected by anchor plate, and anchor plate is adopted
With U-shaped moulding.
The steel spring plate top sets upper padding plate, sets backing plate in the lower part of crossbeam, corresponding to lower bolster in upper padding plate
Position respectively sets four drillings, is tightened upper lower bolster by bolt and nut, so that latch plate and crossbeam be tightened;On lower bolster
Portion sets tilt prop, and tilt prop is respectively welded with vehicle beam, lower bolster and is connect;Using rotation screw rod by upper junction plate, middle company
Fishplate bar, lower connecting plate are separately connected, and two rotation screw rods of top and the bottom form two rotation axis.
The coupling unit includes traction stringer, traction crossbeam, trapezoidal fixed plate, impacting type water brake trailer company
Device is connect, overlapping alignment overlaps certain length, welded connecting to the traction stringer up and down with the side bar of corresponding trailer, at two
Traction crossbeam is welded between traction stringer, trapezoidal fixed plate and traction stringer are welded to connect, and the trapezoidal fixed plate is equipped with connection
Hole, trapezoidal fixed plate are connect by connecting hole with impacting type water brake trailer connector, the connection of impacting type water brake trailer
Device and bolt-type vehicle traction hook connects.
Square connector is used between the left side wall, right side wall, front side wall, rear side wall and chassis, is consolidated
Determine screw connection;It is connected between front side house roof system and rear side house roof system using non-conventional type joint, fixing screws;Structure in plane
The connection of part is connected using bar shaped connector, fixing screws;The square connector, non-conventional type joint, bar shaped connector are equal
It is evenly arranged using a fixed spacing.
The tire is using the old tire after automobile replacement, and the latch plate is using the old latch plate after automobile replacement.
Beneficial effects of the present invention:
1. caravan trailer of the invention is to install novel building on automobile chassis, can in road surface or designated position, with
Meaning movement, drafting tool either automobile, tractor can also use manpower or animal power, be particularly suitable for park, holiday resort,
Tourist district or excursion are used, and structure is divided into several parts compositions such as left and right sides wall, front and back side wall body, roof system, left and right sides, preceding
It is respectively equipped with window opening, door opening on rear side wall, meets routine building dwelling habits, while using modular construction, it is easy to disassemble
Combination, work efficiency is high.
2. setting tilt prop on lower bolster top, tilt prop is respectively welded with vehicle beam, lower bolster and is connect, is avoided that
Opposite sliding between latch plate and vehicle beam, the connection on latch plate and chassis is realized by load transfer device, by spring
The three-ply plate of steel plate end passes through lower connecting plate, and the two sides and bottom welding of two pieces of upper junction plates and automotive frame are connected
It connects, the two sides of U-shaped lower connecting plate are respectively equipped with symmetrical drilling, and the two sides of upper junction plate are respectively equipped with symmetrical drilling, simultaneously
The top and the bottom of middle connecting plate are respectively equipped with drilling.Because latch plate itself has certain warpage, the setting of screw rod is rotated, spring is made
There is certain space between plate and automobile chassis steel skeleton, is easily installed.Two rotation screw rods are arranged in upper and lower two sides, make automobile bottom
The relative displacement for allowing to have certain between disk and latch plate, and than allowing existing relative displacement when the single rotation screw rod of setting
Amplitude is big.Especially to the rough road in the road surface or tourist attraction jolted, can be dissolved by relative horizontal displacement
The Oscillation Amplitude in top house.Simultaneously downside rotation screw rod setting, when can effectively limit road bump, steel spring plate it is vertical
Displacement amplitude.In addition anchor plate uses U-shaped moulding, and U-shaped moulding energy limited spring plate moves left and right, and can guarantee effective transmitting
Load drills open-work in the corresponding position of latch plate, then installs connecting screw and fixes latch plate in same position, passes through company
Connect the connection of screw rod, can limit between each piece of steel spring plate it is opposite moving forward and backward, ensure that automobile in emergency start or tight
When bringing to a halt, load effectively can be transferred to wheel by steel spring plate.
3. due to vertical main joist, lateral main joist interconnection, complete whole keel frame structure is formed, to mention
The high bearing capacity of component;Left and right sides, front and back side wall body, roof system etc. are all made of entire wall and are made, and whole face wall is intracorporal
The all elongated settings of main joist, to substantially increase the rigidity and stability of whole face wall.Left and right sides, front and back side wall
Body, roof system are mutual and several square connectors, abnormity connection are respectively adopted in their positions for contacting with automobile chassis
Part, the connection of bar shaped connector, so that all walls adjacent thereto or automobile chassis are joined jointly when the stress of a face wall
With share the stress, so that stress-bearing capability greatly improves.
4. the old tire of the invention using automobile, the old latch plate of automobile, effectively realize the reusable of resource.
Since pulling type ecology caravan is not travelled as the main purpose with traffic, it is able to satisfy moving freely, is short-range in scenic spot completely
It is mobile, and other position movements.
5. whole face wall is formed using modular architectural, i.e. two sides steel skeleton overlapping is placed, and is placed between the steel skeleton of two sides
Styrofoam, outer surface welded wire fabric are placed in heat insulating mattress, steel wire, the inside of two sides steel skeleton, and outermost smears cement mortar.Every
Heat pad can effectively completely cut off the heat bridge effect of steel skeleton.Compound steel silk screen is welded to connect with steel skeleton respectively, and component is effectively completely cut off
For several layers, to improve the overall stability of component.Inside filling styrofoam, can effectively play function of heat insulation;Table
Mortar is smeared in face, can play fire prevention, waterproof, moisture-proof effect;Because using the materials such as styrofoam, the weight of whole face wall
Weight relative to reinforced concrete structure wall mitigates significantly, to be conducive to production, installation and transport.
6. in whole face wall, vertical main joist, lateral main joist, encryption main joist, auxiliary keel, oblique main joist are adopted
It with the C-type steel profile of same cross-sectional size, can be accelerated construction progress using same model C-type steel, easy constructing operation, mitigate work
People's labor intensity.All keel contact with each other position, using welded connecting.The flange plate of C-type steel profile in the plate is
Formula that one is long and the other is short construction, and long side is located at the intermediate position of plate, short side is located at outside left, the structure equally long relative to both sides
It makes, which can facilitate construction personnel's outside-in to drill, mounting screw 31.
Detailed description of the invention
Fig. 1 is automotive frame elevation of the present invention;
Fig. 2 is latch plate of the present invention and automobile tire connection schematic diagram;
Fig. 3 is anchor plate of the present invention, latch plate attachment structure schematic diagram;
Fig. 4 is load transfer device structural schematic diagram of the present invention;
Fig. 5 is traction device structural schematic diagram of the present invention;
Fig. 6 is main joist assembly schematic diagram of the present invention;
Fig. 7 is several auxiliary keel placement positions of the invention schematic diagram;
Fig. 8 is that the unilateral keel assembling of the present invention finishes schematic diagram;
It is steel wire of the present invention is heat insulating mattress connection schematic diagram of the present invention that Fig. 9, which is steel skeleton of the present invention,;
Figure 10 is single side modularization heat-insulating bridge-cut-off modularization thermal insulation composite wall material assembling schematic diagram of the present invention;
Figure 11 is the assembling schematic diagram of the main joist of present invention rear side wall;
Figure 12 is several auxiliary keel placement positions of the invention schematic diagram;
Figure 13 is that the unilateral keel assembling of present invention rear side wall finishes schematic diagram;
Figure 14 is the assembling schematic diagram of the main joist of present invention front side wall;
Figure 15 is several auxiliary keel placement positions of the invention schematic diagram;
Figure 16 is that the unilateral keel assembling of present invention front side wall finishes schematic diagram;
Figure 17 is the assembling schematic diagram of the main joist of roof system of the present invention;
Figure 18 is several auxiliary keel placement positions of the invention schematic diagram;
Figure 19 is that the unilateral keel assembling of roof system of the present invention finishes schematic diagram;
Figure 20 is square connection schematic diagram of the present invention;
Figure 21 is the special-shaped connection schematic diagram of the present invention;
Figure 22 is bar shaped connection schematic diagram of the present invention;
Figure 23 is the front view of pulling type ecology caravan;
Figure 24 is automobile chassis plan view.
In figure, 1, crossbeam, 2, side bar, 3, crossbeam, 4, load transfer device, 5, crossbeam, 6, latch plate, 7, anchor plate, 8, on
Backing plate, 9, lower bolster, 10, tilt prop, 11, bolt and nut, 12, upper junction plate, 13, middle connecting plate, 14, lower connecting plate, 15, envelope
Closure plate, 16, tire, 17, vertical main joist, 18, lateral main joist, 19, encryption main joist, 20, auxiliary keel, 21, oblique master
Keel, 22, connecting screw, 23, rotation screw rod, 24, traction stringer, 25, traction crossbeam, 26, fixed plate, 27, impacting type it is hydraulic
Brake trailer connector, 28, bolt-type automobile towing hook, 29, steel wire, 30, heat insulating mattress, 31, screw, 32, styrofoam, 33,
Cement screedn 34, square connector, 35, non-conventional type joint, 36, bar shaped connector, 37, fixing screws.
Specific embodiment
For a better understanding of the present invention, embodiments of the present invention are explained in detail with reference to the accompanying drawing.
In conjunction with Fig. 1 to Figure 24, a kind of pulling type ecology caravan, trailer, the house of tractor, rear portion including front, institute
House is stated on trailer, the trailer includes trailer chassis, tire, and the trailer chassis passes through coupling unit and traction
Traction hook connects on rear side of vehicle, the tire are connect with tire spindle, and trailer chassis includes crossbeam 5, stringer 1, plugging plate 1, institute
Crossbeam 3 and stringer 1 are stated by welded connecting, the plugging plate 15 passes through with crossbeam 5 to be welded to connect, the tire spindle and closure
Plate 15 passes through welded connecting.When vehicle beam is put, crossbeam is in a horizontal position.See Fig. 2.Crossbeam bottom and elastic shock attenuation structure
Connection.The house part includes left side wall, right side wall, front side wall, rear side wall, roof system, the left side wall, the right side
Side wall body structure is identical, and the left side wall, right side wall middle and upper part are equipped with window opening, is equipped with window opening among the rear side wall,
The front side wall is equipped with door opening, and the left side wall, right side wall, front side wall, rear side wall, roof system use heat-insulating bridge-cut-off
Modularization thermal insulation composite wall material is made.
The elastic shock attenuation structure includes latch plate 6, and latch plate is sequentially placed according to the short mode in upper minister, lower part,
Several anchor plates 7 are placed according to a fixed spacing in whole latch plate direction, and latch plate is connected by anchor plate 7.Anchor steel
Plate uses similar U-shaped moulding, which moves left and right, to can guarantee effectively transmitting load.In bullet
The corresponding position of spring plate drills open-work, then installs connecting screw 22 and fixes latch plate in same position, passes through connecting screw
Connection, so as to limit between each piece of steel spring plate it is opposite moving forward and backward, thus ensure that automobile in emergency start or
When emergency brake, load effectively can be transferred to wheel by steel spring plate, see Fig. 1, Fig. 3.
The connection of steel spring plate 6 and crossbeam 5 follows from what mode connected, and steel spring plate top sets 8 upper padding plates,
The lower part of crossbeam 5 sets 9 lower bolsters, respectively sets four drillings in the corresponding position of upper padding plate 8 and lower bolster 9, passes through 11 bolt and nuts
Upper lower bolster is tightened, so that latch plate and crossbeam be tightened;10 tilt props are set on lower bolster top, tilt prop and automobile is horizontal
Connection is respectively welded in beam, lower bolster.The setting of tilt prop, the opposite sliding being avoided that between latch plate and vehicle beam.See
Fig. 1, Fig. 2.The connection on latch plate and chassis is realized by load transfer device 4, and the three-ply plate of steel spring plate end is passed through
The two sides and bottom of two pieces of upper junction plates 12 and automotive frame 1 are welded to connect, the two of U-shaped lower connecting plate by 14 lower connecting plates
Side is respectively equipped with symmetrical drilling, and the two sides of upper junction plate are respectively equipped with symmetrical drilling, while the top and the bottom of middle connecting plate
It She You not drill.Upper junction plate, middle connecting plate, lower connecting plate are separately connected using rotation screw rod 23, two of top and the bottom turn
Dynamic screw rod 23 forms two rotation axis.Because latch plate itself has certain warpage, the setting of screw rod is rotated, latch plate and vapour are made
There is certain space between chassis steel skeleton, is easily installed.Two rotation screw rods are arranged in upper and lower two sides, make automobile chassis and bullet
The relative displacement for allowing to have certain between spring plate, and when allowing existing relative displacement amplitude when single rotation screw rod is set
Greatly.Especially to the rough road in the road surface or tourist attraction jolted, top room can be dissolved by relative horizontal displacement
The Oscillation Amplitude in room.The setting of the screw rod of downside rotation simultaneously, when can effectively limit road bump, the vertical displacement width of steel spring plate
Degree.See Fig. 4.
The connection of automotive couplers and automobile chassis is to realize in the following way, and the coupling unit includes leading
Draw stringer 24, traction crossbeam 25, trapezoidal fixed plate 26, impacting type water brake trailer connector, the traction stringer 24 and phase
Overlapping alignment overlaps certain length, is welded to connect the side bar of corresponding trailer up and down, welds and leads between two traction stringers 24
Draw crossbeam 25, trapezoidal fixed plate 26 is welded to connect with traction stringer 24, and the trapezoidal fixed plate 26 is equipped with connecting hole, trapezoidal fixation
Plate 26 connect by connecting hole with 27 impacting type water brake trailer connectors, impacting type water brake trailer connector 27 with it is slotting
Pin type automobile towing hook 28 connects.
Between the left side wall, right side wall, front side wall, rear side wall and chassis using square connector 34,
Fixing screws 37 connect, and see Figure 20;Non-conventional type joint 35, fixing screws are used between front side house roof system and rear side house roof system
37 connections, are shown in Figure 21;The connection of plane inner member is connected using bar shaped connector 36, fixing screws 37, sees Figure 22;Other each portions
The above various connection types are attached respectively for connection between position.The square connector, non-conventional type joint, bar shaped connection
Part is all made of a fixed spacing and is evenly arranged.
The heat-insulating bridge-cut-off modularization thermal insulation composite wall material includes fashioned iron keel framework, the steel wire one that two sides is connected
291, steel wire 2 292, heat insulating mattress 30, styrofoam 32, cement sand pulp 8, wherein the inner surface covering of one side keel framework
Layer of steel wire net 1, the steel wire 1 are connect with keel contact position spot welding, and the end of all steel wires 1 is answered
At least extend through the center line of section steel flange.PVC material is equipped between the steel wire 1 and the inside of another side keel framework
Heat insulating mattress 30, two sides keel framework, heat insulating mattress 30 are connected by screw 31.Screw 31 is evenly arranged at a certain distance.Respectively
On two sides, the outside filling of keel framework is equipped with styrofoam 32, is equipped with steel wire 2 292, institute in the covering of 32 outer surface of styrofoam
It states steel wire 2 292 to connect with keel contact position spot welding, the end of all steel wires 2 292 should at least extend through section steel flange
Center line smears certain thickness cement mortar 33 in upper and lower 2 292 net surface of two sides steel wire.The vertical main joist 1, transverse direction
Main joist 18, encryption main joist 19, auxiliary keel 20 are all made of the C-type steel profile of same cross-sectional size.The fashioned iron uses c-type
Steel, wherein using one is long and the other is short, formula constructs (see Fig. 3) to the flange plate of C-type steel.The construction can facilitate construction personnel to drill, and install spiral shell
Nail 31.
The keel framework includes vertical main joist 17, lateral main joist 18, the vertical main joist 17 from hole or
Door opening two sides are outside, do not have the position of window opening and door opening, from intermediate symmetrically placed outward to house roof system, in vertical main joist
It is equipped with vertical encryption keel 19 between 17, lateral encryption keel 19, vertical encryption dragon are equipped between lateral main joist 2
Bone 19 is arranged in parallel with vertical main joist 17, and lateral encryption keel and lateral 18 row of main joist are arranged and add respectively with vertical
Close keel, vertical main joist square crossing, the vertical main joist 17, vertical encryption keel 19 respectively with lateral main joist
18, lateral encryption keel 19 form keel framework by being welded to connect in square crossing position.It can also be in keel framework
It adds auxiliary keel 20 and forms unilateral keel framework, see Fig. 7, Fig. 8,.Due to vertical main joist, lateral main joist interconnection,
Complete whole keel frame structure is formed, to improve the bearing capacity of component.It is the vertical encryption keel, lateral
Encryption keel, vertical main joist 17, lateral main joist 18 are all made of the keel of same section model;Each parallel adjacent keel it
Between center away from being size L;Door-window opening planar dimension is also several integral multiples of size L simultaneously.
Although above-mentioned be described in conjunction with specific embodiment of the attached drawing to invention, not to the scope of the present invention
Limitation, based on the technical solutions of the present invention, those skilled in the art do not need to make the creative labor and can make
Various modifications or changes still within protection scope of the present invention.