CN105973506A - Cold-hot independent circulation calorimeter durability test device - Google Patents
Cold-hot independent circulation calorimeter durability test device Download PDFInfo
- Publication number
- CN105973506A CN105973506A CN201610568982.3A CN201610568982A CN105973506A CN 105973506 A CN105973506 A CN 105973506A CN 201610568982 A CN201610568982 A CN 201610568982A CN 105973506 A CN105973506 A CN 105973506A
- Authority
- CN
- China
- Prior art keywords
- outlet
- cold
- meter
- water
- valve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01K—MEASURING TEMPERATURE; MEASURING QUANTITY OF HEAT; THERMALLY-SENSITIVE ELEMENTS NOT OTHERWISE PROVIDED FOR
- G01K19/00—Testing or calibrating calorimeters
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Measuring Temperature Or Quantity Of Heat (AREA)
Abstract
The invention provides a cold-hot independent circulation calorimeter durability test device comprising a first meter clamping device and a second meter clamping device. The cold-hot independent circulation calorimeter durability test device also comprises a cold water tank, a cold water pump and a cold water flow regulating and control module which are connected in turn, and a hot water tank, a hot water pump and a hot water flow regulating and control module which are connected in turn. Two sets of flow regulating and control modules are set to regulate the flow of cold and hot water respectively, the flow regulating and control modules are not repeatedly impacted by cold and hot water, and the accuracy of all sensors and instruments is not liable to decrease or fail to work so that the measurement accuracy is relatively high and reliability and the service life are also relatively high. Besides, two meter clamping devices are arranged, and cold water impact is performed on the other meter clamping device when hot water impact is performed on one meter clamping device so that the influence on the accuracy of the test result due to instant impact force caused by the fact that a pipeline of cold water or hot water is closed and then opened again can be avoided.
Description
Technical field
The present invention relates to the test equipment of a kind of calorimeter, the heat of a kind of cold and hot independent loops
Table durability test device.
Background technology
The northern area of China needs heating winter, and in order to save the energy, most of areas use heat supply network collection
Middle heat supply, now heat energy needs to carry out meterage as a kind of commodity, traditional charging way be by
Construction area carries out charging, more unreasonable, and carrying out household measurement heat-supplying with calorimeter is that heat supply changes
One important step of leather, calorimeter therein is a kind of instrument for measuring heat.
The durability of calorimeter directly influences the service life of calorimeter, due to China's not correspondence
Testing standard, it is resistance to that major part calorimeter manufacturing enterprise Main Basis European standard carries out calorimeter
Property is tested for a long time.The endurancing of calorimeter is increased by up-to-date European standard EN1434-2015
4000 temperature cycles impact tests, but in existing calorimeter endurance test apparatus the most only
It is provided with a set of Flow-rate adjustment control module, when carrying out 4000 temperature cycles impact tests, flow
Various sensors in regulation control module and instrument under the repeated stock of hot and cold water it is possible that accurate
Exactness declines the problems such as even inefficacy, affects the accuracy of test structure, also can affect assay device
Reliability and service life.
In view of this, the durability test device of calorimeter is conducted in-depth research by the applicant,
Then this case is had to produce.
Summary of the invention
It is an object of the invention to provide that a kind of measurement accuracy is of a relatively high and reliable, phase in service life
Calorimeter endurance test apparatus to higher cold and hot independent loops.
To achieve these goals, the present invention adopts the following technical scheme that
The calorimeter endurance test apparatus of a kind of cold and hot independent loops, including the first meter-clamping apparatus and second
Meter-clamping apparatus, the cold water storage cistern also including being sequentially connected with, water supply pump and cold water flow regulation control module and
Boiler, heat-exchanger pump and the hot water flow regulation control module being sequentially connected with;
Between outlet and the water inlet of described first meter-clamping apparatus of described cold water flow regulation control module
Connect and have the first inlet channel, described first inlet channel is provided with the first water intaking valve, described cold water
Being connected between the outlet of Flow-rate adjustment control module and the water inlet of described second meter-clamping apparatus has second to enter
Waterpipe, described second inlet channel is provided with the second water intaking valve, and the regulation of described hot water flow controls
It is connected between the outlet of module and the water inlet of described first meter-clamping apparatus and has the 3rd inlet channel, described
The 3rd water intaking valve, the outlet of described hot water flow regulation control module it is provided with on 3rd inlet channel
And it is connected between the water inlet of described second meter-clamping apparatus and has the 4th inlet channel, described 4th inlet channel
On be provided with the 4th water intaking valve;
It is connected between the outlet of described first meter-clamping apparatus and described cold water storage cistern and has the first outlet conduit, institute
State and on the first outlet conduit, be provided with the first outlet valve, the outlet of described first meter-clamping apparatus and described heat
Connect between water tank and have the second outlet conduit, described second outlet conduit is provided with the second outlet valve,
It is connected between the outlet of described second meter-clamping apparatus and described cold water storage cistern and has the 3rd outlet conduit, described
The 3rd outlet valve, the outlet of described second meter-clamping apparatus and described boiler it is provided with on three outlet conduits
Between connect have the 4th outlet conduit, described 4th outlet conduit is provided with the 4th outlet valve.
As a modification of the present invention, in described cold water storage cistern, it is provided with refrigeration machine and primary heater,
It is provided with secondary heater in described boiler.
As a modification of the present invention, described first water intaking valve, described second water intaking valve, described
Three water intaking valves, described 4th water intaking valve, described first outlet valve, described second outlet valve, described
Three outlet valves and described 4th outlet valve are respectively ecp ball valve.
As a modification of the present invention, described cold water flow adjustment module and the regulation of described hot water flow
Module includes electromagnetic flowmeter, electric control valve and for showing the instrumental panel of flow and temperature respectively.
Use technique scheme, the method have the advantages that
1, respectively the flow of hot and cold water is adjusted by arranging two set Flow-rate adjustment control modules, stream
Amount regulation control module will not be by the repeated stock of hot and cold water, various sensors and the accuracy of instrument
Being difficult to decline, be not easy to lose efficacy, measurement accuracy is of a relatively high and reliable, service life is of a relatively high.
2, by arranging two binding clasps, one of them binding clasp carry out hot water impact time, another
Binding clasp can carry out cold water shock, it is to avoid the pipeline of cold water or hot water reopens generation after being closed
Instant impact affects the accuracy of test result.
Accompanying drawing explanation
Fig. 1 is the calorimeter endurance test apparatus structural representation of the cold and hot independent loops of the present invention.
Figure indicates corresponding as follows:
11-the first meter-clamping apparatus;12-the second meter-clamping apparatus;
21-cold water storage cistern;22-boiler;
23-cooler;24-primary heater;
25-secondary heater;31-water supply pump;
32-heat-exchanger pump;41-cold water flow adjustment module;
42-hot water flow adjustment module;51-the first inlet channel;
52-the second inlet channel;53-the 3rd inlet channel;
54-the 4th inlet channel;55-the first outlet conduit;
56-the second outlet conduit;57-the 3rd outlet conduit;
58-the 4th outlet conduit;51-the first water intaking valve;
52-the second water intaking valve;53-the 3rd water intaking valve;
54-the 4th water intaking valve;55-the first outlet valve;
56-the second outlet valve;57-the 3rd outlet valve;
58-the 4th outlet valve.
Detailed description of the invention
The present invention is described further with specific embodiment below in conjunction with the accompanying drawings.
As it is shown in figure 1, the calorimeter endurance test apparatus of the cold and hot independent loops of the present embodiment offer,
Including the first meter-clamping apparatus 11 and the second meter-clamping apparatus 12, the cold water storage cistern 21 being sequentially connected with, water supply pump 31 and
Cold water flow regulation control module 41 and the boiler 22 being sequentially connected with, heat-exchanger pump 32 and hot water stream
Amount regulation control module 42, wherein the first meter-clamping apparatus 11 and the second meter-clamping apparatus 12 are all conventional heat
The meter-clamping apparatus that table durability test device is conventional, the most no longer describes in detail.
Cold water flow adjustment module 41 and hot water flow adjustment module 42 include respectively electromagnetic flowmeter,
Electric control valve, pressure transducer, temperature sensor and for showing the instrumental panel of flow and temperature
Deng parts, these parts are all the parts that can the most directly buy, and it is in Flow-rate adjustment module
Interior connected mode is also conventional, the most no longer describes in detail.
Connect between outlet and the water inlet of the first meter-clamping apparatus 11 of cold water flow regulation control module 41
It is connected to the first inlet channel 51, the first inlet channel 51 is provided with the first water intaking valve 61, cold water stream
Connecting between outlet and 12 water inlets of the second meter-clamping apparatus of amount regulation control module 41 has second to enter
Waterpipe 52, the second inlet channel 52 is provided with the second water intaking valve 62, i.e. cold water flow regulation control
The outlet of molding block 41 is connected with the first meter-clamping apparatus 11 and the second meter-clamping apparatus 12 respectively;Hot water flow
Connect between outlet and the water inlet of the first meter-clamping apparatus 11 of regulation control module 42 and have the 3rd water inlet
Pipeline 53, the 3rd inlet channel 53 is provided with the 3rd water intaking valve 63, and hot water flow regulation controls mould
Connect between outlet and the water inlet of the second meter-clamping apparatus 12 of block 42 and have the 4th inlet channel 54, the
It is provided with the 4th water intaking valve 64 on four inlet channels 54;Going out of hot water Flow-rate adjustment control module 42
The mouth of a river is connected with the first meter-clamping apparatus 11 and the second meter-clamping apparatus 12 the most respectively.
It is connected between the outlet of the first meter-clamping apparatus 11 and cold water storage cistern 21 and has the first outlet conduit 55, the
The first outlet valve 65, the outlet of the first meter-clamping apparatus 12 and boiler it is provided with on one outlet conduit 55
Connect between 22 and have the second outlet conduit 56, the second outlet conduit 56 is provided with the second outlet valve 66,
The outlet of the i.e. first meter-clamping apparatus 11 is connected with cold water storage cistern 21 boiler 22 respectively;Second meter-clamping apparatus 12
Outlet and cold water storage cistern 21 between be connected and have the 3rd outlet conduit 57, the 3rd outlet conduit 57 sets
Being equipped with the 3rd outlet valve 67, being connected between the outlet of the second meter-clamping apparatus 12 and boiler 22 has the 4th
Outlet conduit 58, the 4th outlet conduit 58 is provided with the 4th outlet valve 68, the i.e. second meter-clamping apparatus 12
Outlet be connected with cold water storage cistern 21 boiler 22 respectively.
Preferably, in the present embodiment, first water intaking valve the 61, second water intaking valve the 62, the 3rd water intaking valve
63, the 4th water intaking valve the 64, first outlet valve the 65, second outlet valve 66, the 3rd outlet valve 67 and
Four outlet valves 68 are respectively ecp ball valve, it is simple to automatization's control of calorimeter endurance test apparatus
System, certainly, the calorimeter endurance test apparatus of the cold and hot independent loops in the present embodiment also includes using
In the control system of each associated components of control, this control system is conventional system, not the present embodiment
Emphasis, the most no longer describe in detail.
Additionally, in the present embodiment, in cold water storage cistern 21, it is provided with refrigeration machine 23 and primary heater 24,
Secondary heater 25 it is provided with in boiler 22.Refrigeration machine 23 can be when the water in cold water storage cistern 21 be overheated
Being cooled to, primary heater 24 can be heated when the water in cold water storage cistern 21 is supercool;Second adds
The hot device 25 hot water in heat hot water case 22, due to the hot water temperature's value required for boiler 22
Lower limit also much larger than the temperature value of normal-temperature water, it is not necessary that in boiler 22, cooler is set.
The calorimeter endurance test apparatus of the cold and hot independent loops that the present embodiment provides can be according to up-to-date
European standard EN1434-2015 carries out " the basic endurancing of 2400h " and " 300h to calorimeter
Additional endurancing ", it is possible to calorimeter is carried out " 4000 temperature (cold and hot) circulation impact tests ".
This sentences operation the most complicated " 4000 temperature (cold and hot) circulation impact tests " in order to this reality
Say as a example by the occupation mode of the calorimeter endurance test apparatus executing the cold and hot independent loops that example provides
Bright.
In an initial condition, each water intaking valve and each outlet valve are all in closed mode;Before test the most past
Cold water storage cistern 21 and boiler 22 water-filling, and two tested calorimeters are separately mounted to the first meter-clamping apparatus
11 and second on meter-clamping apparatus 12, then by refrigeration machine 23 or primary heater 24 by cold water storage cistern
Water temperature cools down or is heated to the lower limit temperature of testing standard, by secondary heater 25 by boiler
Water temp. heating is to the ceiling temperature of testing standard, it should be noted that during test, if
Water temperature in cold water storage cistern 21 or boiler 22 beyond the requirement of testing standard, corresponding cooler or add
Hot device also can cool down or heat;After firing test device proceeds by test, control system according to
Preset open cold water pump 31 and heat-exchanger pump 32, open the first water intaking valve the 61, the 4th water inlet simultaneously
Valve the 64, first outlet valve 65 and the 4th outlet valve 68, the cold water in cold water storage cistern 21 is at water supply pump 31
Driving under through cold water flow regulation control module 41 flow to the first meter-clamping apparatus 11, to being arranged on the first folder
The calorimeter of table device 11 is tested, and is then refluxed for the hot water in cold water storage cistern 21, in boiler 22
The second meter-clamping apparatus 12 is flowed to through hot water flow regulation control module 41 under the driving of heat-exchanger pump 32, right
The calorimeter being arranged on the second meter-clamping apparatus 12 is tested, and is then refluxed in boiler 22;Pass through
After the predetermined time, water intaking valve and the outlet valve of each open mode are closed by control system simultaneously, and
Water intaking valve and the outlet valve of each closed mode are opened so that the second meter-clamping apparatus 12 is surveyed by cold water
Examination, the first meter-clamping apparatus 11 is tested by hot water, circulates until off-test with this.Cold owing to flowing through
Discharge regulation control module 31 is cold water all the time, flows through hot water flow regulation control module 32
All the time it is hot water, corresponding Flow-rate adjustment control module will not effectively be protected stream by thermal shock
Amount regulation control module.
Above in conjunction with accompanying drawing, the present invention is described in detail, but embodiments of the present invention are not
Being only limitted to above-mentioned embodiment, the present invention can be made respectively by those skilled in the art according to prior art
Kind of deformation, such as the filling pipe that connects with external fluid delivery conduit road of setting on cold water storage cistern 21 and/boiler 22
Road, or liquidometer etc. is set on cold water storage cistern 21 and/boiler 22, these broadly fall into the present invention's
Protection domain.
Claims (4)
1. a calorimeter endurance test apparatus for cold and hot independent loops, including the first meter-clamping apparatus and
Two meter-clamping apparatus, it is characterised in that also include that the cold water storage cistern, water supply pump and the cold water flow that are sequentially connected with are adjusted
Joint control module and the boiler being sequentially connected with, heat-exchanger pump and hot water flow regulation control module;
Between outlet and the water inlet of described first meter-clamping apparatus of described cold water flow regulation control module
Connect and have the first inlet channel, described first inlet channel is provided with the first water intaking valve, described cold water
Being connected between the outlet of Flow-rate adjustment control module and the water inlet of described second meter-clamping apparatus has second to enter
Waterpipe, described second inlet channel is provided with the second water intaking valve, and the regulation of described hot water flow controls
It is connected between the outlet of module and the water inlet of described first meter-clamping apparatus and has the 3rd inlet channel, described
The 3rd water intaking valve, the outlet of described hot water flow regulation control module it is provided with on 3rd inlet channel
And it is connected between the water inlet of described second meter-clamping apparatus and has the 4th inlet channel, described 4th inlet channel
On be provided with the 4th water intaking valve;
It is connected between the outlet of described first meter-clamping apparatus and described cold water storage cistern and has the first outlet conduit, institute
State and on the first outlet conduit, be provided with the first outlet valve, the outlet of described first meter-clamping apparatus and described heat
Connect between water tank and have the second outlet conduit, described second outlet conduit is provided with the second outlet valve,
It is connected between the outlet of described second meter-clamping apparatus and described cold water storage cistern and has the 3rd outlet conduit, described
The 3rd outlet valve, the outlet of described second meter-clamping apparatus and described boiler it is provided with on three outlet conduits
Between connect have the 4th outlet conduit, described 4th outlet conduit is provided with the 4th outlet valve.
The calorimeter endurance test apparatus of cold and hot independent loops the most as claimed in claim 1, it is special
Levy and be, be provided with refrigeration machine and primary heater in described cold water storage cistern, be provided with in described boiler
Secondary heater.
The calorimeter endurance test apparatus of cold and hot independent loops the most as claimed in claim 1 or 2,
It is characterized in that, described first water intaking valve, described second water intaking valve, described 3rd water intaking valve, described
4th water intaking valve, described first outlet valve, described second outlet valve, described 3rd outlet valve and described
4th outlet valve is respectively ecp ball valve.
The calorimeter endurance test apparatus of cold and hot independent loops the most as claimed in claim 1 or 2,
It is characterized in that, described cold water flow adjustment module and described hot water flow adjustment module include electricity respectively
Magnetic flowmeter, electric control valve and for showing the instrumental panel of flow and temperature.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610568982.3A CN105973506A (en) | 2016-07-19 | 2016-07-19 | Cold-hot independent circulation calorimeter durability test device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610568982.3A CN105973506A (en) | 2016-07-19 | 2016-07-19 | Cold-hot independent circulation calorimeter durability test device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN105973506A true CN105973506A (en) | 2016-09-28 |
Family
ID=56953048
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610568982.3A Pending CN105973506A (en) | 2016-07-19 | 2016-07-19 | Cold-hot independent circulation calorimeter durability test device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105973506A (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106768977A (en) * | 2017-01-19 | 2017-05-31 | 广州市辉固技术服务有限公司 | Flow controller durability detecting system |
| CN108151918A (en) * | 2018-03-14 | 2018-06-12 | 泉州七洋机电有限公司 | A kind of calorimeter endurance test apparatus and its test method |
| CN108593150A (en) * | 2018-07-10 | 2018-09-28 | 浙江永阳节能技术有限公司 | A kind of hot and cold scale detection device |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20130247997A1 (en) * | 2012-03-22 | 2013-09-26 | Rheem Australia Pty Limited | Circulating hot water system and or appliance |
| CN103884404A (en) * | 2014-04-02 | 2014-06-25 | 中国计量科学研究院 | Alternation type flow instrument durability experimental facility |
| CN103954381A (en) * | 2014-04-30 | 2014-07-30 | 蒋韵坚 | Calorimeter durability test device |
| CN104180930A (en) * | 2014-08-22 | 2014-12-03 | 山西省计量科学研究院 | Calorimeter flow sensor durability test device and method |
| CN205373920U (en) * | 2016-02-03 | 2016-07-06 | 陕西省计量科学研究院 | Heat meter durability test device |
| CN205898332U (en) * | 2016-07-19 | 2017-01-18 | 泉州七洋机电有限公司 | Cold and hot independent endless calorimeter durability test device |
-
2016
- 2016-07-19 CN CN201610568982.3A patent/CN105973506A/en active Pending
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20130247997A1 (en) * | 2012-03-22 | 2013-09-26 | Rheem Australia Pty Limited | Circulating hot water system and or appliance |
| CN103884404A (en) * | 2014-04-02 | 2014-06-25 | 中国计量科学研究院 | Alternation type flow instrument durability experimental facility |
| CN103954381A (en) * | 2014-04-30 | 2014-07-30 | 蒋韵坚 | Calorimeter durability test device |
| CN104180930A (en) * | 2014-08-22 | 2014-12-03 | 山西省计量科学研究院 | Calorimeter flow sensor durability test device and method |
| CN205373920U (en) * | 2016-02-03 | 2016-07-06 | 陕西省计量科学研究院 | Heat meter durability test device |
| CN205898332U (en) * | 2016-07-19 | 2017-01-18 | 泉州七洋机电有限公司 | Cold and hot independent endless calorimeter durability test device |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106768977A (en) * | 2017-01-19 | 2017-05-31 | 广州市辉固技术服务有限公司 | Flow controller durability detecting system |
| CN108151918A (en) * | 2018-03-14 | 2018-06-12 | 泉州七洋机电有限公司 | A kind of calorimeter endurance test apparatus and its test method |
| CN108593150A (en) * | 2018-07-10 | 2018-09-28 | 浙江永阳节能技术有限公司 | A kind of hot and cold scale detection device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR101552087B1 (en) | A heat exchanger performance test apparatus for airconditioner | |
| CN106441797B (en) | The automatic flow resistance test macro of cold plate | |
| CN208537162U (en) | A kind of transmission bench oil temperature stability test simulation real vehicle coolant control device | |
| CN104458063B (en) | A kind of energy-saving heat quantity flow calibrating installation and method | |
| CN203824753U (en) | Engine thermal shock test device | |
| CN201188015Y (en) | Instrument for measuring instantaneous oil consumption of engine | |
| CN105973506A (en) | Cold-hot independent circulation calorimeter durability test device | |
| CN109781782A (en) | A desktop self-water supply heat exchanger performance testing device | |
| CN110954193B (en) | Flow meter durability test device capable of changing temperature and flow rate | |
| CN105181473A (en) | Detection testing bed for circular pressurizing function of gas water heater | |
| CN108917891A (en) | A kind of high-temp liquid flow standard device | |
| CN106482973A (en) | Plate type heat exchanger liquid phase medium pressure fall-off test system and its method of testing | |
| CN106289834B (en) | A kind of experimental system for building the initial operating mode of steam generator secondary side | |
| CN208885688U (en) | A test device for simulating the thermal load of an aircraft hydraulic system | |
| CN109425490A (en) | New-energy automobile simulated testing system | |
| CN205898332U (en) | Cold and hot independent endless calorimeter durability test device | |
| CN210894621U (en) | New forms of energy motor's test system | |
| CN105136342B (en) | The system and method for heat exchanger heat exchange amount measurement accuracy is improved under the conditions of tepor difference | |
| CN113851674A (en) | Thermal management system for testing fuel cell system | |
| CN221945543U (en) | Liquid cooling plate characteristic integrated detection system | |
| CN209326986U (en) | A kind of cylinder pressure sensor constant temperature and pressure control device | |
| CN201885751U (en) | Full-automatic load adjusting and weighing energy efficiency testing table for fuel water heater | |
| CN218098323U (en) | Modular cold and hot impact device | |
| CN107238450A (en) | A kind of cryogenic fluid transfer pipeline leakage heat test device and method | |
| CN208171619U (en) | A kind of enthalpy difference laboratory |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160928 |
|
| RJ01 | Rejection of invention patent application after publication |