CN105971040A - 一种危房加固处理的方法 - Google Patents

一种危房加固处理的方法 Download PDF

Info

Publication number
CN105971040A
CN105971040A CN201610472925.5A CN201610472925A CN105971040A CN 105971040 A CN105971040 A CN 105971040A CN 201610472925 A CN201610472925 A CN 201610472925A CN 105971040 A CN105971040 A CN 105971040A
Authority
CN
China
Prior art keywords
dilapidated
foundation
building
floral tube
jet grouting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610472925.5A
Other languages
English (en)
Inventor
程华清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610472925.5A priority Critical patent/CN105971040A/zh
Publication of CN105971040A publication Critical patent/CN105971040A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures

Abstract

本发明提出了一种危房加固处理的方法,包括以下步骤:步骤1,沿危房原基础边线布置高压旋喷桩;步骤2,高压旋喷桩外侧设置花管注浆体;步骤3,在危房原基础上向外侧置入若干跟植筋;步骤4,在危房原基础外侧并排设置外扩钢筋牢笼,将外扩钢筋牢笼和植筋固定,并在外扩钢筋牢笼上浇注混凝土作业,形成钢筋混凝土外扩基。本方法一是将原房屋条基植筋、加厚并拓宽,拓宽的基础下面施工高压旋喷桩基础;二是在危房靠近基坑一边,朝危房下面斜向施工花管注浆,通过补强加固房屋基础,通过上述施工方法,超深基坑开挖到底了,沉降观测结果,周边危房没受任何影响。

Description

一种危房加固处理的方法
技术领域
本发明涉及建筑施工领域,更具体地说是涉及一种危房加固处理的方法。
背景技术
新世界发展(武汉)有限公司拟建的武汉新世界中心三期写字楼项目,是由一栋37层塔楼和层高6—8米的五层裙楼组成的综合写字楼。建筑面积15.8万㎡,地面以下设四层地下室,基坑开挖面积13240㎡,基坑开挖深度21m—27m(“坑中坑”27m)。
基坑周边环境十分严峻、复杂:北侧位于解放大道闹市区,紧邻航空路立交桥(且基坑边分布有各种管网设施和箱涵);紧邻基坑南侧和西侧有多栋5—8层天然基础、年代久远的危房;深基坑地层上部分布有厚度较大、强度低的流塑状淤泥层及淤泥质粘土软土层,中部为砂层和卵石层,下伏岩层深度达55米以上。而且该基坑的地下水量丰富,与长江相通,本基坑基底进入了砂层,必须采取止水及深井排水、降水处理措施。
针对超深基坑附近紧临的多栋天然地基破旧危房,住户不让进屋加固施工,只能在屋外加固房屋基础,因此这对施工单位提出了严峻的挑战。
发明内容
为了解决上述问题,本发明提出了一种危房加固处理的方法,采用如下方法对这些危房进行基础补强加固:一是将原房屋条基植筋、加厚并拓宽2米,拓宽的基础下面施工高压旋喷桩基础;二是在危房靠近基坑一边,朝危房下面斜向施工25米花管注浆(上下两排),通过补强加固房屋基础,通过上述施工方法,超深基坑开挖到底了,沉降观测结果,周边危房没受任何影响。
本发明的技术方案是这样实现的:
一种危房加固处理的方法,包括以下步骤:
步骤1,沿危房原基础边线布置高压旋喷桩;
步骤2,高压旋喷桩外侧设置花管注浆体;
步骤3,在危房原基础上向外侧置入若干跟植筋;
步骤4,在危房原基础外侧并排设置外扩钢筋牢笼,将外扩钢筋牢笼和植筋固定,并在外扩钢筋牢笼上浇注混凝土作业,形成钢筋混凝土外扩基。
优选地,所述高压旋喷桩的顶部靠内的一侧与危房原基础结合,靠外的一侧与钢筋混凝土外扩基结合。
优选地,所述花管注浆体顶部靠内的一侧与钢筋混凝土外扩基结合。
优选地,所述花管注浆体呈垂直状与高压旋喷桩平行排列。
优选地,所述花管注浆体呈倾斜状且向下朝危房底侧的高压旋喷桩之间。
优选地,所述花管注浆体的倾斜角度为30~40°。
本发明产生的有益效果为:本发明的方案很好的解决了开挖基坑施工对周围破旧危房产生的影响,而且对破旧危房无居住危害,也对危房旁侧的基坑施工无影响。
附图说明
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。
图1为本发明中垂直设置花管注浆体的施工示意图;
图2为本发明中倾斜状设置花管注浆体的施工示意图。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
如图1、2所示分别为两种实施例的施工示意图。
在危房原基础1上向外侧置入若干跟植筋5;在危房原基础1外侧并排设置外扩钢筋牢笼4,将外扩钢筋牢笼4和植筋5固定,并在外扩钢筋牢笼上浇注混凝土作业,形成钢筋混凝土外扩基6。
在沿危房原基础1边线布置高压旋喷桩2,高压旋喷桩2的顶部靠内的一侧与危房原基础1结合,靠外的一侧与钢筋混凝土外扩基6结合;高压旋喷桩2外侧设置花管注浆体3,所述花管注浆体3顶部靠内的一侧与钢筋混凝土外扩基6结合,保证高压旋喷桩2和花管注浆体3将钢筋混凝土外扩基6和危房原基础1支撑抬起。
其中花管注浆体3呈垂直状与高压旋喷桩2平行排列,或者花管注浆体3呈倾斜状且向下朝危房底侧的高压旋喷桩2之间,倾斜角度为30~40°之间;
本发明中基坑周边的危房加固保护方案采用“高压旋喷桩+花管注浆体+基础加宽”的方式处理对建筑物进行加固保护,一方面将原房屋条基植筋、加厚并拓宽2米,拓宽的基础下面施工高压旋喷桩基础;二是在危房靠近基坑一边,朝危房下面斜向施工25米花管注浆体(上下两排),通过补强加固房屋基础,有效的保证了基坑施工不会对周边的危房造成影响。
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。

Claims (6)

1.一种危房加固处理的方法,其特征在于,包括以下步骤:
步骤1,沿危房原基础边线布置高压旋喷桩;
步骤2,高压旋喷桩外侧设置花管注浆体;
步骤3,在危房原基础上向外侧置入若干跟植筋;
步骤4,在危房原基础外侧并排设置外扩钢筋牢笼,将外扩钢筋牢笼和植筋固定,并在外扩钢筋牢笼上浇注混凝土作业,形成钢筋混凝土外扩基。
2.如权利要求1所述的一种危房加固处理的方法,其特征在于,所述高压旋喷桩的顶部靠内的一侧与危房原基础结合,靠外的一侧与钢筋混凝土外扩基结合。
3.如权利要求1所述的一种危房加固处理的方法,其特征在于,所述花管注浆体顶部靠内的一侧与钢筋混凝土外扩基结合。
4.如权利要求1所述的一种危房加固处理的方法,其特征在于,所述花管注浆体呈垂直状与高压旋喷桩平行排列。
5.如权利要求1所述的一种危房加固处理的方法,其特征在于,所述花管注浆体呈倾斜状且向下朝危房底侧的高压旋喷桩之间。
6.如权利要求5所述的一种危房加固处理的方法,其特征在于,所述花管注浆体的倾斜角度为30~40°。
CN201610472925.5A 2016-06-23 2016-06-23 一种危房加固处理的方法 Pending CN105971040A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610472925.5A CN105971040A (zh) 2016-06-23 2016-06-23 一种危房加固处理的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610472925.5A CN105971040A (zh) 2016-06-23 2016-06-23 一种危房加固处理的方法

Publications (1)

Publication Number Publication Date
CN105971040A true CN105971040A (zh) 2016-09-28

Family

ID=57019711

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610472925.5A Pending CN105971040A (zh) 2016-06-23 2016-06-23 一种危房加固处理的方法

Country Status (1)

Country Link
CN (1) CN105971040A (zh)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08296240A (ja) * 1995-04-26 1996-11-12 Kajima Corp 既存基礎の耐震補強工法
CN203654308U (zh) * 2014-01-08 2014-06-18 中铁十一局集团有限公司 用于加固变形桥桩的锚杆桩加固承台结构
CN103953118A (zh) * 2014-04-18 2014-07-30 中国水电顾问集团华东勘测设计研究院有限公司 一种隔断厂房室内地面向柱基和墙体传递沉降的连接结构
CN104179204A (zh) * 2014-08-28 2014-12-03 山西钢铁建设(集团)有限公司 建筑物邻近深基坑基础桩基托换方法
CN104420486A (zh) * 2013-08-21 2015-03-18 贵阳铝镁设计研究院有限公司 一种在已有扩展浅基础底部增设钢管桩的方法及结构
CN204510246U (zh) * 2015-01-27 2015-07-29 北京瑞腾基础工程技术有限公司 一种由既有建筑的独立基础加固成的承台桩基础结构
CN204919635U (zh) * 2015-09-18 2015-12-30 贵州省公路局 一种桥梁基础加固结构

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08296240A (ja) * 1995-04-26 1996-11-12 Kajima Corp 既存基礎の耐震補強工法
CN104420486A (zh) * 2013-08-21 2015-03-18 贵阳铝镁设计研究院有限公司 一种在已有扩展浅基础底部增设钢管桩的方法及结构
CN203654308U (zh) * 2014-01-08 2014-06-18 中铁十一局集团有限公司 用于加固变形桥桩的锚杆桩加固承台结构
CN103953118A (zh) * 2014-04-18 2014-07-30 中国水电顾问集团华东勘测设计研究院有限公司 一种隔断厂房室内地面向柱基和墙体传递沉降的连接结构
CN104179204A (zh) * 2014-08-28 2014-12-03 山西钢铁建设(集团)有限公司 建筑物邻近深基坑基础桩基托换方法
CN204510246U (zh) * 2015-01-27 2015-07-29 北京瑞腾基础工程技术有限公司 一种由既有建筑的独立基础加固成的承台桩基础结构
CN204919635U (zh) * 2015-09-18 2015-12-30 贵州省公路局 一种桥梁基础加固结构

Similar Documents

Publication Publication Date Title
CN105544576B (zh) 一种基坑降排水开挖方法
CN106703044B (zh) 一种流塑状冲填土软弱地层放坡组合支护方法
CN207003499U (zh) 一种地铁隧道上方基坑开挖的抗浮起装置
CN110118090A (zh) 用于防止隧道注浆加固引起地表隆起的防护结构
CN104532714B (zh) 一种处理深厚软土岩溶地基的路基结构
CN110080169A (zh) 一种基于地下室利用的围海造地的施工方法
CN107299650A (zh) 一种远距离沉井排土纠偏方法
CN108222026A (zh) 煤矿小型矸石山的修复方法
CN207143981U (zh) 第三系富水半成岩砂岩段地铁车站基坑排水结构
CN107090842A (zh) 一种地铁车站大厚度湿陷性黄土地基的处理方法
Frere et al. Roman Britain in 1987
CN106120805B (zh) 危房环境下的超深基坑支护的施工方法
CN104480956B (zh) 一种小直径模袋混凝土桩复合地基
CN108867673A (zh) 一种基于抽水帷幕的基坑中地下水治理方法
CN206204972U (zh) 一种兼作井点降水的预制管桩
CN110093971A (zh) 地下隧道的组合式水泵房及其施工方法
CN207176700U (zh) 一种复杂环境下的密排灌注桩内支撑基坑永久支护结构
CN205662938U (zh) 一种基坑降排水开挖结构
CN106120828A (zh) 一种连续墙的夹心饼干式帷幕止水施工方法
CN109881691B (zh) 一种深基坑开挖过程中基坑内基底勘探孔管涌的处理方法
CN105926668A (zh) 一种超深基坑和邻近危房之间的隔断墙施工方法
CN106013164A (zh) 一种基坑的多功能栈桥施工的方法
CN110106886A (zh) 一种地下高水位的深基坑开挖方法
CN107165170B (zh) 一种基坑施工方法
Waliszewski et al. Preliminary report on the 2008 and 2009 excavation seasons at Jiyeh (Porphyreon) With appendices: 1. Sunken vessels in late Roman and Byzantine Houses in area D 2. Preliminary remarks on thresholds from private houses in Jiyeh (Porphyreon)

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160928

RJ01 Rejection of invention patent application after publication