CN105954079A - Cementing forming and maintenance method for rock-soil mass model material and improved mold suitable for method - Google Patents
Cementing forming and maintenance method for rock-soil mass model material and improved mold suitable for method Download PDFInfo
- Publication number
- CN105954079A CN105954079A CN201610316087.2A CN201610316087A CN105954079A CN 105954079 A CN105954079 A CN 105954079A CN 201610316087 A CN201610316087 A CN 201610316087A CN 105954079 A CN105954079 A CN 105954079A
- Authority
- CN
- China
- Prior art keywords
- soil
- rock
- test specimen
- mould
- model test
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000002689 soil Substances 0.000 title claims abstract description 123
- 239000000463 material Substances 0.000 title claims abstract description 96
- 238000000034 method Methods 0.000 title claims abstract description 40
- 238000012423 maintenance Methods 0.000 title claims abstract description 24
- 238000012360 testing method Methods 0.000 claims abstract description 177
- 239000011435 rock Substances 0.000 claims abstract description 89
- 239000004570 mortar (masonry) Substances 0.000 claims abstract description 39
- 238000004519 manufacturing process Methods 0.000 claims abstract description 12
- 238000012545 processing Methods 0.000 claims abstract description 9
- 239000011426 gypsum mortar Substances 0.000 claims description 37
- 229940099259 vaseline Drugs 0.000 claims description 12
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 10
- 239000001509 sodium citrate Substances 0.000 claims description 9
- NLJMYIDDQXHKNR-UHFFFAOYSA-K sodium citrate Chemical compound O.O.[Na+].[Na+].[Na+].[O-]C(=O)CC(O)(CC([O-])=O)C([O-])=O NLJMYIDDQXHKNR-UHFFFAOYSA-K 0.000 claims description 9
- 239000003292 glue Substances 0.000 claims description 8
- 239000007788 liquid Substances 0.000 claims description 8
- 229920006284 nylon film Polymers 0.000 claims description 8
- 239000000203 mixture Substances 0.000 claims description 5
- 239000007864 aqueous solution Substances 0.000 claims description 3
- 239000003153 chemical reaction reagent Substances 0.000 claims description 3
- 238000001035 drying Methods 0.000 claims description 3
- 239000004576 sand Substances 0.000 claims description 3
- 238000007493 shaping process Methods 0.000 claims 8
- OSGAYBCDTDRGGQ-UHFFFAOYSA-L calcium sulfate Chemical group [Ca+2].[O-]S([O-])(=O)=O OSGAYBCDTDRGGQ-UHFFFAOYSA-L 0.000 claims 6
- 239000004568 cement Substances 0.000 claims 4
- 239000011148 porous material Substances 0.000 claims 4
- 239000001175 calcium sulphate Substances 0.000 claims 2
- 235000011132 calcium sulphate Nutrition 0.000 claims 2
- 239000003755 preservative agent Substances 0.000 claims 2
- 230000002335 preservative effect Effects 0.000 claims 2
- 238000013138 pruning Methods 0.000 claims 1
- 239000007787 solid Substances 0.000 claims 1
- 229910052602 gypsum Inorganic materials 0.000 abstract description 9
- 239000010440 gypsum Substances 0.000 abstract description 9
- 238000011160 research Methods 0.000 abstract description 4
- 238000011161 development Methods 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 5
- 239000004033 plastic Substances 0.000 description 4
- 239000012634 fragment Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000007429 general method Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 238000009533 lab test Methods 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 230000009897 systematic effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N1/00—Sampling; Preparing specimens for investigation
- G01N1/28—Preparing specimens for investigation including physical details of (bio-)chemical methods covered elsewhere, e.g. G01N33/50, C12Q
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N1/00—Sampling; Preparing specimens for investigation
- G01N1/28—Preparing specimens for investigation including physical details of (bio-)chemical methods covered elsewhere, e.g. G01N33/50, C12Q
- G01N1/36—Embedding or analogous mounting of samples
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N1/00—Sampling; Preparing specimens for investigation
- G01N1/28—Preparing specimens for investigation including physical details of (bio-)chemical methods covered elsewhere, e.g. G01N33/50, C12Q
- G01N1/36—Embedding or analogous mounting of samples
- G01N2001/366—Moulds; Demoulding
Landscapes
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Biochemistry (AREA)
- General Health & Medical Sciences (AREA)
- General Physics & Mathematics (AREA)
- Immunology (AREA)
- Pathology (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
Description
技术领域 technical field
本发明属于土工试验领域,具体涉及一种岩土体模型材料胶结成形养护方法及适用于其的改进模具。 The invention belongs to the field of geotechnical tests, and in particular relates to a cementation forming maintenance method for rock-soil body model materials and an improved mold suitable for the same.
背景技术 Background technique
关于混凝土砂浆试块试验,以及岩土体模型材料力学试验,对于不同的试验测试指标或不同的测试仪器,相关试件形状、尺寸的要求是不一的。一般的做法是,根据具体试验对试件形状、尺寸的要求,加工一套专用模具,来制作试验要求的试件。这种方法,有两个弊端:①试验成本的增加,包括制作模具耗费的经济成本与时间成本;②模具的有效利率用低,所制作的模具,往往在本次试验后的相当长的一段时间内不会再次使用。另外,对于两种模型材料胶结试件的制作,及其试验研究,鲜见有关专利、学者的研究成果。 Regarding the concrete mortar test block test and the rock and soil model material mechanical test, for different test indicators or different test instruments, the requirements for the shape and size of the relevant test pieces are different. The general method is to process a set of special molds according to the requirements of the specific test on the shape and size of the test piece to make the test piece required by the test. This method has two disadvantages: ①The increase of the test cost, including the economic cost and time cost of making the mold; It will not be used again for a period of time. In addition, for the production of cemented specimens of the two model materials and their experimental research, there are few relevant patents and research results of scholars.
而在实际工程案例中,这种模型对应的原型是广泛存在的,如,滑坡中的“滑体—剪切带—滑床”结构,地基基础中的“岩体—过渡带—土体”结构以及“基础—接触带—地基”结构,地层中的“下岩层—过渡带—上岩层”结构,甚至是一些深大断层中的“上盘—断层带—下盘”结构。将整个结构作为一个整体进行系统的测试及研究,除了一些工程量较大、费用较昂贵的原位测试能满足测试及工程要求外,室内的试验与测试很难达到预期目标。因为实际原型在尺寸上过大,试验室里通常取结构中的各个组成部分,分别进行测试,而各个组成部分的性质并不能直观反映整体系统的性质。 In actual engineering cases, the corresponding prototypes of this model exist widely, such as the "slide mass-shear zone-slide bed" structure in landslides, and the "rock mass-transition zone-soil mass" structure in foundations. Structure and "base-contact zone-foundation" structure, "lower rock layer-transition zone-upper rock layer" structure in strata, and even "hanging wall-fault zone-footwall" structure in some deep and large faults. Carry out systematic testing and research on the entire structure as a whole. Except for some in-situ testing with large engineering volume and high cost, which can meet the testing and engineering requirements, it is difficult to achieve the expected goals in indoor testing and testing. Because the actual prototype is too large in size, each component of the structure is usually taken in the laboratory and tested separately, and the properties of each component cannot directly reflect the properties of the overall system.
为此,在室内试验中,可借助相似原理,采用模型试验的手段,来研究整体系统的性质。而根据相似原理制作上述整体结构模型,是模型试验开展的重要基础。 For this reason, in the laboratory test, the nature of the overall system can be studied by means of the model test with the help of the similarity principle. Making the above-mentioned overall structure model according to the principle of similarity is an important basis for carrying out model tests.
发明内容 Contents of the invention
本发明要解决的技术问题是,针对现有技术存在的上述不足,提供一种岩土模型材料胶结成形养护方法及适用于其的改进模具,减少模型试件制作的成本(包括时间与经济成本),同时给出一种“上结构体—过渡带—下结构体”岩土体模型的制作方法。 The technical problem to be solved by the present invention is to provide a method for bonding and forming maintenance of geotechnical model materials and an improved mold suitable for the above-mentioned deficiencies in the prior art, so as to reduce the cost of making model specimens (including time and economic costs ), at the same time, a method for making the rock-soil mass model of "upper structure-transition zone-lower structure" is given.
本发明为解决上述技术问题所采用的技术方案是: The technical scheme that the present invention adopts for solving the problems of the technologies described above is:
一种岩土体模型材料胶结成形养护方法,包括以下步骤: A method for cementing and forming maintenance of rock and soil model materials, comprising the following steps:
步骤S1、准备试验工具:试验工具包括凡士林、推杆、液体胶、尼龙薄膜、保鲜膜、钢锯、抹刀,其中原始模具采用实验室现有的、最接近试验要求的试模模具; Step S1, prepare test tools: test tools include Vaseline, push rod, liquid glue, nylon film, plastic wrap, hacksaw, spatula, among which the original mold adopts the existing test mold in the laboratory that is closest to the test requirements;
步骤S2、制作改进模具:根据试验需要,通过原始模具连同石膏砂浆试块一起制作得到改进模具; Step S2, making an improved mold: According to the needs of the test, the improved mold is produced by making the original mold together with the gypsum mortar test block;
步骤S3、制作岩土体模型材料试件:按照既定的岩土体模型材料配方成分,采用未改进的原始模具制作岩体模型试件,采用改进模具制作土体模型试件; Step S3, making rock-soil model material test piece: according to the established rock-soil model material formula composition, use the unimproved original mold to make the rock mass model test piece, and use the improved mold to make the soil model test piece;
步骤S4、对已制作好的岩体模型试件、土体模型试件进行加工,并准备胶结岩体模型试件和土体模型试件的岩体模型材料砂浆; Step S4, processing the prepared rock mass model test piece and soil model test piece, and preparing the rock mass model material mortar for cementing the rock mass model test piece and the soil mass model test piece;
步骤S5、胶结岩体模型试件和土体模型试件:将加工好的岩体模型试件放入原始模具中,并均匀平铺准备好的岩体模型材料砂浆,再将加工好的土体模型试件缓慢推入前面已经铺匀岩体模型材料砂浆、装有加工过的岩体模型试块的原始模具中,并用抹刀削去多余的土体模型试件,并抹平,胶结好的岩土体模型材料胶结试件包括岩体模型试件、岩体模型材料砂浆和土体模型试件; Step S5, cementing rock mass model specimens and soil model specimens: put the processed rock mass model specimens into the original mold, and evenly spread the prepared rock mass model material mortar, and then place the processed soil The body model specimen is slowly pushed into the original mold that has been spread evenly before the rock mass model material mortar and the processed rock mass model test block is installed, and the excess soil model specimen is cut off with a spatula, smoothed and cemented Good cemented specimens of rock mass model materials include rock mass model specimens, rock mass model material mortar and soil mass model specimens;
步骤S6、养护胶结试件:将步骤S5中胶结好的岩土体模型材料胶结试件,倒置于经过隔水处理的改进模具中,同时使胶结带出露,并对土体模型试件进行隔水处理;将岩土体模型材料胶结试件连同改进模具,静置于实验室内自然养护3~4天,使胶结岩体模型试件和土体模型试件的岩体模型材料砂浆强度稳定; Step S6, curing the cemented test piece: put the cemented test piece of the rock-soil model material cemented in step S5 upside down in the improved mold that has been treated with water isolation, and at the same time expose the cemented belt, and carry out the soil model test piece Water-proof treatment; put the rock-soil model material cemented specimen together with the improved mold, and put it in the laboratory for natural curing for 3 to 4 days, so that the cemented rock mass model specimen and the rock mass model material mortar strength of the soil model specimen Stablize;
步骤S7、岩土体模型材料脱模:脱模方式为,采用推杆通过改进模具的脱模空压机气孔,推动岩土体模型材料下的石膏砂浆试块,使岩土体模型材料脱模,最终得到养护成形的岩土体模型材料。 Step S7, demoulding of the rock and soil model material: the demoulding method is to use a push rod to push the gypsum mortar test block under the rock and soil model material through the air hole of the demoulding air compressor of the improved mold, so that the rock and soil model material is removed Finally, the cured and formed rock-soil model material is obtained.
按上述方案,所述步骤S2中,改进模具的制作方法,包括步骤:根据试验要求,在原始模具中浇筑一定厚度的石膏砂浆试块,并采用密实振动台进行振密排除气泡,8~12h后通过原始模具底部的脱模空压机气孔用空压机进行脱模,再放入干燥箱75℃干燥12h,然后在室内静置一昼夜,即完成养护;同时,对石膏砂浆试块的上表面进行隔水处理,在石膏砂浆试块上表面均匀涂抹一层液体胶,并粘结一层与原始模具横截面同样大小的尼龙薄膜,安放在原始模具里,这样,原始模具连同隔水处理的石膏砂浆试块一起组成活塞结构形式的改进模具。 According to the above scheme, in the step S2, the manufacturing method of improving the mold includes the steps of: pouring a certain thickness of gypsum mortar test block in the original mold according to the test requirements, and adopting a compact vibration table to vibrate and remove air bubbles, 8 ~ 12h Finally, use an air compressor to demould through the air holes of the demoulding air compressor at the bottom of the original mold, then put it in a drying oven for 12 hours at 75°C, and then let it stand indoors for a whole day and night to complete the curing; at the same time, the upper part of the gypsum mortar test block The surface is subjected to water-proof treatment, and a layer of liquid glue is evenly applied on the surface of the gypsum mortar test block, and a layer of nylon film with the same size as the original mold cross-section is bonded, and placed in the original mold, so that the original mold together with the water-proof treatment The gypsum mortar test blocks together form an improved mold in the form of a piston structure.
按上述方案,所述步骤S3中,为了便于土体模型试件的脱模,在改进模具的四周涂抹凡士林,制作好土体模型试件后用保鲜膜对土体模型试件进行密封。 According to the above scheme, in the step S3, in order to facilitate the demoulding of the soil model test piece, apply vaseline around the improved mold, and seal the soil model test piece with plastic wrap after making the soil model test piece.
按上述方案,所述步骤S4中,对岩体模型试件的加工为将岩体模型试件用钢锯平均锯成两半,并在锯开的表面处,用钢锯均匀地划出5mm深、宽20mm的方格,并清除模型材料碎末,得到加工后的岩体模型试件;对土体模型试件的加工为在土体模型试件的预粘结的表面用抹刀凿毛,并清除模型材料碎末,得到加工后的土体模型试件。 According to the above scheme, in the step S4, the processing of the rock mass model test piece is sawing the rock mass model test piece into two halves with a hacksaw on average, and at the sawed surface, evenly draw 5mm with a hacksaw Depth and width of 20mm grid, and remove the model material debris, to obtain the processed rock model specimen; the processing of the soil model specimen is to chisel the pre-bonded surface of the soil model specimen with a spatula Hair, and remove the model material debris to obtain the processed soil model specimen.
按上述方案,所述步骤S4中,准备的岩体模型材料砂浆为相应岩体模型材料的配比砂浆,步骤S5中岩体模型材料砂浆均匀平铺的方式为,先用抹刀抹平,再用砂浆密实振动台振匀,按1.36g/cm2铺匀岩体模型材料砂浆于加工后的岩体模型试件上。 According to the above scheme, in the step S4, the prepared rock mass model material mortar is the proportioning mortar of the corresponding rock mass model material, and the rock mass model material mortar is evenly tiled in the step S5. Then use the mortar to compact the vibrating table and vibrate evenly, spread the rock mass model material mortar evenly on the processed rock mass model specimen according to 1.36g/cm 2 .
按上述方案,所述步骤S5中,加工好的土体模型试件的推出方式为,用推杆通过改进模具的脱模空压机气孔,推动土体模型试件下的石膏砂浆试块,从而使石膏砂浆试块上的土体模型试件与已经铺好岩体模型材料砂浆的岩体模型试件胶结。 According to the scheme, in the step S5, the processed soil model test piece is released in such a way that the gypsum mortar test block under the soil model test piece is pushed through the air hole of the demoulding air compressor of the improved mold with a push rod, Therefore, the soil model test piece on the gypsum mortar test block is cemented with the rock mass model test piece on which the rock mass model material mortar has been laid.
按上述方案,所述步骤S6中,改进模具的隔水处理方式为,改进模具四周及石膏砂浆试块与原始模具的间隙处均匀涂抹凡士林;胶结后土体模型试件的隔水处理方式为,对出露于改进模具的土体模型试件部分涂抹凡士林。 According to the above scheme, in the step S6, the water-proof treatment method of the improved mold is to apply Vaseline evenly around the improved mold and the gap between the gypsum mortar test block and the original mold; the water-proof treatment method of the soil model specimen after cementation is as follows: , apply vaseline to the part of the soil model specimen exposed in the improved mold.
本发明还提供了一种适用于上述岩土体模型材料胶结成形养护方法的改进模具,包括原始模具和石膏砂浆试块,原始模具底部设置脱模空压机气孔,石膏砂浆试块浇筑在原始模具中。 The present invention also provides an improved mould, which is suitable for the cementing and forming maintenance method of the above-mentioned rock-soil model material, comprising an original mould, and a gypsum mortar test block. in the mold.
按上述方案,所述石膏砂浆试块的成分配比为石膏:粗砂:水=0.353:0.314:0.333,并采用0.15%质量分数的石膏用量,添加石膏缓凝剂柠檬酸钠;所用的石膏缓凝剂柠檬酸钠,为柠檬酸钠分析纯试剂,并采用1/21的质量比的水溶液添加。 According to the above scheme, the composition ratio of the gypsum mortar test block is gypsum: coarse sand: water=0.353:0.314:0.333, and the gypsum dosage of 0.15% mass fraction is adopted, and the gypsum retarder sodium citrate is added; the gypsum used The retarder sodium citrate is an analytically pure reagent for sodium citrate, and is added in an aqueous solution with a mass ratio of 1/21.
按上述方案,所述石膏砂浆试块上表面均匀涂抹一层液体胶,并粘结一层与原始模具横截面同样大小的尼龙薄膜,安放在原始模具中。 According to the above scheme, the upper surface of the gypsum mortar test block is evenly coated with a layer of liquid glue, and a layer of nylon film with the same size as the cross section of the original mold is bonded, and placed in the original mold.
本发明的有益效果: Beneficial effects of the present invention:
1、对砂浆试件的制作,提供了一种改进模具的方式,从而节约了试验成本,主要是模具制作的成本,包括时间与经济成本; 1. For the production of mortar test pieces, it provides a way to improve the mold, thus saving the test cost, mainly the cost of mold production, including time and economic costs;
2、对两种乃至更多种类的模型材料的胶结及结合带的制作,提供了一个多种岩土体模型材料胶结成形养护方法,采用模型试验手段来研究多种岩土体模型材料体系的整体性质,对开创及研究岩土体整体系统模型的特性提供了重要基础。 2. For the cementation of two or more types of model materials and the production of bonding belts, a cementation forming maintenance method for various rock and soil model materials is provided, and model tests are used to study the performance of various rock and soil model material systems. The overall properties provide an important basis for creating and studying the characteristics of the overall system model of rock and soil.
附图说明 Description of drawings
图1为本发明“石膏砂浆试块—原始模具”构成的改进模具纵剖面图; Fig. 1 is the longitudinal sectional view of the improved mold formed by "gypsum mortar test block-original mold" of the present invention;
图2为本发明改进模具与推杆配合的结构示意图; Fig. 2 is the structure schematic diagram that the present invention improves mold and push rod to cooperate;
图3为本发明加工后的岩体模型试件上铺匀岩体模型材料砂浆的结构示意图; Fig. 3 is the structural representation of evenly paving rock mass model material mortar on the rock mass model specimen processed by the present invention;
图4为本发明土体模型试件在改进模具中的成形养护图; Fig. 4 is the forming maintenance figure of the soil model test piece of the present invention in the improved mould;
图5为本发明土体模型试件的加工处理图; Fig. 5 is the processing figure of soil model test piece of the present invention;
图6为加工好的土体模型试件7的推出方式图; Fig. 6 is the push-out mode diagram of processed soil model test piece 7;
图7为本发明岩土体模型材料的胶结成形示意图; Fig. 7 is the cemented forming schematic diagram of rock soil model material of the present invention;
图8为本发明岩土体模型材料胶结成形后推出示意图; Fig. 8 is a schematic diagram of pushing out the rock-soil mass model material of the present invention after it is cemented and formed;
图9为本发明岩土体模型材料倒置于改进模具中养护的结构示意图; Fig. 9 is a schematic structural view of the rock and soil model material of the present invention placed upside down in the improved mold for curing;
图10为本发明岩土体模型材料胶结成形养护后推出改进模具的结构示意图; Fig. 10 is a structural schematic diagram of the improved mold pushed out after the rock-soil model material of the present invention is cemented, formed and cured;
图中:1-原始模具,2-石膏砂浆试块,3-脱模空压机气孔,4-推杆,5-岩体模型试件,6-岩体模型材料砂浆,7-土体模型试件。 In the figure: 1-original mold, 2-gypsum mortar test block, 3-air compressor air hole for demoulding, 4-push rod, 5-rock mass model specimen, 6-rock mass model material mortar, 7-soil mass model Specimen.
具体实施方式 detailed description
下面结合附图和实例对本发明技术方案进行详细的描述。 The technical solutions of the present invention will be described in detail below in conjunction with the accompanying drawings and examples.
如图1所示,本发明实施例所述的改进模具,包括原始模具1和石膏砂浆试块2,其中原始模具1采用实验室现有的、最接近试验要求的工程试模模具,针对内尺寸70.7mm立方体的工程试模,以及直接剪切试验测试抗剪强度指标,改进模具的制作方式为:根据试验要求,在原始模具1中浇筑37mm高的石膏砂浆试块2,并采用密实振动台进行振密排除气泡,8~12h后通过原始模具1底部的脱模空压机气孔3用空压机进行脱模,再放入干燥箱75℃干燥12h,然后在室内静置一昼夜,即完成养护;同时,对石膏砂浆试块2的上表面进行隔水处理,在石膏砂浆试块2上表面均匀涂抹一层液体胶,并粘结上一层同样大小的尼龙薄膜,安放在原始模具1里并使隔水的一面朝上,这样,原始模具1连同隔水处理的石膏砂浆试块2一起组成活塞结构形式的改进模具。 As shown in Figure 1, the improved mold described in the embodiment of the present invention includes an original mold 1 and a gypsum mortar test block 2, wherein the original mold 1 adopts the existing engineering mold in the laboratory, which is the closest to the test requirements, for internal The engineering trial mold with a size of 70.7mm cube, and the direct shear test to test the shear strength index, the production method of the improved mold is: according to the test requirements, a gypsum mortar test block 2 with a height of 37mm is poured in the original mold 1, and the dense vibration is used After 8 to 12 hours, use an air compressor to remove the mold through the air hole 3 of the demoulding air compressor at the bottom of the original mold 1, then put it in a drying oven for 12 hours at 75°C, and then let it stand indoors for a whole day and night, that is, Complete the maintenance; at the same time, carry out water-proof treatment on the upper surface of the gypsum mortar test block 2, apply a layer of liquid glue evenly on the upper surface of the gypsum mortar test block 2, and bond a layer of nylon film of the same size, and place it on the original mold 1 li and make the water-proof side upward, like this, original mold 1 forms the improved mold of piston structure form together with the gypsum mortar test block 2 of water-proof treatment.
改进模具中,石膏砂浆试块2的成分配比为石膏:粗砂:水=0.353:0.314:0.333,并采用0.15%质量分数的石膏用量,添加石膏缓凝剂柠檬酸钠。所用的石膏缓凝剂柠檬酸钠,为柠檬酸钠分析纯试剂,并采用1/21的质量比的水溶液添加。 In the improved mold, the composition ratio of the gypsum mortar test block 2 is gypsum: coarse sand: water = 0.353:0.314:0.333, and the amount of gypsum is 0.15% by mass, and the gypsum retarder sodium citrate is added. The used gypsum retarder sodium citrate is an analytically pure reagent of sodium citrate, and is added with an aqueous solution with a mass ratio of 1/21.
本发明实施例所述的岩土体模型材料胶结成形养护方法,包括以下七个步骤: The rock-soil body model material bonding forming maintenance method described in the embodiment of the present invention includes the following seven steps:
步骤S1、准备试验工具:试验工具包括凡士林、推杆4(空油笔芯)、液体胶、原始模具1横截面形状的尼龙薄膜、保鲜膜、钢锯、抹刀; Step S1, prepare test tools: test tools include vaseline, push rod 4 (empty oil pen refill), liquid glue, nylon film with cross-sectional shape of original mold 1, plastic wrap, hacksaw, spatula;
步骤S2、制作改进模具:根据试验需要,按照上述改进模具的制作方式,通过原始模具1连同石膏砂浆试块2一起制作得到改进模具,改进模具与推杆4配合的结构如图2所示; Step S2, making an improved mold: according to the requirements of the test, according to the manufacturing method of the above-mentioned improved mold, the improved mold is produced through the original mold 1 together with the gypsum mortar test block 2, and the structure of the improved mold and the push rod 4 is shown in Figure 2;
步骤S3、制作岩土体模型材料试件:按照既定的岩土体模型材料配方成分,采用未改进的原始模具1制作岩体模型试件5,采用改进模具(1-2)制作土体模型试件7,同时为了便于土体模型试件7的脱模,在改进模具的四周涂抹凡士林,制作好土体模型试件7后用保鲜膜对土体模型试件7进行密封,制作的土体模型试件7连同改进模具如图4所示; Step S3, making rock-soil model material specimens: according to the established rock-soil model material formula composition, use the unimproved original mold 1 to make rock mass model specimen 5, and use improved molds (1-2) to make soil models Test piece 7, at the same time, in order to facilitate the demoulding of the soil model test piece 7, apply vaseline around the improved mold, make the soil model test piece 7, and seal the soil model test piece 7 with plastic wrap, and the soil model test piece 7 is sealed. The body model test piece 7 is shown in Figure 4 together with the improved mold;
步骤S4、对已制作好的岩体模型试件5、土体模型试件7进行加工,并准备胶结岩体模型试件5和土体模型试件7的岩体模型材料砂浆6(胶结材料);对岩体模型试件5的加工为将岩体模型试件5用钢锯平均锯成两半,并在锯开的表面处,用钢锯均匀地划出5mm深、宽20mm的方格,并清除模型材料碎末,得到图3中所示的加工后的岩体模型试件5;对土体模型试件7的加工为在土体模型试件7的预粘结的表面用抹刀凿毛,并清除模型材料碎末,得到图5中所示的加工后的土体模型试件7;准备的岩体模型材料砂浆6为相应岩体模型材料的配比砂浆,步骤S5中岩体模型材料砂浆6均匀平铺的方式为,先用抹刀抹平,再用砂浆密实振动台振匀,按1.36g/cm2铺匀岩体模型材料砂浆6于加工后的岩体模型试件5上。 Step S4, process the rock mass model test piece 5 and the soil mass model test piece 7 that have been made, and prepare the rock mass model material mortar 6 (cementing material) for cementing the rock mass model test piece 5 and the soil mass model test piece 7 ); the processing of the rock mass model test piece 5 is that the rock mass model test piece 5 is averagely cut into two halves with a hacksaw, and at the sawed surface, a square with a depth of 5 mm and a width of 20 mm is evenly drawn with a hacksaw. grid, and remove the model material fragments to obtain the processed rock model specimen 5 shown in Figure 3; Chisel with a spatula, and remove the model material fragments to obtain the processed soil model specimen 7 shown in Figure 5; the prepared rock mass model material mortar 6 is the proportioning mortar of the corresponding rock mass model material, step S5 The method of evenly paving the medium rock mass model material mortar 6 is as follows: smooth it with a spatula first, then use the mortar to compact the vibrating table and vibrate evenly, and spread the rock mass model material mortar 6 evenly on the processed rock mass at a rate of 1.36g/ cm2 . On model specimen 5.
步骤S5、胶结两种试件——岩体模型试件5和土体模型试件7:将加工好的岩体模型试件5放入原始模具1中,并均匀平铺准备好的岩体模型材料砂浆6,如图3所示;再将加工好的土体模型试件7缓慢推入前面已经铺匀岩体模型材料砂浆6、装有加工过的岩体模型试块5的原始模具1中,加工好的土体模型试件7的推出方式如图6所示,用推杆4通过改进模具的脱模空压机气孔3,推动土体模型试件7下的石膏砂浆试块2(类似“活塞”结构形式),从而使石膏砂浆试块2上的土体模型试件7与已经铺好岩体模型材料砂浆6的岩体模型试件5胶结,并用抹刀削去多余的土体模型试件7,并抹平,胶结好的岩土体模型材料胶结试件包括岩体模型试件5、岩体模型材料砂浆6和土体模型试件7,具体如图7所示; Step S5, cementing the two specimens—the rock mass model specimen 5 and the soil mass model specimen 7: put the processed rock mass model specimen 5 into the original mold 1, and evenly spread the prepared rock mass Model material mortar 6, as shown in Figure 3; Slowly push the processed soil model test piece 7 into the original mold that has evenly paved rock mass model material mortar 6, and processed rock mass model test piece 5 in front again In 1, the push-out method of the processed soil model test piece 7 is shown in Figure 6. Use the push rod 4 to push the gypsum mortar test block under the soil model test piece 7 through the air hole 3 of the demoulding air compressor of the improved mold. 2 (similar to the "piston" structure), so that the soil model specimen 7 on the gypsum mortar test block 2 is cemented with the rock mass model specimen 5 that has been laid with the rock mass model material mortar 6, and the excess is cut off with a spatula. The soil model test piece 7 is smoothed, and the cemented rock-soil model material cemented test piece includes the rock mass model test piece 5, the rock mass model material mortar 6 and the soil model test piece 7, as shown in Fig. 7 Show;
步骤S6、养护胶结试件:将步骤S5中胶结好的岩土体模型材料胶结试件,倒置于经过隔水处理的改进模具中,改进模具的隔水处理方式为,改进模具四周及石膏砂浆试块2与原始模具1的间隙处均匀涂抹凡士林,以减小养护过程对土体模型试件7含水率的影响;同时使胶结带出露,并对土体模型试件7进行隔水处理,胶结后土体模型试件7的隔水处理方式为,对出露于改进模具的土体模型试件7部分涂抹凡士林,以减小养护过程对土体模型试件7含水率的影响;岩土体模型材料胶结成形后的推出方法如图8所示;将岩土体模型材料胶结试件(5-6-7),连同改进模具(1-2),静置于实验室内自然养护3~4天,使胶结岩土体5-7的岩体模型材料砂浆6强度稳定,岩土体模型材料倒置于改进模具中养护的结构如图9所示; Step S6, curing cemented test piece: put the cemented test piece of rock-soil model material cemented in step S5 upside down in the improved mold that has undergone water-proof treatment. Apply vaseline evenly on the gap between the test block 2 and the original mold 1 to reduce the influence of the curing process on the moisture content of the soil model specimen 7; at the same time, expose the cementation zone and perform water-proof treatment on the soil model specimen 7 , the water-proof treatment method of the soil model test piece 7 after cementation is to apply vaseline to the part of the soil model test piece 7 exposed to the improved mold, so as to reduce the influence of the curing process on the moisture content of the soil model test piece 7; The push-out method of the rock-soil model material after cementation and forming is shown in Figure 8; the rock-soil model material cemented specimen (5-6-7), together with the improved mold (1-2), is placed in the laboratory for natural Curing for 3 to 4 days to stabilize the strength of the rock mass model material mortar 6 of the cemented rock and soil mass 5-7, and the structure of the rock and soil mass model material inverted in the improved mold for curing is shown in Figure 9;
步骤S7、岩土体模型材料脱模:如图10所示,脱模方式为,采用推杆4通过改进模具的脱模空压机气孔3,推动岩土体模型材料下的石膏砂浆试块2,使岩土体模型材料脱模,最终得到养护成形的岩土体模型材料。 Step S7, demoulding of the rock-soil model material: as shown in Figure 10, the demoulding method is to use the push rod 4 to push the gypsum mortar test block under the rock-soil model material through the air hole 3 of the demoulding air compressor of the improved mold 2. Demoulding the rock-soil model material to finally obtain the cured rock-soil model material.
显然,上述实施例仅仅是为清楚地说明本发明所作的举例,而并非是对本发明的实施方式的限定。对于所属领域的普通技术人员来说,依本发明的精神所引伸出的显而易见的变化或变动仍处于本发明的保护范围之中。 Apparently, the above-mentioned embodiments are only examples for clearly illustrating the present invention, rather than limiting the implementation of the present invention. For those of ordinary skill in the art, obvious changes or changes derived from the spirit of the present invention are still within the protection scope of the present invention.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610316087.2A CN105954079B (en) | 2016-05-12 | 2016-05-12 | A kind of cementing forming maintenance process of Rock And Soil cast material and the improvement mold suitable for it |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610316087.2A CN105954079B (en) | 2016-05-12 | 2016-05-12 | A kind of cementing forming maintenance process of Rock And Soil cast material and the improvement mold suitable for it |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105954079A true CN105954079A (en) | 2016-09-21 |
CN105954079B CN105954079B (en) | 2018-09-18 |
Family
ID=56912247
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610316087.2A Expired - Fee Related CN105954079B (en) | 2016-05-12 | 2016-05-12 | A kind of cementing forming maintenance process of Rock And Soil cast material and the improvement mold suitable for it |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105954079B (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106746897A (en) * | 2016-12-07 | 2017-05-31 | 中国地质大学(武汉) | One kind injection increases material shaping geotechnical model material and preparation method thereof |
CN108225877A (en) * | 2018-03-06 | 2018-06-29 | 廊坊市阳光建设工程质量检测有限公司 | The manufacturing equipment and its manufacturing method of test block are stretched in thermal insulation mortar cohesion test |
CN110441106A (en) * | 2019-08-06 | 2019-11-12 | 深圳市市政工程总公司 | Inorganic binder roadbed contraction distortion test material preparation method based on building castoff |
CN110658044A (en) * | 2019-11-05 | 2020-01-07 | 大连理工大学 | A kind of model box and sample preparation method for preparing three-layer soil samples of soft soil interlayer |
CN110940565A (en) * | 2019-12-17 | 2020-03-31 | 北京工业大学 | Design and boundary simulation method for non-homogeneous model in tunnel shaking table test |
CN111189929A (en) * | 2020-01-13 | 2020-05-22 | 中国电建集团贵阳勘测设计研究院有限公司 | Rock mass drilling sound wave test block model and manufacturing method thereof |
CN113352431A (en) * | 2021-06-30 | 2021-09-07 | 青岛科技大学 | Improved preparation method of filling body test piece |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6706531B1 (en) * | 1999-09-23 | 2004-03-16 | Institut Francais Du Petrole | Device for conditioning a polluted soil-sample-method of analysis by pyrolysis |
CN101718644A (en) * | 2009-12-07 | 2010-06-02 | 浙江科技学院 | A method for making structural surface model of direct shear test |
CN101949790A (en) * | 2010-09-08 | 2011-01-19 | 中国科学院武汉岩土力学研究所 | Device for preparing multi interbedding rock-soil modeling materials |
CN104634629A (en) * | 2015-01-16 | 2015-05-20 | 中国矿业大学 | Preparation and sampling method for rock-like samples for analog simulation of composite rock formation |
CN104764643A (en) * | 2015-04-08 | 2015-07-08 | 中国科学院武汉岩土力学研究所 | Method for fabricating coupling shear specimen containing natural structure surface |
CN105115794A (en) * | 2015-07-02 | 2015-12-02 | 河海大学 | Sample production apparatus and sample production method of layered rock-soil body sample |
CN205138856U (en) * | 2015-11-18 | 2016-04-06 | 河海大学 | A suppression forming die for making test block of experiment soil matrix material |
-
2016
- 2016-05-12 CN CN201610316087.2A patent/CN105954079B/en not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6706531B1 (en) * | 1999-09-23 | 2004-03-16 | Institut Francais Du Petrole | Device for conditioning a polluted soil-sample-method of analysis by pyrolysis |
CN101718644A (en) * | 2009-12-07 | 2010-06-02 | 浙江科技学院 | A method for making structural surface model of direct shear test |
CN101949790A (en) * | 2010-09-08 | 2011-01-19 | 中国科学院武汉岩土力学研究所 | Device for preparing multi interbedding rock-soil modeling materials |
CN104634629A (en) * | 2015-01-16 | 2015-05-20 | 中国矿业大学 | Preparation and sampling method for rock-like samples for analog simulation of composite rock formation |
CN104764643A (en) * | 2015-04-08 | 2015-07-08 | 中国科学院武汉岩土力学研究所 | Method for fabricating coupling shear specimen containing natural structure surface |
CN105115794A (en) * | 2015-07-02 | 2015-12-02 | 河海大学 | Sample production apparatus and sample production method of layered rock-soil body sample |
CN205138856U (en) * | 2015-11-18 | 2016-04-06 | 河海大学 | A suppression forming die for making test block of experiment soil matrix material |
Non-Patent Citations (1)
Title |
---|
蔡明星 等: "土工实验双向制样仪研制", 《实验技术与管理》 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106746897A (en) * | 2016-12-07 | 2017-05-31 | 中国地质大学(武汉) | One kind injection increases material shaping geotechnical model material and preparation method thereof |
CN106746897B (en) * | 2016-12-07 | 2019-09-17 | 中国地质大学(武汉) | A kind of injection increases material molding geotechnical model material and preparation method thereof |
CN108225877A (en) * | 2018-03-06 | 2018-06-29 | 廊坊市阳光建设工程质量检测有限公司 | The manufacturing equipment and its manufacturing method of test block are stretched in thermal insulation mortar cohesion test |
CN110441106A (en) * | 2019-08-06 | 2019-11-12 | 深圳市市政工程总公司 | Inorganic binder roadbed contraction distortion test material preparation method based on building castoff |
CN110658044A (en) * | 2019-11-05 | 2020-01-07 | 大连理工大学 | A kind of model box and sample preparation method for preparing three-layer soil samples of soft soil interlayer |
CN110658044B (en) * | 2019-11-05 | 2023-07-14 | 大连理工大学 | A model box and sample preparation method for preparing three-layer soil samples of soft soil interlayer |
CN110940565A (en) * | 2019-12-17 | 2020-03-31 | 北京工业大学 | Design and boundary simulation method for non-homogeneous model in tunnel shaking table test |
CN111189929A (en) * | 2020-01-13 | 2020-05-22 | 中国电建集团贵阳勘测设计研究院有限公司 | Rock mass drilling sound wave test block model and manufacturing method thereof |
CN113352431A (en) * | 2021-06-30 | 2021-09-07 | 青岛科技大学 | Improved preparation method of filling body test piece |
Also Published As
Publication number | Publication date |
---|---|
CN105954079B (en) | 2018-09-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105954079B (en) | A kind of cementing forming maintenance process of Rock And Soil cast material and the improvement mold suitable for it | |
CN102628761B (en) | A kind of artificial long rock core and its preparation method | |
CN105651572B (en) | A kind of preparation method of the prismatical joint rock mass sample of the blind joint containing filling | |
WO2018141118A1 (en) | Preparation method for large model microcrack rock core having low permeability | |
CN104764643A (en) | Method for fabricating coupling shear specimen containing natural structure surface | |
CN105181421A (en) | Production method of artificial experimental sample imitating natural crack rock sample | |
CN107976352B (en) | Manufacturing method for simulating transparent tunnel model containing complex fracture network | |
CN107884257B (en) | Artificial core preparation method for fracturing performance test of rock with controllable fractures | |
CN106840800B (en) | A kind of rocks preparation method of sample of the Joint network simulation containing polygonal | |
CN110470522B (en) | Method for prefabricating fracture network rock mass samples with different water saturation degrees | |
CN101462854A (en) | Brittle material for manufacturing rocks and preparation of specimen prefabricated crack thereof | |
CN106227976B (en) | A kind of laboratory mixing proportion design method of permeable regenerated aggregate concrete | |
CN104924497B (en) | A kind of producing device of resin transparent concrete segment and method | |
CN112345334B (en) | A method for preparing rock samples with anisotropic joints based on 3D printing | |
CN112268774B (en) | Preparation device and process of sample preparation for mechanical test of frozen soil and concrete contact surface | |
CN114414326B (en) | Rock sample manufacturing and experimental method for hydraulic fracture interference by natural fracture network | |
CN108237615A (en) | A kind of pervious concrete preparation system and its forming method | |
CN106769321A (en) | Different research of joints roughness coefficient of rock blind joint strata model preparation method of sample and prepare mould | |
US20200300054A1 (en) | Method for preparing artificial core to simulate fluvial sedimentary reservoir | |
CN110376030A (en) | A kind of preparation method of irregular prismatical joint rocks sample | |
CN105388047A (en) | Preparation method of columnar joint fissure network model rock core samples | |
CN206982954U (en) | A kind of artificial roughness adhesive surface of use for laboratory new-old concrete prepares mould | |
CN109211652B (en) | A method for preparing seepage specimens containing monitorable micro-cracks | |
CN111537314B (en) | Rock mass physical model sample considering structural plane network and its preparation method and device | |
CN208366790U (en) | A kind of simulating test device of permeation coefficient of permeable concrete |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180918 Termination date: 20190512 |