CN105952460A - Non-blasting construction method of hard-rock tunnel in city - Google Patents

Non-blasting construction method of hard-rock tunnel in city Download PDF

Info

Publication number
CN105952460A
CN105952460A CN201610348519.8A CN201610348519A CN105952460A CN 105952460 A CN105952460 A CN 105952460A CN 201610348519 A CN201610348519 A CN 201610348519A CN 105952460 A CN105952460 A CN 105952460A
Authority
CN
China
Prior art keywords
chain saw
face
tunnel
construction method
cutting knife
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610348519.8A
Other languages
Chinese (zh)
Inventor
王猛
刘化宽
张艳艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Construction Engineering Co Ltd
Original Assignee
CRRC Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRRC Construction Engineering Co Ltd filed Critical CRRC Construction Engineering Co Ltd
Priority to CN201610348519.8A priority Critical patent/CN105952460A/en
Publication of CN105952460A publication Critical patent/CN105952460A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines

Abstract

The invention discloses a non-blasting construction method of a hard-rock tunnel in a city. The method comprises following steps: step 1, cutting an outer shell grove along the tunnel excavation contour in a horizontal direction with a chain saw cutter in order to form a continuously-enclosed free face; step 2, utilizing the chain saw cutter to inwardly cut the cutting groove in a horizontal direction according to the set trajectory on the tunnel face and dividing the tunnel face into multiple small blocks; step 3, utilizing a crush head to crush and remove fragmented rocks on the tunnel face. The method of utilizing the chain saw cutter and the crushing head is taken for mechanically excavation. Therefore, construction speed is quickened and input in tunneling cost and equipment is reduced. In the complex situation in the city, the construction method is applied to the hard-rock tunnel so that safety, reliably and efficiency are obtained; no influence is caused to the ambient environment and residents living in the ground; easy control of overbreak of the tunnel around is obtained; and the construction method is convenient and easy to promote.

Description

A kind of non-quick-fried construction method of urban hard rock tunnel
Technical field
The present invention relates to technical field of tunnel construction, it is particularly applicable to the non-quick-fried construction of urban hard rock tunnel.
Background technology
In recent years, accelerating along with country's urbanization paces, domestic big and medium-sized cities subway, highway engineering are just starting the upsurge in construction of a new round.Under the complex environment of city, newly built tunnels is in locations such as passing through existing road, pipeline, buildings or structures more, in view of blast working on earth's surface resident, the impact of buildings or structures, for guaranteeing tunnel perimeter Environmental security and social stability, quick-fried construction becomes for the construction method of non-choosing.
Quick-fried construction non-for hard rock tunnel, currently mainly there are full face tunnel boring machine (TBM) method, cantilever excavator method, milling digging machine method, split the law, hydraulic impact hammer method, static crushing method etc., wherein the equipment investment of TBM method is bigger, the most economical for short distance tunnel, it is the most relatively low that remaining several method is applied to work efficiency in the hard rock tunnel that Surrounding Rock Strength is bigger.
Summary of the invention
It is desirable to provide a kind of non-quick-fried construction method being exclusively used in urban hard rock tunnel, it is made to be applicable to pass through the construction of the urban hard rock tunnel of the complex ground such as existing road, pipeline, buildings or structures, significantly improve non-quick-fried construction efficiency, reduce equipment investment cost.
To this end, the technical solution adopted in the present invention is: a kind of non-quick-fried construction method of urban hard rock tunnel, comprise the following steps:
Step one, tunnel excavation contour line along design cut out outer contour grooving with chain saw cutting knife in the horizontal direction, form the free face closed continuously;
Step 2, on inherent face, in the horizontal direction carry out grooving segmentation by the track set from excavation contour line with chain saw cutting knife, face is divided into multiple fritter;
Step 3, the rock divided face with crushing head crush further and remove.
Preferred as such scheme, in described step 2, during the segmentation of chain saw cutting knife grooving, is divided into face interlaced netted free face, can further improve effect.
For preferably implementing the invention, in described step one, step 2, the notch width of chain saw cutting knife is 10~20cm, and the degree of depth determines according to excavation drilling depth.
Additionally, described chain saw cutting knife, crushing head use hydraulic-driven, intelligent measuring instrument is fixed in the walking mechanism of chain saw cutting knife, excavation contour line surveying and locating is carried out by the way of resection, grooving circuit and track is controlled in real time by automatic technology, thus while meeting required precision, save manual measurement required time, improve effect further.
Beneficial effects of the present invention: the mode using chain saw cutting knife to combine crushing head carries out mechanical equivalent of light excavation, is greatly accelerated construction speed, reduces excavation cost and equipment investment cost;Hard rock tunnel under the complex environment of city is implemented this engineering method, safe and reliable, economic and practical, surrounding enviroment and earth's surface resident will not be impacted, be more prone to tunnel perimeter out break control;The easy construction of this engineering method, and easy to spread.
Accompanying drawing explanation
Fig. 1 is the design sketch after step one completes in the present invention.
Fig. 2 is the design sketch after step 2 completes in the present invention.
Detailed description of the invention
A kind of non-quick-fried construction method of urban hard rock tunnel, including the requisite core procedure of three below:
Step one, tunnel excavation contour line along design cut out outer contour grooving with chain saw cutting knife in the horizontal direction, form the free face closed continuously, as shown in Figure 1.
Step 2, on inherent face, in the horizontal direction carry out grooving segmentation by the track set from excavation contour line with chain saw cutting knife, face is divided into multiple fritter, as in figure 2 it is shown, be convenient for the broken of next step.
Step 3, the rock divided face with crushing head crush further and remove.
Preferably, in described step 2, during the segmentation of chain saw cutting knife grooving, face being divided into interlaced netted free face, crushing effect is more preferable;Other irregular some pieces can also be divided into.
It addition, in described step one, step 2, the notch width of chain saw cutting knife is 10~20cm, the degree of depth determines according to excavation drilling depth.Intelligent measuring instrument, preferably with hydraulic-driven, is fixed in the walking mechanism of chain saw cutting knife by described chain saw cutting knife, crushing head, carries out excavation contour line surveying and locating by the way of resection, is controlled grooving circuit and track in real time by automatic technology.
For preferably implementing the invention, determine cutting route and track according to the feature of the aspects such as Rock Joints Surrounding growth, crack, layer reason, and then face is carried out grooving segmentation, work efficiency can be further speeded up and reduce the damage to chain saw cutting knife.

Claims (4)

1. the non-quick-fried construction method of urban hard rock tunnel, it is characterised in that comprise the following steps:
Step one, along design tunnel excavation contour line cut out foreign steamer with chain saw cutting knife in the horizontal direction Profile grooving, forms the free face closed continuously;
Step 2, use chain saw cutting knife press the track set in level from excavation contour line on inherent face Direction carries out grooving segmentation, and face is divided into multiple fritter;
Step 3, the rock divided face with crushing head crush further and remove.
2. according to the non-quick-fried construction method of the urban hard rock tunnel described in claim 1, it is characterised in that: institute State in step 2, during the segmentation of chain saw cutting knife grooving, face is divided into interlaced netted free face.
3. according to the non-quick-fried construction method of the urban hard rock tunnel described in claim 1, it is characterised in that: institute Stating in step one, step 2, the notch width of chain saw cutting knife is 10~20cm, and the degree of depth is according to excavation drilling depth Determine.
4. according to the non-quick-fried construction method of the urban hard rock tunnel described in claim 1, it is characterised in that: institute State chain saw cutting knife, crushing head uses hydraulic-driven, and intelligent measuring instrument is fixed on the row of chain saw cutting knife Walk in mechanism, by the way of resection, carry out excavation contour line surveying and locating, pass through automatic technology Control grooving circuit and track in real time.
CN201610348519.8A 2016-05-24 2016-05-24 Non-blasting construction method of hard-rock tunnel in city Pending CN105952460A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610348519.8A CN105952460A (en) 2016-05-24 2016-05-24 Non-blasting construction method of hard-rock tunnel in city

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610348519.8A CN105952460A (en) 2016-05-24 2016-05-24 Non-blasting construction method of hard-rock tunnel in city

Publications (1)

Publication Number Publication Date
CN105952460A true CN105952460A (en) 2016-09-21

Family

ID=56910313

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610348519.8A Pending CN105952460A (en) 2016-05-24 2016-05-24 Non-blasting construction method of hard-rock tunnel in city

Country Status (1)

Country Link
CN (1) CN105952460A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107740418A (en) * 2017-09-20 2018-02-27 中建四局第六建筑工程有限公司 A kind of construction method excavated for rock vertical wall of deep foundation pit
CN108071401A (en) * 2016-11-10 2018-05-25 上海宝冶集团有限公司 The construction method of karst area subway tunnel
CN108266192A (en) * 2018-02-09 2018-07-10 中交隧道工程局有限公司 A kind of flysch formation tunnel excavation construction method
CN109973089A (en) * 2019-03-19 2019-07-05 宜昌鄂奥图机械制造有限公司 A kind of mining technique
CN110439586A (en) * 2019-08-22 2019-11-12 四川达竹煤电(集团)有限责任公司金刚煤矿 Non- blasting type mine laneway Water Cutting driving method
CN111236959A (en) * 2020-03-20 2020-06-05 中铁工程装备集团有限公司 Chain saw mesh cutting tunneling machine and construction method thereof
CN112145192A (en) * 2020-08-17 2020-12-29 中铁工程服务有限公司 Soft rock tunnel boring machine and construction method thereof
CN112360478A (en) * 2020-11-27 2021-02-12 中铁工程装备集团有限公司 Special-shaped hard rock tunneling machine for sawing and shearing composite rock breaking and construction method
CN113107497A (en) * 2021-04-14 2021-07-13 中铁工程服务有限公司 Hard rock tunnel tunneling construction method
CN113107513A (en) * 2021-04-15 2021-07-13 中铁工程装备集团有限公司 Tunnel construction method for breaking rock by using high-pressure water
CN113279772A (en) * 2021-06-09 2021-08-20 中铁工程装备集团有限公司 Rock tunnel tunneling method and tunneling machine
CN113356847A (en) * 2021-07-14 2021-09-07 中铁工程装备集团有限公司 Rock swelling and breaking equipment and rock swelling and breaking construction method for tunnel
CN113431595A (en) * 2021-07-02 2021-09-24 中铁高新工业股份有限公司 Construction method of non-blasting chain saw cutting machine
CN115787768A (en) * 2022-12-16 2023-03-14 中建海峡建设发展有限公司 Method for excavating harder rock in ultra-narrow and ultra-deep foundation pit

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3834762A (en) * 1973-02-12 1974-09-10 Taiheiyo Coal Mining Co Ltd Gate road dinting equipment
CN1030960A (en) * 1987-07-08 1989-02-08 安德森·斯特拉斯克莱德公司 Digger
CN1059954A (en) * 1990-09-22 1992-04-01 安德森集团公共有限公司 A kind of development machine
CN2573676Y (en) * 2002-09-23 2003-09-17 樊民革 Driving cutting device
CN102162361A (en) * 2010-11-26 2011-08-24 兰海宽 Mechanically-driven hard-rock double-head tunneling machine
CN103883329A (en) * 2014-03-31 2014-06-25 重庆南桐矿业有限责任公司 Excavation construction method for mine hard rock roadway

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3834762A (en) * 1973-02-12 1974-09-10 Taiheiyo Coal Mining Co Ltd Gate road dinting equipment
CN1030960A (en) * 1987-07-08 1989-02-08 安德森·斯特拉斯克莱德公司 Digger
CN1059954A (en) * 1990-09-22 1992-04-01 安德森集团公共有限公司 A kind of development machine
CN2573676Y (en) * 2002-09-23 2003-09-17 樊民革 Driving cutting device
CN102162361A (en) * 2010-11-26 2011-08-24 兰海宽 Mechanically-driven hard-rock double-head tunneling machine
CN103883329A (en) * 2014-03-31 2014-06-25 重庆南桐矿业有限责任公司 Excavation construction method for mine hard rock roadway

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
宋爱志: "《机械预切槽隧道施工法及最新发展》", 《西部探矿工程》 *
张鍼: "《减轻隧道施工爆破对地面振动影响的掘进方法》", 《中国地质灾害与防治学报》 *

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108071401A (en) * 2016-11-10 2018-05-25 上海宝冶集团有限公司 The construction method of karst area subway tunnel
CN107740418A (en) * 2017-09-20 2018-02-27 中建四局第六建筑工程有限公司 A kind of construction method excavated for rock vertical wall of deep foundation pit
CN108266192A (en) * 2018-02-09 2018-07-10 中交隧道工程局有限公司 A kind of flysch formation tunnel excavation construction method
CN108266192B (en) * 2018-02-09 2019-10-18 中交隧道工程局有限公司 A kind of flysch formation tunnel excavation construction method
CN109973089A (en) * 2019-03-19 2019-07-05 宜昌鄂奥图机械制造有限公司 A kind of mining technique
CN110439586A (en) * 2019-08-22 2019-11-12 四川达竹煤电(集团)有限责任公司金刚煤矿 Non- blasting type mine laneway Water Cutting driving method
CN111236959B (en) * 2020-03-20 2021-08-13 中铁工程装备集团有限公司 Chain saw mesh cutting tunneling machine and construction method thereof
CN111236959A (en) * 2020-03-20 2020-06-05 中铁工程装备集团有限公司 Chain saw mesh cutting tunneling machine and construction method thereof
CN112145192A (en) * 2020-08-17 2020-12-29 中铁工程服务有限公司 Soft rock tunnel boring machine and construction method thereof
CN112360478A (en) * 2020-11-27 2021-02-12 中铁工程装备集团有限公司 Special-shaped hard rock tunneling machine for sawing and shearing composite rock breaking and construction method
CN112360478B (en) * 2020-11-27 2022-06-14 中铁工程装备集团有限公司 Special-shaped hard rock tunneling machine for sawing and shearing combined rock breaking and construction method
CN113107497A (en) * 2021-04-14 2021-07-13 中铁工程服务有限公司 Hard rock tunnel tunneling construction method
CN113107497B (en) * 2021-04-14 2022-07-29 中铁工程服务有限公司 Hard rock tunnel tunneling construction method
CN113107513A (en) * 2021-04-15 2021-07-13 中铁工程装备集团有限公司 Tunnel construction method for breaking rock by using high-pressure water
CN113279772A (en) * 2021-06-09 2021-08-20 中铁工程装备集团有限公司 Rock tunnel tunneling method and tunneling machine
CN113431595A (en) * 2021-07-02 2021-09-24 中铁高新工业股份有限公司 Construction method of non-blasting chain saw cutting machine
CN113431595B (en) * 2021-07-02 2022-08-23 中铁高新工业股份有限公司 Construction method of non-blasting chain saw cutting machine
CN113356847A (en) * 2021-07-14 2021-09-07 中铁工程装备集团有限公司 Rock swelling and breaking equipment and rock swelling and breaking construction method for tunnel
CN115787768A (en) * 2022-12-16 2023-03-14 中建海峡建设发展有限公司 Method for excavating harder rock in ultra-narrow and ultra-deep foundation pit

Similar Documents

Publication Publication Date Title
CN105952460A (en) Non-blasting construction method of hard-rock tunnel in city
CN104314574B (en) Hard rock tunnel non-blasting digging blocking method and construction method
CN104314573B (en) A kind of hard rock tunnel construction method based on waterpower cutting
CN103321644B (en) The method of tunneling is combined in machinery and controlled blasting
CN109026019A (en) The method that water mill bores non-blasting rock move hole excavation construction
CN109296378B (en) Down-the-hole drill matched breaking hammer tunneling and excavating construction method
CN107478114A (en) A kind of parallel slope buffered hole depth hole side slope pre split blasting construction method
CN103899318B (en) The milling of medium ground tunnel is dug and supporting machinery construction
CN105605996A (en) Method for carrying out bench cut method construction in IV-grade surrounding rocks by using three-arm drill jumbo
CN111043926B (en) 400m is realized based on electron detonator2Blasting excavation method for tunnel with large cross section
CN103244133B (en) The milling of coal measure strata tunnel is dug and is combined construction with explosion
CN108005660A (en) A kind of Optimization of Expressway Tunnel Construction method
CN110295912B (en) Non-explosive efficient excavation method for hard rock large-section tunnel with good integrity in sensitive area
CN108729924A (en) A kind of urban hard rock tunnel mechanical excavation rapid constructing method
CN107014262B (en) A kind of construction method of subway station artificial digging pile carbon dioxide explosion
CN107313783A (en) Groove presplitting impact type rock breaking method
CN102777185A (en) Inclined well shaft construction technology
CN112983418A (en) Method for hydraulic fracturing pressure relief of coal mine underground coal face withdrawal channel
CN107130964A (en) Small-sized tunnel mud stone excavation construction method
CN110512588B (en) Protection method for tension fracture belt type protection zone crossing mine surface
CN104457461B (en) A kind of method of blasting seepage enhancement and its application
CN112610224B (en) Steep wall tunnel core hole construction process
CN103317603A (en) Method for applying wire saw to underground rock engineering through in-hole anchor guiders
CN105155546B (en) A kind of construction method of prebored hole cubic meter of stone mechanical equivalent of light excavation
KR100923328B1 (en) Rock Excavation Method Using the Free Surface of Large Diameter

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160921