CN105951606A - Steel case bridge installation auxiliary platform - Google Patents
Steel case bridge installation auxiliary platform Download PDFInfo
- Publication number
- CN105951606A CN105951606A CN201610511148.0A CN201610511148A CN105951606A CN 105951606 A CN105951606 A CN 105951606A CN 201610511148 A CN201610511148 A CN 201610511148A CN 105951606 A CN105951606 A CN 105951606A
- Authority
- CN
- China
- Prior art keywords
- support frame
- bottom support
- steel box
- auxiliary platform
- bridge installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
- E01D2/04—Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/30—Metal
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开了一种钢箱桥安装辅助平台,尤其是一种用于钢箱桥安装领域的钢箱桥安装辅助平台。本发明提供了一种构形式简单,拆卸方便,可以重复利用,在减少劳动力和施工成本的同时提高工作效率,降低高空作业的安全风险的钢箱桥安装辅助平台。包括底部支撑架、基座和活动栏杆,所述底部支撑架为矩形框架,底部支撑架由两个以上平行设置的纵向矩形管和两个以上与纵向矩形管垂直相交的横向矩形管组成,基座设置在底部支撑架的四角,活动栏杆与基座为可移动连接。操作工人可以在钢箱桥安装辅助平台上进行衬垫、焊接、打磨、补油漆作业,活动栏杆可以为操作工人提供靠扶,防止工人操作时不小心跌落,让工人专心施工,可显著提高工作效率。
The invention discloses a steel box bridge installation auxiliary platform, in particular to a steel box bridge installation auxiliary platform used in the field of steel box bridge installation. The invention provides a steel box bridge installation auxiliary platform with simple structure, convenient disassembly, reusability, reduced labor and construction costs, improved work efficiency, and reduced safety risks of high-altitude operations. It includes a bottom support frame, a base and a movable railing. The bottom support frame is a rectangular frame. The seat is arranged at the four corners of the bottom support frame, and the movable railing is movably connected with the base. Operators can perform padding, welding, grinding, and paint repairs on the auxiliary platform for steel box bridge installation. The movable railings can provide support for operators to prevent workers from accidentally falling during operation, allowing workers to concentrate on construction, which can significantly improve work efficiency. efficiency.
Description
技术领域technical field
本发明涉及一种钢箱桥安装辅助平台,尤其是一种用于钢箱桥安装领域的钢箱桥安装辅助平台。The invention relates to a steel box bridge installation auxiliary platform, in particular to a steel box bridge installation auxiliary platform used in the field of steel box bridge installation.
背景技术Background technique
随着钢箱桥跨度的不断增加及安装技术的迅速发展,大跨度的钢箱桥根据吊车的起吊能力和运输条件,在工厂将构件分块分段制作完成,然后在现场进行预拼装。在施工现场会有大量的如小型电焊机、氧气瓶、乙炔瓶等工装、机具需要放置以及在高空对接时操作工人到在桥底贴陶瓷衬垫、焊接、打磨、补油漆等工序。在现有技术中均采用操作人员直接在大跨度钢箱桥上进行衬垫、焊接、打磨、补油漆作业,前述施工作业属于高空,高风险作业,缺乏安全设施,并且高空作业难度大,效率低,工时长,而如小型电焊机、氧气瓶、乙炔瓶等工装也没有足够的空间放置,给钢箱桥安装带来了极大的不便。因此现有技术中还没有一种构形式简单,拆卸方便,可以重复利用,在减少劳动力和施工成本的同时提高工作效率,降低高空作业的安全风险的钢箱桥安装辅助平台。With the continuous increase of the span of steel box bridges and the rapid development of installation technology, large-span steel box bridges are manufactured in blocks and sections at the factory according to the lifting capacity of the crane and transportation conditions, and then pre-assembled on site. At the construction site, there will be a large number of small electric welding machines, oxygen cylinders, acetylene cylinders and other tooling and equipment that need to be placed, and when docking at high altitudes, operators will paste ceramic liners at the bottom of the bridge, welding, grinding, and painting. In the prior art, operators are used to directly perform padding, welding, grinding, and repainting operations on long-span steel box bridges. The aforementioned construction operations are high-altitude, high-risk operations, lack of safety facilities, and high-altitude operations are difficult and efficient. Low cost, long working hours, and there is not enough space for tooling such as small electric welding machines, oxygen cylinders, acetylene cylinders, etc., which brings great inconvenience to the installation of steel box bridges. Therefore in the prior art there is not a steel box bridge installation auxiliary platform that is simple in structure, easy to disassemble, can be reused, improves work efficiency while reducing labor and construction costs, and reduces the safety risk of high-altitude operations.
发明内容Contents of the invention
本发明所要解决的技术问题是提供一种构形式简单,拆卸方便,可以重复利用,在减少劳动力和施工成本的同时提高工作效率,降低高空作业的安全风险的钢箱桥安装辅助平台。The technical problem to be solved by the present invention is to provide a steel box bridge installation auxiliary platform which is simple in structure, easy to disassemble, can be reused, reduces labor and construction costs, improves work efficiency, and reduces safety risks of high-altitude operations.
本发明解决其技术问题所采用的钢箱桥安装辅助平台,包括底部支撑架、基座和活动栏杆,所述底部支撑架为矩形框架,所述底部支撑架由两个以上平行设置的纵向矩形管和两个以上与纵向矩形管垂直相交的横向矩形管组成,所述基座设置在底部支撑架的边角处,所述活动栏杆与基座为可移动连接。The steel box bridge installation auxiliary platform adopted by the present invention to solve the technical problem includes a bottom support frame, a base and a movable railing. The bottom support frame is a rectangular frame, and the bottom support frame is composed of two or more vertical rectangular The tube is composed of more than two horizontal rectangular tubes vertically intersecting the longitudinal rectangular tubes, the base is arranged at the corner of the bottom support frame, and the movable railing is movably connected with the base.
进一步的是,还包括平台铺板,所述平台铺板设置在底部支撑架上。Further, it also includes a platform plank, and the platform plank is arranged on the bottom support frame.
进一步的是,所述基座由钢管制成,所述活动栏杆上设置有与钢管相匹配的立柱,所述立柱插入钢管中。Further, the base is made of steel pipes, the movable railings are provided with uprights matching the steel pipes, and the uprights are inserted into the steel pipes.
进一步的是,所述钢管内径比活动栏杆立柱的外径大2mm-3mm。Further, the inner diameter of the steel pipe is 2mm-3mm larger than the outer diameter of the movable railing post.
进一步的是,所述活动栏杆包括U形外框和与外框相连的横向支撑和纵向支撑组成。Further, the movable railing includes a U-shaped outer frame and lateral supports and longitudinal supports connected with the outer frame.
进一步的是,所述横向矩形管等间距设置,其间距范围为200mm-250mm的间距设置。Further, the transverse rectangular tubes are arranged at equal intervals, and the intervals thereof range from 200 mm to 250 mm.
本发明的有益效果是:再将本申请的钢箱桥安装辅助平台放置在钢箱桥箱体上,操作工人可以在钢箱桥安装辅助平台上进行衬垫、焊接、打磨、补油漆作业,活动栏杆可以为操作工人提供靠扶,防止工人操作时不小心跌落,让工人专心施工,可显著提高工作效率。平台铺板可以供操作人员在上面进行工作以及堆放部分工器具,也可以防止板单元焊接时火花溅落到地面,影响过往的行人和车辆。The beneficial effects of the present invention are: the steel box bridge installation auxiliary platform of the present application is placed on the steel box bridge box body, and the operator can perform lining, welding, grinding, and paint repair operations on the steel box bridge installation auxiliary platform. The movable railing can provide support for the operating workers, prevent the workers from accidentally falling during operation, and allow the workers to concentrate on construction, which can significantly improve work efficiency. The platform decking can be used for operators to work on it and stack some tools and equipment, and it can also prevent sparks from splashing to the ground when the plate unit is welded, affecting passing pedestrians and vehicles.
附图说明Description of drawings
图1是本发明的结构示意图;Fig. 1 is a structural representation of the present invention;
图2是本发明的安装示意图;Fig. 2 is the installation schematic diagram of the present invention;
图中零部件、部位及编号:纵向矩形管1、横向矩形管2、基座3、活动栏杆4、外框5、横向支撑6、纵向支撑7、平台铺板8、钢箱桥箱体9。Parts, parts and numbers in the figure: vertical rectangular tube 1, horizontal rectangular tube 2, base 3, movable railing 4, outer frame 5, horizontal support 6, longitudinal support 7, platform decking 8, steel box bridge box 9.
具体实施方式detailed description
下面结合附图对本发明作进一步说明。The present invention will be further described below in conjunction with accompanying drawing.
如图1及图2所示,本发明的钢箱桥安装辅助平台,包括底部支撑架、基座3和活动栏杆4,所述底部支撑架为矩形框架,所述底部支撑架由两个以上平行设置的纵向矩形管1和两个以上与纵向矩形管1垂直相交的横向矩形管2组成,所述基座3设置在底部支撑架的边角处,所述活动栏杆4与基座3为可移动连接。横向矩形管2和纵向矩形管1根据钢箱桥的长度和施工需要,按照4-6m节段组装焊接成整体,并在端部的横向矩管上焊接基座3。使用时先将钢箱桥箱体9、箱桥箱体拼装完成以后吊装在指定的位置上,再将本申请的钢箱桥安装辅助平台放置在钢箱桥箱体9上,操作工人可以在钢箱桥安装辅助平台上进行衬垫、焊接、打磨、补油漆作业,活动栏杆4可以为操作工人提供靠扶,防止工人操作时不小心跌落,让工人专心施工,可显著提高工作效率。纵向矩形管1可以放在设置在底板外缘突出位置,横向矩形管2与纵向矩形管1的上表面平齐。活动栏杆4宽度根据钢箱桥箱体9两腹板之间的距离设置。活动栏杆4与基座3为可移动连接便于活动栏杆4的拆卸与安装。As shown in Figures 1 and 2, the steel box bridge installation auxiliary platform of the present invention includes a bottom support frame, a base 3 and a movable railing 4, the bottom support frame is a rectangular frame, and the bottom support frame is composed of two or more The longitudinal rectangular tube 1 arranged in parallel is composed of more than two transverse rectangular tubes 2 vertically intersecting with the longitudinal rectangular tube 1, the base 3 is arranged at the corner of the bottom support frame, and the movable railing 4 and the base 3 are Removable connection. The horizontal rectangular tube 2 and the vertical rectangular tube 1 are assembled and welded into a whole according to the length and construction requirements of the steel box bridge according to 4-6m segments, and the base 3 is welded on the horizontal rectangular tube at the end. During use, the steel box bridge casing 9 and the box bridge casing are assembled and hoisted on the designated position, then the steel box bridge installation auxiliary platform of the application is placed on the steel box bridge casing 9, and the operator can The steel box bridge is installed on the auxiliary platform for lining, welding, grinding, and painting operations. The movable railing 4 can provide support for the operator to prevent the worker from accidentally falling during operation, allowing the worker to concentrate on construction, which can significantly improve work efficiency. The longitudinal rectangular tube 1 can be placed at a protruding position on the outer edge of the bottom plate, and the transverse rectangular tube 2 is flush with the upper surface of the longitudinal rectangular tube 1 . The width of the movable railing 4 is set according to the distance between the steel box bridge box body 9 two webs. The movable railing 4 and the base 3 are movably connected to facilitate the dismounting and installation of the movable railing 4 .
还包括平台铺板8,所述平台铺板8设置在底部支撑架上。平台铺板8可以供操作人员在上面进行工作以及堆放部分工器具,也可以防止板单元焊接时火花溅落到地面,影响过往的行人和车辆。It also includes a platform plank 8 which is arranged on the bottom support frame. The platform plank 8 can be used for operators to work on it and stack some tools and tools, and can also prevent sparks from splashing to the ground when the plate unit is welded, affecting passing pedestrians and vehicles.
所述基座3由钢管制成,所述活动栏杆4上设置有与钢管相匹配的立柱,所述立柱插入钢管中。采用钢管与立柱的形式实现可以移动连接,结构简单,可靠。The base 3 is made of steel pipes, the movable railing 4 is provided with uprights matching the steel pipes, and the uprights are inserted into the steel pipes. The form of steel pipe and column is used to realize movable connection, and the structure is simple and reliable.
为了便于活动栏杆4的拆卸与安装,钢管内径比活动栏杆4立柱的外径大2mm-3mm。In order to facilitate the disassembly and installation of the movable railing 4, the inner diameter of the steel pipe is 2mm-3mm larger than the outer diameter of the movable railing 4 columns.
所述活动栏杆4包括U形外框5和与外框5相连的横向支撑6和纵向支撑7组成。横向支撑6和纵向支撑7形成骨架结构与U形外框5焊接在一起,结构简单,可以有效保证施工人员安全。The movable railing 4 comprises a U-shaped outer frame 5 and a transverse support 6 and a longitudinal support 7 connected with the outer frame 5 . The transverse support 6 and the longitudinal support 7 form a skeleton structure and are welded together with the U-shaped outer frame 5. The structure is simple and can effectively ensure the safety of construction personnel.
作为一种优选的实施方式,所述横向矩形管2等间距设置,其间距范围为200mm-250mm的间距设置。As a preferred embodiment, the transverse rectangular tubes 2 are arranged at equal intervals, and the intervals thereof range from 200 mm to 250 mm.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610511148.0A CN105951606A (en) | 2016-06-29 | 2016-06-29 | Steel case bridge installation auxiliary platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610511148.0A CN105951606A (en) | 2016-06-29 | 2016-06-29 | Steel case bridge installation auxiliary platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105951606A true CN105951606A (en) | 2016-09-21 |
Family
ID=56903007
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610511148.0A Pending CN105951606A (en) | 2016-06-29 | 2016-06-29 | Steel case bridge installation auxiliary platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105951606A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100987262B1 (en) * | 2010-03-12 | 2010-10-12 | 이희연 | Repair and inspection apparatus of bridge |
CN102433835A (en) * | 2011-10-10 | 2012-05-02 | 镇江蓝舶工程科技有限公司 | Bridge variable cross-section box girder surface operation trolley |
CN204266135U (en) * | 2014-10-09 | 2015-04-15 | 中建钢构有限公司 | Multifunctional mobile operating platform |
CN204644868U (en) * | 2015-04-23 | 2015-09-16 | 中铁第四勘察设计院集团有限公司 | Pier formula case beam inspection car is crossed in one-sided separation traveling |
CN204753397U (en) * | 2015-06-17 | 2015-11-11 | 中国十九冶集团有限公司 | Temporary mounting hanger for steel box bridge |
CN105178189A (en) * | 2015-07-17 | 2015-12-23 | 中建钢构有限公司 | Mounting operation platform for cantilever of steel box girder |
-
2016
- 2016-06-29 CN CN201610511148.0A patent/CN105951606A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100987262B1 (en) * | 2010-03-12 | 2010-10-12 | 이희연 | Repair and inspection apparatus of bridge |
CN102433835A (en) * | 2011-10-10 | 2012-05-02 | 镇江蓝舶工程科技有限公司 | Bridge variable cross-section box girder surface operation trolley |
CN204266135U (en) * | 2014-10-09 | 2015-04-15 | 中建钢构有限公司 | Multifunctional mobile operating platform |
CN204644868U (en) * | 2015-04-23 | 2015-09-16 | 中铁第四勘察设计院集团有限公司 | Pier formula case beam inspection car is crossed in one-sided separation traveling |
CN204753397U (en) * | 2015-06-17 | 2015-11-11 | 中国十九冶集团有限公司 | Temporary mounting hanger for steel box bridge |
CN105178189A (en) * | 2015-07-17 | 2015-12-23 | 中建钢构有限公司 | Mounting operation platform for cantilever of steel box girder |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103556823B (en) | The construction method of lamina tecti form bracing system made by silo sliding formwork operating platform | |
CN204960296U (en) | Adjustable shaped steel stencil assembly | |
CN204531469U (en) | A kind of steel work overhanging component temporary support of tool-type and discharge mechanism | |
CN108222066A (en) | A kind of combined steel formwork support system and its construction method | |
CN104801908B (en) | T profile assembly tool | |
CN105442866A (en) | Protective dismantle and assembly method for large-scale towering steel structures | |
CN103206075B (en) | Suspension platform for construction of steel reinforced concrete cantilever structure | |
CN205206284U (en) | Detachable assembly type elevator shaft operating platform | |
CN103774838A (en) | Assembly type safe operation platform for elevator shaft construction and use method thereof | |
CN214834720U (en) | Tool type unilateral formwork system | |
CN206503347U (en) | A kind of platform for being used to repair grab bucket | |
CN101435270B (en) | Sectional butt joint operation method of high-rise columns | |
CN105951606A (en) | Steel case bridge installation auxiliary platform | |
CN203497150U (en) | Scaffold for hatch coaming of ship | |
CN205617770U (en) | Overhanging movable type edge construction operation platform | |
CN206616840U (en) | A kind of portable construction operation platform | |
CN201826438U (en) | Steel column convenient for constructing temporary operating platform | |
CN205293909U (en) | Mobilizable assembled transport auxiliary device | |
CN105666434B (en) | A kind of rudder blade tray tool | |
CN203222981U (en) | Suspended platform for steel reinforced concrete cantilever structure construction | |
CN113605346A (en) | Non-navigation-stop maintenance method for large drain valve | |
CN205702924U (en) | A kind of construction steel structure pipe girth welding platform | |
CN205421886U (en) | Novel instrument formula elevator shaft operating platform | |
CN110700574A (en) | Post-cast strip supporting structure and construction method thereof | |
CN217480863U (en) | Protective cover for elevator shaft on operation layer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160921 |
|
RJ01 | Rejection of invention patent application after publication |