CN105926532A - 一种墩台施工扁担梁反吊底的工艺 - Google Patents

一种墩台施工扁担梁反吊底的工艺 Download PDF

Info

Publication number
CN105926532A
CN105926532A CN201610355181.9A CN201610355181A CN105926532A CN 105926532 A CN105926532 A CN 105926532A CN 201610355181 A CN201610355181 A CN 201610355181A CN 105926532 A CN105926532 A CN 105926532A
Authority
CN
China
Prior art keywords
shoulder pole
reducing
girder
pole girder
suspended
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201610355181.9A
Other languages
English (en)
Inventor
曹向浦
李向龙
石啸
赵克来
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201610355181.9A priority Critical patent/CN105926532A/zh
Publication of CN105926532A publication Critical patent/CN105926532A/zh
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quay walls; Groynes; Breakwaters Wave dissipating walls; Quay equipment
    • E02B3/068Landing stages for vessels

Abstract

本发明是一种墩台施工扁担梁反吊底的工艺,具体步骤为:桩顶处理平整,将扁担梁放置在桩顶,扁担梁为工字钢双拼组成;将吊底螺栓放置在扁担梁双拼的缝隙中,吊底螺栓外面套装变径PVC管;安装主梁、铺设次梁,在次梁上绑扎木方,木方上装钉木板,木板顶面铺设多层板;墩台一步灰浇筑;利用变径PVC管的拆底通道进行拆底,拆底完成后将吊底螺栓取出,重复使用;制作变径堵头,拆底完成后在变径堵头周边涂环氧树脂对变径PVC管进行封堵,然后在变径PVC预留孔内灌注强度高一级的混凝土进行封堵。本发明完全封闭了钢筋的锈蚀通道,为工程质量提供了可靠保障。吊底螺栓在拆底后可以重复使用,节省了使用用料,降低了施工成本。

Description

一种墩台施工扁担梁反吊底的工艺
技术领域
[0001]本发明涉及高粧码头施工领域,尤其涉及一种墩台施工扁担梁反吊底的工艺。
背景技术
[0002] 在高粧码头施工中经常会遇到水上大型墩台施工。水上大型墩台施工往往采用兜攀吊底工艺,通过在粧顶悬挂兜攀,利用兜攀悬挂主梁,在主梁上布置次梁,次梁上依次布置木方、厚木板及多层板,形成工作平台。采用兜攀吊底工艺会将兜攀浇筑在墩台混凝土内,在墩台拆底后需将底部兜攀进行割除,施工中很难将兜攀切割至理论深度,导致兜攀位置保护层厚度变小,形成钢筋锈蚀通道,给墩台实体质量带来隐患。
发明内容
[0003]本发明旨在解决现有技术的不足,而一种墩台施工扁担梁反吊底的工艺。
[0004]本发明为实现上述目的,采用以下技术方案:一种墩台施工扁担梁反吊底的工艺,具体步骤为:
[0005] (I)粧顶处理平整,将扁担梁放置在粧顶,扁担梁为工字钢双拼组成;
[0006] (2)将吊底螺栓放置在扁担梁双拼的缝隙中,将扁担梁和主梁连接,吊底螺栓外面套装变径PVC管;
[0007] (3)安装主梁、铺设次梁,在次梁上绑扎木方,木方上装钉木板,木板顶面铺设多层板,在多层板拼缝处钉一层三合板;
[0008] (4)墩台一步灰浇筑;
[0009] (5)利用变径PVC管的拆底通道进行拆底,拆底完成后将吊底螺栓取出,重复使用;
[0010] (6)制作变径堵头,拆底完成后在变径堵头周边涂环氧树脂对变径PVC管进行封堵,然后在变径PVC预留孔内灌注强度高一级的混凝土进行封堵。
[0011]所述扁担梁和主梁采用的是40a工字钢双拼组成,所述次梁采用的是20a工字钢组成。
[0012] 所述变径PVC管上部直径为160mm,下部直径为110mm,直径IlOmm的PVC管长度为5cm;所述木方截面为6cm X 9cm;所述木板的厚度为3cm;所述多层板的厚度为I cm ο
[0013]本发明的有益效果是:本发明在拆底后利用外侧涂抹有环氧树脂的变径堵头进行预留变径孔封堵,封堵严密,完全封闭了钢筋的锈蚀通道,为工程质量提供了可靠保障。吊底螺栓在拆底后可以重复使用,节省了使用用料,降低了施工成本。
具体实施方式
[0014]下面结合实施例对本发明作进一步说明:
[0015] 实施例:
[0016] —种墩台施工扁担梁反吊底的工艺,具体步骤为:
[0017] (I)粧顶处理平整,将扁担梁放置在粧顶,扁担梁为工字钢双拼组成;
[0018] (2)将吊底螺栓放置在扁担梁双拼的缝隙中,将扁担梁和主梁连接,吊底螺栓外面套装变径PVC管;
[0019] (3)安装主梁、铺设次梁,在次梁上绑扎木方,木方上装钉木板,木板顶面铺设多层板,在多层板拼缝处钉一层三合板;
[0020] (4)墩台一步灰浇筑;
[0021] (5)利用变径PVC管的拆底通道进行拆底,拆底完成后将吊底螺栓取出,重复使用;
[0022] (6)制作变径堵头,拆底完成后在变径堵头周边涂环氧树脂对变径PVC管进行封堵,然后在变径PVC预留孔内灌注强度高一级的混凝土进行封堵。
[0023]所述扁担梁和主梁采用的是40a工字钢双拼组成,所述次梁采用的是20a工字钢组成。
[0024] 所述变径PVC管上部直径为160mm,下部直径为110mm,直径IlOmm的PVC管长度为5cm;所述木方截面为6cm X 9cm;所述木板的厚度为3cm;所述多层板的厚度为I cm ο
[0025]上面对本发明进行了示例性描述,显然本发明具体实现并不受上述方式的限制,只要采用了本发明的方法构思和技术方案进行的各种改进,或未经改进直接应用于其它场合的,均在本发明的保护范围之内。

Claims (3)

1.一种墩台施工扁担梁反吊底的工艺,其特征在于,具体步骤为: (1)粧顶处理平整,将扁担梁放置在粧顶,扁担梁为工字钢双拼组成; (2)将吊底螺栓放置在扁担梁双拼的缝隙中,将扁担梁和主梁连接,吊底螺栓外面套装变径PVC管; (3)安装主梁、铺设次梁,在次梁上绑扎木方,木方上装钉木板,木板顶面铺设多层板,在多层板拼缝处钉一层三合板; (4)墩台一步灰饶筑; (5)利用变径PVC管的拆底通道进行拆底,拆底完成后将吊底螺栓取出,重复使用; (6)制作变径堵头,拆底完成后在变径堵头周边涂环氧树脂对变径PVC管进行封堵,然后在变径PVC预留孔内灌注强度高一级的混凝土进行封堵。
2.根据权利要求1所述的一种墩台施工扁担梁反吊底的工艺,其特征在于,所述扁担梁和主梁采用的是40a工字钢双拼组成,所述次梁采用的是20a工字钢组成。
3.根据权利要求2所述的一种墩台施工扁担梁反吊底的工艺,其特征在于,所述变径PVC管上部直径为160mm,下部直径为110mm,直径IlOmm的PVC管长度为5cm;所述木方截面为6cm X 9cm;所述木板的厚度为3cm;所述多层板的厚度为Icm0
CN201610355181.9A 2016-05-25 2016-05-25 一种墩台施工扁担梁反吊底的工艺 Withdrawn CN105926532A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610355181.9A CN105926532A (zh) 2016-05-25 2016-05-25 一种墩台施工扁担梁反吊底的工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610355181.9A CN105926532A (zh) 2016-05-25 2016-05-25 一种墩台施工扁担梁反吊底的工艺

Publications (1)

Publication Number Publication Date
CN105926532A true CN105926532A (zh) 2016-09-07

Family

ID=56842192

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610355181.9A Withdrawn CN105926532A (zh) 2016-05-25 2016-05-25 一种墩台施工扁担梁反吊底的工艺

Country Status (1)

Country Link
CN (1) CN105926532A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107227688A (zh) * 2017-06-16 2017-10-03 中交航局第工程有限公司 墩台吊底工艺
CN109024469A (zh) * 2018-06-09 2018-12-18 中交航局第工程有限公司 一种混凝土组件及其在吊底工艺中的应用

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07173831A (ja) * 1993-12-17 1995-07-11 Unyusho Kowan Gijutsu Kenkyusho 鋼骨組コンクリート構造物の建設方法
CN101476339A (zh) * 2009-01-15 2009-07-08 叶长青 一种用扁担梁加固条形基础的方法
CN106938820A (zh) * 2016-01-05 2017-07-11 五冶集团上海有限公司 一种箱型扁担梁吊具及其制作方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07173831A (ja) * 1993-12-17 1995-07-11 Unyusho Kowan Gijutsu Kenkyusho 鋼骨組コンクリート構造物の建設方法
CN101476339A (zh) * 2009-01-15 2009-07-08 叶长青 一种用扁担梁加固条形基础的方法
CN106938820A (zh) * 2016-01-05 2017-07-11 五冶集团上海有限公司 一种箱型扁担梁吊具及其制作方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
曹向浦等: "现浇墩台施工工艺优化", 《中国水运》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107227688A (zh) * 2017-06-16 2017-10-03 中交航局第工程有限公司 墩台吊底工艺
CN107227688B (zh) * 2017-06-16 2019-02-12 中交一航局第一工程有限公司 墩台吊底工艺
CN109024469A (zh) * 2018-06-09 2018-12-18 中交航局第工程有限公司 一种混凝土组件及其在吊底工艺中的应用
CN109024469B (zh) * 2018-06-09 2021-03-19 中交一航局第一工程有限公司 一种混凝土组件及其在吊底工艺中的应用

Similar Documents

Publication Publication Date Title
CN103526929B (zh) 一种超高层钢管柱内混凝土浇筑施工方法
CN106284089B (zh) 一种钢栈桥快速施工方法
CN202227476U (zh) 一种高空大跨度悬挑连廊型钢混凝土结构
CN102444203A (zh) 一种高空大跨度悬挑连廊型钢混凝土结构及施工方法
CN101852031A (zh) 覆土罐施工方法
CN105714684A (zh) 预应力混凝土变截面鱼腹式连续箱梁施工方法
CN104372743B (zh) 栈桥快速施工方法
CN105926532A (zh) 一种墩台施工扁担梁反吊底的工艺
CN108797395A (zh) 一种采用玻纤套筒加固桥梁墩柱的方法
CN110029674A (zh) 一种用于深基坑的内支撑拆除及地下室施工方法
CN101487233B (zh) 大跨径钢箱梁斜拉桥临时墩墩顶梁段的安装方法
CN107190866A (zh) 一种装配式建筑悬挑外架锚箍的施工方法
CN102926504A (zh) 一种用于钢混叠合粱结合部的连接钢构件及施工方法
CN104805857B (zh) 一种可拆卸循环利用无底钢套箱及其施工方法
CN204418000U (zh) 一种大跨径叠合梁斜拉桥压重体系
JP2006169927A (ja) 現場接着連結によるプレハブ式鋼床版鋼桁橋
CN103243912B (zh) 多层无板框架结构施工方法
CN108179758A (zh) 一种新型快速拼装自浮式预应力钢混组合套箱围堰的施工工艺
CN111236069A (zh) 一种新型抗拉拔组合梁接缝结构及制作工艺
CN103184722B (zh) 大跨度双层贝雷桁架结构及其施工方法
CN204139634U (zh) 一种快捷式洞口安全封闭结构
CN104453045B (zh) 一种分离式预制桁架楼承板及其施工方法
CN204080819U (zh) 人员上下基坑用临时通道
CN207619835U (zh) 一种桥面铺装复合型防水结构
Park et al. A Study on Maintenance Cost Model for Establishing a Strategies of Port Facility Maintenance

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20160907