CN105922207A - Electric power cable pole machining frame - Google Patents
Electric power cable pole machining frame Download PDFInfo
- Publication number
- CN105922207A CN105922207A CN201610309402.9A CN201610309402A CN105922207A CN 105922207 A CN105922207 A CN 105922207A CN 201610309402 A CN201610309402 A CN 201610309402A CN 105922207 A CN105922207 A CN 105922207A
- Authority
- CN
- China
- Prior art keywords
- electric power
- power cable
- tower bar
- supporter
- cable tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25H—WORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
- B25H1/00—Work benches; Portable stands or supports for positioning portable tools or work to be operated on thereby
- B25H1/06—Work benches; Portable stands or supports for positioning portable tools or work to be operated on thereby of trestle type
Abstract
The invention discloses an electric power cable pole machining frame. The electric power cable pole machining frame serving as a manufacturing tool is used for manufacturing an electric power cable pole with the round cross section. The manufacturing tool comprises a frame body used for supporting the electric power cable pole. The frame body comprises two top plates; the two top plates are spliced to form a V-shaped supporting body, and the opening end of the supporting body is rightly upward; the lower portion of the supporting body is further connected with a base used for supporting the supporting body; and the width directions of the two top plates which form the supporting body are in the horizontal direction. By means of the electric power cable pole machining frame, improvement of the manufacturing efficiency of the cable pole is facilitated, and the machining quality of the cable pole is improved.
Description
Technical field
The present invention relates to cable steel tower making apparatus technical field in electrical network, particularly relate to a kind of electric power cable tower bar processing frame.
Background technology
Iron tower of power transmission line is called for short electric power tower, is generally divided in shape: wine glass-shaped, cathead, upper font, dry font and barrel shape five kinds.Divide by purposes and have: anchor support, tangent tower, angle tower, transposition tower (restringing phase position tower), terminal tower and crossover tower etc..Electric pole is that a kind of electrical network such as rural area, street that is widely used in is registered one's residence the Wire support parts at end, it is contemplated that the problems such as the scarcity of timber and environmental protection, in prior art, the most widely used iron and steel body of rod substitutes traditional wooden body of rod.Existing shaft-like tower bar is when design, it is contemplated that the security of circuit, and antenna height is the highest, for ease of transport and installation, the existing shaft-like tower bar multi-section combined structure of many employings, and uses the form of bolt series connection between multistage.
So, during shaft-like steel tower prefabrication, exist for shaft-like steel tower is carried out surface anticorrosion process, connect end and be welded to connect the operation of flange, in prior art, above operation typically uses driving to be sling by tower bar or be placed on the bottom surface of factory building by tower bar and complete, and has that tower bar working (machining) efficiency is low, be unfavorable for the problems such as product quality.
Summary of the invention
For in above-mentioned prior art during shaft-like steel tower prefabrication, exist for shaft-like steel tower is carried out surface anticorrosion process, connect end and be welded to connect the operation of flange, in prior art, above operation typically uses driving to be sling by tower bar or be placed on the bottom surface of factory building by tower bar and complete, have that tower bar working (machining) efficiency is low, be unfavorable for the problems such as product quality, the invention provides a kind of electric power cable tower bar processing frame.
The electric power cable tower bar processing frame that the present invention provides solves problem by techniques below main points: electric power cable tower bar processing frame, this making frock is that circular electric power cable tower bar makes for cross section, described making frock includes the support body for supporting electric power cable tower bar, described support body includes two pieces of top boards, two pieces of top boards are spliced into a V-shaped supporter, and the openend of supporter is towards surface;The lower section of described supporter is also associated with for providing, for it, the base supported;The width of two pieces of top boards of composition supporter is respectively positioned on horizontal direction.
Concrete, in above structure, two pieces of top boards are the support of circular electric power cable tower bar for cross section, it is equipped with the base below supporter, processed electric power cable tower bridge is empty, so, multiple frocks with the use of, when carrying out cable tower bar fixed length cutting, use this making frock can make in cutting process without dead angle;It is prone to retrain the cable tower bar in process, is allowed to not rolling etc., be finally reached the purpose improving cable tower bar make efficiency, improving cable tower bar crudy.
Further technical scheme is:
As the technical scheme that a kind of overall weight is light, described base includes base plate and polylith gripper shoe, and the upper end of described gripper shoe is fixedly connected with on the bottom surface of supporter, and the lower end of described gripper shoe is fixedly connected with on base plate.
The set-point positional stability of for the benefit of this making frock, described base plate is additionally provided with the bolt hole for wearing foundation bolt.
The method have the advantages that
In above structure, two pieces of top boards are the support of circular electric power cable tower bar for cross section, it is equipped with the base below supporter, processed electric power cable tower bridge is empty, so, multiple frocks with the use of, when carrying out cable tower bar fixed length cutting, use this making frock can make in cutting process without dead angle;It is prone to retrain the cable tower bar in process, is allowed to not rolling etc., be finally reached the purpose improving cable tower bar make efficiency, improving cable tower bar crudy.
Accompanying drawing explanation
Fig. 1 is the structural representation of electric power cable tower one specific embodiment of bar processing frame of the present invention.
Numbering in figure is followed successively by: 1, top board, and 2, gripper shoe, 3, base plate, 4, bolt hole.
Detailed description of the invention
Below in conjunction with embodiment, the present invention is described in further detail, but the structure of the present invention is not limited only to following example.
Embodiment 1:
As shown in Figure 1, electric power cable tower bar processing frame, this making frock is that circular electric power cable tower bar makes for cross section, described making frock includes the support body for supporting electric power cable tower bar, described support body includes two pieces of top boards 1, two pieces of top boards 1 are spliced into a V-shaped supporter, and the openend of supporter is towards surface;The lower section of described supporter is also associated with for providing, for it, the base supported;
The width of two pieces of top boards 1 of composition supporter is respectively positioned on horizontal direction.
Concrete, in above structure, two pieces of top boards 1 are the support of circular electric power cable tower bar for cross section, it is equipped with the base below supporter, processed electric power cable tower bridge is empty, so, multiple frocks with the use of, when carrying out cable tower bar fixed length cutting, use this making frock can make in cutting process without dead angle;It is prone to retrain the cable tower bar in process, is allowed to not rolling etc., be finally reached the purpose improving cable tower bar make efficiency, improving cable tower bar crudy.
Embodiment 2:
As shown in Figure 1, described ladder head is further qualified on the basis of embodiment 1 by the present embodiment: as the technical scheme that a kind of overall weight is light, described base includes base plate 3 and polylith gripper shoe 2, the upper end of described gripper shoe 2 is fixedly connected with on the bottom surface of supporter, and the lower end of described gripper shoe 2 is fixedly connected with on base plate 3.
The set-point positional stability of for the benefit of this making frock, described base plate 3 is additionally provided with the bolt hole 4 for wearing foundation bolt.
Above content is to combine the further description that the present invention is made by concrete preferred embodiment, it is impossible to assert that the detailed description of the invention of the present invention is confined to these explanations.For general technical staff of the technical field of the invention, other embodiments drawn under without departing from technical scheme, should be included in protection scope of the present invention.
Claims (3)
1. electric power cable tower bar processing frame, this making frock is that circular electric power cable tower bar makes for cross section, described making frock includes the support body for supporting electric power cable tower bar, it is characterized in that, described support body includes two pieces of top boards (1), two pieces of top boards (1) are spliced into a V-shaped supporter, and the openend of supporter is towards surface;The lower section of described supporter is also associated with for providing, for it, the base supported;
The width of two pieces of top boards (1) of composition supporter is respectively positioned on horizontal direction.
Electric power cable tower bar processing frame the most according to claim 1, it is characterized in that, described base includes base plate (3) and polylith gripper shoe (2), the upper end of described gripper shoe (2) is fixedly connected with on the bottom surface of supporter, and the lower end of described gripper shoe (2) is fixedly connected with on base plate (3).
Electric power cable tower bar processing frame the most according to claim 2, it is characterised in that be additionally provided with the bolt hole (4) for wearing foundation bolt on described base plate (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610309402.9A CN105922207A (en) | 2016-05-11 | 2016-05-11 | Electric power cable pole machining frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610309402.9A CN105922207A (en) | 2016-05-11 | 2016-05-11 | Electric power cable pole machining frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105922207A true CN105922207A (en) | 2016-09-07 |
Family
ID=56835846
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610309402.9A Pending CN105922207A (en) | 2016-05-11 | 2016-05-11 | Electric power cable pole machining frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105922207A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07227723A (en) * | 1994-02-17 | 1995-08-29 | Nippon Steel Corp | Method for holding different diameter cylindrical material |
CN201833356U (en) * | 2010-03-19 | 2011-05-18 | 江苏永伟精密工具有限公司 | Milling raw material storage device with stable structure |
CN102441806A (en) * | 2012-01-06 | 2012-05-09 | 昆山海大数控技术有限公司 | Support device of numerically controlled intersection line cutting machine |
CN203390555U (en) * | 2013-06-17 | 2014-01-15 | 上海东方泵业(集团)有限公司 | Novel bracket |
CN203919001U (en) * | 2014-05-26 | 2014-11-05 | 江阴润源机械有限公司 | A kind of long shaft parts bracing frame |
CN104986199A (en) * | 2015-06-29 | 2015-10-21 | 巨万飞 | Device for dismounting and mounting tire |
CN105033674A (en) * | 2015-07-02 | 2015-11-11 | 诸城市智鑫模具装备有限公司 | Long shaft supporting tool |
-
2016
- 2016-05-11 CN CN201610309402.9A patent/CN105922207A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07227723A (en) * | 1994-02-17 | 1995-08-29 | Nippon Steel Corp | Method for holding different diameter cylindrical material |
CN201833356U (en) * | 2010-03-19 | 2011-05-18 | 江苏永伟精密工具有限公司 | Milling raw material storage device with stable structure |
CN102441806A (en) * | 2012-01-06 | 2012-05-09 | 昆山海大数控技术有限公司 | Support device of numerically controlled intersection line cutting machine |
CN203390555U (en) * | 2013-06-17 | 2014-01-15 | 上海东方泵业(集团)有限公司 | Novel bracket |
CN203919001U (en) * | 2014-05-26 | 2014-11-05 | 江阴润源机械有限公司 | A kind of long shaft parts bracing frame |
CN104986199A (en) * | 2015-06-29 | 2015-10-21 | 巨万飞 | Device for dismounting and mounting tire |
CN105033674A (en) * | 2015-07-02 | 2015-11-11 | 诸城市智鑫模具装备有限公司 | Long shaft supporting tool |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10205312B2 (en) | Power transmission tower | |
CN202219536U (en) | Die holder for assembling steel reinforcement cage of prefabricated box girder | |
CN201864454U (en) | Lifting appliance of centralized overhauling transportation system of electrolytic cell | |
CN105922207A (en) | Electric power cable pole machining frame | |
CN105401776A (en) | Device for supporting transmission conductor in process of replacing electric pole | |
CN105922206A (en) | Electric power cable pole manufacturing tool | |
CN105904415A (en) | Support favorable for improvement of machining quality of cable tower rod | |
CN205772893U (en) | A kind of king-tower function at most lifting traction apparatus | |
CN201868786U (en) | Special repairing lifter for 220KV lightning wire of power transmission line | |
CN211908196U (en) | Insulator replacing device | |
CN105881466A (en) | Supporting tool capable of realizing feeding in length direction of rod body | |
CN202322137U (en) | Telescopic hanger | |
CN203188885U (en) | Portable insulated ladder | |
CN208814490U (en) | A kind of novel drainage ditch cover plate hanging apparatus | |
CN201536236U (en) | Bracket for hoisting heavy objects on object like an electrical pole | |
CN205791223U (en) | Use in a kind of 10kV circuit lifts line bracket | |
CN211037005U (en) | Intermediate support template | |
CN205617879U (en) | Transmission line salvagees overhead line pole | |
CN105773547A (en) | Auxiliary tool for prefabricating cable tower pole | |
CN205296979U (en) | Change device that in -process is used for supporting transmission pressure at pole | |
CN108729644A (en) | A kind of novel suspention beam holder and its installation and application | |
CN204867531U (en) | Folding flexible drilling equipment of assembled | |
CN208127763U (en) | A kind of general cross-arm fixture | |
CN203549313U (en) | Wind resistance support of high-altitude test robot | |
CN210418893U (en) | Hoisting tool for power transformation cabinet |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160907 |