CN105914627A - Transformer substation high voltage overhaul work platform - Google Patents

Transformer substation high voltage overhaul work platform Download PDF

Info

Publication number
CN105914627A
CN105914627A CN201610443597.6A CN201610443597A CN105914627A CN 105914627 A CN105914627 A CN 105914627A CN 201610443597 A CN201610443597 A CN 201610443597A CN 105914627 A CN105914627 A CN 105914627A
Authority
CN
China
Prior art keywords
arranges
warehouse
platform
motor
arrange
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201610443597.6A
Other languages
Chinese (zh)
Inventor
徐光武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610443597.6A priority Critical patent/CN105914627A/en
Publication of CN105914627A publication Critical patent/CN105914627A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B3/00Apparatus specially adapted for the manufacture, assembly, or maintenance of boards or switchgear

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Power Engineering (AREA)
  • Warehouses Or Storage Devices (AREA)

Abstract

The invention discloses a transformer substation high voltage overhaul work platform comprising a bin body, a traveling mechanism is arranged below the bin body, and one end of the bin body is connected with a vehicle head; the other end of the bin body is provided with an entrance, an exit and sealing doors arranged on the entrance and the exit; an allocating and transporting device is arranged on an upper part of the interior of the bin body, an overhaul platform is arranged on a bottom face of the interior of the bin body, a tool platform is arranged adjacent to the overhaul platform, an ash removing mechanism arranged on an upper part of the overhaul platform, an air conditioning device is arranged outside the bin body, an annular track is arranged on a support plate inside the overhaul platform, and an ash removing device consisting of a number of ball sheet units is arranged on the annular track; each ball sheet unit comprises a inverted V-shaped elastic column, a dust-separation cloth arranged at the middle of the inverted V-shaped elastic column, and a spherical slide block which is arranged on a lower part of the inverted V-shaped elastic column and matched with the annular track. The transformer substation high voltage overhaul work platform is simple in structure and convenient in operation and is worth applying and popularizing.

Description

Transformer station's high pressure upkeep operation platform
Technical field
The present invention relates to electric power detection equipment technical field, be specifically related to a kind of transformer station high pressure upkeep operation platform.
Background technology
Along with the fast development of power industry, the reliability service of electrical network just becomes more and more important.But, power equipment in transformer station Compared with other primary equipment, its fault rate remains high always.At present, in domestic transformer station, power equipment exists in a large number, as The type power equipment is overhauled and fixes a breakdown by easily and efficiently seems particularly significant.Power equipment in transformer station Consumption is big especially, and corresponding service work is the heaviest.Actual in service work, such as individual part rotates dumb;Environment Pollution causes laying dust;And the problem relatively such as replacing exposing critical component is not the fault of especially severe, can originate in On the basis of product, i.e. original product dismounting need not be overhauled to ground.But, cannot normally divide if running into product, close a floodgate;Produce Product heating is serious and needs to disintegrate original product to carry out large repairs, and generally requires an original product integral demounting and just can examine to ground Repair, and substation field does not overhaul condition, product can only be returned to power equipment producer, be unfavorable for undoubtedly recovering in time to produce Product power transmission, and the cost of overhaul is greatly increased.The maintenance of a kind of disconnecting switch of the disclosure of the invention of Application No. 201510850350.1 Stage apparatus, the fixing device including inspection platform, being arranged on inspection platform lower surface, is arranged on inspection platform upper surface Hanging device, described inspection platform lower surface offers the chute running through left and right side, described fixing device include upper plate, Lower plate and the side plate being connected between upper and lower plate, the upper surface of upper plate is provided with slide block, and slide block is fitted in chute, described side Offer tapped through hole on plate, in tapped through hole, be installed with screw rod, screw rod is equipped clamp nut.Present configuration is simple, It is connected firm, safety with basis channel-section steel, low cost of manufacture, simple to operate, it is simple to carrying out of service work.This invention can not give inspection Repairing one good environment of offer, and cannot arrange fixing for small part during maintenance, scene is the most mixed and disorderly.Application No. The invention of 201410277506.7 provides a kind of electronic inspection platform of disconnecting switch, including two concrete columns be installed in cement Horizontal slide on post, it is characterized in that: have support by anchor ear connection on each concrete column, both sides on two supports Be respectively equipped with strip attachment strap, the gap location of two block length bar attachment straps be provided with by the way of grafting before, during and after connecting plate, described length The outward flange of bar attachment strap is interval with organizes sleeve pipe more, is often socketed with guardrail in group sleeve pipe, is connected by latch between described guardrail Forming the fence closed, described horizontal slide side is provided with dismountable rotation dish, and rotation dish is provided with column, on described column Portion is installed with suspension bracket, and described suspension bracket is provided with electric block.It provides the benefit that: use electric block can save manpower, energy Ensure the persistence of lifting process, the infringement of equipment can be preferably minimized, platform have broad working region, it is ensured that set Standby and the personal safety of staff on inspection platform.But this invention remains adaptation environment, and cannot create environment, So under the extreme cases such as rainy weather cannot site examining and repairing, needing that high-voltage switch gear moves to other places could overhaul, use office Sex-limited bigger.And, current prior art is when electric power apparatus examination, such as to disconnecting switch, and keeping apart under its dismounting The longer member such as the parts especially conductive arm closed the most reasonably put place, are often placed in ground, inconvenience when cleaning polishing Prompt, inefficiency.Additionally, the widgets such as screw, nut and pad are usually lost, are damaged.Power equipment Disintegration overhaul works, and is A kind of electric operating exigent to standard operation, nonstandard putting easily causes working site confusion, creates safety the most hidden Suffer from, also service work is caused strong influence.
Summary of the invention
Problem to be solved by this invention is to provide a kind of transformer station high pressure upkeep operation platform, by storehouse, mobile time side is The upkeep operation of power equipment provides suitable environment, it is to avoid power equipment inner body is made by the air moist, dust is bigger Become damage, it is ensured that smooth, the safety of upkeep operation are carried out, and provide a great convenience for upkeep operation.
For solving above-mentioned technical problem, the technical solution used in the present invention is:
Transformer station's high pressure upkeep operation platform, including warehouse, arranges walking mechanism, described warehouse one end and car below described warehouse Head connects, and the described warehouse other end arranges the hermatic door imported and exported and be disposed thereon, and described warehouse inner upper arranges tune Shipping unit, be arranged on described warehouse inner bottom surface inspection platform is set and described inspection platform adjacent arrange Work tool platform, It is arranged on the deashing mechanism on described inspection platform top and is arranged on the conditioner outside described warehouse, flat in maintenance In gripper shoe in platform, circular orbit is set, if arranging the deashing device being made up of dry bulb blade unit on described circular orbit, institute State ball blade unit to include reverse V-shaped post, the dust-separation cloth being arranged on described reverse V-shaped post centre, be arranged on described reverse V-shaped bullet Property post bottom and the spherical slide block matched with described circular orbit.
Further, described handling apparatus includes the translation slide rail that two side roof parts are arranged in described warehouse, and described translation is sliding Arranging bridge formation on rail, one end of described bridge formation arranges translation motor and driving wheel, and described bridge formation arranges electric block.
Further, described inspection platform includes that support frame, both sides, described support frame upper end arrange chute, corresponding institute Stating chute to slide above in described support frame and arrange gripper shoe, described gripper shoe end arranges translation supporting mechanism, described In support frame frame, rinsing table is set.
Further, described rinsing table uses ultrasonic washing unit, corresponding described support plate edge in described support frame Activity arranges sealing ring.
Arranging in described circular orbit and the bracing wire of spherical slide block secure fit foremost, one end of described bracing wire is arranged Open the motor other end and Guan Bi motor is set.
Described opening arranges deviation motor between motor and Guan Bi motor, and described deviation motor output shaft arranges and is arranged on Circular orbit end and fixing ball blade unit top are connected.
If arranging annular brace circle between described dry bulb blade unit, in the described gripper shoe in described circular orbit, annular sets The suction port put is connected with the ring-type air jet pipe initiating terminal being arranged in the middle part of circular orbit end and fixing ball blade unit, institute Stating setting on air jet pipe is that fixed-direction is connected with the air nozzle of angle with described isolation cloth plane.
Described gripper shoe top arranges working plate by hydraulic stem, and described working plate is in described endless glide, described dust suction Mouthful, described in open elastic cover plate be set at motor, described Guan Bi motor and described deviation motor, described elastic cover plate week side set Put chevron shaped sealing ring.
Further, described support frame edge arranges magnetic receiver.
Further, described Work tool platform includes rotary shaft, and described rotary shaft arranges singletree, described singletree End arranges pallet, and described rotary shaft is in transmission connection with electric rotating machine.
Further, described conditioner includes Temperature Humidity Sensor, baroceptor, controller, heater, enters Feed channel and discharge duct, arrange supply fan, drier and air intake valve, set in described discharge duct in described admission line Put exhaust fan and drain tap, described Temperature Humidity Sensor, air pressure sensing gas, heater, supply fan and exhaust fan and described control Device processed connects.
Further, described warehouse lower inside arranges one and irises out feed channel, and on described outlet pipe, uniform setting is given vent to anger Hole.
Further, hinged with described warehouse on the downside of described hermatic door, described hermatic door arranges automatic open-close mechanism, institute Stating hermatic door week side and arrange a circle groove, arrange pressure bladder in described groove, described pressure bladder passes through pneumatic hose and gas Pump connects, and arranges the slide rail that climbs in the middle of described hermatic door, described in climb to slide on slide rail lifter plate be set, told lifter plate sets Putting static line body, described warehouse is provided above derricking gear.
The invention provides a kind of transformer station high pressure upkeep operation platform, the function in storehouse, side is to provide one to be suitable at the scene The environment of electric power apparatus examination, some electrical power equipment disassemble working environment can not be excessively moist, it is impossible to have dust, otherwise can be right Power equipment inner body causes damage, impact use subsequently.Walking mechanism below warehouse coordinates with headstock, according to warehouse Size, composition full trailor and the form of semitrailer, headstock provide power tractive warehouse to move, power equipment torn open When solving maintenance, warehouse is moved to the power equipment side needing maintenance, by suspension apparatus, power equipment is delivered in warehouse Portion, then hermatic door is closed, just can create into airtight space for maintenance, every to the air in warehouse by conditioner Parameter is adjusted, excessively moist and carry out intensification time dust content is bigger and add row's ventilation, improves warehouse internal medium;Maintenance is flat Platform is used for placing power equipment, and is provided with dust arrester thereon, it is possible to before maintenance, it is carried out deashing, Work tool platform It is arranged on the side of inspection platform, facilitates staff take instrument at any time or change parts, it is simple to the expansion of work.
The invention has the beneficial effects as follows:
1, the upkeep operation being power equipment by storehouse, mobile time side provides suitable environment, it is to avoid the sky moist, dust is bigger Power equipment inner body is caused damage by gas, it is ensured that smooth, the safety of upkeep operation are carried out, and provide greatly for upkeep operation Facility;
2, handling apparatus can carry out handling to power equipment inside warehouse, facilitates the carrying of heavy parts or device, alleviates The burden of staff;
3, deashing and cleaning are set, it is possible to after carrying out overall deashing, part is carried out, such as on inspection platform Insulator surface, wire clamp etc., and use ultrasonic washing unit, can not be by abluent, it is achieved hermetically sealed degreasing, remove dirt Clean, the environment in warehouse will not be impacted;
4, using revolving Work tool platform, staff, when needs instrument or part, rotates Work tool platform and just can obtain , greatly facilitate service work, alleviate the burden of maintainer, accelerate the speed of service work;
5, humidity and the particle content of air in warehouse can be adjusted by conditioner, create for service work Favourable environment.
Accompanying drawing explanation
The invention will be further described below in conjunction with the accompanying drawings:
Fig. 1 is the overall structure schematic diagram of the present invention;
Fig. 2 is the structural representation that the present invention allocates and transports device;
Fig. 3 is the side structure schematic diagram of inspection platform of the present invention;
Fig. 4 is the plan structure schematic diagram of inspection platform of the present invention;
Fig. 5 is the structural representation of Work tool platform of the present invention;
Fig. 6 is the overall side structural representation of the present invention;
Fig. 7 is the another kind of plan structure schematic diagram of inspection platform of the present invention;
Fig. 8 is the plan structure schematic diagram of deashing mechanism of the present invention;
Fig. 9 is deashing mechanism side structure schematic diagram of the present invention;
Figure 10 is the structural representation of ball blade unit of the present invention;
Figure 11 is the structure enlarged diagram of ball blade unit bottom of the present invention.
Detailed description of the invention
Below in conjunction with Fig. 1 to Figure 11 displaying further to technical solution of the present invention, detailed description of the invention is as follows:
Embodiment one: transformer station's high pressure upkeep operation platform, including warehouse 1, arranges walking mechanism 2 below described warehouse 1, described Warehouse 1 one end connects 3 with headstock and connects, and described warehouse 1 other end arranges the hermatic door 5 imported and exported 4 and be disposed thereon, described storehouse Body 1 is internal include allocation and transportation device 6 that described warehouse is provided above, be arranged on described warehouse 1 inner bottom surface arrange inspection platform 7, Work tool platform 8, the deashing mechanism being arranged on described inspection platform 7 top are set with described inspection platform 7 adjacent and set Put at the conditioner outside described warehouse 1.
The function in storehouse, side is to provide the environment of an applicable electric power apparatus examination at the scene, and working environment disassembled by power equipment Can not be excessively moist, it is impossible to have dust, otherwise power equipment inner body can be caused damage, impact use subsequently.Warehouse The walking mechanism of lower section coordinates with headstock, according to the size of warehouse, composition full trailor and the form of semitrailer, headstock provides dynamic Power tractive warehouse moves, and when power equipment is disassembled maintenance, is moved by warehouse to the switch side needing maintenance, passes through Power equipment is delivered to inside warehouse by suspension apparatus, then is closed by hermatic door, just can create into airtight space for maintenance, by sky Air parameters in warehouse is adjusted by gas control device, excessively moist and carry out intensification time dust content is bigger and add row Ventilation, improves warehouse internal medium.Inspection platform is used for placing power equipment, and Work tool platform is arranged on the side of inspection platform Limit, facilitate staff take at any time instrument or change parts, it is simple to the expansion of work, and on the supporting plate portion arrange clear Ash mechanism, it is possible to form the environment of opposing seal, removes dust, it is to avoid in maintenance process, a large amount of dusts cause poor working environment And easily cause inner member and be stained with the phenomenon of ash, conditioner controls the ambient parameter in warehouse, it is provided that be dried, dustless work Make environment.
Described handling apparatus 6 includes the translation slide rail 9 that two side roof parts are arranged in described warehouse 1, and described translation slide rail 9 sets Putting bridge formation 10, one end of described bridge formation 10 arranges translation motor 11 and driving wheel 12, and described bridge formation 10 arranges electric block 13. Translation slide rail is arranged on the top of warehouse, will not take the space in warehouse, and translation motor output power supply driving wheel rotates, Driving builds bridge moves on translation slide rail, and electric block realizes the function of lifting.
Embodiment two: transformer station's high pressure upkeep operation platform, including warehouse 1, arranges walking mechanism 2 below described warehouse 1, Described warehouse 1 one end connects 3 with headstock and connects, and described warehouse 1 other end arranges the hermatic door 5 imported and exported 4 and be disposed thereon, institute State warehouse 1 internal to include allocation and transportation device 6 that described warehouse is provided above, be arranged on described warehouse 1 inner bottom surface that to arrange maintenance flat Platform 7 and described inspection platform 7 adjacent arrange Work tool platform 8, be arranged on the deashing mechanism on described inspection platform 7 top with And it is arranged on the conditioner outside described warehouse 1.
Described inspection platform 7 includes that support frame 14, both sides, described support frame 14 upper end arrange chute 15, corresponding described Chute 15 slides above in described support frame 14 and arranges gripper shoe 16, and described gripper shoe 16 end arranges translation supporting mechanism 17, in described support frame 14, rinsing table 18 is set.Power equipment maintenance time place on the supporting plate, translation supporting mechanism by Pillar and wheel composition, facilitate gripper shoe to translate, and when some parts is carried out by needs, gripper shoe is translated, Expose the rinsing table under support frame, it would be desirable to the parts of cleaning are put into rinsing table and processed, provide pole for upkeep operation Big facility, substantially reduces the time of upkeep operation.
Described rinsing table 18 uses ultrasonic washing unit, corresponding described gripper shoe 16 edge movable in described support frame 14 Arranging sealing ring 19, ultrasonic washing unit utilizes ultrasonic waves for cleaning principle, by cleaning solvent is applied ultrasound wave so that it is produce Substantial amounts of micro-bubble also vibrates, ruptures, and produces great air pressure and heat, it is not necessary to by abluent in very low range, Only component surface dirt and greasy dirt can be carried out strong dispelling by aquiform stool, and cooperate with gripper shoe, clean Time by gripper shoe return, it is to avoid the situation that during ultrasonic waves for cleaning, a large amount of water smokes fill the air, be conducive to controlling the environment in warehouse, no Can cause making moist or the situation such as condensation of other parts, the sealing ring of setting can use flexible material to fill, or agrees with The cover plate of support frame frame, it is achieved the sealing to gripper shoe Yu support frame contact surface.
Described support frame 14 edge arranges magnetic receiver 20, and during upkeep operation, magnetic receiver can be to screw, spiral shell The part such as cap, small spring is collected, it is to avoid part is too small to be scattered in inside inspection platform or warehouse, causes the maintainer cannot be fast Speed finds or loses, and affects the process of upkeep operation.
Described Work tool platform includes rotary shaft 20, and described rotary shaft 20 arranges singletree 21, described singletree 21 End arranges pallet 22, and described rotary shaft 20 is in transmission connection with electric rotating machine 23, and traditional Work tool is all to be deposited by cabinet, Cabinet is further from inspection platform, and maintainer needs to go to cabinet side and selects, and loses time.The Work tool of the present invention Platform carrys out the quick-wear part of carrying tool and power equipment by pallet, and is arranged on inspection platform side, needs certain During Work tool, making rotary shaft rotate by operation handle drives electric rotating machine, pallet correspondence deposited rotates at one's side Take, will not delay and interrupt ongoing work, overhaul more convenient.
Embodiment three: transformer station's high pressure upkeep operation platform, including warehouse 1, arranges walking mechanism 2 below described warehouse 1, Described warehouse 1 one end connects 3 with headstock and connects, and described warehouse 1 other end arranges the hermatic door 5 imported and exported 4 and be disposed thereon, institute State warehouse 1 internal to include allocation and transportation device 6 that described warehouse is provided above, be arranged on described warehouse 1 inner bottom surface that to arrange maintenance flat Platform 7 and described inspection platform 7 adjacent arrange Work tool platform 8, be arranged on the deashing mechanism on described inspection platform 7 top with And it is arranged on the conditioner outside described warehouse 1.
Described conditioner includes Temperature Humidity Sensor 24, baroceptor 25, controller 26, heater 27, enters Feed channel 28 and discharge duct 29, arrange supply fan 30, drier 31 and air intake valve 32 in described admission line 28, described Exhaust fan 33 and drain tap 34, described Temperature Humidity Sensor 24, air pressure sensing gas 25, heater are set in discharge duct 29 27, supply fan 30 and exhaust fan 33 are connected with described controller 26.Temperature and humidity in Temperature Humidity Sensor monitoring warehouse, gas Air pressure in pressure sensor monitoring warehouse, when humidity is bigger, heater heats up so that moisture sufficiently enters air In, and open supply fan and exhaust fan, and the wet gas in warehouse is discharged, extraneous air is dried by drier Introduce, it is achieved the regulation to humidity.When temperature in warehouse is too low, the operating flexibility degree of maintainer can be affected, by heating Device heats up to provide for operating personnel and preferably overhauls environment, and drain tap and air intake valve can also coordinate exhaust fan to seek with ventilation fan Produce subnormal ambient, it is adaptable to the turnaround of unit that the most accurate, insulating requirements is high, powerful.Heater can use electric heating Silk heating, drier can use variable color silica gel, moreover it is possible to easily observes the service condition of drier, be beneficial to and Shi Genghuan.
Described warehouse 1 lower inside arranges one and irises out feed channel 35, uniform on described outlet pipe 35 arranges venthole 36. Outlet pipe arranges a circle, can be filled with bottom warehouse by outside air uniformly, it is simple to by the original damp-heat air in warehouse Discharge from top.
Embodiment four: transformer station's high pressure upkeep operation platform, including warehouse 1, arranges walking mechanism 2 below described warehouse 1, Described warehouse 1 one end connects 3 with headstock and connects, and described warehouse 1 other end arranges the hermatic door 5 imported and exported 4 and be disposed thereon, institute State warehouse 1 internal to include allocation and transportation device 6 that described warehouse is provided above, be arranged on described warehouse 1 inner bottom surface that to arrange maintenance flat Platform 7 and described inspection platform 7 adjacent arrange Work tool platform 8, be arranged on the deashing mechanism on described inspection platform 7 top with And it is arranged on the conditioner outside described warehouse 1.On the downside of described hermatic door 5 hinged with described warehouse 1, described hermatic door Automatic open-close mechanism is set on 5, the folding motor 37 that described automatic open-close mechanism is arranged in including described warehouse 1, described folding Motor 37 is in transmission connection with power transmission shaft 38, and described power transmission shaft 38 stretches out described warehouse 1 both sides, and described power transmission shaft 38 two ends are wound around and set Put 39, folding chain, described in open and be connected with described hermatic door 5 with chain 39, described power transmission shaft 38 two ends arrange block 40.Seal On the downside of Men hinged with warehouse, contact with ground on the upside of hermatic door when opening, facilitate staff upper and lower, the most beneficially power equipment Transport.Automatic open-close mechanism is rotated by power transmission shaft and is wound around folding chain or extends, it is achieved the folding to hermatic door controls. Power transmission shaft is arranged on the top of warehouse, and folding chain is connected with two ends on the upside of hermatic door, uses safer, and will not be to warehouse Interior space and staff's work impact.
5 weeks sides of described hermatic door arrange a circle groove 41, arrange pressure bladder 42, described pressure bladder in described groove 41 42 are connected with air pump 44 by pneumatic hose 43, and hermatic door exists gap with import and export after closing, now by air pump deliver to by Pressure bladder is propped up, to sealing gap, and this sealing means simple in construction, very easy to use, and when not sealing, Pressure bladder can be contracted in groove, will not should be extraneous sharp weapon and scratch and cause balloon rupture, affect sealing effectiveness.
The slide rail 45 that climbs is set in the middle of described hermatic door 5, described in climb to slide on slide rail 45 lifter plate 46, told liter be set On fall plate 46, static line body 47 is set.When power equipment needs to be transported in warehouse, first place it on lifter plate, with fixing Rope body is fixed, and uses the handling apparatus in warehouse to catch on power equipment, is then climbed on power equipment edge by handling apparatus Slide rail oblique lifting, it is achieved the transport of power equipment, it is ensured that the power equipment safety when carrying.
Described warehouse 1 is provided above derricking gear 48, if arranging derricking gear, need to install at warehouse correspondence position and reinforcing Beam, it is ensured that the solidness of warehouse, warehouse both sides are preferably provided the gimbal lever, it is ensured that the stability during handling.Arrange rises The power equipment in high-altitude can be installed or remove and lower by loop wheel machine structure, it is not necessary to extra crane helps, side Upkeep operation.
Embodiment five: it is with the difference of embodiment one to four: circular orbit 49 is set in described gripper shoe 16, described If arranging the deashing device being made up of dry bulb blade unit 50 on circular orbit 49, described ball blade unit 50 includes reverse V-shaped post 62, be arranged on the dust-separation cloth 63 in the middle of described reverse V-shaped post 62, be arranged on described reverse V-shaped post 62 bottom and with annular The spherical slide block 64 that track 49 matches.
Arranging and the bracing wire of spherical slide block secure fit foremost in described circular orbit 49, one end of described bracing wire sets Put open motor 51 other end arrange Guan Bi motor 56.
Described opening arranges deviation motor 55 between motor 51 and Guan Bi motor 56, described deviation motor 55 output shaft is arranged Be arranged on circular orbit 49 end and fixing ball blade unit 50 top is connected.
If arranging annular brace circle 54 between described dry bulb blade unit 50, the described gripper shoe 16 in described circular orbit 49 Upper annular arrange suction port 52 and be arranged on the ring-type jet in the middle part of circular orbit 49 end and fixing ball blade unit 50 Pipe 53 initiating terminal is connected, and on described air jet pipe 53, setting and described isolation cloth plane are the air nozzle 57 of fixed-direction and angle It is connected.
Described gripper shoe 16 top arranges working plate 61 by hydraulic stem 60, and described working plate 61 is in described endless glide 49, described suction port 52, described in open at motor 51, described Guan Bi motor 56 and described deviation motor 55, elastic cover plate be set 58。
58 weeks sides of described elastic cover plate arrange chevron shaped sealing ring.
In the present embodiment, use and circular orbit is set on the supporting plate, and setting can be with free-open-close on circular orbit If dry bulb blade unit composition airtight chamber so that the power equipment of Awaiting Overhaul, after being hoisted on working plate, passes through hydraulic pressure Working plate is declined by bar, and makes gripper shoe circular orbit thereon, suction port, opens motor, Guan Bi motor and deviation electricity The elastic cover plate arranged on it broken through by machine, then unclamps deviation motor so that ball blade unit resets, and by opening turning of motor Dynamic so that ball blade unit rotates along circular orbit, forms airtight chamber, by the air nozzle on ball blade unit so that its During winding-up, not only obtain good recoil strength so that the chamber that ball blade unit is formed is more airtight, and can be at ball Die cavity chamber interior walls forms whirlwind, it is possible to preferably removed by the dust on power equipment, and air jet pipe is connected respectively with suction port Common air pump and Negative pressure machine, so that this device is easy and simple to handle;Also it is more conducive to clean out dust thereon, it is to avoid During dismounting, the phenomenon that the dust caused owing to not carrying out deashing flashes and easily made a mess of by equipment.
It addition, use ball blade unit be made up of with dust-separation cloth reverse V-shaped post, this design can close with After occupy less space as far as possible, and provide a relatively flat and wide maintenance face, and control to beat by controller Driving motor, Guan Bi motor and deviation motor, so that it easily facilitates intelligence, and the air nozzle used can arrange literary composition in front portion Family name's pipe shower nozzle, so that the gas flow rate of ejection is higher, more conducively deashing, and during deashing, batch (-type) can be used It is cleaner that the mode of deashing makes that dust clears up;Annular brace ring is set on reverse V-shaped post top and is obtained in that guiding is made With so that it is airtight chamber can be formed smoothly and carry out dedusting.
Finally illustrating, above example is only in order to illustrate technical scheme and unrestricted, and this area is common Other amendment or equivalents that technical scheme is made by technical staff, without departing from technical solution of the present invention Spirit and scope, all should contain in the middle of scope of the presently claimed invention.

Claims (5)

1. transformer station's high pressure upkeep operation platform, including warehouse, arranges walking mechanism below described warehouse, described warehouse one end with Headstock connects, and the described warehouse other end arranges the hermatic door imported and exported and be disposed thereon, and described warehouse inner upper is arranged Allocation and transportation device, it is arranged on described warehouse inner bottom surface inspection platform is set and described inspection platform adjacent arranges Work tool and puts down Platform, being arranged on the deashing mechanism on described inspection platform top and be arranged on the conditioner outside described warehouse, it is special Levy and be: in the gripper shoe in described inspection platform, circular orbit is set, if arranging on described circular orbit by dry bulb sheet list The deashing device of unit's composition, described ball blade unit includes reverse V-shaped post, is arranged on the dust-separation in the middle of described reverse V-shaped post Cloth, it is arranged on described reverse V-shaped post bottom and the spherical slide block matched with described circular orbit, described Work tool platform bag Including rotary shaft, described rotary shaft arranges singletree, the end of described singletree arranges pallet, described rotary shaft and electric rotating machine Being in transmission connection, described warehouse lower inside arranges one and irises out feed channel, uniform on described outlet pipe arranges venthole;Described hang Shipping unit includes the translation slide rail that two side roof parts are arranged in described warehouse, and described translation slide rail arranges bridge formation, described bridge formation One end arranges translation motor and driving wheel, and described bridge formation arranges electric block, hinged with described warehouse on the downside of described hermatic door, Automatic open-close mechanism is set on described hermatic door, described hermatic door week side one circle groove is set, in described groove, blanket gas is set Capsule, described pressure bladder is connected with air pump by pneumatic hose, and the setting of described hermatic door centre is climbed slide rail, described in climb slide rail Upper slip arranges lifter plate, and told lifter plate arranges static line body, and described warehouse is provided above derricking gear.
Transformer station the most according to claim 1 high pressure upkeep operation platform, it is characterised in that: described inspection platform includes propping up Support frame frame, both sides, described support frame upper end arrange chute, and corresponding described chute slides above in described support frame and arranges institute Stating gripper shoe, described gripper shoe end arranges translation supporting mechanism, arranges rinsing table in described support frame.
Transformer station the most according to claim 2 high pressure upkeep operation platform, it is characterised in that: described rinsing table uses ultrasonic Ripple cleaning machine, in described support frame, corresponding described support plate edge activity arranges sealing ring.
Transformer station the most according to claim 2 high pressure upkeep operation platform, it is characterised in that: arrange in described circular orbit With the bracing wire of spherical slide block secure fit foremost, one end setting of described bracing wire is opened the motor other end and is arranged Guan Bi electricity Machine, described in open between motor and Guan Bi motor deviation motor be set, described deviation motor output shaft arranges and is arranged on annular Track end and fixing ball blade unit top are connected, and described gripper shoe top arranges working plate, described work by hydraulic stem Make plate described endless glide, described suction port, described in open at motor, described Guan Bi motor and described deviation motor arrange Elastic cover plate, described elastic cover plate week side chevron shaped sealing ring is set.
Transformer station the most according to claim 4 high pressure upkeep operation platform, it is characterised in that: if described dry bulb blade unit it Between annular brace circle is set, in the described gripper shoe in described circular orbit annular arrange suction port and be arranged on circular orbit Ring-type air jet pipe initiating terminal in the middle part of end and fixing ball blade unit is connected, and described air jet pipe is arranged and described isolation cloth Plane is that fixed-direction is connected with the air nozzle of angle;Described conditioner includes Temperature Humidity Sensor, air pressure sensing Device, controller, heater, admission line and discharge duct, arrange supply fan, drier and intake valve in described admission line Door, arranges exhaust fan and drain tap, described Temperature Humidity Sensor, air pressure sensing gas, heater, air inlet in described discharge duct Fan and exhaust fan are connected with described controller.
CN201610443597.6A 2016-06-20 2016-06-20 Transformer substation high voltage overhaul work platform Withdrawn CN105914627A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610443597.6A CN105914627A (en) 2016-06-20 2016-06-20 Transformer substation high voltage overhaul work platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610443597.6A CN105914627A (en) 2016-06-20 2016-06-20 Transformer substation high voltage overhaul work platform

Publications (1)

Publication Number Publication Date
CN105914627A true CN105914627A (en) 2016-08-31

Family

ID=56758201

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610443597.6A Withdrawn CN105914627A (en) 2016-06-20 2016-06-20 Transformer substation high voltage overhaul work platform

Country Status (1)

Country Link
CN (1) CN105914627A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106374373A (en) * 2016-11-10 2017-02-01 南京铁道职业技术学院 Open-close type transformer substation centralized dispatching system and method
CN106374372A (en) * 2016-11-10 2017-02-01 南京铁道职业技术学院 Convenient-to-connect transformer substation dispatching system and method
CN106374374A (en) * 2016-11-10 2017-02-01 南京铁道职业技术学院 Substation scheduling system equipped with stoppers and method thereof
CN106364859A (en) * 2016-11-10 2017-02-01 南京铁道职业技术学院 Transformer substation dispatching system facilitating appearance and method of transformer substation dispatching system
CN106384958A (en) * 2016-11-10 2017-02-08 南京铁道职业技术学院 High-flexibility transformer substation centralized scheduling system and method thereof
CN106451153A (en) * 2016-11-10 2017-02-22 南京铁道职业技术学院 System and method for dispatching transformer substations
CN107332143A (en) * 2016-11-19 2017-11-07 国网河南省电力公司周口供电公司 A kind of urban distribution network miniature transformer assistance platform

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106374373A (en) * 2016-11-10 2017-02-01 南京铁道职业技术学院 Open-close type transformer substation centralized dispatching system and method
CN106374372A (en) * 2016-11-10 2017-02-01 南京铁道职业技术学院 Convenient-to-connect transformer substation dispatching system and method
CN106374374A (en) * 2016-11-10 2017-02-01 南京铁道职业技术学院 Substation scheduling system equipped with stoppers and method thereof
CN106364859A (en) * 2016-11-10 2017-02-01 南京铁道职业技术学院 Transformer substation dispatching system facilitating appearance and method of transformer substation dispatching system
CN106384958A (en) * 2016-11-10 2017-02-08 南京铁道职业技术学院 High-flexibility transformer substation centralized scheduling system and method thereof
CN106451153A (en) * 2016-11-10 2017-02-22 南京铁道职业技术学院 System and method for dispatching transformer substations
CN106374372B (en) * 2016-11-10 2018-08-03 南京铁道职业技术学院 System and method are dispatched convenient for the substation of connection
CN107332143A (en) * 2016-11-19 2017-11-07 国网河南省电力公司周口供电公司 A kind of urban distribution network miniature transformer assistance platform
CN107332143B (en) * 2016-11-19 2019-03-22 国网河南省电力公司周口供电公司 A kind of urban distribution network miniature transformer assistance platform

Similar Documents

Publication Publication Date Title
CN105914627A (en) Transformer substation high voltage overhaul work platform
CN105914626A (en) Movable maintenance square warehouse
CN106229868A (en) The regulator cubicle maintenance of a kind of transformer station monitors scavenging system with condensation
CN101972726A (en) Hydraulic cylinder surface shot blasting, paint spraying and drying system and shot blasting, paint spraying and drying process thereof
CN201815459U (en) Hydraulic cylinder surface shot-blasting paint-spraying drying system
CN109303515A (en) A kind of side compression type high-rise glass curtain cleaning special equipment
CN205921273U (en) High pressure overhauls work platform
CN106090957A (en) A kind of towed chimney cleaning plant and method for cleaning
CN106733355A (en) For the paint finishing of application inner-walls of duct
CN109552905A (en) Dust unloads ash trapping integrated apparatus
CN106025889A (en) Multifunctional power taking and overhaul system
CN107131743A (en) One kind is used for solar silicon wafers drying plant
CN113581882A (en) Ore aggregate machine-made sand dust removal charging devices
CN106129875A (en) A kind of online transformer station Quick overhaul platform
CN209334047U (en) A kind of mist cleaning system
CN105932582A (en) Configuration-based high-voltage maintenance operation platform
CN105896359A (en) Mobile square bin-based comprehensive maintenance system for combined electrical appliance
CN209334046U (en) A kind of paint spraying apparatus with Recovery Purifying function
CN106129878A (en) A kind of comprehensive examination and repair system for power switch cabinet
CN205680986U (en) Disconnecting switch comprehensive test device
CN106058696A (en) Isolating switch comprehensive overhauling system based on mobile square cabin
CN205680985U (en) Comprehensive testing device for transformer
CN207879280U (en) A kind of movable environmental protection hole flushing device
CN205680984U (en) System for Circuit Breaker monitoring device
CN211846437U (en) Negative pressure dust removal closed system for unloading bulk cargo

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C04 Withdrawal of patent application after publication (patent law 2001)
WW01 Invention patent application withdrawn after publication

Application publication date: 20160831