CN105908991A - 一种楼板悬挂式逆向拆除施工方法 - Google Patents
一种楼板悬挂式逆向拆除施工方法 Download PDFInfo
- Publication number
- CN105908991A CN105908991A CN201610243653.1A CN201610243653A CN105908991A CN 105908991 A CN105908991 A CN 105908991A CN 201610243653 A CN201610243653 A CN 201610243653A CN 105908991 A CN105908991 A CN 105908991A
- Authority
- CN
- China
- Prior art keywords
- floor
- construction method
- lifting rope
- hole
- hoist
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/08—Wrecking of buildings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/08—Wrecking of buildings
- E04G23/082—Wrecking of buildings using shears, breakers, jaws and the like
Abstract
本发明公开了一种楼板悬挂式逆向拆除施工方法,包括以下步骤:沿待拆除楼板四边使用机械凿出一圈宽缝,并保留钢筋;在待拆除楼板上开设一个吊装孔;安装吊具及吊绳,所述吊具的一端固定于周边固定结构上,所述吊具的另一端通过吊绳固定于楼板的吊装孔处;张紧吊绳;割断三边钢筋,保留一边钢筋;慢慢放松吊绳,使待拆除楼板下放至自然垂体状态;拆除吊具,凿除楼板,割断保留的那一边钢筋。本发明对上部空间受限无法正向拆除的楼板进行反向拆除施工,解决了正向拆除施工难以顺利开展的难题,免去了反向拆除施工时大面积开凿的高强度施工,提高了特殊条件下楼板拆除的施工效率。
Description
技术领域
本发明涉及钢筋混凝土结构拆除,具体涉及一种楼板悬挂式逆向拆除施工方法。
背景技术
随着现代建筑业的迅速发展,因使用功能改变或需要扩容等因素影响,旧建筑的改扩建工程也日益增多,其中不乏现有常规施工技术难以顺利完成的工程。
在传统的改扩建工程中,楼板的拆除通常采用风镐、盘锯等机械设备于板面进行拆除施工。然而当楼板上部的施工空间受到周边环境的制约,如加盖新结构楼板导致的上部操作空间受限,将难以采用传统的正向拆除方法,而在板底进行反向凿除楼板,不仅施工强度高,且效率低下。
发明内容
本发明为了克服以上不足,提供了一种既可以降低施工强度,又能提高施工效率的楼板悬挂式逆向拆除施工方法。
为了解决上述技术问题,本发明的技术方案是:
一种楼板悬挂式逆向拆除施工方法,包括以下步骤:
S1:沿待拆除楼板四边使用机械凿出一圈宽缝,并保留钢筋;
S2:在待拆除楼板上开设一个吊装孔;
S3:安装吊具及吊绳,所述吊具的一端固定于周边固定结构上,所述吊具的另一端通过吊绳固定于楼板的吊装孔处;
S4:张紧吊绳;
S5:割断三边钢筋,保留一边钢筋;
S6:慢慢放松吊绳,使待拆除楼板下放至自然垂体状态;
S7:拆除吊具,凿除楼板,割断保留的那一边钢筋。
进一步的,所述步骤S1中,所述机械为手持风镐。
进一步的,所述步骤S2中,所述吊装孔的直径大于吊绳的直径。
进一步的,所述步骤S3中,吊具及吊绳的承载力大于所述楼板的自重。
进一步的,所述步骤S4中,所述吊绳通过一固定装置固定于楼板的吊装孔处。
进一步的,所述步骤S4中,所述固定装置包括:一设置于吊装孔下方的横向挡板,所述吊绳穿过吊装孔与所述横向挡板固定连接,所述横向挡板的大小大于所述吊装孔的大小。
进一步的,所述步骤S5中,,保留远离吊装孔的那一边钢筋。
本发明提供的楼板悬挂式逆向拆除施工方法,将楼板凿透三边并吊放至垂直状态,利用单边悬挂后凿除的方法,不仅解决了上部空间受限无法施工的问题,而且降低了板底反向凿除的施工强度和安全风险。本发明将原本反向施工的拆除工作转化为侧向破碎,化繁为简,大大提高了工作效率。
附图说明
图1是本发明楼板悬挂式逆向拆除施工方法的流程图;
图2是本发明楼板悬挂式逆向拆除施工方法的平面示意图;
图3是本发明楼板悬挂式逆向拆除施工方法的剖面示意图。
图2-3中所示:1、待拆除楼板;2、宽缝;3、吊绳;4、周边固定结构;5、吊装孔;6、梁;7、吊具;8、固定装置。
具体实施方式
以下结合附图和具体实施例对本发明提出的楼板悬挂式逆向拆除施工方法作进一步详细说明。根据下面的说明和权利要求书,本发明的优点和特征将更清楚。以下将由所列举之实施例结合附图,详细说明本发明的技术内容及特征。需另外说明的是,附图均采用非常简化的形式且均使用非精准的比例,仅用以方便、明晰地辅助说明本发明实施例的目的。为叙述方便,下文中所述的“上”、“下”与附图的上、下的方向一致,但这不能成为本发明技术方案的限制。
如图1-3所示,本发明提供一种楼板悬挂式逆向拆除施工方法,包括以下步骤:
S1:沿待拆除楼板1四边使用机械凿出一圈宽缝2,并保留四边钢筋;其中,所述机械为手持风镐;优选的,所述宽缝2宽度为200-500mm。
S2:在待拆除楼板1上开设一个吊装孔5。优选的,所述吊装孔5的直径大于吊绳3的直径,优选为200mm-300mm。
S3:安装吊具7及吊绳3,所述吊具7的一端固定于周边固定结构4上,所述吊具7的另一端通过吊绳3固定于楼板1的吊装孔5处。优选的,所述吊具7及所述吊绳3承载力应大于楼板1自重。所述吊绳3的直径由承载力计算确定。
S4:张紧吊绳3。吊绳3跨过梁6后固定于楼板吊装孔5。优选的,所述吊绳3通过一固定装置8固定于楼板1的吊装孔5处。所述固定装置8包括一设置于吊装孔5下方的横向挡板,所述吊绳3穿过吊装孔5与所述横向挡板固定连接,所述横向挡板的大小大于所述吊装孔5的大小。所述固定装置8的结构简单,使用方便,当然也可以采用其他结构形式的固定装置8,只要能够使得吊绳3固定于楼板1的吊装孔5处即可。
S5:割断待拆除楼板1三边钢筋,保留一边钢筋。优选的,为了吊放方便、省力,保留楼板1上远离所述吊装孔5的那一边钢筋。
S6:慢慢放松吊绳3,使楼板1下放至自然垂体状态。
S7:拆除吊具7,凿除楼板1,割断保留的那一边钢筋。优选的,在步骤S7中,如登高施工可采用门式脚手架。
综上所述,采用本发明楼板悬挂式逆向拆除施工方法,将待拆除楼板1凿透三边并吊放至垂直状态,利用单边悬挂后凿除的方法,不仅解决了上部空间受限无法施工的问题,而且降低了板底反向凿除的施工强度和安全风险。该发明将原本反向施工的拆除工作转化为侧向破碎,化繁为简,大大提高了工作效率。
虽然说明书中对本发明的实施方式进行了说明,但这些实施方式只是作为提示,不应限定本发明的保护范围。在不脱离本发明宗旨的范围内进行各种省略、置换和变更均应包含在本发明的保护范围内。
Claims (10)
1.一种楼板悬挂式逆向拆除施工方法,其特征在于,包括以下步骤:
S1:沿待拆除楼板四边使用机械凿出一圈宽缝,并保留钢筋;
S2:在待拆除楼板上开设一个吊装孔;
S3:安装吊具及吊绳,所述吊具的一端固定于周边固定结构上,所述吊具的另一端通过吊绳固定于楼板的吊装孔处;
S4:张紧吊绳;
S5:割断三边钢筋,保留一边钢筋;
S6:慢慢放松吊绳,使待拆除楼板下放至自然垂体状态;
S7:拆除吊具,凿除楼板,割断保留的那一边钢筋。
2.根据权利要求1所述的楼板悬挂式逆向拆除施工方法,其特征在于,所述步骤S1中,所述机械为手持风镐。
3.根据权利要求1所述楼板悬挂式逆向拆除施工方法,其特征在于,所述步骤S2中,所述吊装孔的直径大于吊绳的直径。
4.根据权利要求3所述的楼板悬挂式逆向拆除施工方法,其特征在于,所述吊装孔的直径为200mm-300mm。
5.根据权利要求1所述的楼板悬挂式逆向拆除施工方法,其特征在于,所述步骤S3中,吊具及吊绳的承载力大于所述楼板的自重。
6.根据权利要求5所述楼板悬挂式逆向拆除施工方法,其特征在于,所述步骤S4中,所述吊绳通过一固定装置固定于楼板的吊装孔处。
7.根据权利要求1所述的楼板悬挂式逆向拆除施工方法,其特征在于,所述步骤S4中,所述固定装置包括一设置于吊装孔下方的横向挡板,所述吊绳穿过吊装孔与所述横向挡板固定连接,所述横向挡板的大小大于所述吊装孔的大小。
8.根据权利要求1所述的楼板悬挂式逆向拆除施工方法,其特征在于,在步骤S7中,如登高施工可采用门式脚手架。
9.根据权利要求1所述的楼板悬挂式逆向拆除施工方法,其特征在于,所述宽缝的宽度为200-500mm。
10.根据权利要求1-9中任意一项所述的楼板悬挂式逆向拆除施工方法,其特征在于,所述步骤S5中,保留远离吊装孔的那一边钢筋。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2015110301777 | 2015-12-31 | ||
CN201511030177 | 2015-12-31 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105908991A true CN105908991A (zh) | 2016-08-31 |
CN105908991B CN105908991B (zh) | 2018-02-09 |
Family
ID=56747679
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610243653.1A Active CN105908991B (zh) | 2015-12-31 | 2016-04-19 | 一种楼板悬挂式逆向拆除施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105908991B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108708566A (zh) * | 2018-05-28 | 2018-10-26 | 中国二十二冶集团有限公司 | 超高超大混凝土平台大梁拆除施工方法 |
CN108756295A (zh) * | 2018-06-14 | 2018-11-06 | 上海二十冶建设有限公司 | 新增净循环冷却塔的原水池平台拆除方法 |
CN109252693A (zh) * | 2018-08-28 | 2019-01-22 | 上海建工七建集团有限公司 | 无支撑底托的混凝土支护体系机械分段切割施工方法 |
CN114278114A (zh) * | 2022-02-09 | 2022-04-05 | 中建八局深圳科创发展有限公司 | 高层建筑外多层连续悬挑板拆除方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101832034A (zh) * | 2010-04-22 | 2010-09-15 | 上海市第一建筑有限公司 | 结构整体逆向置换施工方法 |
CN102650170A (zh) * | 2012-05-03 | 2012-08-29 | 中国十七冶集团有限公司 | 一种设备混凝土基础无振动切割方法 |
CN102808526A (zh) * | 2011-06-01 | 2012-12-05 | 永升建设集团有限公司 | 钢筋混凝土框架梁无损拆除施工方法 |
CN103291085A (zh) * | 2013-06-07 | 2013-09-11 | 陈春来 | 混凝土静力切割拆除施工方法 |
JP2014001561A (ja) * | 2012-06-19 | 2014-01-09 | Kajima Corp | 解体方法、解体補助装置 |
JP2014047479A (ja) * | 2012-08-30 | 2014-03-17 | Takenaka Komuten Co Ltd | 解体建物への解体重機揚重方法 |
-
2016
- 2016-04-19 CN CN201610243653.1A patent/CN105908991B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101832034A (zh) * | 2010-04-22 | 2010-09-15 | 上海市第一建筑有限公司 | 结构整体逆向置换施工方法 |
CN102808526A (zh) * | 2011-06-01 | 2012-12-05 | 永升建设集团有限公司 | 钢筋混凝土框架梁无损拆除施工方法 |
CN102650170A (zh) * | 2012-05-03 | 2012-08-29 | 中国十七冶集团有限公司 | 一种设备混凝土基础无振动切割方法 |
JP2014001561A (ja) * | 2012-06-19 | 2014-01-09 | Kajima Corp | 解体方法、解体補助装置 |
JP2014047479A (ja) * | 2012-08-30 | 2014-03-17 | Takenaka Komuten Co Ltd | 解体建物への解体重機揚重方法 |
CN103291085A (zh) * | 2013-06-07 | 2013-09-11 | 陈春来 | 混凝土静力切割拆除施工方法 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108708566A (zh) * | 2018-05-28 | 2018-10-26 | 中国二十二冶集团有限公司 | 超高超大混凝土平台大梁拆除施工方法 |
CN108756295A (zh) * | 2018-06-14 | 2018-11-06 | 上海二十冶建设有限公司 | 新增净循环冷却塔的原水池平台拆除方法 |
CN109252693A (zh) * | 2018-08-28 | 2019-01-22 | 上海建工七建集团有限公司 | 无支撑底托的混凝土支护体系机械分段切割施工方法 |
CN114278114A (zh) * | 2022-02-09 | 2022-04-05 | 中建八局深圳科创发展有限公司 | 高层建筑外多层连续悬挑板拆除方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105908991B (zh) | 2018-02-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105908991A (zh) | 一种楼板悬挂式逆向拆除施工方法 | |
CN105888294B (zh) | 一种链锯逆拆楼板施工方法 | |
CN109235290A (zh) | 桥梁安拆施工方法 | |
CN108560560A (zh) | 一种基坑围护结构的拆除方法 | |
CN204552119U (zh) | 一种梁筋架立绑扎装置 | |
CN206189270U (zh) | 一种整体式牵引及轨道组合结构 | |
JP2017115331A (ja) | 橋の構築方法 | |
CN204112242U (zh) | 一种钢管混凝土桁架拱桥吊杆更换专用工具吊杆系统 | |
CN110409378A (zh) | 用于大型渠道的不停水检修方法 | |
CN106087698A (zh) | 一种钻孔桩移动式施工操作平台 | |
CN109230966A (zh) | 一种用于矿井提升机的矿井井口防护装置 | |
CN108252218A (zh) | 一种大跨度提篮拱桥钢拱肋外包混凝土底模滑移装置 | |
CN207878284U (zh) | 贝雷梁索鞍吊装支架 | |
CN205676920U (zh) | 一种地铁车站混凝土支撑绳锯拆除预埋套管结构 | |
CN204001751U (zh) | 超高层钢结构施工悬挑卸料平台 | |
CN209179001U (zh) | 一种快速凿桩头装置 | |
CN209081297U (zh) | 一种倾斜断裂塔吊的加固装置 | |
CN202897816U (zh) | 一种钢筋吊钩 | |
CN205932883U (zh) | 竖井施工罐笼 | |
CN105060124A (zh) | 一种框架内龙门吊系统及其吊装使用方法 | |
CN105178416A (zh) | 箱涵水下接入施工方法 | |
CN211522822U (zh) | 一种配合隧道盾构施工用栈桥钢结构 | |
CN204174518U (zh) | 一种桥面桁架式工具吊杆系统 | |
CN104370202B (zh) | 一种管片吊具 | |
CN204022373U (zh) | 用于顶推临时支撑件拆除用的吊装设备 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20160831 Assignee: Shanghai Yuxia Construction Engineering Co.,Ltd. Assignor: SHANGHAI NO.7 CONSTRUCTION Co.,Ltd. Contract record no.: X2021310000010 Denomination of invention: A construction method of floor suspended reverse demolition Granted publication date: 20180209 License type: Common License Record date: 20210402 |
|
EE01 | Entry into force of recordation of patent licensing contract |