CN105888063A - Structural steel and column beam joint connecting device and construction method thereof - Google Patents

Structural steel and column beam joint connecting device and construction method thereof Download PDF

Info

Publication number
CN105888063A
CN105888063A CN201610395151.0A CN201610395151A CN105888063A CN 105888063 A CN105888063 A CN 105888063A CN 201610395151 A CN201610395151 A CN 201610395151A CN 105888063 A CN105888063 A CN 105888063A
Authority
CN
China
Prior art keywords
web
screw sleeve
rustless steel
muscle
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610395151.0A
Other languages
Chinese (zh)
Inventor
张海云
关朝辉
白小青
李伟
张丽丽
姜彦军
董经民
赵亚东
万磊
李玉明
王泽江
吕薇
翟桂庆
王正泽
齐胜利
马永花
王志刚
黄普
韩丽霞
侯晓敏
裴毅明
梁胖胖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Construction Engineering Group Co Ltd
Original Assignee
Shanxi Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Construction Engineering Group Co Ltd filed Critical Shanxi Construction Engineering Group Co Ltd
Priority to CN201610395151.0A priority Critical patent/CN105888063A/en
Publication of CN105888063A publication Critical patent/CN105888063A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2406Connection nodes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2415Brackets, gussets, joining plates
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2418Details of bolting
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2427Connection details of the elongated load-supporting parts using adhesives or hardening masses

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a structural steel and column beam joint connecting device and a construction method thereof, and belongs to the technical field of construction. The connecting device comprises stainless steel straight-thread sleeves, four flange plates, frame beam main reinforcing steel ribs, a middle web, a left web and a right web. The middle web and any two flange plates form an H shape. One end of the left web and one end of the right web form two T shapes together with the other two flange plates respectively. The other end of the left web and the other end of the right web are fixed to the centers of the two side faces of the middle web forming the H shape respectively. The two ends of the outer side face of each flange plate are symmetrically provided with the corresponding stainless steel straight-thread sleeves respectively. The two sides of the middle web, the two sides of the left web and the two sides of the right web on one side of the flange plates are each symmetrically provided with the corresponding stainless steel straight-thread sleeves respectively. The frame beam main reinforcing steel ribs are arranged on the stainless steel straight-thread sleeves respectively. One end of each frame beam main reinforcing steel rib is connected with the corresponding stainless steel straight-thread sleeve through a screw thread, and the other end of each frame beam main reinforcing steel rib is welded to the other reinforcing steel ribs. The connecting device has the advantages that quality is ensured and benefits are high.

Description

A kind of steel pier joint connection and construction method thereof
Technical field
The invention belongs to technical field of building construction, be specifically related to a kind of steel pier joint connection and construction method thereof.
Background technology
The construction of type steel-concrete combined structure is complex, the connection that is mainly manifested between reinforcing bar and steel structure member and Cross-operation aspect.The conventional construction method of the main muscle of beam stress is, welding node steel plate on the post edge of a wing, is welded by the main muscle of beam It is connected on gusset plate;Or muscle is worn in punching on flange plate.If the method using above-mentioned gusset plate welded reinforcement, by In being affected by gap, inner side reinforcing bar is difficult to ensure that welding quality, there is hidden danger of quality.If using the method that muscle is worn in punching, Punching quantity is more, and required precision is higher, and quality is difficult to ensure.
By the technical improvements to joint structure, the main muscle of beam stress at bean column node uses straight screw sleeve to connect, Not only solve cross-operation construction difficult problem, and improve construction speed, it is ensured that construction quality, reduce construction cost, Improve efficiency of construction.
Summary of the invention
It is an object of the invention to as solving to be connected between reinforcing bar with steel structure member in construction and the weldering of existence during cross-operation Connect the problem that quality cannot ensure, and a kind of steel pier joint connection is provided.
Another goal of the invention of the present invention is to provide the method utilizing this device to carry out constructing.
For achieving the above object, the technical solution adopted in the present invention is: a kind of steel pier joint connection, wherein: Advocated muscle, median ventral plate, left web, right web including rustless steel straight screw sleeve, 4 blocks of flange plates, Vierendeel girder;Described In median ventral plate and 4 blocks of flange plates, any two blocks of flange plates are fixing connects and becomes an I-shaped, described left web and right abdomen One end of plate is fixing with remaining two blocks of flange plate respectively to be connected and becomes two " " fonts;Described left web is another with right web One end is separately fixed at the center of the median ventral plate two sides of formation " work " shape;At the lateral surface two ends of every block of flange plate all It is symmetrical arranged rustless steel straight screw sleeve, is positioned at the two sides of the median ventral plate of 4 blocks of flange plates, left web and right web also All it is symmetrical arranged rustless steel straight screw sleeve, each rustless steel straight screw sleeve is respectively provided with Vierendeel girder and is advocated muscle, and institute Stating every Vierendeel girder to be all connected with each rustless steel straight screw sleeve by screw thread by the one end of muscle of advocating, the other end is fixed on frame The main muscle of beam stress.
A kind of method utilizing above-mentioned steel pier joint connection to construct of the present invention, wherein: comprise the following steps:
Two pieces of assemblings any in median ventral plate and 4 blocks of flange plates full penetration are first become an I-shaped by the first step;
Second step, more left web is become two " " with remaining two pieces of flange plate full penetration respectively with one end of right web Font;
3rd step, then by the other end of above-mentioned left web and right web full penetration respectively in the midfield forming " work " shape The center of plate two sides, the assembly welding of framework completes;
4th step, makes a call to 45 by rustless steel straight screw sleeve.Groove, then by rustless steel straight screw sleeve full penetration in The lateral surface two ends of every block of flange plate, it is positioned at the two sides of 4 blocks of flange plates median ventral plate on one side, left web and right web;
5th step, carries out 100% ultrasonic examination process by the circular weld of each for full penetration rustless steel straight screw sleeve, Manufacture steel pier joint connection main body;
6th step, is transported to job site by steel pier joint connection main body, installs after fixing, by Vierendeel girder stress Main muscle is screwed in rustless steel straight screw sleeve be fixed by screw thread, and qualified with Torque wrench detection;
7th step, the muscle other end of being advocated by Vierendeel girder muscle of being advocated with grid beam welds or colligation is in the little place of beam stress;
8th step, uses multi-layer sheet thick for 15mm all to close fixing by above-mentioned attachment means, then uses concreting Molding.
The present invention uses straight screw sleeve by the technical improvements to joint structure, the main muscle of beam stress at bean column node Connect, not only solve cross-operation construction difficult problem, and improve construction speed, it is ensured that construction quality, reduce and execute Work cost, improves efficiency of construction.
Therefore, compared with prior art, the present invention has easy for installation, quick, it is ensured that quality, the advantage of high efficiency.
Accompanying drawing explanation
Fig. 1 is the planar structure schematic diagram of the present invention.
Fig. 2 is the side structure schematic diagram of the present invention.
Detailed description of the invention
As shown in Figure 1 and Figure 2, a kind of steel pier joint connection in the present embodiment, wherein: include the straight spiral shell of rustless steel 1,4 blocks of flange plates 2 of stricture of vagina sleeve, Vierendeel girder are advocated muscle 3, median ventral plate 4, left web 5, right web 6;Described midfield Plate 4 two block flange plates any with 4 blocks of flange plates 22 are fixing is connected and becomes an I-shaped, described left web 5 and One end of right web 6 is fixed with remaining two blocks of flange plate 2 respectively and is connected and becomes two " " fonts;Described left web 5 with The other end of right web 6 is separately fixed at the center of median ventral plate 4 two sides of formation " work " shape;At every block of flange plate The lateral surface two ends of 2 are all symmetrical arranged rustless steel straight screw sleeve 1, be positioned at 4 blocks of flange plates 2 median ventral plate 4, Left web 5 is the most all symmetrical arranged rustless steel straight screw sleeve 1, at each rustless steel straight screw sleeve with the two sides of right web 6 Be respectively provided with Vierendeel girder on 1 to be advocated muscle 3, and described every Vierendeel girder by muscle 3 of advocating one end all by screw thread and each not Rust steel straight screw sleeve 1 connects, and the other end is fixed on grid beam is advocated muscle.
A kind of method utilizing above-mentioned steel pier joint connection to construct of the present embodiment, wherein: comprise the following steps:
The first step, first assembles any with 4 blocks of flange plates 2 for median ventral plate 4 two pieces and full penetration becomes " work " word Shape;
Second step, more left web 5 is become two with remaining two pieces of flange plate 2 full penetration respectively with one end of right web 6 " " font;
3rd step, is then forming " work " shape by the other end full penetration respectively of above-mentioned left web 5 with right web 6 The center of median ventral plate 4 two sides, the assembly welding of framework completes;
4th step, makes a call to 45 by rustless steel straight screw sleeve 1.Groove, then welds rustless steel straight screw sleeve 1 full penetration It is connected to the lateral surface two ends of 2 every block of flange plates 2, is positioned at 4 blocks of flange plates 2 median ventral plate 4, left web 5 and right abdomen on one side The two sides of plate 6;
5th step, is carried out the circular weld of each for full penetration rustless steel straight screw sleeve 1 at 100% ultrasonic examination Reason, manufactures steel pier joint connection main body;
6th step, is transported to job site by steel pier joint connection main body, installs after fixing, by Vierendeel girder stress Main muscle 3 is screwed in rustless steel straight screw sleeve 1 be fixed by screw thread, and qualified with Torque wrench detection;
7th step, muscle 3 other end of being advocated by Vierendeel girder muscle of being advocated with grid beam welds or colligation is in the little place of beam stress;
8th step, uses multi-layer sheet thick for 15mm all to close fixing by above-mentioned attachment means, then uses concreting Molding.
The present invention a kind of steel pier joint connection, in concrete construction, is unit according to said structure, according to construction Specific requirement carry out designed size.

Claims (2)

1. a steel pier joint connection, is characterized in that: include rustless steel straight screw sleeve (1), 4 pieces of edges of a wing Plate (2), Vierendeel girder are advocated muscle (3), median ventral plate (4), left web (5), right web (6);Described median ventral plate (4) Two piece flange plates (2) any with 4 pieces of flange plates (2) are fixing is connected and becomes an I-shaped, described left web (5) Fix with remaining two pieces of flange plate (2) respectively with one end of right web (6) and be connected and become two " " fonts;A described left side The other end of web (5) and right web (6) is separately fixed at the center of median ventral plate (4) two sides of formation " work " shape Position;All it is symmetrical arranged rustless steel straight screw sleeve (1) at the lateral surface two ends of every block of flange plate (2), is positioned at 4 pieces The two sides of flange plate (2) median ventral plate (4), left web (5) and right web (6) on one side is the most all symmetrical arranged rustless steel Straight screw sleeve (1), is respectively provided with Vierendeel girder on each rustless steel straight screw sleeve (1) and is advocated muscle (3), and described Every Vierendeel girder is all connected with each rustless steel straight screw sleeve (1) by screw thread by the one end of muscle (3) of advocating, the other end It is fixed on grid beam to be advocated muscle.
2. the method utilizing the steel pier joint connection described in claim 1 to construct, is characterized in that: include Following steps:
The first step, first assembles any with 4 pieces of flange plates (2) for median ventral plate (4) two pieces and full penetration becomes one " work " Font;
Second step, then by one end of left web (5) and right web (6) respectively with remaining two pieces of flange plate (2) full penetration It is welded into two " " fonts;
3rd step, is then forming " work " by the other end full penetration respectively of above-mentioned left web (5) with right web (6) The center of median ventral plate (4) two sides of shape, the assembly welding of framework completes;
4th step, makes a call to 45 ° of grooves, then by rustless steel straight screw sleeve (1) fine melt by rustless steel straight screw sleeve (1) Thoroughly be welded in (2) every block of flange plate (2) lateral surface two ends, be positioned at 4 pieces of flange plates (2) median ventral plate (4) on one side, Left web (5) and the two sides of right web (6);
5th step, carries out 100% ultrasonic examination by the circular weld of each for full penetration rustless steel straight screw sleeve (1) Process, manufacture steel pier joint connection main body;
6th step, is transported to job site by steel pier joint connection main body, installs after fixing, by Vierendeel girder stress Main muscle (3) is screwed in rustless steel straight screw sleeve (1) be fixed by screw thread, and qualified with Torque wrench detection;
7th step, muscle (3) other end of being advocated by Vierendeel girder muscle of being advocated with grid beam welds or colligation is in the little place of beam stress;
8th step, uses multi-layer sheet thick for 15mm all to close fixing by above-mentioned attachment means, then uses concreting Molding.
CN201610395151.0A 2016-06-06 2016-06-06 Structural steel and column beam joint connecting device and construction method thereof Pending CN105888063A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610395151.0A CN105888063A (en) 2016-06-06 2016-06-06 Structural steel and column beam joint connecting device and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610395151.0A CN105888063A (en) 2016-06-06 2016-06-06 Structural steel and column beam joint connecting device and construction method thereof

Publications (1)

Publication Number Publication Date
CN105888063A true CN105888063A (en) 2016-08-24

Family

ID=56710800

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610395151.0A Pending CN105888063A (en) 2016-06-06 2016-06-06 Structural steel and column beam joint connecting device and construction method thereof

Country Status (1)

Country Link
CN (1) CN105888063A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112575896A (en) * 2020-12-29 2021-03-30 中铁三局集团建筑安装工程有限公司 Complex steel reinforced concrete composite structure and construction method
CN113152679A (en) * 2021-05-28 2021-07-23 广州市房屋开发建设有限公司 Steel structure node and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101333825A (en) * 2008-08-06 2008-12-31 北京首钢建设集团有限公司 Construction Method of Transfer Floor of Frame-supported Steel Concrete Beam Structure of High-Rise Building
CN203284893U (en) * 2013-06-05 2013-11-13 山东淄建集团有限公司 Connecting device of section steel columns and steel bars of beam column joints
CN103669572A (en) * 2012-09-24 2014-03-26 贵阳铝镁设计研究院有限公司 Construction method and structure for beam column joints in steel reinforced concrete structure
CN105040817A (en) * 2015-07-30 2015-11-11 北京建筑大学 Prestressed assembled middle column steel frame recoverable in function

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101333825A (en) * 2008-08-06 2008-12-31 北京首钢建设集团有限公司 Construction Method of Transfer Floor of Frame-supported Steel Concrete Beam Structure of High-Rise Building
CN103669572A (en) * 2012-09-24 2014-03-26 贵阳铝镁设计研究院有限公司 Construction method and structure for beam column joints in steel reinforced concrete structure
CN203284893U (en) * 2013-06-05 2013-11-13 山东淄建集团有限公司 Connecting device of section steel columns and steel bars of beam column joints
CN105040817A (en) * 2015-07-30 2015-11-11 北京建筑大学 Prestressed assembled middle column steel frame recoverable in function

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
高蕤: "浅谈型钢柱与框架梁钢筋连接技术", 《物流工程与管理》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112575896A (en) * 2020-12-29 2021-03-30 中铁三局集团建筑安装工程有限公司 Complex steel reinforced concrete composite structure and construction method
CN112575896B (en) * 2020-12-29 2022-03-29 中铁三局集团建筑安装工程有限公司 Complex steel reinforced concrete composite structure and construction method
CN113152679A (en) * 2021-05-28 2021-07-23 广州市房屋开发建设有限公司 Steel structure node and construction method thereof

Similar Documents

Publication Publication Date Title
CN201068603Y (en) Joist end weakened replaced type steel frame beam-column anti-knock joint
CN109881789A (en) A detachable steel beam-concrete-filled steel tubular column through-core connection node
CN204252286U (en) A kind of rectangular steel-tube concrete column-steel beam connecting joint
CN103821235B (en) U-shaped steel-concrete composite beam and the node component of rectangular steel-tube concrete column
CN103243818B (en) The connected node of a kind of concrete column and girder steel
CN104032864B (en) The web perforate H section steel connecting node that buckling-restrained steel plate wall is connected with concrete frame
CN202658532U (en) Bridge wet joint construction template
CN103015534A (en) Lateral connection node of concrete-filled rectangular steel tube column and steel beams
CN108104267A (en) H profile steel column and I-beam flat push type dovetail assembling frame Joint design method
CN104775517A (en) Connecting node for steel frame and steel structure module
CN104213645B (en) H section steel girder-column minor axis connecting top and bottom angle steel node and preparing method of H section steel girder-column minor axis connecting top and bottom angle steel node
CN106592841B (en) Steel bar truss floor support plate and stiffness steel reinforced concrete beam bridging arrangement and its lapping construction method
CN103406674B (en) Method for manufacturing and welding wave web box type section beam and diaphragms
CN205444492U (en) An H-shaped cantilever steel beam-column geometric section splicing structure
CN204551732U (en) A kind of steel frame and steel structure module connected node
CN103174222A (en) Steel casting modularization panel point for connection of steel pipe column and H-shaped beam
CN209941509U (en) Temporary connecting device for mid-span closure construction of steel-concrete composite beam cable-stayed bridge
CN102493553A (en) Member for connection node of reinforced beam and steel beam and construction method thereof
CN105888063A (en) Structural steel and column beam joint connecting device and construction method thereof
CN109057331A (en) A kind of full construction method for disconnecting Long-span Cantilever system support at construction joint
CN202969593U (en) Beam-column rigid connection structure of H-shaped column in weak axis direction
CN105926774B (en) A kind of end plate connection monoblock type Composite frame beam and combinations thereof method
CN105040822A (en) Steel coupling beam and concrete shear wall assembly type connecting structure reserving construction allowance
CN105088971B (en) Mid-span closure construction method of corrugated steel web PC box girder cable-stayed bridge
CN109881790A (en) Steel bar template integrated wall adds movable reinforcing bar connecting structure and installation method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160824

WD01 Invention patent application deemed withdrawn after publication