CN105887689A - 桥梁浇筑施工装置及其施工方法 - Google Patents
桥梁浇筑施工装置及其施工方法 Download PDFInfo
- Publication number
- CN105887689A CN105887689A CN201610275818.3A CN201610275818A CN105887689A CN 105887689 A CN105887689 A CN 105887689A CN 201610275818 A CN201610275818 A CN 201610275818A CN 105887689 A CN105887689 A CN 105887689A
- Authority
- CN
- China
- Prior art keywords
- formwork
- placing
- template
- bridge
- laid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 41
- 238000009415 formwork Methods 0.000 claims description 123
- 238000005520 cutting process Methods 0.000 claims description 9
- 230000015572 biosynthetic process Effects 0.000 claims description 3
- 230000000903 blocking effect Effects 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims description 3
- 238000000926 separation method Methods 0.000 claims 1
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000005266 casting Methods 0.000 description 6
- 230000007423 decrease Effects 0.000 description 2
- 238000007711 solidification Methods 0.000 description 2
- 230000008023 solidification Effects 0.000 description 2
- 239000010426 asphalt Substances 0.000 description 1
- 230000033228 biological regulation Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000003756 stirring Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610275818.3A CN105887689B (zh) | 2016-04-29 | 2016-04-29 | 桥梁浇筑施工装置及其施工方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610275818.3A CN105887689B (zh) | 2016-04-29 | 2016-04-29 | 桥梁浇筑施工装置及其施工方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN105887689A true CN105887689A (zh) | 2016-08-24 |
| CN105887689B CN105887689B (zh) | 2018-02-06 |
Family
ID=56701786
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610275818.3A Expired - Fee Related CN105887689B (zh) | 2016-04-29 | 2016-04-29 | 桥梁浇筑施工装置及其施工方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105887689B (zh) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115369771A (zh) * | 2022-09-03 | 2022-11-22 | 南通路桥工程有限公司 | 一种新型钢混叠合梁桥面悬臂现浇支架体系 |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101001137B1 (ko) * | 2008-07-31 | 2010-12-15 | 계문교 | 교량용 콘크리트 거더 성형을 위한 거푸집 장치 |
| CN102691270A (zh) * | 2012-06-27 | 2012-09-26 | 中铁四局集团机电设备安装有限公司 | 一种高效快速移动模架 |
| CN103074854A (zh) * | 2013-01-23 | 2013-05-01 | 中交四航局第一工程有限公司 | 后支点三角托架挂篮及应用该挂篮的桥梁施工方法 |
| CN203049466U (zh) * | 2012-11-30 | 2013-07-10 | 山东省路桥集团有限公司 | 一种下行式牛腿自行移动模架造桥机 |
| CN103669228A (zh) * | 2013-12-24 | 2014-03-26 | 中铁十九局集团第三工程有限公司 | 自行式移动模架预拱度调整装置及其调整方法 |
| CN105155423A (zh) * | 2015-09-15 | 2015-12-16 | 中建五局土木工程有限公司 | 用于连续箱梁施工的上行式移动模架 |
-
2016
- 2016-04-29 CN CN201610275818.3A patent/CN105887689B/zh not_active Expired - Fee Related
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101001137B1 (ko) * | 2008-07-31 | 2010-12-15 | 계문교 | 교량용 콘크리트 거더 성형을 위한 거푸집 장치 |
| CN102691270A (zh) * | 2012-06-27 | 2012-09-26 | 中铁四局集团机电设备安装有限公司 | 一种高效快速移动模架 |
| CN203049466U (zh) * | 2012-11-30 | 2013-07-10 | 山东省路桥集团有限公司 | 一种下行式牛腿自行移动模架造桥机 |
| CN103074854A (zh) * | 2013-01-23 | 2013-05-01 | 中交四航局第一工程有限公司 | 后支点三角托架挂篮及应用该挂篮的桥梁施工方法 |
| CN103669228A (zh) * | 2013-12-24 | 2014-03-26 | 中铁十九局集团第三工程有限公司 | 自行式移动模架预拱度调整装置及其调整方法 |
| CN105155423A (zh) * | 2015-09-15 | 2015-12-16 | 中建五局土木工程有限公司 | 用于连续箱梁施工的上行式移动模架 |
Non-Patent Citations (1)
| Title |
|---|
| 石恒: "上行式移动模架在南太子湖大桥施工中的应用", 《城市建筑》 * |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115369771A (zh) * | 2022-09-03 | 2022-11-22 | 南通路桥工程有限公司 | 一种新型钢混叠合梁桥面悬臂现浇支架体系 |
| CN115369771B (zh) * | 2022-09-03 | 2023-08-25 | 南通路桥工程有限公司 | 一种钢混叠合梁桥面悬臂现浇支架体系 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN105887689B (zh) | 2018-02-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7461427B2 (en) | Bridge construction system and method | |
| KR101632922B1 (ko) | 비자주식 빔 런처를 이용한 교량시공방법 | |
| CN106012797A (zh) | 一种全地锚式独塔双跨斜拉桥结构及其施工方法 | |
| CN101158146A (zh) | 斜拉桥主梁滑动模架系统及施工方法 | |
| KR101193608B1 (ko) | 교량 가설용 앵커장치를 구비한 빔 런처 | |
| CN110939071A (zh) | 一种装配式钢-混工字组合梁桥无支墩施工方法 | |
| CN109184699A (zh) | 明挖隧道下穿既有河道施工工法 | |
| CN113668399B (zh) | 一种中承式系杆钢箱拱桥施工方法 | |
| CN116377899A (zh) | 一种水中旧桥改扩建加高的施工方法 | |
| CN107151981B (zh) | 桥梁桥面施工装置的施工方法 | |
| CN109706842A (zh) | 一种城市高架桥独柱墩盖梁施工装置 | |
| CN105887689A (zh) | 桥梁浇筑施工装置及其施工方法 | |
| JP6950549B2 (ja) | 搬入出方法および搬入出設備 | |
| CN110886235B (zh) | 桥梁施工方法 | |
| CN112523097A (zh) | 大跨度架桥龙门吊及其施工方法 | |
| CN211395313U (zh) | 一种桥面可升降式系杆拱桥 | |
| KR100904987B1 (ko) | 연속압출공법을 이용한 아치교시공방법 | |
| CN113307147B (zh) | 一种龙门吊安装方法 | |
| CN114671265A (zh) | 智能化重物移位装置 | |
| CN114701949A (zh) | 一种泵站主厂房桥机主梁安装方法 | |
| CN102102341A (zh) | 一种高架桥面施工方法 | |
| CN117286805B (zh) | 一种复杂运输条件非对称钢混组合梁安装工艺 | |
| CN107815976B (zh) | 一种多联连续梁或多联刚构梁边跨直线梁段的施工方法 | |
| CN217479985U (zh) | 一种采用托架和临时拉索的主梁安装装置 | |
| CN111945572A (zh) | 多联拱桥架桥机及多联拱桥架桥方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| CB03 | Change of inventor or designer information | ||
| CB03 | Change of inventor or designer information |
Inventor after: Hou Hongwei Inventor after: Ding Jiayang Inventor after: Fu Xiangli Inventor after: Dai Xianping Inventor after: Yu Bin Inventor before: Hou Hongwei Inventor before: Qian Zhihua Inventor before: Jin Xin Inventor before: Tang Shaoming Inventor before: Kang Jianhua Inventor before: Ye Qiming |
|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180206 Termination date: 20190429 |