CN105881723B - 双块式轨枕脱模缓冲系统 - Google Patents
双块式轨枕脱模缓冲系统 Download PDFInfo
- Publication number
- CN105881723B CN105881723B CN201610393779.7A CN201610393779A CN105881723B CN 105881723 B CN105881723 B CN 105881723B CN 201610393779 A CN201610393779 A CN 201610393779A CN 105881723 B CN105881723 B CN 105881723B
- Authority
- CN
- China
- Prior art keywords
- sleeper
- double
- block type
- steel
- crossbeam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B13/00—Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
- B28B13/04—Discharging the shaped articles
- B28B13/06—Removing the shaped articles from moulds
- B28B13/065—Removing the shaped articles from moulds by applying electric current or other means of discharging, e.g. pneumatic or hydraulic discharging means
Landscapes
- Engineering & Computer Science (AREA)
- Ceramic Engineering (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Mechanical Engineering (AREA)
- Railway Tracks (AREA)
Abstract
本发明公开了一种双块式轨枕脱模缓冲系统,解决了双块式轨枕脱模时损伤和报废率高的问题。包括轨枕脱模站两横梁和未脱模的双块式轨枕,在左缓冲装置支撑架(7)上设置有底部左钢板(8),在底部左钢板(8)上分别设置有上下方向的前侧钢管座(9)和上下方向的后侧钢管座(10),在两钢管座中均设置有弹簧,在前弹簧(11)的顶端与后弹簧(12)的顶端之间设置有顶部钢板(13),在顶部钢板(13)的上方设置有双块式轨枕的左轨枕块(3)的轨枕钢筋桁架(14),在轨枕钢筋桁架(14)上设置有双块式轨枕的左轨枕块(3)。本发明大大降低了轨枕受到的冲击力和扭曲力的作用,降低了双块式轨枕脱模时的损伤和报废率。
Description
技术领域
本发明涉及一种双块式轨枕脱模缓冲系统,用于对双块式轨枕从模具内脱离出来后下落到脱模站横梁的过程中所产生的冲击力的缓冲。
背景技术
在高速铁路的轨枕一般采用双块式轨枕,双块式轨枕预制好后要在脱模站进行气动脱摸。双块式轨枕脱模时,脱模站气囊充气将双块式轨枕的模具顶升到一定高度,然后气囊自动放气,模具自由下落到脱模站的四个支撑点上,将轨枕从模具内脱离出来。脱模出来的轨枕携带着一定的冲击力,其底部的钢筋桁架直接落到脱模站的横梁上,因轨枕从模具内脱离出来后,轨枕的两个钢筋支撑桁架下落到脱模站横梁顶面时,会对双块式轨枕产生冲击力,由于两个钢筋支撑桁架下落时的不平衡不同步,会加大对双块式轨枕的冲击,造成双块式轨枕的损伤甚至报废。尤其是,当双块式轨枕中的一侧轨枕块已经与模具脱离,而另一侧轨枕块未与模具脱离的情况下,双块式轨枕受扭力作用损伤和报废的概率会成倍地增加。
发明内容
本发明提供了一种双块式轨枕脱模缓冲系统,解决了双块式轨枕脱模时损伤和报废率高的技术问题。
本发明是通过以下技术方案解决以上技术问题的:
一种双块式轨枕脱模缓冲系统,包括轨枕脱模站左横梁和轨枕脱模站右横梁,在轨枕脱模站左横梁和轨枕脱模站右横梁的上方设置有未脱模的双块式轨枕,在未脱模的双块式轨枕的左轨枕块的下方的轨枕脱模站左横梁内侧面上设置有左缓冲装置,在未脱模的双块式轨枕的右轨枕块的下方的轨枕脱模站右横梁内侧面上设置有右缓冲装置,左缓冲装置的结构与右缓冲装置的结构完全相同,左缓冲装置的结构为:在轨枕脱模站左横梁内侧设置有左缓冲装置支撑架,在左缓冲装置支撑架上设置有底部左钢板,在底部左钢板上分别设置有上下方向的前侧钢管座和上下方向的后侧钢管座,在前侧钢管座中设置有前弹簧,在后侧钢管座中设置有后弹簧,前弹簧的顶端穿出前侧钢管座的顶端后设置在轨枕脱模站左横梁的顶端上方,后弹簧的顶端穿出后侧钢管座的顶端后设置在轨枕脱模站左横梁的顶端上方,在前弹簧的顶端与后弹簧的顶端之间设置有顶部钢板,在顶部钢板的上方设置有双块式轨枕的左轨枕块的轨枕钢筋桁架,在轨枕钢筋桁架上设置有双块式轨枕的左轨枕块。
在轨枕脱模站左横梁的内侧设置有测力传感器支撑架,在测力传感器支撑架上设置有测力传感器,测力传感器设置在顶部钢板的正下方。
在脱模站两侧横梁对应的每根轨枕钢筋桁架下落的位置上各设置有一个缓冲装置。
本发明在双块式轨枕进行气动脱模时,双块式轨枕底部的钢筋桁架首先落到弹簧顶部的钢板上,即使双块式轨枕一侧的轨枕块已经与模具脱离,另一侧轨枕块未与模具脱离时,已经与模具脱离的轨枕块底部的钢筋桁架也会首先落到弹簧顶部的钢板上,而弹簧会吸收大部分轨枕下落时产生的冲击能量,大大降低了轨枕受到的冲击力和扭曲力的作用,降低了双块式轨枕脱模时的损伤和报废率。
附图说明
图1是本发明的结构示意图;
图2是图1中的A-A向剖视图。
具体实施方式
下面结合附图对本发明进行详细说明:
一种双块式轨枕脱模缓冲系统,包括轨枕脱模站左横梁1和轨枕脱模站右横梁2,在轨枕脱模站左横梁1和轨枕脱模站右横梁2的上方设置有未脱模的双块式轨枕,在未脱模的双块式轨枕的左轨枕块3的下方的轨枕脱模站左横梁1内侧面上设置有左缓冲装置5,在未脱模的双块式轨枕的右轨枕块4的下方的轨枕脱模站右横梁2内侧面上设置有右缓冲装置6,左缓冲装置5的结构与右缓冲装置6的结构完全相同,左缓冲装置5的结构为:在轨枕脱模站左横梁1内侧设置有左缓冲装置支撑架7,在左缓冲装置支撑架7上设置有底部左钢板8,在底部左钢板8上分别设置有上下方向的前侧钢管座9和上下方向的后侧钢管座10,在前侧钢管座9中设置有前弹簧11,在后侧钢管座10中设置有后弹簧12,前弹簧11的顶端穿出前侧钢管座9的顶端后设置在轨枕脱模站左横梁1的顶端上方,后弹簧12的顶端穿出后侧钢管座10的顶端后设置在轨枕脱模站左横梁1的顶端上方,在前弹簧11的顶端与后弹簧12的顶端之间设置有顶部钢板13,在顶部钢板13的上方设置有双块式轨枕的左轨枕块3的轨枕钢筋桁架14,在轨枕钢筋桁架14上设置有双块式轨枕的左轨枕块3。
在轨枕脱模站左横梁1的内侧设置有测力传感器支撑架16,在测力传感器支撑架16上设置有测力传感器15,测力传感器15设置在顶部钢板13的正下方。顶部钢板13在自由状态下要高出脱模站横梁顶面一定的高度。
在脱模站两侧横梁对应每根轨枕钢筋桁架下落的位置各设置一个所述的缓冲装置。
采用本发明的缓冲装置,使双块式轨枕底部的钢筋桁架首先落到弹簧顶部的钢板上,而弹簧会吸收大部分轨枕下落时产生的冲击能量,降低轨枕受扭力的作用,因而会从很大程度上减少因脱模给轨枕造成的损伤,提高了成品轨枕的质量,减少不合格品的产生。并且该缓冲装置构造简单,且两根弹簧与顶部钢板连接在一起,与底部钢管及钢管底部的钢板不连接,如果弹簧或顶部钢板需更换时,将连接为一体的两根弹簧与顶部钢板直接从钢管中取出更换新的即可,操作十分方便快捷。
Claims (2)
1.一种双块式轨枕脱模缓冲系统,包括轨枕脱模站左横梁(1)和轨枕脱模站右横梁(2),在轨枕脱模站左横梁(1)和轨枕脱模站右横梁(2)的上方设置有未脱模的双块式轨枕,在未脱模的双块式轨枕的左轨枕块(3)的下方的轨枕脱模站左横梁(1)内侧面上设置有左缓冲装置(5),在未脱模的双块式轨枕的右轨枕块(4)的下方的轨枕脱模站右横梁(2)内侧面上设置有右缓冲装置(6),左缓冲装置(5)的结构与右缓冲装置(6)的结构完全相同,其特征在于,左缓冲装置(5)的结构为:在轨枕脱模站左横梁(1)内侧设置有左缓冲装置支撑架(7),在左缓冲装置支撑架(7)上设置有底部左钢板(8),在底部左钢板(8)上分别设置有上下方向的前侧钢管座(9)和上下方向的后侧钢管座(10),在前侧钢管座(9)中设置有前弹簧(11),在后侧钢管座(10)中设置有后弹簧(12),前弹簧(11)的顶端穿出前侧钢管座(9)的顶端后设置在轨枕脱模站左横梁(1)的顶端上方,后弹簧(12)的顶端穿出后侧钢管座(10)的顶端后设置在轨枕脱模站左横梁(1)的顶端上方,在前弹簧(11)的顶端与后弹簧(12)的顶端之间设置有顶部钢板(13),在顶部钢板(13)的上方设置有双块式轨枕的左轨枕块(3)的轨枕钢筋桁架(14),在轨枕钢筋桁架(14)上设置有双块式轨枕的左轨枕块(3)。
2.根据权利要求1所述的一种双块式轨枕脱模缓冲系统,其特征在于,在轨枕脱模站左横梁(1)的内侧设置有测力传感器支撑架(16),在测力传感器支撑架(16)上设置有测力传感器(15),测力传感器(15)设置在顶部钢板(13)的正下方。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610393779.7A CN105881723B (zh) | 2016-06-07 | 2016-06-07 | 双块式轨枕脱模缓冲系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610393779.7A CN105881723B (zh) | 2016-06-07 | 2016-06-07 | 双块式轨枕脱模缓冲系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105881723A CN105881723A (zh) | 2016-08-24 |
CN105881723B true CN105881723B (zh) | 2018-01-12 |
Family
ID=56710219
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610393779.7A Active CN105881723B (zh) | 2016-06-07 | 2016-06-07 | 双块式轨枕脱模缓冲系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105881723B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109968510B (zh) * | 2019-04-12 | 2024-03-15 | 北京好运达智创科技有限公司 | 一种双块式轨枕脱模和输出系统 |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200439510Y1 (ko) * | 2006-10-25 | 2008-04-16 | 이동기 | 모노레일 바이크의 완충구조 |
DE102008037171A1 (de) * | 2008-08-06 | 2010-02-11 | Institut für Fertigteiltechnik und Fertigbau Weimar e.V. | Beton und Bahnschwelle aus Beton |
CN201835193U (zh) * | 2010-10-25 | 2011-05-18 | 乐昌市安捷铁路轨枕有限公司 | 一种脱模缓冲装置 |
CN201922501U (zh) * | 2010-10-25 | 2011-08-10 | 乐昌市安捷铁路轨枕有限公司 | 一种双块式轨枕脱模工艺线 |
CN202952365U (zh) * | 2012-12-04 | 2013-05-29 | 中铁株洲桥梁有限公司 | 一种地铁短轨枕模型 |
CN202964885U (zh) * | 2012-08-28 | 2013-06-05 | 中铁十九局集团第五工程有限公司 | 一种双块式轨枕生产线布置方式 |
CN203381036U (zh) * | 2013-08-17 | 2014-01-08 | 乐昌市安捷铁路轨枕有限公司 | 脱模缓冲装置 |
CN203901504U (zh) * | 2014-05-23 | 2014-10-29 | 中铁十八局集团第四工程有限公司 | 双块式轨枕脱模装置 |
CN104669429A (zh) * | 2015-03-06 | 2015-06-03 | 广西三维铁路轨道制造有限公司 | 轨枕脱模装置 |
CN205818133U (zh) * | 2016-06-07 | 2016-12-21 | 中铁十九局集团第五工程有限公司 | 双块式轨枕脱模缓冲系统 |
-
2016
- 2016-06-07 CN CN201610393779.7A patent/CN105881723B/zh active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200439510Y1 (ko) * | 2006-10-25 | 2008-04-16 | 이동기 | 모노레일 바이크의 완충구조 |
DE102008037171A1 (de) * | 2008-08-06 | 2010-02-11 | Institut für Fertigteiltechnik und Fertigbau Weimar e.V. | Beton und Bahnschwelle aus Beton |
CN201835193U (zh) * | 2010-10-25 | 2011-05-18 | 乐昌市安捷铁路轨枕有限公司 | 一种脱模缓冲装置 |
CN201922501U (zh) * | 2010-10-25 | 2011-08-10 | 乐昌市安捷铁路轨枕有限公司 | 一种双块式轨枕脱模工艺线 |
CN202964885U (zh) * | 2012-08-28 | 2013-06-05 | 中铁十九局集团第五工程有限公司 | 一种双块式轨枕生产线布置方式 |
CN202952365U (zh) * | 2012-12-04 | 2013-05-29 | 中铁株洲桥梁有限公司 | 一种地铁短轨枕模型 |
CN203381036U (zh) * | 2013-08-17 | 2014-01-08 | 乐昌市安捷铁路轨枕有限公司 | 脱模缓冲装置 |
CN203901504U (zh) * | 2014-05-23 | 2014-10-29 | 中铁十八局集团第四工程有限公司 | 双块式轨枕脱模装置 |
CN104669429A (zh) * | 2015-03-06 | 2015-06-03 | 广西三维铁路轨道制造有限公司 | 轨枕脱模装置 |
CN205818133U (zh) * | 2016-06-07 | 2016-12-21 | 中铁十九局集团第五工程有限公司 | 双块式轨枕脱模缓冲系统 |
Also Published As
Publication number | Publication date |
---|---|
CN105881723A (zh) | 2016-08-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106334950A (zh) | 一种机床减震底座 | |
CN103640587A (zh) | 一种电力调车机车用Co转向架 | |
CN106740951A (zh) | 磁浮车辆底架安装结构 | |
CN105881723B (zh) | 双块式轨枕脱模缓冲系统 | |
CN106759084A (zh) | 水利工程用防护装置 | |
CN203960688U (zh) | 一种道岔及其基本轨的固定装置 | |
CN205818133U (zh) | 双块式轨枕脱模缓冲系统 | |
CN206856653U (zh) | 一种汽车防撞缓冲装置 | |
CN201969855U (zh) | 一种带有分组夹持装置的摆动支撑 | |
CN105313914B (zh) | 超高速动车组转向架弹性构架 | |
CN103670443A (zh) | 一种组合式门架隧道衬砌台车 | |
CN201432200Y (zh) | 钢轨矫直机 | |
CN201546140U (zh) | 一种用于铁路道岔的轨撑 | |
CN202316550U (zh) | 带减震装置的热锭承接辊道 | |
CN104816737B (zh) | 用于地铁钢轨打磨车的车架 | |
CN102699995B (zh) | 一种双块式轨枕生产线辊轴通道装置 | |
CN202592502U (zh) | 一种双块式轨枕生产线辊轴通道装置 | |
CN207295452U (zh) | 一种桥梁用防撞栏 | |
CN201082712Y (zh) | 一种轴向驱动电力机车牵引装置 | |
CN204642856U (zh) | 货架的缓冲防撞结构 | |
CN204296486U (zh) | 接触网的单下腕臂底座 | |
CN212686814U (zh) | 带式输送机转载点缓冲装置 | |
CN203345609U (zh) | 综掘皮带机机尾架 | |
CN214929721U (zh) | 一种缓冲性能好的铁路客车转向架用横向缓冲器 | |
CN205221980U (zh) | 一种180°翻转机缓冲结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |