- CN105866972A CN105866972A CN201610405079.5A CN201610405079A CN105866972A CN 105866972 A CN105866972 A CN 105866972A CN 201610405079 A CN201610405079 A CN 201610405079A CN 105866972 A CN105866972 A CN 105866972A
- Authority
- CN
- China
- Prior art keywords
- frame
- bending
- injection
- double
- mold
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G02—OPTICS
- G02C—SPECTACLES; SUNGLASSES OR GOGGLES INSOFAR AS THEY HAVE THE SAME FEATURES AS SPECTACLES; CONTACT LENSES
- G02C5/00—Constructions of non-optical parts
-
- G—PHYSICS
- G02—OPTICS
- G02C—SPECTACLES; SUNGLASSES OR GOGGLES INSOFAR AS THEY HAVE THE SAME FEATURES AS SPECTACLES; CONTACT LENSES
- G02C5/00—Constructions of non-optical parts
- G02C5/008—Spectacles frames characterized by their material, material structure and material properties
Landscapes
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- General Physics & Mathematics (AREA)
- Ophthalmology & Optometry (AREA)
- Optics & Photonics (AREA)
- Eyeglasses (AREA)
Abstract
A manufacturing method for integrally-formed double-layer glasses comprises the following steps of mold designing, mold manufacturing, mold debugging, parameter adjusting, injection molding, bending, manual surface treatment, mark printing, lens cutting, lens assembling, frame calibration, washing, inspection, packaging and warehousing; wherein in the first step, an integral frame double-injection molding mold is used for manufacturing integrally-formed glasses with unbent legs; two materials involved in the fifth step are a hard material and a soft material respectively; according to bending in the sixth step, hot air at 100-150 DEG C is blown for 10-20 s with the passing air pressure at 0.4-0.6 mPa, pushing is formed through downward pressing of an air cylinder, and cooling and forming are achieved by blowing in air. By introducing a novel manufacturing process, the mold becomes simple, cost of the mold is greatly reduced, the requirement for double-injection molding can be met, and a manufactured finished product can meet the wearing requirement of children; meanwhile, the injection molding efficiency can be improved, the production speed can be increased, and the manual cost can be reduced.
Description
Technical field
The invention belongs to glasses and manufacture field, relate to the manufacture method of a kind of one-body molded Two-layer spectacle.
Background technology
Glasses are generally made up of spectacle-frame, earpiece and lens; there is the effect correcting defects of vision or protecting eyes; along with myopia, hypermetropia number constantly rise, various decorative glasses popular; glasses increasingly become the necessary of people's life, and aesthetic property, convenience and the comfortableness etc. worn of glasses are required more and more higher by people.
Glasses on existing market, between spectacle-frame and earpiece, general employing hinge screws is connected.Earpiece is typically shaft-like, the effect of earpiece is the most also only confined in the fixing spectacle-frame that matches with nose support and uses, if and what prior art earpiece to be made and spectacle-frame were formed in one, need first to design and produce out integrated lens molds (as shown in Figure 1), and this mould is the biggest, complicated again, the lens molds cost payout of molding of being made into one needs at 50,000 yuan one secondary, cost is high, and can only a kind of material injection when glasses are molded, and bi-material can not be used to be molded on double coloured plastic injection machine simultaneously, the injection of a kind of material of glasses can only be to be molded the most common framework hard material, injection glasses out are that rigidity is harder, this injection glasses out can not meet child and wear requirement.
Summary of the invention
The defect existed according to prior art, the present invention provides the manufacture method of a kind of one-body molded Two-layer spectacle, pass through technical scheme, can effectively save the production time, improve production efficiency, reduce production cost, at the same time it can also be reach double injection requirement, wear requirement with meet Kids eyeglasses.
For solving above-mentioned technical problem, the technical solution adopted in the present invention is:
A kind of manufacture method of one-body molded Two-layer spectacle, its step is as follows:
(1) design mould: design the double injection mold of integrated frame;
(2) mould is made: the double injection mold of integrated frame will be set and make;
(3) debugging mould: the mould made is carried out mode transfer repeatedly and die trial, carries out next step installation after reaching standard again;
(4) parameter adjustment: the mould debugged is arranged on the enterprising line parameter of injection molding machine and adjusts, is adjusted to parameter size required during integrated frame double injection mold injection;
(5) injection: double for the integrated frame adjusting parameter injection molds are placed on double coloured plastic injection machine and carry out bi-material injection;
(6) bending: the frame of injection formed is fixed on the fixture on the equipment of bending and carries out bending;
(7) manual surface processes: glasses semi-finished product good for bending carry out Jiao Kou polishing, closes mill line polishing;
(8) mark is known: the semi-finished product assembled stamp the mark of model, specification;
(9) eyeglass is cut: carry out eyeglass according to the specification size of spectacle-frame and cut off;
(10) upper eyeglass: be arranged on cuing off the eyeglass corresponding with spectacle-frame on a frame;
(11) school frame: the spectacle-frame of first-class eyeglass is adjusted school frame;
(12) clean: the finished product of eyeglass good to school frame carries out surface contaminant and is carried out;
(13) inspection: check that the finished product cleaned is the most qualified;
(14) packaging warehouse-in: carry out packaging warehouse-in by checking qualified finished product.
The double injection mold of integrated frame in described step (1) is formed in one the mould of the non-bending of earpiece;
Bi-material in described step (5) is respectively as follows: hard material and flexible material.
Bending in described step (6) is to first pass through hot blast 100~150 ° of blowings 10~20s, by air pressure 0.4~0.6mPa, becomes to promote, by cooling molding of blowing in atmosphere by cylinder down swaging.
Beneficial effects of the present invention: by the importing of new processing technology, mould becomes simple, make die cost about 1.5 ten thousand, greatly reducing the cost of mould, can reach double injection requirement, the finished product made can meet the requirement of wearing of child, can improve injection efficiency simultaneously, accelerate speed of production, reduce cost of labor.
Accompanying drawing explanation
Fig. 1 is prior art mold structural representation;
Fig. 2 is inventive die structural representation.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention will be further described.
A kind of manufacture method of one-body molded Two-layer spectacle, its step is as follows:
(1) design mould: design the double injection mold of integrated frame;
(2) mould is made: the double injection mold of integrated frame will be set and make;
(3) debugging mould: the mould made is carried out mode transfer repeatedly and die trial, carries out next step installation after reaching standard again;
(4) parameter adjustment: the mould debugged is arranged on the enterprising line parameter of injection molding machine and adjusts, is adjusted to parameter size required during integrated frame double injection mold injection;
(5) injection: double for the integrated frame adjusting parameter injection molds are placed on double coloured plastic injection machine and carry out bi-material injection;
(6) bending: the frame of injection formed is fixed on the fixture on the equipment of bending and carries out bending;
(7) manual surface processes: glasses semi-finished product good for bending carry out Jiao Kou polishing, closes mill line polishing;
(8) mark is known: the semi-finished product assembled stamp the mark of model, specification;
(9) eyeglass is cut: carry out eyeglass according to the specification size of spectacle-frame and cut off;
(10) upper eyeglass: be arranged on cuing off the eyeglass corresponding with spectacle-frame on a frame;
(11) school frame: the spectacle-frame of first-class eyeglass is adjusted school frame;
(12) clean: the finished product of eyeglass good to school frame carries out surface contaminant and is carried out;
(13) inspection: check that the finished product cleaned is the most qualified;
(14) packaging warehouse-in: carry out packaging warehouse-in by checking qualified finished product.
The double injection mold of integrated frame in described step (1) is formed in one the mould of the non-bending of earpiece;
Bi-material in described step (5) is respectively as follows: hard material and flexible material.
Bending in described step (6) is to first pass through hot blast 100~150 ° of blowings 10~20s, by air pressure 0.4~0.6mPa, becomes to promote, by cooling molding of blowing in atmosphere by cylinder down swaging.
Claims (3)
1. a manufacture method for one-body molded Two-layer spectacle, its step is as follows:
(1) design mould: design the double injection mold of integrated frame;
(2) mould is made: the double injection mold of integrated frame will be set and make;
(3) debugging mould: the mould made is carried out mode transfer repeatedly and die trial, carries out next step installation after reaching standard again;
(4) parameter adjustment: the mould debugged is arranged on the enterprising line parameter of injection molding machine and adjusts, is adjusted to the double injection mold of integrated frame
Parameter size required during injection;
(5) injection: double for the integrated frame adjusting parameter injection molds are placed on double coloured plastic injection machine and carry out bi-material injection;
(6) bending: the frame of injection formed is fixed on the fixture on the equipment of bending and carries out bending;
(7) manual surface processes: glasses semi-finished product good for bending carry out Jiao Kou polishing, closes mill line polishing;
(8) mark is known: the semi-finished product assembled stamp the mark of model, specification;
(9) eyeglass is cut: carry out eyeglass according to the specification size of spectacle-frame and cut off;
(10) upper eyeglass: be arranged on cuing off the eyeglass corresponding with spectacle-frame on a frame;
(11) school frame: the spectacle-frame of first-class eyeglass is adjusted school frame;
(12) clean: the finished product of eyeglass good to school frame carries out surface contaminant and is carried out;
(13) inspection: check that the finished product cleaned is the most qualified;
(14) packaging warehouse-in: carry out packaging warehouse-in by checking qualified finished product;
It is characterized in that: the double injection mold of the integrated frame in described step (1) is formed in one the mould of the non-bending of earpiece.
The manufacture method of a kind of one-body molded Two-layer spectacle the most according to claim 1, it is characterised in that: described step (5)
In bi-material be respectively as follows: hard material and flexible material.
The manufacture method of a kind of one-body molded Two-layer spectacle the most according to claim 1, it is characterised in that: described step (6)
In bending be to first pass through hot blast 100~150 ° of blowings 10~20s, by air pressure 0.4~0.6mPa, become by cylinder down swaging
Promote, by cooling molding of blowing in atmosphere.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610405079.5A CN105866972A (en) | 2016-06-11 | 2016-06-11 | Manufacturing method for integrally-formed double-layer glasses |
PCT/CN2016/095089 WO2017211003A1 (en) | 2016-06-11 | 2016-08-14 | Method for manufacturing integrally-moulded dual-layer glasses |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610405079.5A CN105866972A (en) | 2016-06-11 | 2016-06-11 | Manufacturing method for integrally-formed double-layer glasses |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105866972A true CN105866972A (en) | 2016-08-17 |
Family
ID=56676273
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610405079.5A Pending CN105866972A (en) | 2016-06-11 | 2016-06-11 | Manufacturing method for integrally-formed double-layer glasses |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN105866972A (en) |
WO (1) | WO2017211003A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108067812A (en) * | 2016-11-10 | 2018-05-25 | 青岛牧港畜牧机械有限公司 | Special L-shaped regulating arm manufacturing process on improved egg collection band |
CN112068329A (en) * | 2020-08-25 | 2020-12-11 | 厦门淳诚工贸有限公司 | Glasses leg, mold for injection molding of glasses leg and molding method of glasses leg |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1794041A (en) * | 2005-12-30 | 2006-06-28 | 寿加定 | Primary shaping technology of polariscope lens |
US20140204331A1 (en) * | 2013-01-18 | 2014-07-24 | Otos Wing Co., Ltd. | Safety glasses for blocking harmful electromagnetic radiation and preventing dazzling |
CN103955069A (en) * | 2014-05-07 | 2014-07-30 | 温州市冠豪眼镜有限公司 | Novel detachable eyeglasses and manufacturing method thereof |
CN203930232U (en) * | 2014-05-07 | 2014-11-05 | 温州市冠豪眼镜有限公司 | A kind of Novel dismountable glasses |
CN104325667A (en) * | 2014-08-27 | 2015-02-04 | 温州市冠豪眼镜有限公司 | Manufacturing method of one-piece dual-layer glasses |
CN104678593A (en) * | 2013-11-29 | 2015-06-03 | 温州市冠豪眼镜有限公司 | Manufacturing method of novel leg change eyeglasses |
-
2016
- 2016-06-11 CN CN201610405079.5A patent/CN105866972A/en active Pending
- 2016-08-14 WO PCT/CN2016/095089 patent/WO2017211003A1/en active Application Filing
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1794041A (en) * | 2005-12-30 | 2006-06-28 | 寿加定 | Primary shaping technology of polariscope lens |
US20140204331A1 (en) * | 2013-01-18 | 2014-07-24 | Otos Wing Co., Ltd. | Safety glasses for blocking harmful electromagnetic radiation and preventing dazzling |
CN104678593A (en) * | 2013-11-29 | 2015-06-03 | 温州市冠豪眼镜有限公司 | Manufacturing method of novel leg change eyeglasses |
CN103955069A (en) * | 2014-05-07 | 2014-07-30 | 温州市冠豪眼镜有限公司 | Novel detachable eyeglasses and manufacturing method thereof |
CN203930232U (en) * | 2014-05-07 | 2014-11-05 | 温州市冠豪眼镜有限公司 | A kind of Novel dismountable glasses |
CN104325667A (en) * | 2014-08-27 | 2015-02-04 | 温州市冠豪眼镜有限公司 | Manufacturing method of one-piece dual-layer glasses |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108067812A (en) * | 2016-11-10 | 2018-05-25 | 青岛牧港畜牧机械有限公司 | Special L-shaped regulating arm manufacturing process on improved egg collection band |
CN112068329A (en) * | 2020-08-25 | 2020-12-11 | 厦门淳诚工贸有限公司 | Glasses leg, mold for injection molding of glasses leg and molding method of glasses leg |
Also Published As
Publication number | Publication date |
---|---|
WO2017211003A1 (en) | 2017-12-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103955069A (en) | Novel detachable eyeglasses and manufacturing method thereof | |
CN103214161B (en) | A kind of non-isothermal mould pressing method for glass optical component | |
EP1752271A4 (en) | Mold designing method, mold, and molded piece | |
CN105866972A (en) | Manufacturing method for integrally-formed double-layer glasses | |
KR20110035543A (en) | Manufacturing methods of synthetic resin spectacle frame | |
CN104325667A (en) | Manufacturing method of one-piece dual-layer glasses | |
CN103319077B (en) | Mould structure for manufacturing moulded glass | |
CN101276064A (en) | Method for making glasses frame | |
CN104400966A (en) | Dazzle-proof injection part mould and manufacturing method thereof | |
CN102012568A (en) | Lens and lens frame integrated glasses and processing method thereof | |
CN109422445B (en) | Processing method of bent glass product | |
CN108706860A (en) | A kind of indeformable production technology of tempered glass hot shaping | |
CN204278390U (en) | A kind of mould of the breathing mask for the manufacture of different hardness silicon rubber compound | |
CN101591135A (en) | Polarized lens automatic bending forming machine | |
CN104678593A (en) | Manufacturing method of novel leg change eyeglasses | |
CN103524021A (en) | Manufacturing method for aspheric lens through precise glass compression molding | |
CN107825725A (en) | The more embedding seam production technology of mould zero | |
CN209636102U (en) | Pneumatic moulding mould for 3D bend glass | |
CN104597620A (en) | Manufacturing method of gradual-zooming spectacle lens | |
CN206848605U (en) | Novel glasses | |
CN203930232U (en) | A kind of Novel dismountable glasses | |
CN105128373A (en) | Preparation process of integrally-molded double-colored glasses frame | |
CN112876045A (en) | Asymmetric 3D glass hot bending forming process | |
CN208188507U (en) | A kind of antifog complex optics | |
CN101700689B (en) | Production method of contact lens multi-section combined type mold by centrifugal casting method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160817 |