CN105847172B - Job flow control method and device - Google Patents

Job flow control method and device Download PDF

Info

Publication number
CN105847172B
CN105847172B CN201610190968.4A CN201610190968A CN105847172B CN 105847172 B CN105847172 B CN 105847172B CN 201610190968 A CN201610190968 A CN 201610190968A CN 105847172 B CN105847172 B CN 105847172B
Authority
CN
China
Prior art keywords
resource
notification
message
literary number
occupancy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610190968.4A
Other languages
Chinese (zh)
Other versions
CN105847172A (en
Inventor
陆学锋
徐林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CN201610190968.4A priority Critical patent/CN105847172B/en
Publication of CN105847172A publication Critical patent/CN105847172A/en
Application granted granted Critical
Publication of CN105847172B publication Critical patent/CN105847172B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L47/00Traffic control in data switching networks
    • H04L47/10Flow control; Congestion control

Abstract

The invention discloses a kind of job flow control method and devices, belong to the communications field.The described method includes: periodically acquiring the first resource occupancy of the multiple first resource and the Secondary resource occupancy of the multiple Secondary resource;When reaching corresponding flow control threshold value there are the resources occupation rate of at least one resource in the multiple first resource and the multiple Secondary resource, according to the resources occupation rate of at least one resource, calculates corresponding put of every kind of resource at least one resource and be notified to literary number;The literary number of notification is put according to every kind of resource at least one resource is corresponding, controls business clearance amount.The present invention passes through simultaneously according to NFVI layers and the occupation condition of application layer, service traffics are controlled, avoid the occurrence of when application layer resource is not overloaded and when NFVI layers of resource overload, due to the problem of can not controling effectively to service traffics, business processing success rate is caused to reduce.

Description

Job flow control method and device
Technical field
The present invention relates to the communications field, in particular to a kind of job flow control method and device.
Background technique
With the continuous growth of the network size of communication system, the framework of communication system becomes increasingly complex, and type of business is got over Come more, has pushed the development of NFV (Network Function Virtualization, network function virtualization) technology. NFV technology refers to through software and hardware decoupling and function modeling, and network equipment function is made to be no longer dependent on specialized hardware, and resource can be with It is sufficiently flexibly shared, realize the quick exploitation and deployment of new business, and automatic deployment and elasticity are carried out based on practical business demand It stretches.Application entity of the NFV system as NFV technology in the communications field, including NFVI (NFV Infrastructure, NFV Infrastructure layer) and application layer etc., for realizing different function.Generated when the system receives a large amount of voice and packet data concurrent service compared with Big flow will lead to the overall performance decline of the system, even result in system crash, at this time with regard to needing to carry out the voice and packet data concurrent service Flow control, to avoid above situation occurs.
In NFV system, job flow control method can be with are as follows: when the resources occupation rate of any resource of application layer reaches stream When controlling threshold value, calculates corresponding put of the resource and be notified to literary number (Windows Access Limit, WAL), this, which puts the literary number of notification, is Finger system in the resources occupation rate is capable of the maximum traffic quantity of concurrent processing, puts the literary number processing of notification accordingly according to this The service message of quantity;When the resources occupation rate of resources all in application layer is not up to flow control threshold value, it is arranged according to system Default put the literary number of notification, handle the service message of respective numbers;When the resources occupation rate of the multiple resources of application layer reaches flow control It when threshold value, calculates separately that overload resource is corresponding to put the literary number of notification, puts the literary number of notification according to the smallest and handle respective numbers Service message.
In the implementation of the present invention, the inventor finds that the existing technology has at least the following problems:
Since whether above-mentioned business flow control method only reaches flow control threshold value according to the resource of application layer, flow is carried out to business Therefore control will lead to when the resource of infrastructure layer first reaches flow control threshold value, and the resource of application layer is also not up to flow control threshold When value, effective flow control can not be carried out to business, and then lead to the success rate for reducing business processing.
Summary of the invention
In order to solve problems in the prior art, the embodiment of the invention provides a kind of job flow control method and devices. The technical solution is as follows:
On the one hand, a kind of job flow control method is provided, the method is applied to network function and virtualizes NFV system It unites, includes NFVI layers and application layer in the NFV system, wherein NFVI layers include multiple first resources, and the application layer includes Multiple Secondary resources, which comprises periodically acquire the first resource occupancy of the multiple first resource and described more The Secondary resource occupancy of a Secondary resource;It is at least one when existing in the multiple first resource and the multiple Secondary resource When the resources occupation rate of resource reaches corresponding flow control threshold value, according to the resources occupation rate of at least one resource, described in calculating Every kind of resource is corresponding at least one resource puts the literary number of notification;It is put according to every kind of resource is corresponding at least one resource It is notified to literary number, controls business clearance amount.By being controlled to service traffics according to NFVI layers and the occupation condition of application layer System, avoid the occurrence of when application layer resource is not overloaded and when NFVI layer of resource overload, due to that can not be carried out effectively to service traffics The problem of controlling, business processing success rate caused to reduce.
In the first possible implementation of the first aspect of the present invention, according to every kind of money at least one resource Source is corresponding to put the literary number of notification, and control business clearance amount includes: to put according to every kind of resource is corresponding at least one resource It is notified to literary number, determines that target puts the literary number of notification;The literary number of notification is put according to the target, controls business clearance amount.By according to mistake It carries corresponding put of resource and is notified to literary number, control business clearance amount, can be avoided since resource overload leads to business processing success rate Low or even system crash.
In second of possible implementation of the first aspect of the present invention, according to every kind of money at least one resource Source is corresponding to put the literary number of notification, determine target put the literary number of notification include: from least one resource every kind of resource it is corresponding It puts in the literary number of notification, determines that minimum puts the literary number of notification;The minimum is put into the literary number of notification it is determined as the target and puts the literary number of notification. By the way that when the resources occupation rate there are many resource reaches flow control threshold value, corresponding put of the multiple resources is notified in literary number most The small literary number of notification of putting is determined as object message number, controls business clearance amount, can utmostly guarantee the stability of system performance, Avoid the case where system crash is led to due to resource heavy overload.
In the third possible implementation of the first aspect of the present invention, the multiple first resource is periodically acquired First resource occupancy and the Secondary resource occupancy of the multiple Secondary resource include: to receive NFVI layers of the resource management The first message that module is sent, the first message include at least the first resource occupancy of the multiple first resource;Or, from VNF manager obtains second message, and the second message is the VNF manager from the virtualized infrastructure manager The message that the VIM that VIM is obtained periodically is obtained from described NFVI layers, the second message include at least the multiple first The first resource occupancy of resource.By obtaining NFVI layers of resources occupation rate, can be provided according to multiple the first of NFVI layers The resources occupation rate of multiple Secondary resources of the resources occupation rate and application layer in source realizes service traffics control.
In the 4th kind of possible implementation of the first aspect of the present invention, obtaining second message from VNF manager includes: Receive the second message that the VNF manager is sent;Or, periodically obtaining the second message from the VNF manager. By obtaining NFVI layers of resources occupation rate, with can be according to the resources occupation rate and application layer of NFVI layers of multiple first resources Multiple Secondary resources resources occupation rate, realize service traffics control.
In the 5th kind of possible implementation of the first aspect of the present invention, the multiple first resource is periodically acquired After first resource occupancy and the Secondary resource occupancy of the multiple Secondary resource, the method also includes: it will be described more The first resource occupancy of a first resource and the Secondary resource occupancy of the multiple Secondary resource are stored to burdened resource pipe It manages in list.By the burdened resource management list, the resources occupation rate according to NFVI layers of multiple first resources can be realized With the resources occupation rate of multiple Secondary resources of application layer, service traffics control is realized.
In the 6th kind of possible implementation of the first aspect of the present invention, the multiple first resource is included at least: net Port band width, central processing unit and memory.By whether being overloaded according to multiple first resources, service traffics are controlled, it can Guarantee the enough systems of multiple first resource to processing business message.
On the other hand, a kind of service traffics control device is provided, is applied to network function and virtualizes NFV system, it is described It include NFVI layer and application layer in NFV system, wherein NFVI layers include multiple first resources, and the application layer includes multiple the Two resources, described device include:
Resources occupation rate obtains module, for periodically acquiring first resource occupancy and the institute of the multiple first resource State the Secondary resource occupancy of multiple Secondary resources;
Computing module, for obtaining the multiple first resource that gets of module and described more when the resources occupation rate When reaching corresponding flow control threshold value there are the resources occupation rate of at least one resource in a Secondary resource, according at least one money The resources occupation rate in source calculates corresponding put of every kind of resource at least one resource and is notified to literary number;
Control module, every kind of resource is corresponding at least one resource for being obtained according to the computing module puts It is notified to literary number, controls business clearance amount.
By controlling service traffics according to NFVI layers and the occupation condition of application layer, avoids the occurrence of to work as and answer It is not overloaded with layer resource when NFVI layers of resource overload, due to that can not control effectively to service traffics, is caused at business Manage the problem of success rate reduces.
In the first possible implementation of the second aspect of the present invention, the control module is used for:
The literary number of notification is put according to every kind of resource at least one resource is corresponding, determines that target puts the literary number of notification;
The literary number of notification is put according to the target, controls business clearance amount.
By putting the literary number of notification according to overload resource is corresponding, business clearance amount is controlled, can be avoided due to resource overload Cause business processing success rate low or even system crash.
In second of possible implementation of the second aspect of the present invention, the control module is used for:
It is put in the literary number of notification from every kind of resource at least one resource is corresponding, determines that minimum puts the literary number of notification;
The minimum is put into the literary number of notification it is determined as the target and puts the literary number of notification.
By the way that when the resources occupation rate there are many resource reaches flow control threshold value, corresponding put of the multiple resources is notified to text Minimum in number puts the literary number of notification and is determined as object message number, controls business clearance amount, can utmostly guarantee system performance Stability, avoid the case where system crash is led to due to resource heavy overload.
In the third possible implementation of the second aspect of the present invention, the resources occupation rate obtains module and is used for:
The first message that NFVI layers of the resource management module is sent is received, the first message includes at least described more The first resource occupancy of a first resource;Or,
Second message is obtained from VNF manager, the second message is that the VNF manager is set from the virtualization basis The message that the VIM of manager VIM acquisition is periodically obtained from described NFVI layers is applied, the second message includes at least described The first resource occupancy of multiple first resources.
By obtaining NFVI layers of resources occupation rate, with can be according to the resources occupation rate of NFVI layers of multiple first resources With the resources occupation rate of multiple Secondary resources of application layer, service traffics control is realized.
In the 4th kind of possible implementation of the second aspect of the present invention, the resources occupation rate obtains module and is used for:
Receive the second message that the VNF manager is sent;Or,
Periodically the second message is obtained from the VNF manager.
By obtaining NFVI layers of resources occupation rate, with can be according to the resources occupation rate of NFVI layers of multiple first resources With the resources occupation rate of multiple Secondary resources of application layer, service traffics control is realized.
In the 5th kind of possible implementation of the second aspect of the present invention, described device further include:
Memory module, for by the of the first resource occupancy of the multiple first resource and the multiple Secondary resource Two resources occupation rates are stored into burdened resource management list.
By the burdened resource management list, can be realized according to the resources occupation rates of NFVI layers of multiple first resources and The resources occupation rate of multiple Secondary resources of application layer realizes service traffics control.
In the 6th kind of possible implementation of the second aspect of the present invention, the multiple first resource is included at least: net Port band width, central processing unit and memory.
By whether being overloaded according to multiple first resources, service traffics are controlled, can guarantee multiple first money The enough systems in source are to processing business message.
Technical solution provided in an embodiment of the present invention has the benefit that
By periodically acquire NFVI layers of multiple first resources first resource occupancy and application layer multiple second The resources occupation rate of resource, according to reaching at least the one of corresponding flow control threshold value in multiple first resource and multiple Secondary resource The resources occupation rate of kind resource calculates corresponding put of at least one resource and is notified to literary number, and according at least one resource pair That answers puts the literary number of notification, controls business clearance amount, can be simultaneously according to NFVI layers and the occupation condition of application layer, to business Flow is controlled, and is avoided the occurrence of when application layer resource is not overloaded and NFVI layers of resource overload, due to can not be to Business Stream The problem of amount control effectively, and business processing success rate is caused to reduce;Further, by VNF, NFVI, VNFM and VIM Between establish channel so that VNF obtains NFVI layers of resources occupation rate, with can be according to the money of NFVI layers of multiple first resources The resources occupation rate of multiple Secondary resources of source occupancy and application layer realizes service traffics control.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing.
Fig. 1 is a kind of architecture diagram of network function virtualization NFV system 100 provided in an embodiment of the present invention;
Fig. 2 is a kind of job flow control method flow chart provided in an embodiment of the present invention;
Fig. 3 is a kind of service traffics control device block diagram provided in an embodiment of the present invention;
Fig. 4 is a kind of block diagram of device 400 for service traffics control provided in an embodiment of the present invention.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with attached drawing to embodiment party of the present invention Formula is described in further detail.
Example embodiments are described in detail here, and the example is illustrated in the accompanying drawings.Following description is related to When attached drawing, unless otherwise indicated, the same numbers in different drawings indicate the same or similar elements.Following exemplary embodiment Described in embodiment do not represent all embodiments consistented with the present invention.On the contrary, they be only with it is such as appended The example of device and method being described in detail in claims, some aspects of the invention are consistent.
Fig. 1 is a kind of architecture diagram of network function virtualization NFV system 100 provided in an embodiment of the present invention, such as Fig. 1 institute Showing, it includes NFVI layer 130 and application layer which, which virtualizes NFV system, wherein NFVI layers include multiple first resources, The application layer includes multiple Secondary resources.Multiple first resource includes at least: network interface bandwidth, central processing unit and memory, It can also include other resources, it also may include software resource that multiple Secondary resource, which may include hardware resource, for example, disappearing Breath processing delay, message queue occupancy and memory usage etc., the embodiment of the present invention is not construed as limiting this.
The NFV system further includes VIM (Virtualized Infrastructure Manager, virtualized infrastructure Manager) 106, multiple VNF (Virtual Network Function, virtual network function) 108 and more for managing this The VNFM (VNF Manager, VNF manager) 104 of a VNF.The VNFM104 can execute the various management function to VNF108 Can, such as instantiate, update, inquiry, scaling and/or terminate VNF;The VIM106 can execute the function of resource management, for example, The distribution of management infrastructure resource, including increase resource to virtual container, which can also be performed operating function, including Collect the fault message etc. of NFVI130.It can be in communication with each other between the VNFM and the VIM, to realize that resource allocation and exchange are empty The configuration and status information of quasi-ization resource.
In addition, the NFV system can also include multiple EM (Element Management, NE management) 122, network clothes Business, multiple NE managements (Element Management, EM) 122, network service, VNF and infrastructure describe (Network Service, VNF and Infrastructure Description) 126 and business support management system (Operation-Support System/Business Support System, OSS/BSS) 124.Wherein, NFV management and Arranging system 101 includes NFV composer (NFV Orchestrator, NFVO) 102, one or more VNFM (VNF Manager, VNFM) 104 and virtualized infrastructure manager (Virtualized Infrastructure Manager, VIM)106.NFVI 130 includes computing hardware 112, storage hardware 114, the network hardware 116, virtualization layer (Virtualization Layer), virtual computing 110, virtual memory 118 and virtual network 120.Computing hardware 112 can be Ready-made hardware and/or customized hardware in the market, for providing processing and computing resource.Storage hardware 114 can be The interior memory capacity provided of network or memory capacity (being locally stored in server for residing in storage hardware 114 itself Device).In an implementation, the resource of computing hardware 112 and storage hardware 114 can be brought together.The network hardware 116 can be interchanger, router and/or be configured to any other network equipment with function of exchange.The network hardware 116 can It with across multiple domains, and may include multiple networks interconnected by one or more transmission networks.Network services, VNF Describing 126 and OSS/BSS 124 in 002 V1.1.1 standard of ETSI GS NFV with infrastructure has further discussion.
The virtualization layer of the inside NFVI 130 can be abstracted hardware resource and decoupling VNF 108 from physical layer, so as to VNF 108 provide virtualization resource.Virtual resource layer includes virtual computing 110, virtual memory 118 and virtual network 120.Virtual meter Calculation 110 and virtual memory 118 can be supplied to VNF 108 in the form of virtual machine, and/or other virtual containers.For example, one Or more than one VNF 108 can be deployed on a virtual machine (Virtual Machine).Virtualization layer abstract network is hard For part 116 to form virtual network 120, virtual network 120 may include virtual switch (Virtual Switch), the void Quasi- interchanger is used to provide the connection between virtual machine and other virtual machines.In addition, the transmission network in the network hardware 116, it can Using centerized fusion plane and individual Forwarding plane (such as software defined network, a SDN) virtualization.
NFV management and arranging system (NFV MANO) 101 are used to execute monitoring and the pipe to VNF 108 and NFVI 130 Reason.The network service on NFVI 130 may be implemented in NFVO 102, can also execute from one or more VNFM's 104 Resource association requests send configuration information to VNFM 104, and collect the status information of VNF 108.In addition, NFVO 102 can be with It is communicated with VIM 106, to realize the distribution and/or reserved and exchange virtualization resource configuration and status information of resource.
As shown in Figure 1, VNFM 104 can be interacted with VNF 108 and EM 122 to be managed to the life cycle of VNF And exchange configures and status information.VNF 108 can be configured as at least one executed by a physical network device The virtualization of network function.For example, the VNF 108 can be by configuration to provide in IMS network in an implementation The function that has of different network elements, such as P-SCSCF, S-CSCF or the network function of HSS etc..EM 122 is by configuration to one Or more than one VNF108 is managed.
Fig. 2 is a kind of job flow control method flow chart provided in an embodiment of the present invention, and this method is applied to above-mentioned net Network virtualization of function NFV system, referring to fig. 2, this method comprises:
201, the resource management module of VNF periodically acquires the first resource occupancy of multiple first resource and multiple The Secondary resource occupancy of Secondary resource.
In order to guarantee the overall performance of system, when receiving a large amount of business, need to control service traffics, to keep away The case where exempting from the reduction of business processing success rate, even resulting in system crash generation.
In NFV system, according to the priority of service message, service message is stored respectively to absolute priority list and In relative priority list, which is used to store the service message of absolutely not flow control, as the centre of business disappears Breath etc., the relative priority queue be used to store can flow control service message, such as the first message of business;System Priority processing should Service message in absolute priority queue, if there is no service message to need to handle in the absolute priority queue, processing Service message in relative priority queue.When the service message in the relative priority queue is excessive, and system resource can not It when meeting concurrent processing a large number of services, needs to control service traffics, to guarantee that system can operate normally.
Specifically, the resource management module of VNF periodically acquires the side of the first resource occupancy of multiple first resource Method, which can be divided into, to be directly acquired and two kinds of indirect gain.Wherein, directly acquiring method can be with are as follows: the resource management module of VNF connects The first message that the NFVI layers of resource management module is sent is received, which includes at least the first of multiple first resource Resources occupation rate;Indirect gain method refers to by establishing channel, the resource management of VNF between VNF, NFVI, VNFM and VIM The first resource occupancy of NFVI layers of module indirect gain of multiple first resources, specifically includes following two method:
The first, the resource management module of VNF receive the second message that the VNF manager is sent, described second Message is that the VIM that the VNF manager is obtained from the virtualized infrastructure manager VIM is periodical from the NFVI The message that layer obtains, the second message include at least the first resource occupancy of the multiple first resource.It that is to say, it should VIM periodically obtains the first resource occupancy of multiple first resource from NFVI layer, and VNFM is again from VIM acquisition multiple the The first resource occupancy of one resource, and the first resource occupancy of multiple first resource is sent to the resource pipe of the VNF Manage module.
Second, the resource management module of VNF periodically obtains the second message from the VNF manager, and described the Two message are that the VIM that the VNF manager is obtained from the virtualized infrastructure manager VIM is periodical from described The message of NFVI layers of acquisition, the second message include at least the first resource occupancy of the multiple first resource.It that is to say, The VIM periodically obtains the first resource occupancy of multiple first resource from NFVI layers, and VNFM obtains from the VIM multiple again The first resource occupancy of first resource, the resource management module of the VNF obtain the of multiple first resource from the VNFM again One resources occupation rate.
It should be noted that the second quantity of the first quantity and multiple Secondary resource for multiple first resource, First quantity can be 1, or maximum resource number possessed by being less than or equal to NFVI layers greater than 1, the embodiment of the present invention This is not construed as limiting, similarly, the embodiment of the present invention is also not especially limited second quantity.
In the present embodiment, only with obtained simultaneously according to same period the first resource first resource occupancy and this For the Secondary resource occupancy of two resources, job flow control method provided by the present invention is illustrated;In fact, obtaining The period for taking the period of the first resource occupancy of the first resource and obtaining the Secondary resource occupancy of the Secondary resource can be with It is identical, it can also be different, furthermore, it is possible to obtain the first resource occupancy of the first resource and the resource of the Secondary resource simultaneously Occupancy can also obtain the first resource occupancy of the first resource in different time respectively and the resource of the Secondary resource accounts for With rate, the embodiment of the present invention is not construed as limiting this.
By establishing channel between VNF, NFVI, VNFM and VIM, so that VNF obtains NFVI layers of resources occupation rate, with It can be real according to the resources occupation rate of multiple Secondary resources of the resources occupation rate and application layer of NFVI layers of multiple first resources Existing service traffics control.
202, the resource management module of VNF is by the first resource occupancy of multiple first resource and multiple Secondary resource Secondary resource occupancy store into burdened resource management list.
The content stored in the burdened resource management list includes at least multiple first resource and multiple second money The identification information of every kind of resource, resources occupation rate and flow control threshold value in source.The identification information of the resource is corresponding for unique identification Resource, the flow control threshold value are somebody's turn to do as the measurement standard for judging whether resource overloads if the resources occupation rate of any resource is greater than The flow control threshold value of resource, it is determined that the resource overload needs to control service traffics at this time, in order to avoid influence business processing at Power.It should be noted that other can also be stored in the burdened resource management list with multiple first resource and this is more The relevant information of a Secondary resource, the present invention is not especially limit this.
For example, when the flow control threshold value of any first resource is 80%, if the first resource occupancy of the first resource Greater than 80%, it is determined that first resource overload.It certainly, can also include other information in the burdened resource management list, this Inventive embodiments are not construed as limiting this.
203, when there are the resources occupation rates of at least one resource to reach in multiple first resource and multiple Secondary resource When to corresponding flow control threshold value, the business flow control module of VNF according to the resources occupation rate of at least one resource, calculate this at least one Every kind of resource is corresponding in kind resource puts the literary number of notification.
This is put the literary number of notification and refers to that resource is capable of the traffic peak of concurrent processing, and every kind of resource, which has, corresponding puts notification The literary number of notification of putting of literary number, different resource may be the same or different, and the embodiment of the present invention is not construed as limiting this.
The corresponding method for putting the literary number of notification of the resource is calculated according to the resources occupation rate for any resource for reaching flow control threshold value It can be with are as follows: according to the resources occupation rate of preset ratio and the resource, calculate and corresponding puts the literary number of notification;For example, if the resource It is 10000 that correspondence system default, which puts the literary number of notification, when resources occupation rate is not up to flow control threshold value, which is 80%, the money Every to increase by 5% after the resources occupation rate in source reaches the flow control threshold value, it is 20% reduction that this, which puts the literary number of notification by preset ratio, with Reduce system burden;Wherein, which may be other numerical value, and the embodiment of the present invention is not construed as limiting this.Certainly, This can be calculated using other methods and puts the literary number of notification, and the embodiment of the present invention is also not construed as limiting this.
204, the business flow control module of VNF puts the literary number of notification, control according to every kind of resource in at least one resource is corresponding Business clearance amount processed.
Select any resource is corresponding to put notification from corresponding put in the literary number of notification of every kind of resource in at least one resource Literary number puts the literary number of notification as target, controls business clearance amount;Also it can choose and put by what step 203 calculating obtained at first It is notified to literary number as target and puts the literary number of notification, controls business clearance amount, the embodiment of the present invention is not construed as limiting this.
In an alternative embodiment of the invention, the literary number of notification, control are put according to every kind of resource in at least one resource is corresponding Business clearance amount processed can be with are as follows: puts the literary number of notification according to every kind of resource in at least one resource is corresponding, it is logical to determine that target is put Message number;The literary number of notification is put according to the target, controls business clearance amount.
Specifically, the literary number of notification is put according to every kind of resource in at least one resource is corresponding, determines that target puts notification text Number includes: to put in the literary number of notification from every kind of resource in at least one resource is corresponding, determines that minimum puts the literary number of notification;Most by this It is small put the literary number of notification and be determined as the target put the literary number of notification.It that is to say, when in multiple first resource and multiple Secondary resource When only existing the resources occupation rate of resource a kind of and reaching corresponding flow control threshold value, the literary number of notification of putting of the resource is determined as target report Literary number, when there are the resources occupation rates of at least two resources to reach corresponding stream in multiple first resource and multiple Secondary resource When controlling threshold value, the corresponding minimum being notified in literary number of putting of at least two resource is put into the literary number of notification, is determined as target and puts notification Literary number.
By the way that when the resources occupation rate there are many resource reaches flow control threshold value, corresponding put of the multiple resources is notified to text Minimum in number puts the literary number of notification and is determined as object message number, controls business clearance amount, can utmostly guarantee system performance Stability, avoid the case where system crash is led to due to resource heavy overload.
By putting the literary number of notification according to the target, business clearance amount is controlled, can be realized according to Current resource occupancy, On the basis of making full use of resource, processing business message as much as possible had not only guaranteed the success rate and efficiency of business processing, but also not The overall performance of system is impacted.For example, putting the literary number of notification is when the resources occupation rate of a certain resource is 85% 10000;When the resources occupation rate of the resource is 90%, putting the literary number of notification is 5000;When the resources occupation rate of the resource When being 95%, putting the literary number of notification is 1000.It that is to say, when resources occupation rate is higher, it is fewer to put the literary number of notification accordingly, to keep away Exempt to cause bigger system burden, influences the overall performance of system.
By periodically acquire NFVI layers of multiple first resources first resource occupancy and application layer multiple second The resources occupation rate of resource, according to reaching at least the one of corresponding flow control threshold value in multiple first resource and multiple Secondary resource The resources occupation rate of kind resource calculates corresponding put of at least one resource and is notified to literary number, and according at least one resource pair That answers puts the literary number of notification, controls business clearance amount, can be simultaneously according to NFVI layers and the occupation condition of application layer, to business Flow is controlled, and is avoided the occurrence of when application layer resource is not overloaded and NFVI layers of resource overload, due to can not be to Business Stream The problem of amount control effectively, and business processing success rate is caused to reduce;Further, by VNF, NFVI, VNFM and VIM Between establish channel so that VNF obtains NFVI layers of resources occupation rate, with can be according to the money of NFVI layers of multiple first resources The resources occupation rate of multiple Secondary resources of source occupancy and application layer realizes service traffics control.
Fig. 3 is a kind of service traffics control device block diagram provided in an embodiment of the present invention.Referring to Fig. 3, which is applied to Network function virtualizes NFV system, includes NFVI layers and application layer in the NFV system, wherein NFVI layers include multiple first Resource, the application layer include multiple Secondary resources, and described NFVI layers described in the multiple first resource management for by answering With multiple Secondary resources in layer, which includes that resources occupation rate obtains module 301, computing module 302 and control module 303。
Resources occupation rate obtains module 301, for periodically acquiring the first resource occupancy of the multiple first resource With the Secondary resource occupancy of the multiple Secondary resource;
Computing module 302, for obtaining the multiple first resource and institute that module is got when the resources occupation rate It states when reaching corresponding flow control threshold value there are the resources occupation rate of at least one resource in multiple Secondary resources, according to described at least one The resources occupation rate of kind resource calculates corresponding put of every kind of resource at least one resource and is notified to literary number;
Control module 303, every kind of resource is corresponding at least one resource for being obtained according to the computing module Put the literary number of notification, control business clearance amount.
In the first possible implementation provided by the invention, the control module 303 is used for:
The literary number of notification is put according to every kind of resource at least one resource is corresponding, determines that target puts the literary number of notification;
The literary number of notification is put according to the target, controls business clearance amount.
In second provided by the invention possible implementation, the control module 303 is used for:
It is put in the literary number of notification from every kind of resource at least one resource is corresponding, determines that minimum puts the literary number of notification;
The minimum is put into the literary number of notification it is determined as the target and puts the literary number of notification.
In the third possible implementation provided by the invention, the resources occupation rate obtains module 301 and is used for:
The first message that NFVI layers of the resource management module is sent is received, the first message includes at least described more The first resource occupancy of a first resource;Or,
Second message is obtained from VNF manager, the second message is that the VNF manager is set from the virtualization basis The message that the VIM of manager VIM acquisition is periodically obtained from described NFVI layers is applied, the second message includes at least described The first resource occupancy of multiple first resources.
In the 4th kind of possible implementation provided by the invention, the resources occupation rate obtains module 301 and is used for:
Receive the second message that the VNF manager is sent;Or,
Periodically the second message is obtained from the VNF manager.
In the 5th kind of possible implementation provided by the invention, described device further include:
Memory module, for by the of the first resource occupancy of the multiple first resource and the multiple Secondary resource Two resources occupation rates are stored into burdened resource management list.
In the 6th kind of possible implementation provided by the invention, the multiple first resource is included at least: network interface bandwidth, Central processing unit and memory.
It should be understood that service traffics control device provided by the above embodiment is when controlling service traffics, only more than The division progress of each functional module is stated for example, can according to need and in practical application by above-mentioned function distribution by difference Functional module complete, i.e., the internal structure of equipment is divided into different functional modules, with complete it is described above whole or Person's partial function.In addition, service traffics control device provided by the above embodiment belongs to job flow control method embodiment Same design, specific implementation process are detailed in embodiment of the method, and which is not described herein again.
Fig. 4 is a kind of block diagram of device 400 for service traffics control provided in an embodiment of the present invention.For example, device 400 may be provided as a server.Referring to Fig. 4, it further comprises one or more that device 400, which includes processing component 422, Processor, and the memory resource as representated by memory 432, for store can by the instruction of the execution of processing component 422, Such as application program.The application program stored in memory 432 may include it is one or more each correspond to one The module of group instruction.In addition, processing component 422 is configured as executing instruction, to execute the above method.
Device 400 can also include the power management that a power supply module 426 is configured as executive device 400, and one has Line or radio network interface 450 are configured as device 400 being connected to network and input and output (I/O) interface 458.Dress Setting 400 can operate based on the operating system for being stored in memory 432, such as Windows ServerTM, Mac OS XTM, UnixTM, LinuxTM, FreeBSDTMOr it is similar.
Those of ordinary skill in the art will appreciate that realizing that all or part of the steps of above-described embodiment can pass through hardware It completes, relevant hardware can also be instructed to complete by program, the program can store in a kind of computer-readable In storage medium, storage medium mentioned above can be read-only memory, disk or CD etc..
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (14)

1. a kind of job flow control method, which is characterized in that be applied to network function and virtualize NFV system, the NFV system In include NFVI layer and application layer, wherein NFVI layers include multiple first resources, the application layer includes multiple Secondary resources, The described method includes:
The Secondary resource of the first resource occupancy and the multiple Secondary resource that periodically acquire the multiple first resource accounts for With rate;
When reaching pair in the multiple first resource and the multiple Secondary resource there are the resources occupation rate of at least one resource When answering flow control threshold value, according to the resources occupation rate of at least one resource, every kind of resource at least one resource is calculated It is corresponding to put the literary number of notification, every kind of resource is corresponding put the literary number of notification refer to every kind of resource can concurrent processing most High traffic;
The literary number of notification is put according to every kind of resource at least one resource is corresponding, controls business clearance amount.
2. the method according to claim 1, wherein corresponding according to every kind of resource at least one resource The literary number of notification is put, control business clearance amount includes:
The literary number of notification is put according to every kind of resource at least one resource is corresponding, determines that target puts the literary number of notification;
The literary number of notification is put according to the target, controls business clearance amount.
3. according to the method described in claim 2, it is characterized in that, corresponding according to every kind of resource at least one resource The literary number of notification is put, determines that target puts the literary number of notification and includes:
It is put in the literary number of notification from every kind of resource at least one resource is corresponding, determines that minimum puts the literary number of notification;
The minimum is put into the literary number of notification it is determined as the target and puts the literary number of notification.
4. the method according to claim 1, wherein periodically acquiring the first resource of the multiple first resource Occupancy and the Secondary resource occupancy of the multiple Secondary resource include:
Receive the first message that NFVI layers of the resource management module is sent, the first message includes at least the multiple the The first resource occupancy of one resource;Or,
Second message is obtained from VNF manager, the second message is the VNF manager from virtualized infrastructure manager The message that the VIM that VIM is obtained periodically is obtained from described NFVI layers, the second message include at least the multiple first The first resource occupancy of resource.
5. according to the method described in claim 4, it is characterized in that, including: from VNF manager acquisition second message
Receive the second message that the VNF manager is sent;Or,
Periodically the second message is obtained from the VNF manager.
6. the method according to claim 1, wherein periodically acquiring the first resource of the multiple first resource After occupancy and the Secondary resource occupancy of the multiple Secondary resource, the method also includes:
The first resource occupancy of the multiple first resource and the Secondary resource occupancy of the multiple Secondary resource are stored Into burdened resource management list.
7. the method according to claim 1, wherein the multiple first resource includes at least: network interface bandwidth, in Central processor and memory.
8. a kind of service traffics control device, which is characterized in that be applied to network function and virtualize NFV system, the NFV system In include NFVI layer and application layer, wherein NFVI layers include multiple first resources, the application layer includes multiple Secondary resources, Described device includes:
Resources occupation rate obtains module, for periodically acquiring the first resource occupancy of the multiple first resource and described more The Secondary resource occupancy of a Secondary resource;
Computing module, for obtaining the multiple first resource that gets of module and the multiple the when the resources occupation rate When reaching corresponding flow control threshold value there are the resources occupation rate of at least one resource in two resources, according at least one resource Resources occupation rate calculates corresponding put of every kind of resource at least one resource and is notified to literary number, and every kind of resource is corresponding It puts the literary number of notification and refers to that every kind of resource is capable of the traffic peak of concurrent processing;
Control module, every kind of resource is corresponding at least one resource for being obtained according to the computing module puts notification Literary number controls business clearance amount.
9. device according to claim 8, which is characterized in that the control module is used for:
The literary number of notification is put according to every kind of resource at least one resource is corresponding, determines that target puts the literary number of notification;
The literary number of notification is put according to the target, controls business clearance amount.
10. device according to claim 9, which is characterized in that the control module is used for:
It is put in the literary number of notification from every kind of resource at least one resource is corresponding, determines that minimum puts the literary number of notification;
The minimum is put into the literary number of notification it is determined as the target and puts the literary number of notification.
11. device according to claim 8, which is characterized in that the resources occupation rate obtains module and is used for:
Receive the first message that NFVI layers of the resource management module is sent, the first message includes at least the multiple the The first resource occupancy of one resource;Or,
Second message is obtained from VNF manager, the second message is the VNF manager from virtualized infrastructure manager The message that the VIM that VIM is obtained periodically is obtained from described NFVI layers, the second message include at least the multiple first The first resource occupancy of resource.
12. device according to claim 11, which is characterized in that the resources occupation rate obtains module and is used for:
Receive the second message that the VNF manager is sent;Or,
Periodically the second message is obtained from the VNF manager.
13. device according to claim 8, which is characterized in that described device further include:
Memory module, for being provided the second of the first resource occupancy of the multiple first resource and the multiple Secondary resource Source occupancy is stored into burdened resource management list.
14. device according to claim 8, which is characterized in that the multiple first resource includes at least: network interface bandwidth, Central processing unit and memory.
CN201610190968.4A 2016-03-30 2016-03-30 Job flow control method and device Active CN105847172B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610190968.4A CN105847172B (en) 2016-03-30 2016-03-30 Job flow control method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610190968.4A CN105847172B (en) 2016-03-30 2016-03-30 Job flow control method and device

Publications (2)

Publication Number Publication Date
CN105847172A CN105847172A (en) 2016-08-10
CN105847172B true CN105847172B (en) 2019-03-19

Family

ID=56584268

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610190968.4A Active CN105847172B (en) 2016-03-30 2016-03-30 Job flow control method and device

Country Status (1)

Country Link
CN (1) CN105847172B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109450715B (en) * 2018-12-26 2022-01-25 新华三技术有限公司 Message processing method and device

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1361696A1 (en) * 2002-05-09 2003-11-12 Altima Communications, Inc. Dynamic adjustment of multicast drop thresholds to guarantee fairness between multicast and unicast frames
CN101056264A (en) * 2007-04-25 2007-10-17 华为技术有限公司 Traffic control method and service processing system
EP2642704A1 (en) * 2012-03-23 2013-09-25 Broadcom Corporation Reducing headroom
CN103856337A (en) * 2012-11-28 2014-06-11 华为技术有限公司 Resource occupation rate acquiring method, providing method, system and server thereof
CN104021046A (en) * 2014-05-29 2014-09-03 深圳市深信服电子科技有限公司 Method and device for processing applications
CN104461731A (en) * 2014-10-23 2015-03-25 杭州华三通信技术有限公司 Virtual machine resource recycling method and device in dynamic resource expanding
CN104601492A (en) * 2014-12-29 2015-05-06 上海华为技术有限公司 Method and device for controlling business flow under NFV framework
WO2015126507A1 (en) * 2014-02-24 2015-08-27 Hewlett-Packard Development Company, L.P. Providing policy information
CN105162716A (en) * 2015-07-28 2015-12-16 上海华为技术有限公司 Flow control method and apparatus under NFV configuration

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9813335B2 (en) * 2014-08-05 2017-11-07 Amdocs Software Systems Limited System, method, and computer program for augmenting a physical system utilizing a network function virtualization orchestrator (NFV-O)

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1361696A1 (en) * 2002-05-09 2003-11-12 Altima Communications, Inc. Dynamic adjustment of multicast drop thresholds to guarantee fairness between multicast and unicast frames
CN101056264A (en) * 2007-04-25 2007-10-17 华为技术有限公司 Traffic control method and service processing system
EP2642704A1 (en) * 2012-03-23 2013-09-25 Broadcom Corporation Reducing headroom
CN103856337A (en) * 2012-11-28 2014-06-11 华为技术有限公司 Resource occupation rate acquiring method, providing method, system and server thereof
WO2015126507A1 (en) * 2014-02-24 2015-08-27 Hewlett-Packard Development Company, L.P. Providing policy information
CN104021046A (en) * 2014-05-29 2014-09-03 深圳市深信服电子科技有限公司 Method and device for processing applications
CN104461731A (en) * 2014-10-23 2015-03-25 杭州华三通信技术有限公司 Virtual machine resource recycling method and device in dynamic resource expanding
CN104601492A (en) * 2014-12-29 2015-05-06 上海华为技术有限公司 Method and device for controlling business flow under NFV framework
CN105162716A (en) * 2015-07-28 2015-12-16 上海华为技术有限公司 Flow control method and apparatus under NFV configuration

Also Published As

Publication number Publication date
CN105847172A (en) 2016-08-10

Similar Documents

Publication Publication Date Title
EP3530037B1 (en) System and method for network slice management in a management plane
US10827366B2 (en) System and methods for monitoring performance of slices
CN112153700B (en) Network slice resource management method and equipment
US9838483B2 (en) Methods, systems, and computer readable media for a network function virtualization information concentrator
CN104202264B (en) Distribution method for beared resource, the apparatus and system of cloud data center network
CN108370341B (en) Resource allocation method, virtual network function manager and network element management system
EP2957071B1 (en) Method, system, and computer readable medium for providing a thinking diameter network architecture
US9588815B1 (en) Architecture for data collection and event management supporting automation in service provider cloud environments
WO2017214932A1 (en) Network-slice resource management method and apparatus
Yousaf et al. Cost analysis of initial deployment strategies for virtualized mobile core network functions
US20150215228A1 (en) Methods, systems, and computer readable media for a cloud-based virtualization orchestrator
CN108667777B (en) Service chain generation method and network function orchestrator NFVO
US20140280864A1 (en) Methods of Representing Software Defined Networking-Based Multiple Layer Network Topology Views
US20180302299A1 (en) Networking service level agreements for computer datacenters
Kukliński et al. Key Performance Indicators for 5G network slicing
CN108476175B (en) Transfer SDN traffic engineering method and system using dual variables
Houidi et al. Exact multi-objective virtual network embedding in cloud environments
Borylo et al. Latency and energy-aware provisioning of network slices in cloud networks
Kafle et al. Adaptive virtual network slices for diverse IoT services
Gharbaoui et al. On virtualization-aware traffic engineering in OpenFlow data centers networks
CN109600760A (en) Network management, equipment and system
CN114666222A (en) Operation and maintenance method, device and system of network slice and storage medium
Celenlioglu et al. An SDN based intra-domain routing and resource management model
CN108965147B (en) Network control method, device and network equipment
WO2017133020A1 (en) Method and device for policy transmission in nfv system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant