CN105840199B - A kind of static blasting coordinates the rock lane comprehensive driving method of development machine - Google Patents

A kind of static blasting coordinates the rock lane comprehensive driving method of development machine Download PDF

Info

Publication number
CN105840199B
CN105840199B CN201610317557.7A CN201610317557A CN105840199B CN 105840199 B CN105840199 B CN 105840199B CN 201610317557 A CN201610317557 A CN 201610317557A CN 105840199 B CN105840199 B CN 105840199B
Authority
CN
China
Prior art keywords
blasthole
rock
circle
development machine
resistance wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610317557.7A
Other languages
Chinese (zh)
Other versions
CN105840199A (en
Inventor
杨国梁
杨仁树
郭东明
程帅杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing CUMTB
Original Assignee
China University of Mining and Technology Beijing CUMTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing CUMTB filed Critical China University of Mining and Technology Beijing CUMTB
Priority to CN201610317557.7A priority Critical patent/CN105840199B/en
Publication of CN105840199A publication Critical patent/CN105840199A/en
Application granted granted Critical
Publication of CN105840199B publication Critical patent/CN105840199B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/006Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries

Abstract

Embodiments of the invention disclose the rock lane comprehensive driving method that a kind of static blasting coordinates development machine, are related to stone drifting technical field.Methods described, including:First lap blasthole, the second circle blasthole, the 3rd circle blasthole etc. are drilled with successively until periphery blasthole visiting water hole periphery;In first lap blasthole, the second circle blasthole, the 3rd circle blasthole etc. and periphery blasthole, resistance wire is arranged;The swelling agent matched is filled into each blasthole of arranged resistance wire;The resistance wire is powered, wire temperature control swelling agent expanded by heating after predetermined temperature, the scheduled time that is persistently powered is caused blasthole presplitting, stops being powered to the resistance wire;Driving machine gun head is directed at the spy water hole, and makes the first row pick on big gun head corresponding with the described second circle blasthole, development machine is started, fragmented rock body, forms initial vallecular cavity.The present invention is applied to the harder occasion stone drifting of rock.

Description

A kind of static blasting coordinates the rock lane comprehensive driving method of development machine
Technical field
The present invention relates to stone drifting technical field, more particularly to a kind of static blasting to coordinate the rock lane comprehensive pick of development machine Enter method.
Background technology
As China's industrialized level steps up, the demand of the energy increasingly increases, and 80% energy comes from coal. Rock tunnel engineering is the foundation stone of Dissertation of Development of Coal Industry, and the important item work of Enterprises Sustainable Developing Strategy.Rock gangway speedy drivage is The basic assurance that gurmy, exploiting field, stope " three take over greatly " are smoothed out.
Construction of rock gangway first has to brokenly pure rock, and conventional rock breaking method has two kinds of mechanical rock breaking and blasting rock-broken.Wherein, machine Tool broken rock is to use development machine broken rock, and suitable for the softer occasion of rock, Pick Loss is serious when running into solid rock, same to opportunity Dust is larger in tool rock break-off process;Blasting rock-broken is applied to the harder occasion of rock, but blast action is larger to rock convergence measure, Wall rock destabilization is easily induced, while the harm such as toxic gas, vibration is very important caused by blast action.It can be seen that single is broken All there is drawback in rock mode, have certain limitation.
The content of the invention
In view of this, the embodiment of the present invention provides the rock lane comprehensive driving method that a kind of static blasting coordinates development machine, energy Enough improve the driving speed of rock gangway.
To reach above-mentioned purpose, embodiments of the invention adopt the following technical scheme that:
A kind of static blasting coordinates the rock lane comprehensive driving method of development machine, including:
It is drilled with working face and visits water hole, the regimen in the rock in front of working face is detected using the spy water hole;
After spy water terminates, first lap blasthole, the second circle blasthole, the 3rd circle big gun are drilled with successively in the spy water hole periphery Hole ... until periphery blasthole;
First lap blasthole, the second circle blasthole, the 3rd circle blasthole ... and in the blasthole of periphery, arrange resistance wire;
The swelling agent matched is filled into each blasthole of arranged resistance wire;
The resistance wire is powered, makes wire temperature control swelling agent after predetermined temperature, the scheduled time that is persistently powered Expanded by heating causes blasthole presplitting, stops being powered to the resistance wire;
Driving machine gun head is directed at the spy water hole, and makes the first row pick and the described second circle blasthole phase on big gun head It is corresponding, development machine is started, fragmented rock body, forms initial vallecular cavity;
Using the big gun head of the development machine to the rock around initial vallecular cavity, crushed according to order from inside to outside;
Make the big gun head of the development machine peripherally profile wire cutting rock, form smooth excavation contour line.
Alternatively, the aperture for visiting water hole is 150mm, hole depth 100m;
The aperture 42mm of the first lap blasthole, hole depth 2-3m, pitch of holes 0.1m;
The second circle blasthole arranges that the distance that distance visits water hole gradually increases in the shape of a spiral, between the hole of the second circle blasthole Away from equal with the space width of the first row pick on driving machine gun head.
Alternatively, in the periphery blasthole, every three blastholes are one group, blasthole spacing 0.1m.Every group of blasthole spacing 0.5m, It is evenly arranged on the contour line of tunnel;
In every group of blasthole of periphery blasthole, resistance wire is only arranged in middle blasthole, another two blasthole is used as expansion auxiliary Hole is helped not arrange resistance wire.
Alternatively, the weight proportion of the swelling agent is:
Cement 100, calcium oxide 70, calcium carbonate 10, sodium sulphate 50, water 80.
Alternatively, the weight proportion of the swelling agent is:
Cement 100, calcium sulphoaluminate 20, red mud 50, calcium oxide 80, water 100.
Alternatively, the predetermined temperature is 20 degrees Celsius;The scheduled time is 1 hour.
A kind of static blasting provided in an embodiment of the present invention coordinates the rock lane comprehensive driving method of development machine, utilizes resistance wire And swelling agent carries out static blasting to blasthole, makes the leading presplitting of blasthole, driving machine gun head is then directed at the spy water hole, and Make the first row pick on big gun head corresponding with the described second circle blasthole, start development machine, fragmented rock body, form initial vallecular cavity, Then crushed along vallecular cavity according to order from inside to outside;Finally make the big gun head peripherally profile wire cutting of the development machine Rock, smooth excavation contour line is formed, be so combined the static blasting of blasthole with the Mechanical Crushing of development machine, energy Enough improve the driving speed of rock gangway.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is the schematic flow sheet for the rock lane comprehensive driving method embodiment that static blasting of the present invention coordinates development machine;
Fig. 2 is that static blasting of the present invention coordinates the steel for shot in the rock lane comprehensive driving method embodiment of development machine to illustrate Figure.
Embodiment
The rock lane comprehensive driving method for coordinating development machine to a kind of static blasting of the embodiment of the present invention below in conjunction with the accompanying drawings is entered Row is described in detail.
It will be appreciated that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.Base Embodiment in the present invention, those of ordinary skill in the art obtained under the premise of creative work is not made it is all its Its embodiment, belongs to the scope of protection of the invention.
Referring to Fig. 1 and Fig. 2, static blasting of the present invention coordinates the rock lane comprehensive driving method embodiment of development machine, the present invention Embodiment includes step:
S101, it is drilled with working face and visits water hole 1, the regimen in the rock in front of working face is carried out using the spy water hole Detection.
In the present embodiment, suitable for solid coefficient f > 12 rock gangway end face.Solid coefficient f represents the rock failure mechanism of rock It is difficult to degree.F=R/10, wherein, R represents the uniaxial compressive strength of rock.
The aperture for visiting water hole can be 150mm, hole depth 100m.
After S102, spy water terminate, first lap blasthole 2, second is drilled with successively in the periphery of spy water hole 1 and encloses blasthole, the 3rd Circle blasthole 3 ... until periphery blasthole 6.
In the present embodiment, after spy water terminates, first lap blasthole 2, second is drilled with successively in the periphery of spy water hole 1 and encloses blasthole 3rd, the 3rd circle blasthole the 4, the 4th encloses blasthole 5, periphery blasthole 6.
Wherein, the aperture 42mm of the first lap blasthole 2, hole depth 2-3m, pitch of holes 0.1m.
The second circle blasthole 3 arranges that the distance that distance visits water hole gradually increases in the shape of a spiral, the hole of the second circle blasthole 3 Spacing is equal with the space width of the first row pick on driving machine gun head.The specific size of blasthole by development machine pick distribution feelings Condition determines.In the present embodiment, by taking existing MH620 types hard rock mole as an example, first row totally 4 picks on its big gun head, in spiral shell Shape arrangement to be revolved, and is gradually increased apart from the distance of big gun head central shaft, the distance apart from big gun head central shaft is respectively 0.15m, 0.2m, 0.25m, 0.3m.The second circle blasthole 3 shown in corresponding diagram 2 is distinguished in the position of 4 picks of first row on the driving machine gun head Four blastholes, the mark of four blastholes is respectively 3-1,3-2,3-3,3-4.
3rd circle blasthole 4 is arranged in the outside of the second circle blasthole 3, and it is 0.5m that distance, which visits water hole (centre bore) distance,.
4th circle blasthole 5 is arranged in the outside of the 3rd circle blasthole 4, and distance the 3rd encloses blasthole 0.3m.
According to the size of section, the 5th circle, the 6th circle blasthole etc. can be also arranged, the spacing between circle and circle is 0.3m.
S103, first lap blasthole, the second circle blasthole, the 3rd circle blasthole ... and in the blasthole of periphery, arrange resistance Silk.
In the present embodiment, resistance wire is not arranged in the spy water hole as centre bore, in first lap blasthole, the second circle big gun Hole, the 3rd circle blasthole ... and in the blasthole of periphery, arrange resistance wire.The resistance wire is insulation resistance wire.
S104, the swelling agent matched is filled into each blasthole of arranged resistance wire.
In the present embodiment, grouter can be used, the swelling agent matched is filled into each big gun of arranged resistance wire Kong Zhong.
As an alternative embodiment, the weight proportion of the swelling agent is:Cement 100, calcium oxide (CaO) 70, calcium carbonate (CaCO3) 10, sodium sulphate (Na2SO4) 50, water 80.The expansion rate of the swelling agent of the present embodiment is 260.
As another alternative embodiment, the weight proportion of the swelling agent is:Cement 100, calcium sulphoaluminate 20, red mud 50, Calcium oxide (CaO) 80, water 100.The expansion rate of the swelling agent of the present embodiment is 214.
The contaminative waste residue that red mud is discharged when being aluminium industry extraction aluminum oxide, average often produces 1 ton of aluminum oxide, attached Band produces 1.0~2.0 tons of red muds.
S105, the resistance wire is powered, makes wire temperature control swollen after predetermined temperature, the scheduled time that is persistently powered Swollen dose of expanded by heating causes blasthole presplitting, stops being powered to the resistance wire.
In the present embodiment, the predetermined temperature is 20 degrees Celsius;The scheduled time is 1 hour.
In the present embodiment, spy water hole diameter is relatively large, and does not arrange resistance wire and perfusion swelling agent in water hole is visited, It can so make full use of and visit the spy water hole that water terminates to be left afterwards, provide free face for the static blasting of first lap blasthole, just In the presplitting of first lap blasthole, precrack is formed between adjacent blasthole in first lap blasthole.
S106, the machine gun head alignment spy water hole will be tunneled, and make the first row pick and the described second circle on big gun head Blasthole is corresponding, starts development machine, fragmented rock body, forms initial vallecular cavity.
In the present embodiment, driving machine gun head is directed at the spy water hole, and make first row pick on big gun head with it is described Second circle blasthole is corresponding, is easy to driving machine gun head to force in rock mass, makes rock mass quick crashing.
S107, using the big gun head of the development machine to the rock around initial vallecular cavity, carried out according to order from inside to outside It is broken.
S108, make the big gun head of the development machine peripherally profile wire cutting rock, form smooth outline excavation Line.
A kind of static blasting provided in an embodiment of the present invention coordinates the rock lane comprehensive driving method of development machine, utilizes resistance wire And swelling agent carries out static blasting to blasthole, makes the leading presplitting of blasthole, driving machine gun head is then directed at the spy water hole, and Make the first row pick on big gun head corresponding with the described second circle blasthole, start development machine, fragmented rock body, form initial vallecular cavity, Then crushed along vallecular cavity according to the order of (i.e. from centre bore towards periphery blasthole) from inside to outside;Finally make the development machine Big gun head peripherally profile wire cutting rock, form smooth excavation contour line, so by the static blasting of blasthole with The Mechanical Crushing of development machine is combined, it is possible to increase the driving speed of rock gangway.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any Those familiar with the art the invention discloses technical scope in, the change or replacement that can readily occur in, all should It is included within the scope of the present invention.Therefore, protection scope of the present invention should be defined by scope of the claims.

Claims (6)

1. a kind of static blasting coordinates the rock lane comprehensive driving method of development machine, it is characterised in that including:
It is drilled with working face and visits water hole, the regimen in the rock in front of working face is detected using the spy water hole;
After spy water terminates, first lap blasthole, the second circle blasthole, the 3rd circle big gun are drilled with successively in the spy water hole periphery Hole ... until periphery blasthole;
First lap blasthole, the second circle blasthole, the 3rd circle blasthole ... and in the blasthole of periphery, arrange resistance wire;
The swelling agent matched is filled into each blasthole of arranged resistance wire;
The resistance wire is powered, wire temperature control swelling agent after predetermined temperature, the scheduled time that is persistently powered is heated Expansion causes blasthole presplitting, stops being powered to the resistance wire;
Driving machine gun head is directed at the spy water hole, and makes the first row pick on big gun head relative with the described second circle blasthole Should, development machine is started, fragmented rock body, forms initial vallecular cavity;
Using the big gun head of the development machine to the rock around initial vallecular cavity, crushed according to order from inside to outside;
Make the big gun head of the development machine peripherally profile wire cutting rock, form smooth excavation contour line.
2. static blasting according to claim 1 coordinates the rock lane comprehensive driving method of development machine, it is characterised in that
The aperture for visiting water hole is 150mm, hole depth 100m;
The aperture 42mm of the first lap blasthole, hole depth 2-3m, pitch of holes 0.1m;
It is described second circle blasthole arranges in the shape of a spiral, distance visit water hole distance gradually increase, second circle blasthole pitch of holes with The space width of the first row pick tunneled on machine gun head is equal.
3. static blasting according to claim 1 or 2 coordinates the rock lane comprehensive driving method of development machine, it is characterised in that
In the periphery blasthole, every three blastholes are one group, blasthole spacing 0.1m;Every group of blasthole spacing 0.5m, is evenly arranged in On the contour line of tunnel;
In every group of blasthole of periphery blasthole, resistance wire is only arranged in middle blasthole, another two blasthole is as expansion via hole Do not arrange resistance wire.
4. static blasting according to claim 1 coordinates the rock lane comprehensive driving method of development machine, it is characterised in that described The weight proportion of swelling agent is:
Cement 100, calcium oxide 70, calcium carbonate 10, sodium sulphate 50, water 80.
5. static blasting according to claim 1 coordinates the rock lane comprehensive driving method of development machine, it is characterised in that described The weight proportion of swelling agent is:
Cement 100, calcium sulphoaluminate 20, red mud 50, calcium oxide 80, water 100.
6. static blasting according to claim 1 coordinates the rock lane comprehensive driving method of development machine, it is characterised in that described Predetermined temperature is 20 degrees Celsius;The scheduled time is 1 hour.
CN201610317557.7A 2016-05-12 2016-05-12 A kind of static blasting coordinates the rock lane comprehensive driving method of development machine Active CN105840199B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610317557.7A CN105840199B (en) 2016-05-12 2016-05-12 A kind of static blasting coordinates the rock lane comprehensive driving method of development machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610317557.7A CN105840199B (en) 2016-05-12 2016-05-12 A kind of static blasting coordinates the rock lane comprehensive driving method of development machine

Publications (2)

Publication Number Publication Date
CN105840199A CN105840199A (en) 2016-08-10
CN105840199B true CN105840199B (en) 2017-12-29

Family

ID=56591896

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610317557.7A Active CN105840199B (en) 2016-05-12 2016-05-12 A kind of static blasting coordinates the rock lane comprehensive driving method of development machine

Country Status (1)

Country Link
CN (1) CN105840199B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105736000B (en) * 2016-03-08 2018-12-21 北京住总集团有限责任公司 The construction method of shield molding tunnel nullring section of jurisdiction is removed in a kind of static blasting
CN110259468A (en) * 2019-05-31 2019-09-20 江苏锐成机械有限公司 Driving engineering method of the shield machine in full ground consisting of hard rock
CN110847916B (en) * 2019-10-22 2020-11-24 中国电建集团铁路建设有限公司 Construction method for shield tunneling civil air defense engineering

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR970007384B1 (en) * 1994-07-13 1997-05-08 Sunkyong Const Co Method for excavating a working face
KR100866105B1 (en) * 2007-03-20 2008-10-31 정영문 blast construction working method for a tunnel
CN102519328B (en) * 2011-12-30 2013-05-22 中国矿业大学(北京) Stone drift driving method adopting technologies of water cutting and cut blasting
CN103291308B (en) * 2013-05-29 2015-09-16 北京中铁瑞威基础工程有限公司 For boom-type roadheader and the method for tunnel construction of constructing tunnel
CN104390535B (en) * 2014-10-11 2016-03-23 中国矿业大学(北京) Hard rock deep hole Cut Blasting method in one

Also Published As

Publication number Publication date
CN105840199A (en) 2016-08-10

Similar Documents

Publication Publication Date Title
CN105840199B (en) A kind of static blasting coordinates the rock lane comprehensive driving method of development machine
CN100564803C (en) Rock lane digging method
Zhang et al. The stability and roof-support optimization of roadways passing through unfavorable geological bodies using advanced detection and monitoring methods, among others, in the Sanmenxia Bauxite Mine in China’s Henan Province
CN107701188B (en) One kind cutting top destressing method for the mined out side static state spalling of gob side entry driving thin coal pillar
CN106225618B (en) A kind of method that semo-infinite rock mass borehole blasting expansion is split
Yang et al. Experimental and theoretical design for decreasing wear in conical picks in rotation-drilling cutting process
CN109470099B (en) Rock breaking process with mixed smooth blasting and splitting blasting
CN108643910A (en) A method of controlling caving for coal mine stope tight roof Advance presplitting
CN101363701A (en) Double-medium decoupling fracture damage blasting control method and auget
CN104596375A (en) Fully mechanized excavation construction method for rock roadway
CN105890475A (en) Underpass superhighway tunnel trunk excavation static blasting construction method
CN101363321A (en) Application method for horizontal V-shaped tunnel face for digging tunnel
CN109386289B (en) Blasting, hole sealing and grouting integrated construction method
CN104776765A (en) Static blasting and energy-gathering device and blasting method thereof
CN103790591A (en) Comprehensive mechanized impact type rock tunneling machine
CN108917503A (en) The horizontal presplit blasting method of deep hole applied to power station rock excavation
CN105507907B (en) A kind of method that hydrogen sulfide gas discharge rate is reduced in constructing tunnel
CN204594356U (en) The quick spacing charge constitution of a kind of novel tunnel light blast hole
CN101922902B (en) Method for weakening strength of hard rock
CN110500107B (en) Shield tunneling machine normal-pressure warehouse opening front maintenance tool changing construction method
CN109578058B (en) Method for improving gas extraction concentration of extraction borehole through auxiliary drilling
Sazid et al. Effective explosive energy utilization for engineering blasting–initial results of an inventive stemming plug, SPARSH
CN107014263B (en) Eccentric powder charge joint-cutting pipe and roadway construction method applied to tunnelling construction
CN105298502B (en) The construction method of rock hole wall large diameter pipeline Blasting Excavation
CN201661242U (en) Large-aperture petroleum drilling and production impactor

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Yang Guoliang

Inventor after: Yang Renshu

Inventor after: Guo Dongming

Inventor after: Cheng Shuaijie

Inventor before: Yang Renshu

Inventor before: Yang Guoliang

Inventor before: Guo Dongming

GR01 Patent grant