CN105836680A - Installation device for electric power construction - Google Patents

Installation device for electric power construction Download PDF

Info

Publication number
CN105836680A
CN105836680A CN201610328493.0A CN201610328493A CN105836680A CN 105836680 A CN105836680 A CN 105836680A CN 201610328493 A CN201610328493 A CN 201610328493A CN 105836680 A CN105836680 A CN 105836680A
Authority
CN
China
Prior art keywords
box body
motor
power construction
flat board
installation equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610328493.0A
Other languages
Chinese (zh)
Other versions
CN105836680B (en
Inventor
王宗丽
宋强
张涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longkou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Longkou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longkou Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Longkou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority to CN201610328493.0A priority Critical patent/CN105836680B/en
Publication of CN105836680A publication Critical patent/CN105836680A/en
Application granted granted Critical
Publication of CN105836680B publication Critical patent/CN105836680B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F11/00Lifting devices specially adapted for particular uses not otherwise provided for
    • B66F11/04Lifting devices specially adapted for particular uses not otherwise provided for for movable platforms or cabins, e.g. on vehicles, permitting workmen to place themselves in any desired position for carrying out required operations
    • B66F11/044Working platforms suspended from booms

Abstract

The invention discloses an installation device for electric power construction. The installation device comprises a flat plate. Wheels are arranged at the lower portion of the flat plate. A supporting frame is arranged at the upper portion of the flat plate. A box body is arranged on the supporting frame. A first motor is arranged at the lower portion of the box body. A center shaft is arranged on the first motor. A coil is arranged at one end of the center shaft. A thin wire is wound around the coil. The thin wire is led to a wire outlet hole formed in the box body. An angle plate is further arranged on the box body. A pointer is arranged on the angle plate. Two opposite long rods are arranged on the flat plate. A transverse rod is arranged at the upper portions of the long rods. A pulley set is arranged at the lower portion of the transverse rod. A hook is arranged at the lower portion of the pulley set. A second motor is further arranged on the flat plate. The second motor is connected with the pulley set through a pull wire. The hook is connected with a carriage box through a pull wire. The installation device has the beneficial effects that functions are diverse, measuring, transporting and installing are integrated, and use is convenient.

Description

A kind of power construction installation equipment
Technical field
The present invention relates to electrical equipment technical field, be specially a kind of power construction installation equipment
Background technology
In power system production process, owing to job location is many in the wild, safety, the rapid construction therefore constructed are each targets ultimate in engineering.At present, in most work progress, many work manually to be carried out.In order to provide quality service, each electric company is equipped with repair car of electric power.Breakdown van is generally picking-up vehicle, and driving cabin places repairing apparatus, standby redundancy in sitting repair personnel, container.The method of this power construction and repairing has certain limitation, the difficulty considering power construction, installing and overhaul, and we have proposed for this and a kind of collects measurement, transports and be installed on power construction installation equipment all over the body, meets use demand.
Summary of the invention
The invention provides a kind of power construction installation equipment, Main Function is to provide and a kind of collects measurements, transports and be installed on power construction erecting device all over the body, meets use needs.The power construction of present invention installation equipment, reasonable in design, diverse in function, both power construction place and equipment can be measured, additionally it is possible to power equipment transported and installs, substantially increasing work efficiency.
nullFor solving the problems referred to above,The embodiment of the present application provides a kind of power construction installation equipment,Including flat board,Described flat board bottom is provided with wheel,Described flat board top is provided with bracing frame,A box body it is provided with on support frame as described above,Described box body bottom is provided with the first motor,It is provided with central shaft on described first motor,One end of described central shaft is provided with coiling,It is wound with fine rule on described coiling,Described fine rule leads to the wire hole arranged on box body,It is additionally provided with angle board on described box body,It is provided with pointer on described angle board,Two relative stocks it are provided with on described flat board,The top of described stock is provided with a cross bar,Described cross bar bottom is provided with assembly pulley,Described assembly pulley bottom is provided with hook,The second motor it is additionally provided with on described flat board,Described second motor is connected with assembly pulley by wire drawing,Described hook is connected with carriage box by wire drawing.
As the preferred embodiment of this programme, the side of described angle board is additionally provided with the dial gauge isometric with pointer.
As the preferred embodiment of this programme, described box body is movably housed on bracing frame, and support frame as described above is movably housed on flat board.
As the preferred embodiment of this programme, between described two relative stocks, it is provided with more than one support bar.
As the preferred embodiment of this programme, described two relative stocks are telescopic, and the side of two stocks is additionally provided with fixing device.
The one or more technical schemes provided in the embodiment of the present application, at least have the following technical effect that or advantage: reasonable in design, diverse in function, both power construction place and equipment can be measured, power equipment can also be transported and install, substantially increase work efficiency.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, the accompanying drawing used required in embodiment or description of the prior art will be briefly described below, apparently, accompanying drawing in describing below is only some embodiments of the present invention, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the structural representation of the embodiment of the present application;
Fig. 2 is the schematic diagram of the stock of the embodiment of the present application.
In figure: 1 wheel, 2 supports, 3 flat boards, 4 bracing frames, 5 coilings, 6 fine rules, 7 wire holes, 8 pointers, 9 dial gauges, 10 box bodys, 11 angle boards, 12 central shafts, 13 first motor, 14 stocks, 141 support bars, 15 cross bars, 16 assembly pulleys, 17 hooks, 18 wire drawings, 19 fixing devices, 20 second motor and 21 carriage box.
Detailed description of the invention
The invention provides a kind of power construction installation equipment, Main Function is to provide and a kind of collects measurements, transports and be installed on power construction erecting device all over the body, meets use needs.The power construction of present invention installation equipment, reasonable in design, diverse in function, both power construction place and equipment can be measured, additionally it is possible to power equipment transported and installs, substantially increasing work efficiency.
In order to be better understood from technique scheme, below in conjunction with Figure of description and specific embodiment, technique scheme is described in detail.
Refer to shown in Fig. 1-2, a kind of power construction installation equipment, including flat board 3, also include wheel 1, support 2, bracing frame 4, coiling 5, fine rule 6, wire hole 7, pointer 8, dial gauge 9, box body 10, angle board 11, central shaft the 12, first motor 13, stock 14, support bar 141, cross bar 15, assembly pulley 16, hook 17, drag hook 18, fixing device the 19, second motor 20 and carriage box 21.
nullWherein,In actual applications,Described flat board 3 bottom is provided with wheel 1,Flat board 3 can be dragged by wheel 1,Power equipment can be placed on flat board 3,Thus conveniently transport,Described flat board 3 top is provided with bracing frame 4,A box body 10 it is provided with on support frame as described above 4,Described box body 10 is movably housed on bracing frame 4,Support frame as described above 4 is movably housed on flat board 3,Described box body 10 bottom is provided with the first motor 13,It is provided with central shaft 12 on described first motor 13,One end of described central shaft 12 is provided with coiling 5,It is wound with fine rule 6 on described coiling 5,Described fine rule 6 leads to the wire hole 7 arranged on box body 10,First motor 13 is driven coiling 5 to rotate by central shaft 12 and then is discharged from wire hole 7 by fine rule 6,Such that it is able to power construction place and power equipment etc. are carried out measurement of length,Described box body 10 is additionally provided with angle board 11,It is provided with pointer 8 on described angle board 11,The side of described angle board 11 is additionally provided with the dial gauge 9 isometric with pointer 8,By angle board 11、Pointer 8 and dial gauge 9 can calculate building and the height of construction equipment in construction site,Thus convenient construction.
nullWherein,In actual applications,Two relative stocks 14 it are provided with on described flat board 3,The top of described stock 14 is provided with a cross bar 15,Described cross bar 15 bottom is provided with assembly pulley 16,Described assembly pulley 16 bottom is provided with hook 17,The second motor 20 it is additionally provided with on described flat board 3,Described second motor 20 is connected with assembly pulley 16 by wire drawing 18,Described hook 17 is connected with carriage box 21 by wire drawing 18,Second motor 20 pulls assembly pulley 16 by wire drawing 18 and then pulls hook 17 to move up,And then pull carriage box 21 to move up by hook 17,Such that it is able to by power construction equipment、Material and staff are dragged to high-altitude,Thus facilitate installation and the maintenance etc. of power equipment,It is provided with more than one support bar 141 between described two relative stocks 14,Stock 14 and support bar 141 can be used as cat ladder,Thus facilitate staff to climb to eminence power equipment to be installed and overhauling,Described two relative stocks 14 are telescopic,And two the side of stock 14 be additionally provided with fixing device 19,Can be according to the height of the Level Change stock 14 of power equipment,And two stocks 14 are fixed by the fixing device 19 also set up by the side of two stocks 14,The convenient suitably height that is transported to by power equipment etc. uses for electric power installation and maintenance.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, and without departing from the spirit or essential characteristics of the present invention, it is possible to realize the present invention in other specific forms.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is limited by claims rather than described above, it is intended that include in the present invention by all changes fallen in the implication of equivalency and scope of claim, should not be considered as limiting involved claim by any reference in claim.
The above; it is only the present invention preferably detailed description of the invention; but protection scope of the present invention is not limited thereto; any those familiar with the art is in the technical scope that the invention discloses; according to technical scheme and inventive concept equivalent or change in addition thereof, all should contain within protection scope of the present invention.

Claims (5)

  1. null1. a power construction installation equipment,Including flat board (3),It is characterized in that: described flat board (3) bottom is provided with wheel (1),Described flat board (3) top is provided with bracing frame (4),A box body (10) it is provided with on support frame as described above (4),Described box body (10) bottom is provided with the first motor (13),It is provided with central shaft (12) on described first motor (13),One end of described central shaft (12) is provided with coiling (5),Fine rule (6) it is wound with on described coiling (5),Described fine rule (6) leads to the upper wire hole (7) arranged of box body (10),Described box body (10) is additionally provided with angle board (11),Pointer (8) it is provided with on described angle board (11),Two relative stocks (14) it are provided with on described flat board (3),The top of described stock (14) is provided with a cross bar (15),Described cross bar (15) bottom is provided with assembly pulley (16),Described assembly pulley (16) bottom is provided with hook (17),The second motor (20) it is additionally provided with on described flat board (3),Described second motor (20) is connected with assembly pulley (16) by wire drawing (18),Described hook (17) is connected with carriage box (21) by wire drawing (18).
  2. A kind of power construction installation equipment the most according to claim 1, it is characterised in that: the side of described angle board (11) is additionally provided with the dial gauge (9) isometric with pointer (8).
  3. A kind of power construction installation equipment the most according to claim 1, it is characterised in that: described box body (10) is movably housed on bracing frame (4), and support frame as described above (4) is movably housed on flat board (3).
  4. A kind of power construction installation equipment the most according to claim 1, it is characterised in that: it is provided with more than one support bar (141) between described two relative stocks (14).
  5. A kind of power construction installation equipment the most according to claim 1, it is characterised in that: described two relative stocks (14) are telescopic, and the side of two stocks (14) is additionally provided with fixing device (19).
CN201610328493.0A 2016-05-18 2016-05-18 A kind of power construction installation equipment Expired - Fee Related CN105836680B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610328493.0A CN105836680B (en) 2016-05-18 2016-05-18 A kind of power construction installation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610328493.0A CN105836680B (en) 2016-05-18 2016-05-18 A kind of power construction installation equipment

Publications (2)

Publication Number Publication Date
CN105836680A true CN105836680A (en) 2016-08-10
CN105836680B CN105836680B (en) 2018-09-28

Family

ID=56592638

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610328493.0A Expired - Fee Related CN105836680B (en) 2016-05-18 2016-05-18 A kind of power construction installation equipment

Country Status (1)

Country Link
CN (1) CN105836680B (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4466506A (en) * 1982-01-15 1984-08-21 Dolenti Alfred N Wire lift device for high tension electric line
JPH0912285A (en) * 1995-06-27 1997-01-14 Nippon Densetsu Kogyo Co Ltd Vehicle for high lift work
CN1241713A (en) * 1998-07-14 2000-01-19 董非 Measurement method and measurement instrument for overhead wire for electric locomotive
CN2881524Y (en) * 2006-03-17 2007-03-21 周纬 Portable height measuring rule for electric power appliance
CN201521919U (en) * 2009-09-25 2010-07-07 上海半导体照明工程技术研究中心 Device for testing road lamp
CN201562914U (en) * 2009-12-08 2010-08-25 武汉大学 Self-propelled intelligent power overhaul lifting truck
CN101907458A (en) * 2010-08-18 2010-12-08 陈连宇 Simple height indicator
CN203274734U (en) * 2013-06-03 2013-11-06 长春理工大学 Vehicle-mounted photoelectric automatic measuring device of power transmission line, target dimension and spacing
CN203349738U (en) * 2013-06-28 2013-12-18 国家电网公司 Height measuring instrument
CN203928921U (en) * 2014-04-16 2014-11-05 国家电网公司 Power matching network engineering measuring scale
CN104953510A (en) * 2015-07-03 2015-09-30 国网山东商河县供电公司 Insulating operation rod capable of measuring distances and heights
CN205634819U (en) * 2016-05-18 2016-10-12 国网山东省电力公司龙口市供电公司 Erection equipment for electric power construction

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4466506A (en) * 1982-01-15 1984-08-21 Dolenti Alfred N Wire lift device for high tension electric line
JPH0912285A (en) * 1995-06-27 1997-01-14 Nippon Densetsu Kogyo Co Ltd Vehicle for high lift work
CN1241713A (en) * 1998-07-14 2000-01-19 董非 Measurement method and measurement instrument for overhead wire for electric locomotive
CN2881524Y (en) * 2006-03-17 2007-03-21 周纬 Portable height measuring rule for electric power appliance
CN201521919U (en) * 2009-09-25 2010-07-07 上海半导体照明工程技术研究中心 Device for testing road lamp
CN201562914U (en) * 2009-12-08 2010-08-25 武汉大学 Self-propelled intelligent power overhaul lifting truck
CN101907458A (en) * 2010-08-18 2010-12-08 陈连宇 Simple height indicator
CN203274734U (en) * 2013-06-03 2013-11-06 长春理工大学 Vehicle-mounted photoelectric automatic measuring device of power transmission line, target dimension and spacing
CN203349738U (en) * 2013-06-28 2013-12-18 国家电网公司 Height measuring instrument
CN203928921U (en) * 2014-04-16 2014-11-05 国家电网公司 Power matching network engineering measuring scale
CN104953510A (en) * 2015-07-03 2015-09-30 国网山东商河县供电公司 Insulating operation rod capable of measuring distances and heights
CN205634819U (en) * 2016-05-18 2016-10-12 国网山东省电力公司龙口市供电公司 Erection equipment for electric power construction

Also Published As

Publication number Publication date
CN105836680B (en) 2018-09-28

Similar Documents

Publication Publication Date Title
US9592998B2 (en) Apparatus for transporting commercial and industrial appliance units
CN102338845B (en) Insulation characteristic test device of insulating rod
CN104131519B (en) A kind of bridging toughening equipment construction method
CN104291223A (en) Adjustable support leg hook type lifting double-locking mounting mechanism for electromechanical equipment in substation
CN104527691A (en) Mounting method and mounting bases for locomotive underframe parts
CN205634819U (en) Erection equipment for electric power construction
CN105836680A (en) Installation device for electric power construction
CN203865931U (en) Hoisting combination tool of distribution transformer
CN204079309U (en) Mechanical and electric equipment installation mechanism of supporting leg adjustable hook type lifting Dual-locking substation
CN204474128U (en) A kind of Electric equipment hoisting device
CN103381996B (en) HGIS self-adaption emergency first-aid repair device and applications thereof
CN206813806U (en) A kind of weighing system based on intelligent conveying process
CN206336292U (en) Defectoscope and inspection car
CN105977889B (en) The installation method and auxiliary adjustment frock of a kind of enclosed busbar
CN203021062U (en) Lifting-type gallery-bridge loading platform
CN104112996B (en) Change current transformer Portable handcart and preparation method thereof
CN110817693A (en) Quick installation of wiping line, maintenance device
CN109987523A (en) A kind of electromechanical mounting device for shop equipment installation
CN205593522U (en) Detection and monitoring device of slipform platform
CN204198283U (en) A kind of hospital transmits the feedway of valuable medicine equipment
CN105666434B (en) A kind of rudder blade tray tool
CN204675782U (en) A kind of lifting work platform
CN204162436U (en) A kind of silicon core mounting device of reducing furnace
CN204906129U (en) Change vibrating motor's device
CN105467350B (en) A kind of vehicle-mounted extra-high voltage CVT verifications Z-type lifting gear and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Hu Shaobo

Inventor after: Wang Ping

Inventor after: Sun Lijun

Inventor after: Zhao Jun

Inventor after: Wang Zongli

Inventor after: Meng Tao

Inventor after: Song Qiang

Inventor after: Zhang Tao

Inventor before: Wang Zongli

Inventor before: Song Qiang

Inventor before: Zhang Tao

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180928