CN105826892A - 用于减少山区750kV同杆双回线路绕击暴露弧的屏蔽线系统 - Google Patents

用于减少山区750kV同杆双回线路绕击暴露弧的屏蔽线系统 Download PDF

Info

Publication number
CN105826892A
CN105826892A CN201610348393.4A CN201610348393A CN105826892A CN 105826892 A CN105826892 A CN 105826892A CN 201610348393 A CN201610348393 A CN 201610348393A CN 105826892 A CN105826892 A CN 105826892A
Authority
CN
China
Prior art keywords
tower
shielding
line
common
phase conductor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610348393.4A
Other languages
English (en)
Other versions
CN105826892B (zh
Inventor
邓军波
张冠军
李元
穆海宝
韩彦华
高峰
张鹏
齐卫东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Xian Jiaotong University
Electric Power Research Institute of State Grid Shaanxi Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Xian Jiaotong University
Electric Power Research Institute of State Grid Shaanxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Xian Jiaotong University, Electric Power Research Institute of State Grid Shaanxi Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610348393.4A priority Critical patent/CN105826892B/zh
Publication of CN105826892A publication Critical patent/CN105826892A/zh
Application granted granted Critical
Publication of CN105826892B publication Critical patent/CN105826892B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G13/00Installations of lightning conductors; Fastening thereof to supporting structure

Abstract

本发明公开了一种用于减少山区750kV同杆双回线路绕击暴露弧的屏蔽线系统,包括屏蔽线横担、固定装置和屏蔽线,蔽线横担固定到塔身一段远离山体的外侧上,所述塔身一段为750kV同杆双回线路杆塔的一部分;屏蔽线固定在屏蔽线横担上;塔身一段、屏蔽线横担及屏蔽线整体位于750kV同杆双回线路中架空地线、A相导线、B相导线及C相导线的下方;屏蔽线横担的长度比A相导线、B相导线及C相导线的横担长度长。本发明通过对位于地面倾斜角大于20度的山区750kV输电线路,在其导线的下方杆塔的外侧安装屏蔽线,从而减少导线对雷电的暴露弧,进而达到降低导线被绕击的概率,提高输电线路运行的可靠性。

Description

用于减少山区750kV同杆双回线路绕击暴露弧的屏蔽线系统
技术领域
本发明属于高电压与绝缘技术领域,具体涉及一种用于减少位于山区750kV同杆双回线路绕击暴露弧的屏蔽线系统。
背景技术
对于位于山区的传统750kV同杆双回线路,由于地面倾斜角增大,地面对导线的屏蔽性能减弱,使得导线对雷电的暴露弧增加,输电导线遭受雷电绕击的概率迅速上升。在输电导线遭受绕击时,导线上的电压会上升的很高,容易造成线路绝缘子闪络,从而导致线路跳闸事故;另外雷电产生的过电压会沿着线路传播到变电站,造成电站内的设备因为过电压过高而损坏,影响电力系统的安全可靠运行。
发明内容
本发明的目的在于提供一种用于减少山区750kV同杆双回线路绕击暴露弧的屏蔽线系统,以解决山区的750kV同杆双回线路,由于地面倾斜角增大,输电导线经常遭受雷电绕击的问题;本发明实施后能够有效地降低绕击率。
为实现上述目的,本发明采用如下技术方案:
用于减少山区750kV同杆双回线路绕击暴露弧的屏蔽线系统,包括屏蔽线横担、固定装置和屏蔽线,蔽线横担固定到塔身一段远离山体的外侧上,所述塔身一段为750kV同杆双回线路杆塔的一部分;屏蔽线固定在屏蔽线横担上。
进一步的,塔身一段、屏蔽线横担及屏蔽线整体位于750kV同杆双回线路中架空地线、A相导线、B相导线及C相导线的下方。
进一步的,屏蔽线所在横担与C相导线所在横担之间的垂直距离和C相导线所在横担与B相导线所在横担之间的垂直距离相同。
进一步的,屏蔽线横担的长度比A相导线、B相导线及C相导线的横担长度长。
进一步的,屏蔽线的位置较A相导线、B相导线及C相导线更远离杆塔。
进一步的,所述杆塔固定于地面倾斜角大于20度的山区。
相对于现有技术,本发明具有以下有益效果:本发明通过对位于地面倾斜角大于20度的山区750kV输电线路,在其导线的下方杆塔的外侧安装屏蔽线,从而减少导线对雷电的暴露弧,进而达到减低导线被绕击的概率,提高输电线路运行的可靠性。
本发明尽可能地增加架设屏蔽线的横担的长度,以达到进一步增加屏蔽线的屏蔽范围,减少导线对雷电的暴露弧,进而降低导线被绕击的概率,提高输电线路运行的可靠性的目的。
附图说明
图1为本发明的结构示意图;
图2为本发明的在杆塔上的安装位置示意图:
图3为平原地区输电线路杆塔的暴露弧示意图,其弧长为hijk;
图4为山区输电线路杆塔的暴露弧示意图,其弧长为hijk`;
图5山区输电线路杆塔安装屏蔽线后的暴露弧示意图,其弧长为hij`。
其中:1、塔身一段,2、屏蔽线横担,3、固定装置,4、屏蔽线,5、6、7、8螺母,9、架空地线G,10、A相导线,11、B相导线,12、C相导线,13、杆塔。
具体实施方式
下面结合附图对本发明作进一步详细说明。
请参阅图1所示,本发明一种用于减少山区750kV同杆双回线路绕击暴露弧的屏蔽线系统,包括屏蔽线横担2、固定装置3和屏蔽线4;屏蔽线横担2通过螺母5、6固定到塔身一段1远离山体的外侧上,塔身一段1为杆塔13的一部分。屏蔽线4通过固定装置3和螺母7、8固定到横担2上。
请参阅图2所示,塔身一段1、屏蔽线横担2及屏蔽线4应整体位于架空地线9、A相导线10、B相导线11及C相导线12的下方。横担2的长度应该比A相导线10、B相导线11及C相导线12的横担长度都要长,以增加屏蔽的线的屏蔽范围。
请参阅图3所示,平原地区输电线路杆塔的暴露弧弧长为hijk,雷电绕击导线的概率较小。
请参阅图4所示,对于山区的输电线路杆塔,其暴露弧弧长为hijk`,比平原地区增加了很多,雷电绕击导线的概率会随着地面倾斜角的增大而急剧增加,线路的安全性变差。
请参阅图5所示,对于山区的输电线路杆塔,安装本发明的屏蔽线后,其暴露弧弧长变为hij`,比以上两种情况都缩短了很多,雷电绕击导线的概率会随之下降,从而达到降低雷电绕击率,提高线路的安全性可靠性的目的。

Claims (6)

1.用于减少山区750kV同杆双回线路绕击暴露弧的屏蔽线系统,其特征在于,包括屏蔽线横担(2)、固定装置(3)和屏蔽线(4),蔽线横担(2)固定到塔身一段(1)远离山体的外侧上,所述塔身一段(1)为750kV同杆双回线路杆塔(13)的一部分;屏蔽线(4)固定在屏蔽线横担(2)上。
2.根据权利要求1所述的用于减少山区750kV同杆双回线路绕击暴露弧的屏蔽线系统,其特征在于,塔身一段(1)、屏蔽线横担(2)及屏蔽线(4)整体位于750kV同杆双回线路中架空地线(9)、A相导线(10)、B相导线(11)及C相导线(12)的下方。
3.根据权利要求2所述的用于减少山区750kV同杆双回线路绕击暴露弧的屏蔽线系统,其特征在于,屏蔽线(4)所在横担与C相导线(12)所在横担之间的垂直距离和C相导线(12)所在横担与B相导线(11)所在横担之间的垂直距离相同。
4.根据权利要求1所述的用于减少山区750kV同杆双回线路绕击暴露弧的屏蔽线系统,其特征在于,屏蔽线横担(2)的长度比同侧A相导线(10)、B相导线(11)及C相导线(12)的横担长度长。
5.根据权利要求1所述的用于减少山区750kV同杆双回线路绕击暴露弧的屏蔽线系统,其特征在于,屏蔽线(4)的位置较同侧A相导线(10)、B相导线(11)及C相导线(12)更远离杆塔(13)。
6.根据权利要求1所述的用于减少山区750kV同杆双回线路绕击暴露弧的屏蔽线系统,其特征在于,所述杆塔(13)固定于地面倾斜角大于20度的山区。
CN201610348393.4A 2016-05-23 2016-05-23 用于减少山区750kV同杆双回线路绕击暴露弧的屏蔽线系统 Expired - Fee Related CN105826892B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610348393.4A CN105826892B (zh) 2016-05-23 2016-05-23 用于减少山区750kV同杆双回线路绕击暴露弧的屏蔽线系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610348393.4A CN105826892B (zh) 2016-05-23 2016-05-23 用于减少山区750kV同杆双回线路绕击暴露弧的屏蔽线系统

Publications (2)

Publication Number Publication Date
CN105826892A true CN105826892A (zh) 2016-08-03
CN105826892B CN105826892B (zh) 2018-03-02

Family

ID=56530454

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610348393.4A Expired - Fee Related CN105826892B (zh) 2016-05-23 2016-05-23 用于减少山区750kV同杆双回线路绕击暴露弧的屏蔽线系统

Country Status (1)

Country Link
CN (1) CN105826892B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3379668A1 (de) * 2017-03-24 2018-09-26 Axpo Power AG Umrüstverfahren bzw. herstellungsverfahren für freileitungsmasten und freileitungsmasten

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2013998A (en) * 1978-02-03 1979-08-15 Energie Froide Int Sa Improvements in or relating to electric power lines
CN201256276Y (zh) * 2008-09-25 2009-06-10 张俊奇 架空输电线路防绕击雷的屏蔽装置
CN101499638A (zh) * 2009-03-13 2009-08-05 国网电力科学研究院 一种提高超、特高压输电线路防雷能力的方法
CN102684134A (zh) * 2012-05-25 2012-09-19 济南大学 特高压交流双回直线塔的防雷系统
CN205791424U (zh) * 2016-05-23 2016-12-07 国家电网公司 用于减少山区750kV同杆双回线路绕击暴露弧的屏蔽线系统

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2013998A (en) * 1978-02-03 1979-08-15 Energie Froide Int Sa Improvements in or relating to electric power lines
CN201256276Y (zh) * 2008-09-25 2009-06-10 张俊奇 架空输电线路防绕击雷的屏蔽装置
CN101499638A (zh) * 2009-03-13 2009-08-05 国网电力科学研究院 一种提高超、特高压输电线路防雷能力的方法
CN102684134A (zh) * 2012-05-25 2012-09-19 济南大学 特高压交流双回直线塔的防雷系统
CN205791424U (zh) * 2016-05-23 2016-12-07 国家电网公司 用于减少山区750kV同杆双回线路绕击暴露弧的屏蔽线系统

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
鄂盛龙等: "平原和山区同塔双回特高压输电线路雷击特性模拟试验", 《电网技术》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3379668A1 (de) * 2017-03-24 2018-09-26 Axpo Power AG Umrüstverfahren bzw. herstellungsverfahren für freileitungsmasten und freileitungsmasten

Also Published As

Publication number Publication date
CN105826892B (zh) 2018-03-02

Similar Documents

Publication Publication Date Title
CN203423465U (zh) 一种配电架空输电线路雷电感应过电压防雷保护装置
KR101166307B1 (ko) 전주용 피뢰기 설치구조
CN207701299U (zh) 一种防击穿型风电叶片避雷装置
CN202058515U (zh) 一种绝缘架空线路绝缘子防雷过电压保护器
CN104659776A (zh) 防反击雷装置
CN105826892A (zh) 用于减少山区750kV同杆双回线路绕击暴露弧的屏蔽线系统
CN205791424U (zh) 用于减少山区750kV同杆双回线路绕击暴露弧的屏蔽线系统
CN205453120U (zh) 一种防雷线路过电压保护器
CN103236674A (zh) 避雷针
CN204407847U (zh) 一种预绞丝型防雷金具保护器
CN204304426U (zh) 防反击雷装置
CN106684833A (zh) 一种防工频续流放电间隙装置
CN203180467U (zh) 交联电缆终端与gis开关外壳屏蔽连接装置
CN204537777U (zh) 防闪络并联间隙上招弧角
CN206650184U (zh) 一种单芯电缆护层接地结构
CN215868826U (zh) 一种绝缘子防雷结构
Rasel et al. Design of Lightning Protection Scheme of a Grid Substation Using Rolling Sphere Method
Yokoyama Lightning protection of overhead power distribution lines—Outage aspects, mitigation methods and future projects
Chen et al. Research on lightning overvoltage in Ecuador 230kV GIS substation based on EMTP-RV
CN215185797U (zh) 一种避雷线的接地引下线装置
CN204288986U (zh) 一种新型氧化锌避雷器
CN204464915U (zh) 交流输电线路铁塔
CN215733387U (zh) 一种避雷杆塔
CN203660276U (zh) 间隙防雷保护装置
CN203632182U (zh) 一种20kV架空线路的防雷装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180302

Termination date: 20210523