CN105824814A CN201510002758.3A CN201510002758A CN105824814A CN 105824814 A CN105824814 A CN 105824814A CN 201510002758 A CN201510002758 A CN 201510002758A CN 105824814 A CN105824814 A CN 105824814A
Authority
CN
China
Prior art keywords
described
pending data
work order
order table
data
Prior art date
Application number
CN201510002758.3A
Other languages
Chinese (zh)
Inventor
李凯
唐涛
王晓征
伍飞
方国梁
Original Assignee
中国移动通信集团浙江有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中国移动通信集团浙江有限公司 filed Critical 中国移动通信集团浙江有限公司
Priority to CN201510002758.3A priority Critical patent/CN105824814A/en
Publication of CN105824814A publication Critical patent/CN105824814A/en

Links

Abstract

The invention embodiment provides a control method, a device and an electronic device; the control method comprises the following steps: detecting to-be-processed data size in a work order table of a service system; determining whether a first to-be-processed data size detected in the work order table exceeds a set first threshold data size or not, if not, the service system is stable in performance; if the first to-be-processed data size exceeds the set first threshold data size, removing at least partial the to-be-processed data from the work order table to a buffer zone, so the to-be-processed data size in the work order table after the removing step cannot exceed the threshold data size. The method, device and electronic device can prevent service system failure caused by mass data overstocking.

Description

A kind of control method, device and electronic equipment

Technical field

The present invention relates to business support field, particularly relate to a kind of control method, device and electronic equipment.

Background technology

Because backstage batch jobs and foreground batch data import, in causing the operation system short time, data volume explodes, and can exceed that system maximum loadability, consume a large amount of system resource, and cause data to process to overstock, time serious, even cause systemic breakdown, use two kinds of solutions at present.

The first solution: manual transfer upstream data, attendant is when manual process, stop upstream service cutoff full dose or partial data stream enters, remove overstocking data in a large number by hand, then viewing system disposal ability, if system process performance has been recovered, value is manual the most by rule of thumb moves into part data, pending complete after move into part data again, until having overstocked data all to process to open upstream passageway again.

Second workaround: switch to escape truck, when a failure occurs it, attendant's start-up by hand emergence program, and walk around current performance bottleneck by green channel, data are fed directly to downstream traffic.

Above-mentioned solution is the reply just carried out when having had mass data to overstock and having caused systematic function to decline, and easily causes operation system to paralyse because mass data overstocks.

Summary of the invention

The purpose of the embodiment of the present invention is to provide a kind of control method, device and electronic equipment, to avoid causing operation system to paralyse because mass data overstocks.

For solving above-mentioned technical problem, the embodiment of the present invention provides scheme as follows:

The embodiment of the present invention provides a kind of control method, including:

Pending data volume in the work order table of detection operation system;

Judge whether the first pending data volume in the described work order table detected exceedes the first threshold data amount of setting, wherein, when the pending data volume in described work order table is less than described first threshold data amount, the stable performance of described operation system;

When described first pending data volume exceedes described threshold data amount, from described work order table, remove at least some of pending data in relief area so that after removal, the pending data volume in described work order table is less than described threshold data amount.

Preferably, the priority of pending data in described work order table after the priority that described at least some of pending data have not higher than removal.

Preferably, also include:

Described from described work order table, remove at least some of pending data after, judging whether the second pending data volume in the described work order table detected is less than the second threshold data amount set, described second threshold data amount is less than or equal to described first threshold data amount;

When described second pending data volume is less than the second threshold data amount set, by being inserted at least partially in described work order table in described at least some of pending data from relief area so that after insertion, the pending data volume in described work order table is less than described first amount data threshold.

Preferably, the priority having at least partially in described at least some of pending data be not less than in described at least some of pending data except described at least some of in addition to the priority of data.

Preferably, also include:

Described from described work order table, remove at least some of pending data to after in relief area, it is judged that whether described relief area exists the pending data of validity rule being unsatisfactory for setting;

When described relief area exists the pending data of the validity rule being unsatisfactory for setting, the pending data of the described validity rule being unsatisfactory for and setting are removed from described relief area.

Preferably, also include:

Described from described work order table, remove at least some of pending data to after in relief area, it is judged that whether the pending data volume in described relief area exceedes the 3rd threshold data amount of setting;

When the pending data volume in described relief area exceedes the 3rd threshold data amount of setting, described operation system is controlled so that described operation system stops receiving upstream business data, and/or generates warning information.

The embodiment of the present invention also provides for a kind of control device, including:

Detection module, the pending data volume in the work order table detecting operation system;

First judge module, for judging whether the first pending data volume in the described work order table detected exceedes the first threshold data amount of setting, wherein, when the pending data volume in described work order table is less than described first threshold data amount, the stable performance of described operation system;

Removal module, for when described first pending data volume exceedes described threshold data amount, at least some of pending data are removed in relief area so that after removal, the pending data volume in described work order table is less than described threshold data amount from described work order table.

Preferably, the priority of pending data in described work order table after the priority that described at least some of pending data have not higher than removal.

Preferably, also include:

Second judge module, for described from described work order table, remove at least some of pending data after, judging whether the second pending data volume in the described work order table detected is less than the second threshold data amount set, described second threshold data amount is less than or equal to described first threshold data amount;

Insert module, for when described second pending data volume is less than the second threshold data amount set, by being inserted at least partially in described work order table in described at least some of pending data from relief area so that after insertion, the pending data volume in described work order table is less than described first amount data threshold.

Preferably, the priority having at least partially in described at least some of pending data be not less than in described at least some of pending data except described at least some of in addition to the priority of data.

The embodiment of the present invention also provides for a kind of electronic equipment including above-described control device.

From the above it can be seen that the embodiment of the present invention at least has the advantages that

Ensure that stablizing of operation system performance;Avoid and cause operation system to paralyse because mass data overstocks.

Accompanying drawing explanation

Fig. 1 represents the flow chart of steps of a kind of control method that the embodiment of the present invention provides;

Fig. 2 A, 2B represent open loop figure out of control and closed loop feedback control figure respectively;

Fig. 3 A, 3B represent device application architecture figure and device closed loop feedback control figure respectively;

Fig. 4 represents performance feedback device figure;

Fig. 5 represents application architecture figure;

Fig. 6 represents a kind of structured flowchart controlling device that the embodiment of the present invention provides.

Detailed description of the invention

For making the purpose of the embodiment of the present invention, technical scheme and advantage clearer, below in conjunction with the accompanying drawings and the specific embodiments the embodiment of the present invention is described in detail.

Fig. 1 represents the flow chart of steps of a kind of control method that the embodiment of the present invention provides, and with reference to Fig. 1, the embodiment of the present invention provides a kind of control method, comprises the steps:

Step 101, the pending data volume in the work order table of detection operation system;

Step 102, it is judged that whether the first pending data volume in the described work order table detected exceedes the first threshold data amount of setting, wherein, when the pending data volume in described work order table is less than described first threshold data amount, the stable performance of described operation system;

Step 103, when described first pending data volume exceedes described threshold data amount, removes at least some of pending data in relief area so that after removal, the pending data volume in described work order table is less than described threshold data amount from described work order table.

Visible, by the way, it is ensured that stablizing of operation system performance;Avoid and cause operation system to paralyse because mass data overstocks.

In the embodiment of the present invention, the priority that described at least some of pending data have can not higher than remove after the priority of pending data in described work order table.

So, it is ensured that the data that priority is higher can obtain priority treatment.

In the embodiment of the present invention, may also include that

Described from described work order table, remove at least some of pending data after, judging whether the second pending data volume in the described work order table detected is less than the second threshold data amount set, described second threshold data amount is less than or equal to described first threshold data amount;

When described second pending data volume is less than the second threshold data amount set, by being inserted at least partially in described work order table in described at least some of pending data from relief area so that after insertion, the pending data volume in described work order table is less than described first amount data threshold.

So, the waste of the system processing resources caused because data pending in work order table are processed a part is avoided.

Wherein, the priority having at least partially in described at least some of pending data can be not less than in described at least some of pending data except described at least some of in addition to the priority of data.

So, it is ensured that the data that priority is higher can obtain priority treatment.

In addition, it may further comprise:

Described from described work order table, remove at least some of pending data to after in relief area, it is judged that whether described relief area exists the pending data of validity rule being unsatisfactory for setting;

When described relief area exists the pending data of the validity rule being unsatisfactory for setting, the pending data of the described validity rule being unsatisfactory for and setting are removed from described relief area.

So, it is to avoid invalid data is back to the operation system that work order table causes from relief area and processes the waste of resource.

In addition, it may further comprise:

Described from described work order table, remove at least some of pending data to after in relief area, it is judged that whether the pending data volume in described relief area exceedes the 3rd threshold data amount of setting;

When the pending data volume in described relief area exceedes the 3rd threshold data amount of setting, described operation system is controlled so that described operation system stops receiving upstream business data, and/or generates warning information.

For illustrating clearer by the embodiment of the present invention, provide below the better embodiment of the embodiment of the present invention.

This better embodiment provides a kind of operation system adaptive-flow based on feedback control to control device.

This better embodiment belongs to business support field, feeds back to controller based on real-time traffic detected value and realizes adaptive optimum control, it is adaptable in each operation system of mobile communications industry business supporting network.

First method in background technology has a disadvantage in that owing to causing the reason overstock be often batch operation, the requirement of real-time of these data own is the highest, overstock and have been introduced in production system when occurring, now the flow of hand control upstream is the most of no avail, it is longer that the front desk service fault that possibly even interruption requirement of real-time is higher affects duration, when data volume is the biggest, fault occurs again for fear, the data volume that attendant moves into is the least, zero load may be striden into from overload, cause that the waste data processing time of system processing resources is meaningless spins out, the fast quick-recovery of the business that affects, the data higher especially for withdrawing the requirement of real-times such as machine, it is likely in this way cause and withdraws machine time delay, affect user's perception, still can cause complaint.

Use the second method in background technology, need to build emergent green channel, expend ample resources, business is simplified by escape truck simultaneously, has skipped some service link, has been likely to result in data problem, such as data are inconsistent, error in data etc., follow-up batch data reparation to be carried out.

What this better embodiment was initiative propose a kind of realizes operation system performance Based Intelligent Control by four devices such as configuration management device, performance diagnogtics feedback device, intelligent controller, shunting managing devices.Thus the system that realizes from open loop (as shown in Figure 2 A) out of control to the transformation of closed loop feedback control (as shown in Figure 2 B), it is ensured that system load balancing.

(1), when systematic function reaches bottleneck or when systematic function declines, by feeding back the detection of performance indications, intelligent control individual flows back to scheduling, and reasonable distribution resource, it is ensured that high-priority data obtains priority treatment, system totally keeps efficient stable to run.

(2) processed offline redundancy junk data, it is to avoid in the case of system resource the most anxiety, invalid data brings system resource waste.

With reference to Fig. 3 A, this better embodiment uses three tiers application framework from master-plan, is respectively as follows: metadata acquisition layer, data analysis layer and application layer.Wherein, metadata acquisition layer comprises performance feedback device;Data analysis layer comprises intelligent controller and shunting managing device;Application layer comprises configuration management device.Three tiers application framework, the most separate interdepends again, embodies the motility of framework, and four devices of this motion define closed loop feedback control in logic.As shown in Figure 3 B, performance feedback device obtains the performance indications testing result about work order list processing, the parameter configured by configuration management device with attendant is combined, obtain real-time threshold data amount, for comparing with data volume in work order table and relief area, thus carry out the control that shunts or reflux.It is specifically described below as follows:

One, intelligent controller

The effect of intelligent controller is mainly fed back and index baseline value comparison difference according to the Indexs measure of property detector, by amplifier amplified differences amount, calculating the data volume ∑ Px of this shunting in current time work order table and the data volume ∑ Qx of backflow, concrete backstage can realize by the way of SQL statement filters out top (n) according to priority.

[principle]

Assuming that operation system maximum processes concurrency is Mmax, P=[P1, P2, ..., Pn] it is the data volume in current work order table, Pn represents the data volume (distinguishing, then subsequent calculations step is all reduced to randomly select a certain amount of data) that priority is n without data priority;Q=[Q1, Q2 ..., Qn] it is the data volume in the table of current buffer, Qn represents the data volume that priority is n;

K is controller control coefrficient, K ∈ (0,1], K is performance test results Ci and the ratio of baseline setting value Cst (user's configuration), K ∈ (0,1] between, the normalization modes such as linear or power exponent type can be selected based on experience value, such as K=Cst/Ci, is automatically set to 1 when K is more than 1, and the system treatment effeciency when K*Mmax of the data volume in current table is the highest and stable system performance;

Then the control of a certain moment systematic function can be attributed to and solves this moment i value by we, meets P1+P2+ ...+Pi+Q1+Q2+ ...+Qi<K*Mmax, P1+P2+ ...+P (i+1)+Q1+Q2+ ...+Q (i+1)>=K*Mmax, (i=1,2 ..., n), final calculate inflow and outflow data volume, in current active table discharge ∑ Px (x=i+1 ..., n), from relief area influx ∑ Qx (x=1 ..., i).

(1) if P1<Mmax, P1+Q1>Mmax, then Mmax-P1 it is swapped out;If P1 < Mmax, P1+Q1 < Mmax, then it is swapped out Q1, Mmax=Mmax-P1-Q1, P1=P2, P1=P2;

……

I () repeats such step, use recursive algorithm, search out an i, work as P1+P2+ ...+Pi+Q1+Q2+ ...+Qi<K*Mmax, P1+P2+ ...+P (i+1)+Q1+Q2+ ...+Q (i+1)>=K*Mmax,

Calculate this moment flow out data volume ∑ Px (x=i+1 ..., n), backflow data volume ∑ Qx (x=1 ..., i), the most all determine that an i value, determine valve open degree discharge ∑ Px (x=i+1 ..., n).

Subsequent time repeats above 1-i step.

It is exemplified below:

[data]

Assuming Mmax=10000, in current work order table of a certain moment, data have 4 class priority, [P1, P2, P3, P4]=[1000,5000,6000,3000], relief area has 4 class data [Q1, Q2, Q3, Q4]=[2500,2500,3000,4000], performance baseline be average treatment duration Cst be 0.5 minute, the average treatment duration that each moment device for detecting performance detects all < 0.5 minute, then Ki=1.Now calculate i value.

[step]

(1) P1=1000, < Mmax is then swapped out Q1, Mmax=Mmax-P1-Q1=6500, P1=P2, P1=P2 from relief area for Q1=2500, Mmax=10000, P1+Q1;

(2) P2=5000, Q2=2500, Mmax=6500, P2+Q2 > Mmax, then from relief area, it is swapped out Mmax-P2=6500-5000=1500;

(3) through twice iterative computation, calculate i=1, current time should be swapped out data volume 2500 (priority is 1 data)+1500 (priority is 2 data) from relief area, and the data volume that should write relief area from work order table is 6000 (priority is 3 data)+3000 (priority is 4 data).

Two, shunting managing device

Stream manager is responsible for relief area and rubbish district data, filtering spam data simultaneously, reduces flow pressure during backflow, and its composition includes that treatment progress and relief area, rubbish district, relief area and rubbish district set up automatically when plant running.

(1) according to the algorithm of configuration in application layer Policy model, the data that intelligent controller is diverted from current work order table are accepted.

(2) the backflow data volume requirement sent intelligent controller, according to the Queue Management Algorithm such as priority and LIFO/FIFO, inserts current work order table by corresponding data.

(3) periodically data expired in relief area are proceeded to garbage areas.

(4) according to data validity rule (as the data of same user number need to shave weight, data lifetime), invalid data is transferred to rubbish district.

(5) when buffer size surpasses setting value, fuse associated process, thoroughly stops upstream business and enters, and starts alarm notification attendant.

Three, configuration management device

This module is that user carries out single unit system parameter configuration interface, configures all kinds of parameters of parameter of overall importance and other three modules, mainly includes.

(1) data priority field.

(2) type function of the amplification coefficient Ki in intelligent controller.

(3) the performance monitoring index of performance controller and acquisition mode, collection script, index baseline value.

(4) the management rule of stream manager, queue management pattern (LIFO, FIFO), data life cycles, uniqueness field and homogeneous data clash handle pattern, relief area fusing mechanism.

(5) configuration rubbish district management strategy, such as data periodic cleaning, or by alarm notification attendant.

Four, performance feedback device

As shown in Figure 4, by selecting single or one group of combined index of service link, detecting performance data in real time by probe mode high frequency, feed back to intelligent controller, index can comprise as follows:

(1) situation is overstock according to tables of data, such as backlog, processing speed, average treatment duration.

(2) business process resource consumption situation, as process consumes CPU, internal memory, I/O.

(3) queue queuing situation, such as queuing number.

Five, device is disposed

As it is shown in figure 5, device program only need to be wrapped and reaches application server when disposing by device, and configure sample plan task, parameter, data base's connection etc..Owing to being non-intrusion type, existing monitoring system is had little to no effect, the least to the load of host computer system.

The intelligent controller based on feedback control of this better embodiment, is attached to cybernetics in software application, and by feedback control shunting backflow, reasonable distribution resource, safeguards system efficient stable runs;Relief area in stream manager, the design in rubbish district, synchronize to carry out data cleansing while shunting.

The method of hand control flow, expends a large amount of manpower and materials, and can only range of application extremely limited, this better embodiment possesses automatic learning capacity, can both save Financial cost along with the automatic evolution of system change, possessed again adaptivity.Additionally, this better embodiment degree of modularity is high, versatility is good, and autgmentability is very strong, for different monitoring systems, when this device is disposed, only need to revise some configuration parameters.

Fig. 6 represents a kind of structured flowchart controlling device that the embodiment of the present invention provides, and with reference to Fig. 6, the embodiment of the present invention also provides for a kind of control device, including:

Detection module 601, the pending data volume in the work order table detecting operation system;

First judge module 602, for judging whether the first pending data volume in the described work order table detected exceedes the first threshold data amount of setting, wherein, when the pending data volume in described work order table is less than described first threshold data amount, the stable performance of described operation system;

Removal module 603, for when described first pending data volume exceedes described threshold data amount, at least some of pending data are removed in relief area so that after removal, the pending data volume in described work order table is less than described threshold data amount from described work order table.

Visible, by the way, it is ensured that stablizing of operation system performance;Avoid and cause operation system to paralyse because mass data overstocks.

In the embodiment of the present invention, the priority that described at least some of pending data have can not higher than remove after the priority of pending data in described work order table.

In the embodiment of the present invention, may also include that

Second judge module, for described from described work order table, remove at least some of pending data after, judging whether the second pending data volume in the described work order table detected is less than the second threshold data amount set, described second threshold data amount is less than or equal to described first threshold data amount;

Insert module, for when described second pending data volume is less than the second threshold data amount set, by being inserted at least partially in described work order table in described at least some of pending data from relief area so that after insertion, the pending data volume in described work order table is less than described first amount data threshold.

In the embodiment of the present invention, the priority having at least partially in described at least some of pending data can be not less than in described at least some of pending data except described at least some of in addition to the priority of data.

The embodiment of the present invention also provides for a kind of electronic equipment, and described electronic equipment includes above-described control device.

The above is only the embodiment of the embodiment of the present invention; it should be pointed out that, for those skilled in the art, on the premise of without departing from embodiment of the present invention principle; can also make some improvements and modifications, these improvements and modifications also should be regarded as the protection domain of the embodiment of the present invention.

Claims (11)

1. a control method, it is characterised in that including:
Pending data volume in the work order table of detection operation system;
Judge whether the first pending data volume in the described work order table detected exceedes the first threshold data amount of setting, wherein, when the pending data volume in described work order table is less than described first threshold data amount, the stable performance of described operation system;
When described first pending data volume exceedes described threshold data amount, from described work order table, remove at least some of pending data in relief area so that after removal, the pending data volume in described work order table is less than described threshold data amount.
Control method the most according to claim 1, it is characterised in that the priority of pending data in described work order table after the priority that described at least some of pending data have not higher than removal.
Control method the most according to claim 1, it is characterised in that also include:
Described from described work order table, remove at least some of pending data after, judging whether the second pending data volume in the described work order table detected is less than the second threshold data amount set, described second threshold data amount is less than or equal to described first threshold data amount;
When described second pending data volume is less than the second threshold data amount set, by being inserted at least partially in described work order table in described at least some of pending data from relief area so that after insertion, the pending data volume in described work order table is less than described first amount data threshold.
Control method the most according to claim 3, it is characterised in that the priority having at least partially in described at least some of pending data be not less than in described at least some of pending data except described at least some of in addition to the priority of data.
Control method the most according to claim 3, it is characterised in that also include:
Described from described work order table, remove at least some of pending data to after in relief area, it is judged that whether described relief area exists the pending data of validity rule being unsatisfactory for setting;
When described relief area exists the pending data of the validity rule being unsatisfactory for setting, the pending data of the described validity rule being unsatisfactory for and setting are removed from described relief area.
Control method the most according to claim 3, it is characterised in that also include:
Described from described work order table, remove at least some of pending data to after in relief area, it is judged that whether the pending data volume in described relief area exceedes the 3rd threshold data amount of setting;
When the pending data volume in described relief area exceedes the 3rd threshold data amount of setting, described operation system is controlled so that described operation system stops receiving upstream business data, and/or generates warning information.
7. one kind controls device, it is characterised in that including:
Detection module, the pending data volume in the work order table detecting operation system;
First judge module, for judging whether the first pending data volume in the described work order table detected exceedes the first threshold data amount of setting, wherein, when the pending data volume in described work order table is less than described first threshold data amount, the stable performance of described operation system;
Removal module, for when described first pending data volume exceedes described threshold data amount, at least some of pending data are removed in relief area so that after removal, the pending data volume in described work order table is less than described threshold data amount from described work order table.
Control device the most according to claim 7, it is characterised in that the priority of pending data in described work order table after the priority that described at least some of pending data have not higher than removal.
Control device the most according to claim 7, it is characterised in that also include:
Second judge module, for described from described work order table, remove at least some of pending data after, judging whether the second pending data volume in the described work order table detected is less than the second threshold data amount set, described second threshold data amount is less than or equal to described first threshold data amount;
Insert module, for when described second pending data volume is less than the second threshold data amount set, by being inserted at least partially in described work order table in described at least some of pending data from relief area so that after insertion, the pending data volume in described work order table is less than described first amount data threshold.
Control device the most according to claim 9, it is characterised in that the priority having at least partially in described at least some of pending data be not less than in described at least some of pending data except described at least some of in addition to the priority of data.
11. 1 kinds of electronic equipments, it is characterised in that include the control device as described in any claim in claim 7 to 10.
CN201510002758.3A 2015-01-05 2015-01-05 Control method, device and electronic device CN105824814A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510002758.3A CN105824814A (en) 2015-01-05 2015-01-05 Control method, device and electronic device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510002758.3A CN105824814A (en) 2015-01-05 2015-01-05 Control method, device and electronic device

Publications (1)

Publication Number Publication Date
CN105824814A true CN105824814A (en) 2016-08-03

Family

ID=56513559

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510002758.3A CN105824814A (en) 2015-01-05 2015-01-05 Control method, device and electronic device

Country Status (1)

Country Link
CN (1) CN105824814A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101118626A (en) * 2007-09-13 2008-02-06 中兴通讯股份有限公司 Electronic worksheets automatic construction system and electric electronic worksheets processing method
CN101588556A (en) * 2008-05-23 2009-11-25 中兴通讯股份有限公司 Method for processing short message overloading
CN101635908A (en) * 2009-06-15 2010-01-27 中兴通讯股份有限公司 Ticket transmission processing method and system of billing system
CN103442391A (en) * 2013-09-12 2013-12-11 华为终端有限公司 Data transmission method and system as well as user terminal

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101118626A (en) * 2007-09-13 2008-02-06 中兴通讯股份有限公司 Electronic worksheets automatic construction system and electric electronic worksheets processing method
CN101588556A (en) * 2008-05-23 2009-11-25 中兴通讯股份有限公司 Method for processing short message overloading
CN101635908A (en) * 2009-06-15 2010-01-27 中兴通讯股份有限公司 Ticket transmission processing method and system of billing system
CN103442391A (en) * 2013-09-12 2013-12-11 华为终端有限公司 Data transmission method and system as well as user terminal

Similar Documents

Publication Publication Date Title
US8832063B1 (en) Dynamic request throttling
US9680919B2 (en) Intelligent messaging grid for big data ingestion and/or associated methods
Agarwal et al. Real time discovery of dense clusters in highly dynamic graphs: identifying real world events in highly dynamic environments
CN108156265B (en) A kind of application control method and mobile device
CN102281329B (en) Resource scheduling method and system for platform as a service (Paas) cloud platform
TWI603266B (en) Resource adjustment methods and systems for virtual machines
US8635263B2 (en) Node processing device and its processing method
US20190238437A1 (en) Flexible and safe monitoring of computers
KR101624765B1 (en) Energy-aware server management
JP6559670B2 (en) Method, system, and computer-readable medium for network function virtualization information concentrator
CN101989283B (en) Monitoring method and device of performance of database
EP2357559A1 (en) Performing a workflow having a set of dependancy-related predefined activities on a plurality of task servers
Wang et al. Performability analysis of clustered systems with rejuvenation under varying workload
CN104657215A (en) Virtualization energy-saving system in Cloud computing
KR101723203B1 (en) Apparatus and method for delivery control of application data to a mobile device in a communication network
CN103246735B (en) A kind of method for processing abnormal data and system
CN103176842B (en) background process management method and mobile terminal thereof
CN103401804B (en) Wireless sensor network node data buffer storage transmission control system and method
CN103281301A (en) System and method for judging cloud safety malicious program
US20050198200A1 (en) Method and apparatus for facilitating fulfillment of web-service requests on a communication network
EP2672777B1 (en) Radio resource optimization method, device and system
CN101472245B (en) Method and apparatus for intercepting rubbish short message
US7890620B2 (en) Monitoring system and monitoring method
US20040163000A1 (en) Network processor power management
US20080086469A1 (en) Model-based self-optimizing distributed information management

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination