CN105821203A - Dismounting and mounting device of raking arm for molybdenum concentrate roasting multi-hearth furnace and dismounting and mounting method - Google Patents

Dismounting and mounting device of raking arm for molybdenum concentrate roasting multi-hearth furnace and dismounting and mounting method Download PDF

Info

Publication number
CN105821203A
CN105821203A CN201610376080.XA CN201610376080A CN105821203A CN 105821203 A CN105821203 A CN 105821203A CN 201610376080 A CN201610376080 A CN 201610376080A CN 105821203 A CN105821203 A CN 105821203A
Authority
CN
China
Prior art keywords
rake arms
rod
counterweight
hearth furnace
connecting pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610376080.XA
Other languages
Chinese (zh)
Other versions
CN105821203B (en
Inventor
张五兴
杨新峰
刘玲
杨涛
肖华
张燕红
田三坤
于辉
张智辉
王鹏鹏
崔广权
蔡朝辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Molybdenum Co Ltd
Original Assignee
China Molybdenum Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Molybdenum Co Ltd filed Critical China Molybdenum Co Ltd
Priority to CN201610376080.XA priority Critical patent/CN105821203B/en
Publication of CN105821203A publication Critical patent/CN105821203A/en
Application granted granted Critical
Publication of CN105821203B publication Critical patent/CN105821203B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B1/00Preliminary treatment of ores or scrap
    • C22B1/02Roasting processes

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Materials Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Manufacture And Refinement Of Metals (AREA)

Abstract

The invention discloses a dismounting and mounting device of a raking arm for a molybdenum concentrate roasting multi-hearth furnace. The device comprises a quick dismounting rod for dismounting and mounting a connecting pin between the raking arm and a center shaft, a clamping device for taking out and feeding the raking arm from and in a high-temperature multi-hearth furnace, and a traction mechanism; the quick dismounting rod includes a rod body; a U-shaped joint matched with the connecting pin is arranged at one end of the machine body, and a handle perpendicular to the rod body is arranged at the other end; the clamping device comprises a counterweight beam; a dovetail plate clamped with the raking arm is arranged at one end of the counterweight beam, and the other end is movably connected with a steering rod; a counterweight tray is suspended at the lower part of the steering rod through a pull rod; a counterweight is put in the counterweight tray; the traction mechanism is connected with the counterweight beam through a guide chain; and meanwhile, the invention discloses a dismounting and mounting method of the raking arm for the molybdenum concentrate roasting multi-hearth furnace. The device largely reduces the replacement time of the raking arm, effectively improves the operation efficiency of multi-hearth furnace roasting equipment, and provides the technical support for advancement and improvement of a multi-hearth furnace roasting technology.

Description

Calcining molybdenum ore concentrate multiple hearth furnace rake arms removes and installs device and removes and installs method
Technical field
The invention belongs to non-ferrous metallurgy technology field, especially relate to a kind of calcining molybdenum ore concentrate multiple hearth furnace rake arms and remove and install device and remove and install method.
Background technology
Existing calcining molybdenum ore concentrate technique mainly has reverberatory furnace roasting technique, rotary kiln baking technique, multiple hearth furnace roasting technique and fluidized bed furnace roasting technique.Reverberatory furnace baking modes small investment, instant effect, easily operate, but, mechanization degree is low, and labor intensity is big, and molybdenum loss is many, and discontinuity goes out pan feeding, is the production technology of a kind of backwardness, seldom uses in large-scale production;Fluidized bed furnace roasting technique has the advantage that oxidation sweetening rate is high, and the smelting for sulphide ore produces, but range of application is limited to;Rotary kiln baking mode small investment, equipment and technique are simple, but, production capacity is little, and converter life is short, and productivity ratio is low, and calcining contains MoO2Height, affects extraction ratio and the molybdenum soluble rate of follow-up Ammonia leaching molybdenum;Multiple hearth furnace baking modes structure is relatively simple, and mechanization degree is high, and production capacity is big, and desulfurized effect is good, and product quality is high, and calcining sulfur content is low, is current domestic and international application most commonly used calcining molybdenum ore concentrate technique.And use multiple hearth furnace calcining molybdenum concentrate, lead concentrate, copper concentrate etc. to be increasingly becoming main flow both at home and abroad.To this end, improve the maintenance of multiple hearth furnace equipment, reduce equipment fault and there is profound significance.
In multiple hearth furnace calcining molybdenum concentrate technique, multiple hearth furnace is typically by 8~16 layers, and every layer of tilting rake arms having four and furnace bottom keeping parallelism, rake arms is to be connected with axis by the connecting pin of a high intensity, and every rake arms has some rake teeths.During roasting, molybdenum concntrate is added ground floor by furnace roof, and passes sequentially through each layer of stove under the stirring of every layer of rake arms rake teeth, and final products are discharged by bottom.In actual production, rake arms can cause irregular breakage phenomenon because of reasons such as castability, service life, applying working conditions, if changing not in time, will cause that product is defective, solid accumulation, cleaning difficulty increase, causing the damage of the key position such as reductor, siege what is more.Need frequent shutdown maintenance, bring many adverse effects to equipment and production.And multiple hearth furnace is continuous dosing, Sequential Production, stop the most for a long time, in molybdenum concntrate containing calcium, phosphorus, copper etc. impurity, the multiple molybdate such as the high viscosity calcium molybdate generated in high temperature environments, calcium phosphate can harden at siege and the position such as rake arms, axis, causes the loss that cannot retrieve.
Summary of the invention
In order to solve the problems referred to above, it is an object of the invention to provide a kind of calcining molybdenum ore concentrate multiple hearth furnace rake arms and remove and install device and remove and install method, it can efficiently change damage rake arms in the case of multiple hearth furnace roasting apparatus is not parking.
For achieving the above object, the present invention adopts the following technical scheme that
A kind of calcining molybdenum ore concentrate multiple hearth furnace rake arms removes and installs device, and it includes the Quick release for the connecting pin between rake arms and axis is dismantled, installed operation and for rake arms carries out taking out from high temperature multiple hearth furnace, sending into clamping apparatus and the haulage gear of operation;Described Quick release includes that the body of rod, body of rod one end are provided with the u shaped connector matched with connecting pin, and the other end is provided with the handle vertical with the body of rod;Described clamping apparatus includes counterweight beam, counterweight beam one end is provided with the coattail board of one and rake arms phase clamping, and the other end is connected with a tuning bar, and there is a counterweight pallet tuning bar bottom by pull bar suspention, being placed with balancing weight in counterweight pallet, haulage gear is connected with counterweight beam by guide chain.
Described calcining molybdenum ore concentrate multiple hearth furnace rake arms removes and installs device, and the body of rod of its Quick release is hollow tubular structures.
Described calcining molybdenum ore concentrate multiple hearth furnace rake arms removes and installs device, and its counterweight beam outer surface is set with connection sleeve pipe, connects and is provided with the suspension ring for connecting guide chain on sleeve pipe.
A kind of calcining molybdenum ore concentrate multiple hearth furnace rake arms removes and installs method, and it comprises the following steps:
(1), fractureed or the dismounting of connecting pin between the old rake arms and the axis that damage: the body of rod of Quick release is stretched in the burner hearth of multiple hearth furnace, the u shaped connector of body of rod one end is stuck on connecting pin, operator grip the handle of the body of rod other end, force vertical to connecting pin, can extract between old rake arms and axis smoothly by connecting pin;
(2), fractureed or the old rake arms damaged has been taken out in the burner hearth of multiple hearth furnace: be positioned at the haulage gear above counterweight beam and move horizontally, drive counterweight beam moves horizontally, the coattail board making counterweight beam one end inserts in the dovetail groove in old rake arms, after counterweight beam holds old rake arms, the weight of the balancing weight placed in adjusting counterweight pallet, counterweight beam two ends are made to reach balance, counterweight beam opposite direction is driven to move by haulage gear, old rake arms is pulled out, midway adjusts lifting point to below rake arms, can old rake arms be quickly removed;
(3), new rake arms loads in the burner hearth of multiple hearth furnace: inserted by the coattail board of counterweight beam one end in the dovetail groove in new rake arms, after counterweight beam holds new rake arms, the weight of the balancing weight placed in adjusting counterweight pallet, counterweight beam two ends are made to reach balance, haulage gear moves horizontally and makes new rake arms rise and fall smoothly and in major part entrance burner hearth, after entering burner hearth, the weight of the balancing weight placed in again adjusting counterweight pallet, to adjust lifting point, new rake arms is completely fed in burner hearth, the weight of the balancing weight placed in the most constantly adjusting counterweight pallet balances rake arms, and then new rake arms is sent directly into axis anastomotic site;
(4), the installation of the connecting pin between new rake arms and axis: the body of rod of Quick release is stretched in the burner hearth of multiple hearth furnace, the u shaped connector of body of rod one end is installed with connecting pin, operator grip the handle of the body of rod other end, force vertical to connecting pin, are inserted between new rake arms and axis by connecting pin.
Owing to using technical scheme as above, the present invention has a following superiority:
Calcining molybdenum ore concentrate multiple hearth furnace rake arms of the present invention removes and installs device, and its simple in construction is reasonable in design, it is simple to operation, low cost, easy to use, using effect is good, is substantially reduced rake arms replacing construction, alleviates the labor intensity of operator, it is simple to promote the use of.
Calcining molybdenum ore concentrate multiple hearth furnace rake arms of the present invention removes and installs method, it only fully achieved the equipment repair and maintenance in the case of shutdownvoltage in 30 minutes, reach good effect, there is feature safe efficient, simple to operate, efficiently the old rake arms fractureed in hot environment is taken out in time and new rake arms is installed, be effectively increased multiple hearth furnace roasting apparatus running rate, for multiple hearth furnace roasting technology progress improve provide technical support.
Accompanying drawing explanation
Fig. 1 is the structural representation of rake arms;
Fig. 2 is that the A of Fig. 1 is to profile;
Fig. 3 is the structural representation of Quick release;
Fig. 4 is the structural representation of clamping apparatus and haulage gear;
Fig. 5 is that Fig. 4 " B B " is to profile;
In figure: 1-connecting pin;2-pin-and-hole;3-rake arms;4-dovetail groove;5-U type joint;The 6-body of rod;7-handle;8-slide rail;9-haulage gear;10-guide chain;11-coattail board;12-suspension ring;13-connects sleeve pipe: 14-counterweight beam;15-tuning bar: 16-pull bar;17-counterweight pallet.
Detailed description of the invention
Below by drawings and Examples, technical scheme is described in further detail.
As shown in Fig. 1,2,3,4,5, this calcining molybdenum ore concentrate multiple hearth furnace rake arms removes and installs device, and it includes the Quick release for the connecting pin 1 between rake arms 3 and axis being dismantled, installed operation and for rake arms carries out taking out from high temperature multiple hearth furnace, sending into clamping apparatus and the haulage gear 9 of operation;Described Quick release includes that the body of rod 6, body of rod one end are provided with the u shaped connector 5 matched with connecting pin 1, and the other end is provided with the handle 7 vertical with the body of rod;Described clamping apparatus includes counterweight beam 14, counterweight beam one end is provided with the coattail board 11 of one and rake arms phase clamping, the other end is connected with a tuning bar 15, there is a counterweight pallet 17 tuning bar bottom by pull bar 16 suspention, being placed with balancing weight in counterweight pallet, haulage gear is connected with counterweight beam by guide chain 10.
The body of rod 6 of above-mentioned Quick release is hollow tubular structures.
Above-mentioned counterweight beam 14 outer surface is set with connection sleeve pipe 13, connects and is provided with the suspension ring 12 for connecting guide chain 10 on sleeve pipe.
Above-mentioned haulage gear 9 uses hoist engine.
Calcining molybdenum ore concentrate multiple hearth furnace rake arms of the present invention removes and installs method, and it includes step in detail below:
(1), fractureed or the dismounting of connecting pin between the old rake arms and the axis that damage: the body of rod 6 of Quick release is stretched in the burner hearth of multiple hearth furnace, the u shaped connector 5 of body of rod one end is stuck on connecting pin 1, operator grip the handle 7 of the body of rod other end, force vertical to connecting pin, can extract from the pin-and-hole 2 between old rake arms and axis smoothly by connecting pin;
(2), the old rake arms fractureed or damage is taken out in the burner hearth of multiple hearth furnace: is positioned at the haulage gear 9 above counterweight beam and moves horizontally on slide rail 8, counterweight beam 14 is driven to move horizontally, the coattail board 11 making counterweight beam one end inserts in the dovetail groove 4 in old rake arms, after counterweight beam holds old rake arms, the weight of the balancing weight placed in adjusting counterweight pallet 17, counterweight beam two ends are made to reach balance, counterweight beam opposite direction is driven to move by haulage gear, old rake arms is pulled out, midway adjusts lifting point to below rake arms, can will conduct oneself with dignity more than 300 jin in high temperature environments, old rake arms up to 2.7m passes through area less than 0.4m2Fire door quickly remove;
(3), new rake arms loads in the burner hearth of multiple hearth furnace: inserted by the coattail board of counterweight beam one end in the dovetail groove in new rake arms, after counterweight beam holds new rake arms, the weight of the balancing weight placed in adjusting counterweight pallet, counterweight beam two ends are made to reach balance, haulage gear moves horizontally and makes new rake arms rise and fall smoothly and in major part entrance burner hearth, after entering burner hearth, the weight of the balancing weight placed in again adjusting counterweight pallet, to adjust lifting point, new rake arms is completely fed in burner hearth, the weight of the balancing weight placed in the most constantly adjusting counterweight pallet balances rake arms, and then new rake arms is sent directly into axis anastomotic site;
(4), the installation of the connecting pin between new rake arms and axis: the body of rod of Quick release is stretched in the burner hearth of multiple hearth furnace, the u shaped connector of body of rod one end is installed with connecting pin, operator grip the handle of the body of rod other end, force vertical to connecting pin, are inserted between new rake arms and axis by connecting pin.
The foregoing is only the better embodiment of the present invention, not in order to limit the present invention, all within the spirit and principles in the present invention, any modification, equivalent substitution and improvement etc. made, should be included within the scope of the present invention.

Claims (4)

1. calcining molybdenum ore concentrate multiple hearth furnace rake arms removes and installs a device, it is characterized in that: it includes the Quick release for the connecting pin between rake arms and axis is dismantled, installed operation and for rake arms carries out taking out from high temperature multiple hearth furnace, sending into clamping apparatus and the haulage gear of operation;Described Quick release includes that the body of rod, body of rod one end are provided with the u shaped connector matched with connecting pin, and the other end is provided with the handle vertical with the body of rod;Described clamping apparatus includes counterweight beam, counterweight beam one end is provided with the coattail board of one and rake arms phase clamping, and the other end is connected with a tuning bar, and there is a counterweight pallet tuning bar bottom by pull bar suspention, being placed with balancing weight in counterweight pallet, haulage gear is connected with counterweight beam by guide chain.
Calcining molybdenum ore concentrate multiple hearth furnace rake arms the most according to claim 1 removes and installs device, it is characterized in that: the body of rod of its Quick release is hollow tubular structures.
Calcining molybdenum ore concentrate multiple hearth furnace rake arms the most according to claim 1 removes and installs device, it is characterized in that: its counterweight beam outer surface is set with connection sleeve pipe, connects and is provided with the suspension ring for connecting guide chain on sleeve pipe.
4. remove and install a method by the rake arms removing and installing device enforcement described in any claim in claims 1 to 3, it is characterized in that: it comprises the following steps:
(1), fractureed or the dismounting of connecting pin between the old rake arms and the axis that damage: the body of rod of Quick release is stretched in the burner hearth of multiple hearth furnace, the u shaped connector of body of rod one end is stuck on connecting pin, operator grip the handle of the body of rod other end, force vertical to connecting pin, can extract between old rake arms and axis smoothly by connecting pin;
(2), fractureed or the old rake arms damaged has been taken out in the burner hearth of multiple hearth furnace: be positioned at the haulage gear above counterweight beam and move horizontally, drive counterweight beam moves horizontally, the coattail board making counterweight beam one end inserts in the dovetail groove in old rake arms, after counterweight beam holds old rake arms, the weight of the balancing weight placed in adjusting counterweight pallet, counterweight beam two ends are made to reach balance, counterweight beam opposite direction is driven to move by haulage gear, old rake arms is pulled out, midway adjusts lifting point to below rake arms, can old rake arms be quickly removed;
(3) in, new rake arms loads the burner hearth of multiple hearth furnace: the coattail board of counterweight beam one end is inserted in the dovetail groove in new rake arms, after counterweight beam holds new rake arms, the weight of the balancing weight placed in adjusting counterweight pallet, counterweight beam two ends are made to reach balance, haulage gear moves horizontally and makes new rake arms major part enter in burner hearth, after entering burner hearth, again adjust lifting point, new rake arms is completely fed in burner hearth, the weight of the balancing weight placed in the most constantly adjusting counterweight pallet balances rake arms, and then new rake arms is sent directly into axis anastomotic site;
(4), the installation of the connecting pin between new rake arms and axis: the body of rod of Quick release is stretched in the burner hearth of multiple hearth furnace, the u shaped connector of body of rod one end is installed with connecting pin, operator grip the handle of the body of rod other end, force vertical to connecting pin, are inserted between new rake arms and axis by connecting pin.
CN201610376080.XA 2016-05-31 2016-05-31 Calcining molybdenum ore concentrate multiple hearth furnace removes and installs device with rake arms and removes and installs method Active CN105821203B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610376080.XA CN105821203B (en) 2016-05-31 2016-05-31 Calcining molybdenum ore concentrate multiple hearth furnace removes and installs device with rake arms and removes and installs method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610376080.XA CN105821203B (en) 2016-05-31 2016-05-31 Calcining molybdenum ore concentrate multiple hearth furnace removes and installs device with rake arms and removes and installs method

Publications (2)

Publication Number Publication Date
CN105821203A true CN105821203A (en) 2016-08-03
CN105821203B CN105821203B (en) 2018-04-06

Family

ID=56532457

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610376080.XA Active CN105821203B (en) 2016-05-31 2016-05-31 Calcining molybdenum ore concentrate multiple hearth furnace removes and installs device with rake arms and removes and installs method

Country Status (1)

Country Link
CN (1) CN105821203B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106594755A (en) * 2017-01-23 2017-04-26 中冶焦耐(大连)工程技术有限公司 Hollow shaft structure of multi-layer furnace as well as dismounting tool and dismounting method for rabble arm and rabble teeth
CN107941035A (en) * 2017-12-21 2018-04-20 中冶焦耐(大连)工程技术有限公司 A kind of light calcined magnesia multilayer combustion stove combines rake tooth type rake arms with double-deck cooling

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202913000U (en) * 2012-09-28 2013-05-01 宝钢工程技术集团有限公司 Quick replacement tool for molten iron desulphurization stirring paddle
CN203695952U (en) * 2013-12-17 2014-07-09 上海梅山钢铁股份有限公司 Rapid replacing device of continuous-casting steel ladle long-nozzle bracket
CN205128912U (en) * 2015-11-07 2016-04-06 武钢集团昆明钢铁股份有限公司 Quick replacement immersion nozzle's fixing device
CN205774715U (en) * 2016-05-31 2016-12-07 洛阳栾川钼业集团股份有限公司 Calcining molybdenum ore concentrate multiple hearth furnace rake arms removes and installs device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202913000U (en) * 2012-09-28 2013-05-01 宝钢工程技术集团有限公司 Quick replacement tool for molten iron desulphurization stirring paddle
CN203695952U (en) * 2013-12-17 2014-07-09 上海梅山钢铁股份有限公司 Rapid replacing device of continuous-casting steel ladle long-nozzle bracket
CN205128912U (en) * 2015-11-07 2016-04-06 武钢集团昆明钢铁股份有限公司 Quick replacement immersion nozzle's fixing device
CN205774715U (en) * 2016-05-31 2016-12-07 洛阳栾川钼业集团股份有限公司 Calcining molybdenum ore concentrate multiple hearth furnace rake arms removes and installs device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106594755A (en) * 2017-01-23 2017-04-26 中冶焦耐(大连)工程技术有限公司 Hollow shaft structure of multi-layer furnace as well as dismounting tool and dismounting method for rabble arm and rabble teeth
CN106594755B (en) * 2017-01-23 2019-01-11 中冶焦耐(大连)工程技术有限公司 A kind of extracting tool and method for dismounting of the rake arms rake teeth of multihearth hollow shaft structure
CN107941035A (en) * 2017-12-21 2018-04-20 中冶焦耐(大连)工程技术有限公司 A kind of light calcined magnesia multilayer combustion stove combines rake tooth type rake arms with double-deck cooling

Also Published As

Publication number Publication date
CN105821203B (en) 2018-04-06

Similar Documents

Publication Publication Date Title
CN110238630B (en) Automatic disassembling equipment for mining hydraulic support pin shaft and application thereof
CN204528595U (en) A kind of axle sleeve gripping feedway
CN1222626C (en) Method for reconstructing and building blast furnace in short time and its equipment
CN110137852B (en) Single-piece replacement method for tension insulator of ultra-high voltage transmission line
CN205382894U (en) Four connecting rods pipe pole conveyer
CN102699318A (en) Submerged slag conveyer
CN205774715U (en) Calcining molybdenum ore concentrate multiple hearth furnace rake arms removes and installs device
CN105821203A (en) Dismounting and mounting device of raking arm for molybdenum concentrate roasting multi-hearth furnace and dismounting and mounting method
CN103420264A (en) Stretcher jaw clamping device and mounting method thereof
CN104482768A (en) Sleeve-retractable type automatic opener-mutgun
CN108927643A (en) A kind of sea horse damper attaching/detaching apparatus and method
CN202832307U (en) Numerical control operating line in oil well maintenance
CN110510500B (en) Special lifting appliance for carbon bar basket moving
CN201999638U (en) Hoisting device for ascending pipe and bridge pipe of coke oven
CN215050556U (en) Automatic conveying device of anticorrosive steel pipe heating furnace
CN212639788U (en) Building secondary structure material loading machine
CN205352087U (en) Iron and steel electric stove feeding device
CN211225109U (en) Scraper conveyor for waste filling
CN109894798B (en) Method for overhauling conveyor chain
CN211644474U (en) Online replacement and movement lifting trolley for RH vacuum chamber insert tube in steelmaking refining
CN109837368B (en) Device and method for replacing radiant tube
CN217147545U (en) Cover plate for chute, conveying trough for smelting lead and metallurgical system
CN106828664B (en) A kind of moveable cart and application method for converter vaporization cooling petticoat pipe
CN206570361U (en) Device is built by laying on a kind of mammoth conveter furnace lining
CN215249025U (en) High performance flange heat treatment hoisting structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211224

Address after: 471500 Miao Zi Zhen Shang He Cun, Luanchuan County, Luoyang City, Henan Province

Patentee after: LUOYANG LUANCHUAN MOLYBDENUM GROUP SMELTING Co.,Ltd.

Address before: 471500 north of Yihe River, huameishan Road, Chengdong new district, Luanchuan County, Luoyang City, Henan Province

Patentee before: China Molybdenum Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240108

Address after: North of Yihe, Huameishan Road, Chengdong New District, Luanchuan County, Luoyang City, Henan Province, 471000

Patentee after: China Molybdenum Co.,Ltd.

Address before: 471500 Miao Zi Zhen Shang He Cun, Luanchuan County, Luoyang City, Henan Province

Patentee before: LUOYANG LUANCHUAN MOLYBDENUM GROUP SMELTING Co.,Ltd.

TR01 Transfer of patent right