CN105811306B - A kind of live-wire work insulating cross arm - Google Patents

A kind of live-wire work insulating cross arm Download PDF

Info

Publication number
CN105811306B
CN105811306B CN201610269108.XA CN201610269108A CN105811306B CN 105811306 B CN105811306 B CN 105811306B CN 201610269108 A CN201610269108 A CN 201610269108A CN 105811306 B CN105811306 B CN 105811306B
Authority
CN
China
Prior art keywords
rod
hole
sleeve
connecting rod
card slot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610269108.XA
Other languages
Chinese (zh)
Other versions
CN105811306A (en
Inventor
高同亮
刘婷婷
宋俊岭
王鹏
于潇
卢爱
徐静
薄其波
马军
孙成功
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd
State Grid Corp of China
Original Assignee
Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd
State Grid Corp of China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd, State Grid Corp of China filed Critical Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority to CN201610269108.XA priority Critical patent/CN105811306B/en
Publication of CN105811306A publication Critical patent/CN105811306A/en
Application granted granted Critical
Publication of CN105811306B publication Critical patent/CN105811306B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H—ELECTRICITY
    • H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)
  • Electric Cable Installation (AREA)

Abstract

本发明公开了一种带电作业绝缘横担,安装在电线杆的顶部,包括底座杆、伸缩杆、导向杆、移动卡槽,底座杆的上端设置有与伸缩杆对应的空腔,伸缩杆安装在空腔中,导向杆横向设置在套筒a的侧面,套筒a上竖直方向设置有与伸缩杆对应的开孔,移动卡槽通过横向导向孔安装在导向杆上,移动卡槽的底部通过连杆连接套筒b,连杆与移动卡槽、套筒b的连接都为活动连接。本发明通过调节伸缩杆在底座杆中的位置可对设备高度进行初步确定,然后通过调节导向杆的高度可确定设备的工作高度,通过调节移动卡槽的横向位置可使移动卡槽进入工作位置,并实现对导线的安装,移动卡槽的移动通过调节套筒b的位置以及连杆的长度实现,人手远离导线,操作安全。

The invention discloses an insulated cross arm for live work, which is installed on the top of a utility pole and includes a base pole, a telescopic pole, a guide pole, and a moving slot. The upper end of the base pole is provided with a cavity corresponding to the telescopic pole. In the cavity, the guide rod is horizontally arranged on the side of the sleeve a, and the sleeve a is vertically provided with an opening corresponding to the telescopic rod. The bottom is connected to the sleeve b through a connecting rod, and the connection between the connecting rod, the moving card slot and the sleeve b is a flexible connection. The invention can preliminarily determine the height of the equipment by adjusting the position of the telescopic rod in the base rod, and then determine the working height of the device by adjusting the height of the guide rod, and make the mobile card slot enter the working position by adjusting the lateral position of the mobile card slot , and realize the installation of the wire, the movement of the moving card slot is realized by adjusting the position of the sleeve b and the length of the connecting rod, keeping the hands away from the wire, and the operation is safe.

Description

一种带电作业绝缘横担An insulating crossarm for live work

技术领域technical field

本发明涉及农业生产设备技术领域,尤其涉及一种带电作业绝缘横担。The invention relates to the technical field of agricultural production equipment, in particular to an insulating cross arm for live work.

背景技术Background technique

目前,国网公司对供电可靠率的要求逐步提高,对供电企业给客户的服务标准要求也越来越严格,而减少用户停电面积、减少用户停电时间等最显著可行的方式就是进行带电作业。带电作业是一项技术含量高、安全技艺要求严格,并且经济效益显著的线路检修方法。通过对带电作业方法和工具的研究和改进,无疑对提高带电作业效率,扩展带电作业范围,能起到良好的效果。郊区较市区地形复杂,许多带电工作施工现场受地形的影响绝缘抖臂车无法靠近,不能实施中间电位作业,因而经常采用地电位作业法开展带电工作。城市郊区电网建设标准与市区一致,10KV主线路多采用JKLYJ-240绝缘线,较原来的LGJ-185裸线重。而现今使用的带电绝缘横担的升降部分是以绳带为牵引,很难吊起导线,加之作业工具笨重,加重了作业人员的劳动强度。At present, the State Grid Corporation of China has gradually increased its requirements on the reliability of power supply, and its requirements on the service standards of power supply companies to customers are becoming more and more stringent. The most obvious and feasible way to reduce the area of power outages and reduce the time of power outages for users is to carry out live work. Live working is a line maintenance method with high technical content, strict safety technical requirements, and significant economic benefits. Through the research and improvement of live working methods and tools, there is no doubt that it will have a good effect on improving the efficiency of live working and expanding the scope of live working. The terrain in the suburbs is more complicated than that in the urban area. Due to the influence of the terrain, many live work construction sites cannot be approached by insulating jib trucks, and intermediate potential work cannot be carried out. Therefore, the ground potential work method is often used to carry out live work. The construction standards of power grids in the suburbs of cities are consistent with those in urban areas. JKLYJ-240 insulated wires are mostly used for 10KV main lines, which are heavier than the original LGJ-185 bare wires. And the lifting part of the live insulating cross arm that uses now is to be traction with rope belt, is difficult to lift lead, and operating tool is heavy in addition, has increased the labor intensity of operating personnel.

申请号“201110341349.8”“一种带电作业绝缘横担”的发明专利即是以绳带为牵引进行升降的;申请号“201210512574.8”“一种带电作业用临时支撑横担”的发明专利通过连杆滑块进行升降,但升降过程中不能保证导线固定槽的竖直,存在导线脱落的危险隐患;通过丝杠调整设备的高度,效率低下,且设备上端易旋转,影响正常工作。申请号“201110072527.1”“带有移动式弧形槽的绝缘横担”的发明专利,也是通过丝杠调整设备的高度,效率低下,通过移动移动式弧形槽对导线进行移动,由于人手与移动式弧形槽直接接触,存在一定的安全隐患。The invention patent of application number "201110341349.8" "an insulating crossarm for live work" is lifted and lowered by rope belt; The slider is lifted and lowered, but the verticality of the wire fixing groove cannot be guaranteed during the lifting process, and there is a danger of the wire falling off; the height of the device is adjusted by the screw, which is inefficient, and the upper end of the device is easy to rotate, which affects normal work. The invention patent of application number "201110072527.1" "Insulation cross arm with movable arc groove" also adjusts the height of the equipment through the screw, which is inefficient. There is a certain potential safety hazard in direct contact with the arc-shaped groove.

发明内容Contents of the invention

本发明针对现有设备的不足,研制了一种结构简单合理、连接牢固、起重能力强、劳动强度低、工作效率高的带电作业绝缘横担。Aiming at the deficiency of existing equipment, the invention develops an insulating cross arm for live working with simple and reasonable structure, firm connection, strong lifting capacity, low labor intensity and high work efficiency.

本发明解决技术问题的技术方案为:一种带电作业绝缘横担,安装在电线杆的顶部,包括底座杆、伸缩杆、导向杆、移动卡槽,所述的底座杆的底部设置有与电线杆顶部对应的安装槽,安装槽的侧面设置有螺纹通孔a,螺纹通孔a中安装有顶紧螺钉,底座杆的上端设置有与伸缩杆对应的空腔,空腔上端开口位置的侧面设置有螺纹通孔b,螺纹通孔b中安装有弹簧销;伸缩杆安装在空腔中,伸缩杆上设置多个与螺纹通孔b对应的通孔a;导向杆横向设置在套筒a的侧面,套筒a上竖直方向设置有与伸缩杆对应的开孔,套筒a的侧面设置有螺纹通孔b,螺纹通孔b中安装有弹簧销;移动卡槽上设置有横向导向孔,移动卡槽通过横向导向孔安装在导向杆上,移动卡槽的底部通过连杆连接套筒b,套筒b的竖直方向设置有与伸缩杆对应的开孔,套筒b的侧面设置有螺纹通孔b,螺纹通孔b中安装有弹簧销,连杆与移动卡槽、套筒b的连接都为活动连接。The technical solution of the present invention to solve the technical problem is: an insulating cross arm for live work, installed on the top of the utility pole, including a base rod, a telescopic rod, a guide rod, and a moving card slot. The bottom of the base rod is provided with a The installation groove corresponding to the top of the rod, the side of the installation groove is provided with a threaded through hole a, and a jacking screw is installed in the threaded through hole a, the upper end of the base rod is provided with a cavity corresponding to the telescopic rod, and the side of the opening position of the upper end of the cavity A threaded through hole b is provided, and a spring pin is installed in the threaded through hole b; the telescopic rod is installed in the cavity, and a plurality of through holes a corresponding to the threaded through hole b are arranged on the telescopic rod; the guide rod is horizontally arranged on the sleeve a On the side of the sleeve a, there is an opening corresponding to the telescopic rod in the vertical direction. The side of the sleeve a is provided with a threaded through hole b, and a spring pin is installed in the threaded through hole b; hole, the moving card slot is installed on the guide rod through the horizontal guide hole, the bottom of the moving card slot is connected to the sleeve b through the connecting rod, the vertical direction of the sleeve b is provided with an opening corresponding to the telescopic rod, the side of the sleeve b A threaded through hole b is provided, and a spring pin is installed in the threaded through hole b, and the connection between the connecting rod, the moving card slot and the sleeve b is a flexible connection.

所述连杆包括上连杆、下连杆、中间杆,中间杆的上半段、下半段设置有方向相反的外螺纹,上连杆、下连杆上设置有对应的内螺纹。The connecting rod includes an upper connecting rod, a lower connecting rod and an intermediate rod. The upper half and the lower half of the intermediate rod are provided with external threads in opposite directions, and the upper connecting rod and the lower connecting rod are provided with corresponding internal threads.

所述连杆包括上连杆、下连杆、中间杆,中间杆的上半段、下半段设置有方向相反的内螺纹,上连杆、下连杆上设置有对应的外螺纹。The connecting rod includes an upper connecting rod, a lower connecting rod, and an intermediate rod. The upper half and the lower half of the intermediate rod are provided with internal threads in opposite directions, and the upper and lower connecting rods are provided with corresponding external threads.

所述伸缩杆上的通孔a均匀分布。The through holes a on the telescopic rod are evenly distributed.

所述底座杆、伸缩杆、导向杆为圆管或方管。The base rod, telescopic rod and guide rod are round pipes or square pipes.

所述导向杆设置至少两根,导向杆均匀分布在套筒a的侧面。There are at least two guide rods, and the guide rods are evenly distributed on the side of the sleeve a.

每根导向杆上至少安装一个移动卡槽。At least one mobile card slot is installed on each guide rod.

本发明的有益效果:Beneficial effects of the present invention:

1.本发明结构简单合理、连接牢固、起重能力强、劳动强度低、工作效率高。通过调节伸缩杆在底座杆中的位置可对设备高度进行初步确定,然后通过调节导向杆的高度可确定设备的工作高度,通过调节移动卡槽的横向位置可使移动卡槽进入工作位置,并实现对导线的安装,移动卡槽的移动通过调节套筒b的位置以及连杆的长度实现,人手远离导线,操作安全。1. The present invention has simple and reasonable structure, firm connection, strong lifting capacity, low labor intensity and high work efficiency. The height of the equipment can be preliminarily determined by adjusting the position of the telescopic rod in the base rod, and then the working height of the device can be determined by adjusting the height of the guide rod, and the mobile card slot can enter the working position by adjusting the lateral position of the mobile card slot, and The installation of the wire is realized, and the movement of the moving card slot is realized by adjusting the position of the sleeve b and the length of the connecting rod, keeping the hands away from the wire, and the operation is safe.

2.通过将连杆设置成螺纹调节的多段杆,可对移动卡槽的位置进行微调,与设备主体配合使用,提高了设备的工作效率。2. By setting the connecting rod as a thread-adjustable multi-segment rod, the position of the mobile card slot can be fine-tuned, and it can be used in conjunction with the main body of the device to improve the working efficiency of the device.

3.导向杆设置至少两根,每根导向杆上至少安装一个移动卡槽,可使用与线路密集的场合,提高了设备的利用率。3. There are at least two guide rods, and at least one mobile card slot is installed on each guide rod, which can be used in places with dense lines and improves the utilization rate of the equipment.

附图说明Description of drawings

图1为本发明一种实施例的正视图。Figure 1 is a front view of an embodiment of the present invention.

图2为本发明另一种实施例的正视图。Fig. 2 is a front view of another embodiment of the present invention.

图3为本发明第三种实施例的正视图。Fig. 3 is a front view of a third embodiment of the present invention.

其中:110底座杆、111顶紧螺钉、112安装槽、113空腔、120伸缩杆、121通孔a、130导向杆、131套筒a、140移动卡槽、141弹簧销、142连杆、143套筒b、144中间杆、145下连杆、146上连杆、2电线杆。Among them: 110 base rod, 111 jacking screw, 112 installation groove, 113 cavity, 120 telescopic rod, 121 through hole a, 130 guide rod, 131 sleeve a, 140 moving card slot, 141 spring pin, 142 connecting rod, 143 sleeve b, 144 middle rod, 145 lower connecting rod, 146 upper connecting rod, 2 utility poles.

具体实施方式Detailed ways

为了更好地理解本发明,下面结合附图来详细解释本发明的实施方式。In order to better understand the present invention, the implementation manner of the present invention will be explained in detail below in conjunction with the accompanying drawings.

图1为本发明的一种实施例,如图1所示,一种带电作业绝缘横担,安装在电线杆2的顶部,包括底座杆110、伸缩杆120、导向杆130、移动卡槽140,所述的底座杆110的底部设置有与电线杆2顶部对应的安装槽112,安装槽112的侧面设置有螺纹通孔a,螺纹通孔a中安装有顶紧螺钉111,底座杆110的上端设置有与伸缩杆120对应的空腔113,空腔113上端开口位置的侧面设置有螺纹通孔b,螺纹通孔b中安装有弹簧销141;伸缩杆120安装在空腔113中,伸缩杆120上设置多个与螺纹通孔b对应的通孔a121;导向杆130横向设置在套筒a131的侧面,套筒a131上竖直方向设置有与伸缩杆120对应的开孔,套筒a131的侧面设置有螺纹通孔b,螺纹通孔b中安装有弹簧销141;移动卡槽140上设置有横向导向孔,移动卡槽140通过横向导向孔安装在导向杆130上,移动卡槽140的底部通过连杆142连接套筒b143,套筒b143的竖直方向设置有与伸缩杆120对应的开孔,套筒b143的侧面设置有螺纹通孔b,螺纹通孔b中安装有弹簧销141,连杆142与移动卡槽140、套筒b143的连接都为活动连接。所述伸缩杆120上的通孔a121均匀分布。所述底座杆110、伸缩杆120、导向杆130为圆管。所述导向杆130设置两根,导向杆130均匀分布在套筒a131的侧面。每根导向杆130上安装一个移动卡槽140。Fig. 1 is an embodiment of the present invention, as shown in Fig. 1, a live working insulating cross arm is installed on the top of the utility pole 2, including a base rod 110, a telescopic rod 120, a guide rod 130, and a moving slot 140 , the bottom of the base rod 110 is provided with a mounting groove 112 corresponding to the top of the utility pole 2, and the side of the mounting groove 112 is provided with a threaded through hole a, and a jacking screw 111 is installed in the threaded through hole a, and the base rod 110 The upper end is provided with a cavity 113 corresponding to the telescopic rod 120, and the side of the opening position of the upper end of the cavity 113 is provided with a threaded through hole b, and a spring pin 141 is installed in the threaded through hole b; the telescopic rod 120 is installed in the cavity 113. The rod 120 is provided with a plurality of through holes a121 corresponding to the threaded through holes b; the guide rod 130 is arranged laterally on the side of the sleeve a131, and the sleeve a131 is vertically provided with openings corresponding to the telescopic rod 120, and the sleeve a131 A threaded through hole b is provided on the side of the threaded through hole b, and a spring pin 141 is installed in the threaded through hole b; a horizontal guide hole is arranged on the moving card slot 140, and the moving card slot 140 is installed on the guide rod 130 through the horizontal guide hole, and the moving card slot 140 The bottom of the sleeve b143 is connected to the sleeve b143 through the connecting rod 142. The vertical direction of the sleeve b143 is provided with an opening corresponding to the telescopic rod 120. The side of the sleeve b143 is provided with a threaded through hole b, and a spring pin is installed in the threaded through hole b. 141, the connections between the connecting rod 142 and the moving slot 140 and the sleeve b143 are all movable connections. The through holes a121 on the telescopic rod 120 are evenly distributed. The base rod 110, telescopic rod 120, and guide rod 130 are circular tubes. Two guide rods 130 are provided, and the guide rods 130 are evenly distributed on the side of the sleeve a131. A moving slot 140 is installed on each guide rod 130 .

图2为本发明的第二种实施例,如图2所示,一种带电作业绝缘横担,安装在电线杆2的顶部,包括底座杆110、伸缩杆120、导向杆130、移动卡槽140,所述的底座杆110的底部设置有与电线杆2顶部对应的安装槽112,安装槽112的侧面设置有螺纹通孔a,螺纹通孔a中安装有顶紧螺钉111,底座杆110的上端设置有与伸缩杆120对应的空腔113,空腔113上端开口位置的侧面设置有螺纹通孔b,螺纹通孔b中安装有弹簧销141;伸缩杆120安装在空腔113中,伸缩杆120上设置多个与螺纹通孔b对应的通孔a121;导向杆130横向设置在套筒a131的侧面,套筒a131上竖直方向设置有与伸缩杆120对应的开孔,套筒a131的侧面设置有螺纹通孔b,螺纹通孔b中安装有弹簧销141;移动卡槽140上设置有横向导向孔,移动卡槽140通过横向导向孔安装在导向杆130上,移动卡槽140的底部通过连杆142连接套筒b143,套筒b143的竖直方向设置有与伸缩杆120对应的开孔,套筒b143的侧面设置有螺纹通孔b,螺纹通孔b中安装有弹簧销141,连杆142与移动卡槽140、套筒b143的连接都为活动连接。所述连杆142包括上连杆146、下连杆145、中间杆144,中间杆144的上半段、下半段设置有方向相反的外螺纹,上连杆146、下连杆145上设置有对应的内螺纹。所述伸缩杆120上的通孔a121均匀分布。所述底座杆110、伸缩杆120、导向杆130为圆管。所述导向杆130设置两根,导向杆130均匀分布在套筒a131的侧面。每根导向杆130上安装一个移动卡槽140。Fig. 2 is the second embodiment of the present invention. As shown in Fig. 2, a kind of insulating cross arm for live work is installed on the top of the utility pole 2, including a base pole 110, a telescoping pole 120, a guide pole 130, and a moving slot 140, the bottom of the base rod 110 is provided with a mounting groove 112 corresponding to the top of the utility pole 2, and the side of the mounting groove 112 is provided with a threaded through hole a, and a jacking screw 111 is installed in the threaded through hole a, and the base rod 110 The upper end of the telescopic rod 120 is provided with a cavity 113 corresponding to the telescopic rod 120, and the side of the opening position of the upper end of the cavity 113 is provided with a threaded through hole b, and a spring pin 141 is installed in the threaded through hole b; the telescopic rod 120 is installed in the cavity 113, The telescopic rod 120 is provided with a plurality of through holes a121 corresponding to the threaded through holes b; the guide rod 130 is arranged laterally on the side of the sleeve a131, and the sleeve a131 is vertically provided with openings corresponding to the telescopic rod 120. The side of a131 is provided with a threaded through hole b, and a spring pin 141 is installed in the threaded through hole b; a horizontal guide hole is arranged on the moving card slot 140, and the moving card slot 140 is installed on the guide rod 130 through the lateral guide hole, and the moving card slot The bottom of 140 is connected to the sleeve b143 through the connecting rod 142. The vertical direction of the sleeve b143 is provided with an opening corresponding to the telescopic rod 120. The side of the sleeve b143 is provided with a threaded through hole b, and a spring is installed in the threaded through hole b. The connection between the pin 141, the connecting rod 142, the moving slot 140, and the sleeve b143 is a flexible connection. The connecting rod 142 includes an upper connecting rod 146, a lower connecting rod 145, and an intermediate rod 144. The upper half and the lower half of the intermediate rod 144 are provided with opposite external threads, and the upper connecting rod 146 and the lower connecting rod 145 are provided with There are corresponding internal threads. The through holes a121 on the telescopic rod 120 are evenly distributed. The base rod 110, telescopic rod 120, and guide rod 130 are circular tubes. Two guide rods 130 are provided, and the guide rods 130 are evenly distributed on the side of the sleeve a131. A moving slot 140 is installed on each guide rod 130 .

图3为本发明的第三种实施例,如图3所示,一种带电作业绝缘横担,安装在电线杆2的顶部,包括底座杆110、伸缩杆120、导向杆130、移动卡槽140,所述的底座杆110的底部设置有与电线杆2顶部对应的安装槽112,安装槽112的侧面设置有螺纹通孔a,螺纹通孔a中安装有顶紧螺钉111,底座杆110的上端设置有与伸缩杆120对应的空腔113,空腔113上端开口位置的侧面设置有螺纹通孔b,螺纹通孔b中安装有弹簧销141;伸缩杆120安装在空腔113中,伸缩杆120上设置多个与螺纹通孔b对应的通孔a121;导向杆130横向设置在套筒a131的侧面,套筒a131上竖直方向设置有与伸缩杆120对应的开孔,套筒a131的侧面设置有螺纹通孔b,螺纹通孔b中安装有弹簧销141;移动卡槽140上设置有横向导向孔,移动卡槽140通过横向导向孔安装在导向杆130上,移动卡槽140的底部通过连杆142连接套筒b143,套筒b143的竖直方向设置有与伸缩杆120对应的开孔,套筒b143的侧面设置有螺纹通孔b,螺纹通孔b中安装有弹簧销141,连杆142与移动卡槽140、套筒b143的连接都为活动连接。所述连杆142包括上连杆146、下连杆145、中间杆144,中间杆144的上半段、下半段设置有方向相反的外螺纹,上连杆146、下连杆145上设置有对应的内螺纹。所述伸缩杆120上的通孔a121均匀分布。所述底座杆110、伸缩杆120、导向杆130为圆管。所述导向杆130设置两根,导向杆130均匀分布在套筒a131的侧面。每根导向杆130上安装两个移动卡槽140。Fig. 3 is the third embodiment of the present invention. As shown in Fig. 3, a kind of insulating cross arm for live work is installed on the top of the utility pole 2, including a base pole 110, a telescopic pole 120, a guide pole 130, and a moving slot 140, the bottom of the base rod 110 is provided with a mounting groove 112 corresponding to the top of the utility pole 2, and the side of the mounting groove 112 is provided with a threaded through hole a, and a jacking screw 111 is installed in the threaded through hole a, and the base rod 110 The upper end of the telescopic rod 120 is provided with a cavity 113 corresponding to the telescopic rod 120, and the side of the opening position of the upper end of the cavity 113 is provided with a threaded through hole b, and a spring pin 141 is installed in the threaded through hole b; the telescopic rod 120 is installed in the cavity 113, The telescopic rod 120 is provided with a plurality of through holes a121 corresponding to the threaded through holes b; the guide rod 130 is arranged laterally on the side of the sleeve a131, and the sleeve a131 is vertically provided with openings corresponding to the telescopic rod 120. The side of a131 is provided with a threaded through hole b, and a spring pin 141 is installed in the threaded through hole b; a horizontal guide hole is arranged on the moving card slot 140, and the moving card slot 140 is installed on the guide rod 130 through the lateral guide hole, and the moving card slot The bottom of 140 is connected to the sleeve b143 through the connecting rod 142. The vertical direction of the sleeve b143 is provided with an opening corresponding to the telescopic rod 120. The side of the sleeve b143 is provided with a threaded through hole b, and a spring is installed in the threaded through hole b. The connection between the pin 141, the connecting rod 142, the moving slot 140, and the sleeve b143 is a flexible connection. The connecting rod 142 includes an upper connecting rod 146, a lower connecting rod 145, and an intermediate rod 144. The upper half and the lower half of the intermediate rod 144 are provided with opposite external threads, and the upper connecting rod 146 and the lower connecting rod 145 are provided with There are corresponding internal threads. The through holes a121 on the telescopic rod 120 are evenly distributed. The base rod 110, telescopic rod 120, and guide rod 130 are circular tubes. Two guide rods 130 are provided, and the guide rods 130 are evenly distributed on the side of the sleeve a131. Two moving slots 140 are installed on each guide rod 130 .

使用时,一、通过底座杆110的底部的安装槽112将设备安装在电线杆2的顶部,通过拧紧顶紧螺钉111将设备固定牢固。During use, first, the equipment is installed on the top of the utility pole 2 through the mounting groove 112 at the bottom of the base pole 110, and the equipment is fixed firmly by tightening the jacking screw 111.

二、松开空腔113上的弹簧销141,调节伸缩杆120在底座杆110中的位置对设备高度进行初步确定,调节完成后固定弹簧销141。2. Loosen the spring pin 141 on the cavity 113, adjust the position of the telescopic rod 120 in the base rod 110 to preliminarily determine the height of the equipment, and fix the spring pin 141 after the adjustment is completed.

三、松开套筒a131上的弹簧销141,调节套筒a131的高度至合适的工作高度,调节完成后固定弹簧销141。3. Loosen the spring pin 141 on the sleeve a131, adjust the height of the sleeve a131 to a suitable working height, and fix the spring pin 141 after the adjustment is completed.

四、松开套筒b143上的弹簧销141,调节套筒b143的高度至移动卡槽140的横向位置进入工作位置,还可通过调节连杆142的长度实现移动卡槽140横向位置的微调。调节完成后固定弹簧销141。Four, unclamp the spring pin 141 on the sleeve b143, adjust the height of the sleeve b143 to the lateral position of the moving slot 140 to enter the working position, and also realize the fine adjustment of the lateral position of the moving slot 140 by adjusting the length of the connecting rod 142. After the adjustment is completed, fix the spring pin 141.

上述虽然结合附图对发明的具体实施方式进行了描述,但并非对本发明保护范围的限制,在本发明的技术方案的基础上,本领域技术人员不需要付出创造性劳动即可做出的各种修改或变形仍在本发明的保护范围以内。Although the specific implementation of the invention has been described above in conjunction with the accompanying drawings, it does not limit the protection scope of the present invention. On the basis of the technical solution of the present invention, those skilled in the art can make various Modifications or variations are still within the protection scope of the present invention.

Claims (7)

1. a kind of live-wire work insulating cross arm, mounted on the top of electric pole (2), it is characterised in that:Including base rod (110), Telescopic rod (120), guide rod (130), mobile card slot (140), the bottom of the base rod (110) is provided with and electric pole (2) the corresponding mounting groove (112) in top, the side of mounting groove (112) is provided with tapped through hole a, top is equipped in tapped through hole a Tight screw (111), the upper end of base rod (110) is provided with cavity (113) corresponding with telescopic rod (120), cavity (113) upper end The side of aperture position is provided with tapped through hole b, and spring catch (141) is equipped in tapped through hole b;Telescopic rod (120) is mounted on In cavity (113), multiple through-hole a (121) corresponding with tapped through hole b are set on telescopic rod (120);Guide rod (130) is laterally The side of sleeve a (131) is arranged on, vertical direction is provided with trepanning corresponding with telescopic rod (120), sleeve on sleeve a (131) The side of a (131) is provided with tapped through hole b, and spring catch (141) is equipped in tapped through hole b;Mobile card slot is set on (140) There is laterally steering hole, mobile card slot (140) is mounted on by laterally steering hole on guide rod (130), the bottom of mobile card slot (140) Portion is provided with open corresponding with telescopic rod (120) by connecting rod (142) branch sleeve b (143), the vertical direction of sleeve b (143) Hole, the side of sleeve b (143) are provided with tapped through hole b, spring catch (141) are equipped in tapped through hole b, connecting rod (142) is with moving The connection of dynamic card slot (140), sleeve b (143) is all flexible connection.
2. a kind of live-wire work insulating cross arm as described in claim 1, it is characterized in that, the connecting rod (142) is including upper connecting rod (146), lower link (145), intermediate bar (144), upper semisection, the lower semisection of intermediate bar (144) are provided with the opposite outer spiral shell in direction Line, upper connecting rod (146), lower link are provided with corresponding internal thread on (145).
3. a kind of live-wire work insulating cross arm as described in claim 1, it is characterized in that, the connecting rod (142) is including upper connecting rod (146), lower link (145), intermediate bar (144), upper semisection, the lower semisection of intermediate bar (144) are provided with the opposite interior spiral shell in direction Line, upper connecting rod (146), lower link are provided with corresponding external screw thread on (145).
4. a kind of live-wire work insulating cross arm as described in claim 1, it is characterized in that, the through-hole a on the telescopic rod (120) (121) it is uniformly distributed.
5. a kind of live-wire work insulating cross arm as described in claim 1, it is characterized in that, the base rod (110), telescopic rod (120), guide rod (130) is pipe or square tube.
6. a kind of live-wire work insulating cross arm as described in claim 1, it is characterized in that, guide rod (130) setting is at least Two, guide rod (130) is evenly distributed on the side of sleeve a (131).
7. a kind of live-wire work insulating cross arm as described in claim 1, it is characterized in that, at least pacify on every guide rod (130) Fill a mobile card slot (140).
CN201610269108.XA 2016-04-27 2016-04-27 A kind of live-wire work insulating cross arm Active CN105811306B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610269108.XA CN105811306B (en) 2016-04-27 2016-04-27 A kind of live-wire work insulating cross arm

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610269108.XA CN105811306B (en) 2016-04-27 2016-04-27 A kind of live-wire work insulating cross arm

Publications (2)

Publication Number Publication Date
CN105811306A CN105811306A (en) 2016-07-27
CN105811306B true CN105811306B (en) 2018-06-29

Family

ID=56457770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610269108.XA Active CN105811306B (en) 2016-04-27 2016-04-27 A kind of live-wire work insulating cross arm

Country Status (1)

Country Link
CN (1) CN105811306B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107732756A (en) * 2017-08-31 2018-02-23 合保电气(芜湖)有限公司 Electric wire aids in installing arm
CN108524980A (en) * 2018-07-04 2018-09-14 南通安企熙医疗科技有限公司 A kind of surgical cutter chlorination equipment
CN110616941A (en) * 2019-09-26 2019-12-27 国网河北省电力有限公司石家庄市藁城区供电分公司 10kV distribution network insulating cross arm
CN111162490B (en) * 2020-03-03 2021-06-15 蒋运臣 Automatic assembly equipment for adjustable electric power transmission frame
CN112202139B (en) * 2020-08-27 2021-11-19 南京市晨枭软件技术有限公司 Cable guiding device for industrial robot

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102191874A (en) * 2011-03-25 2011-09-21 河南省电力公司郑州供电公司 Insulating cross arm with movable arc grooves
CN203430132U (en) * 2013-06-28 2014-02-12 常州井豪机械配件厂 Insulating cross arm
CN203895908U (en) * 2014-04-10 2014-10-22 国家电网公司 Balance cross-arm

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5335034B2 (en) * 2011-06-20 2013-11-06 中国電力株式会社 Arm changer
JP5701933B2 (en) * 2013-05-23 2015-04-15 中国電力株式会社 Arm adjustment device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102191874A (en) * 2011-03-25 2011-09-21 河南省电力公司郑州供电公司 Insulating cross arm with movable arc grooves
CN203430132U (en) * 2013-06-28 2014-02-12 常州井豪机械配件厂 Insulating cross arm
CN203895908U (en) * 2014-04-10 2014-10-22 国家电网公司 Balance cross-arm

Also Published As

Publication number Publication date
CN105811306A (en) 2016-07-27

Similar Documents

Publication Publication Date Title
CN102966258B (en) Temporary supporting crossarm for live working
CN105811306A (en) Insulation crossarm for live line work
CN204645808U (en) Bar stepped on by cement pole cable
CN103647229B (en) Earth potential reset suspension insulator side of wire bowl head W sells special tool utensil
CN203541929U (en) Adjustable hoop welding tool
CN205265149U (en) Be applied to split conductor of transmission line operation and carry line ware
CN203289006U (en) Insulation adjustable yoke plate
CN202039638U (en) Lead screw lifting type insulating cross arm
CN102916372B (en) 10kV multi-circuit lines on the same pole mesophase spherule wire lifting instrument
CN102191874B (en) Insulating cross arm with movable arc grooves
CN201991295U (en) Insulating cross arm capable of adjusting location of wire
CN202937046U (en) Temporary support cross arm for hot-line work
CN206346561U (en) A kind of single loop is arranged vertically anchor support
CN216016404U (en) Double-loop high-voltage direct-current line pole lead and metal return line common-frame angle steel tower
CN103147617B (en) The steel pipe pole that transmission pressure is buried can be realized
CN202882514U (en) 220-kilovolt all-angle single-circuit drilling cross tower
CN210182908U (en) Multifunctional wire support
CN202850574U (en) Wire rod
CN203684772U (en) 220 kV/110 kV quadruple-loop cable terminal steel pipe pole
CN202888720U (en) Wire lifting tool of 10kV same-tower multi-circuit intermediate phase conductor
CN217783072U (en) Adjustable insulating cross arm
CN203871822U (en) Upturned pulley for live installation of zinc oxide lightning arrester on four-bundle conductors of 500kv power transmission line
CN206575071U (en) A kind of tree-like door frame outlet structure of 330kV open airs GIS power distribution equipments
CN204680989U (en) A kind of damping flying car for overhauling overhead ground wire
CN105788816B (en) A kind of combined type distribution transformer stand and its application method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant