CN105803951A - Mutual track device of supporting system which is fixed or can be opened and closed and guide system - Google Patents

Mutual track device of supporting system which is fixed or can be opened and closed and guide system Download PDF

Info

Publication number
CN105803951A
CN105803951A CN201610170773.3A CN201610170773A CN105803951A CN 105803951 A CN105803951 A CN 105803951A CN 201610170773 A CN201610170773 A CN 201610170773A CN 105803951 A CN105803951 A CN 105803951A
Authority
CN
China
Prior art keywords
supporting
bridge
guidance system
track
supporting system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610170773.3A
Other languages
Chinese (zh)
Other versions
CN105803951B (en
Inventor
王文龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610170773.3A priority Critical patent/CN105803951B/en
Publication of CN105803951A publication Critical patent/CN105803951A/en
Application granted granted Critical
Publication of CN105803951B publication Critical patent/CN105803951B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection

Abstract

The invention discloses a mutual track device of a supporting system which is fixed or can be opened and closed and a guide system. The mutual track device comprises the guide system arranged on a bridge deck system in the length direction of a bridge, a track system is arranged on the guide system in the length direction of the guide system, the guide system is associated with the supporting system through the track system, and thus the supporting system and the guide system can both move along the track system. The supporting system comprises rotation power supporting arms, and power systems for spreading the rotation power supporting arms are arranged on the rotation power supporting arms. A support for fixing the supporting system or the guide system is arranged on a bridge pier. In the mutual track device, a walking device does not need to be arranged for hanging baskets as in the prior art, cost is lower, operation is easy and convenient, and labor intensity is low; besides, the risk that the hanging baskets are likely to overturn due to the fact that the walking track is not arranged can be avoided. The construction period is greatly shortened.

Description

The mutual rail device of fixing or supporting system able to turn on or off and guidance system
Technical field
The present invention relates to a kind of Hanging Basket, particularly relate to the mutual rail device of a kind of supporting system fixing or able to turn on or off and guidance system
Background technology
Bridge is generally adopted prestressed reinforced concrete construction or continuous beam, and in work progress, one sections ground cantilever cast-in-place method of application one sections of suspending technology is implemented, and each sections is linked up by reinforcing bar and prestressing force steel hinge line.Cantilever pouring concrete and prestress engineering all carry out on Hanging Basket.After one sections completes, Hanging Basket needs cantilever running to arrive the continuation construction of next position, and so circulation carries out, until last sections.This is accomplished by arranging track on bridge, after cradle construction completes one section, adopts jack stand hanging basket device, and moving track is to next construction predeterminated position, then moves Hanging Basket to predeterminated position.Thus circulate Roadway Construction operation.
Prior art can only adopt the mode that multistage is built to complete on one section of bridge, and present one-time-concreting probably can only build the concrete of about 2 meters length.Owing to cradle structure is complicated, in the process of walking, its spare and accessory parts are many and bridge is interrelated for Hanging Basket, middle also interspersed.From being poured into demoulding walking, the technology gap of single hop is long, and the time of multistage combination waste is longer, and the construction period causing whole bridge is long.
Summary of the invention
The purpose of the present invention is that offer one solves the problems referred to above, it is not necessary to bridge the preceding paragraph section arranges track again, saves the duration, the fixing or supporting system able to turn on or off of simple in construction and the mutual rail device of guidance system.
To achieve these goals, the technical solution used in the present invention is such that the mutual rail device of a kind of supporting system fixing or able to turn on or off and guidance system, including the guidance system being arranged in bridge deck, arrange along bridge length direction;
It is characterized in that: being provided with rail system on described guidance system along its length, guidance system associates supporting system by rail system, make supporting system and guidance system all can move along the direction of rail system;
Described supporting system includes rotary power support arm, and described rotary power support arm is provided with the dynamical system spread out;
Bridge pier is provided with the bearing of fixed bearing system or guidance system.
As preferably: described guidance system is girder steel or trussing.
As preferably: also including antidumping assembly, supporting system or guidance system are fixed in bridge deck by described antidumping assembly.
Compared with prior art, it is an advantage of the current invention that: under the effect of rail system, guidance system and supporting system can move along the direction of rail system, so, in the process of bridge construction, first on access bridge, set guidance system, supporting system, and by both rail system associations, the direction of rail system is along bridge length direction, namely the constructive direction of bridge is arranged, move forward supporting system or guidance system, the system not moved need to be fixed by antidumping assembly, after the system first moved moves to precalculated position, fixed by antidumping assembly, remove the antidumping assembly arranged in the system not moved again, and it is moved forward to precalculated position along rail system.
Generally, we set the system first moved and move forward to bridge span 1/3rd place along track, and the system of rear movement moves again to adjacent bridge pier place.Repeat above-mentioned motion, it is possible to constantly supporting system and guidance system are pushed ahead, thus completing the construction of bridge.
Rail system, it is possible to be a kind of rail set of peripheral hardware, it is also possible to carry out self associating on guidance system with supporting system, make the two association place have the structure of rail set.
Supporting system includes rotary power support arm, and described rotary power support arm is provided with the dynamical system spread out, it is therefore an objective to makes rotary power support arm get around barrier, does not hinder supporting system to travel forward.
In the present invention, Hanging Basket without arranging walking track as prior art, lower in cost, easy and simple to handle, labor intensity is low, and can overcome because being not provided with walking track, and is easily caused the danger that Hanging Basket overturns.Substantially reduce construction period.
Accompanying drawing explanation
Fig. 1 is present configuration schematic diagram;
Fig. 2 is run trace figure first step figure of the present invention;
Fig. 3 is run trace figure second step figure of the present invention;
Fig. 4 is run trace figure the 3rd step figure of the present invention.
In figure: 1, bridge;2, guidance system;3, rail system;4, supporting system;5, rotary power support arm;6, dynamical system;7, antidumping assembly;8, bridge pier.
Detailed description of the invention
Below in conjunction with accompanying drawing, the invention will be further described.
Embodiment 1: referring to Fig. 1, Fig. 2, Fig. 3, Fig. 4, the mutual rail device of a kind of supporting system fixing or able to turn on or off and guidance system, including the guidance system 2 being arranged in bridge deck, arrange along bridge 1 length direction,
Being provided with rail system 3 on described guidance system 2 along its length, guidance system 2 associates supporting system 4 by rail system 3, makes supporting system 4 and guidance system 2 all can move along the direction of rail system 3;
Described supporting system 4 includes rotary power support arm 5, and described rotary power support arm 5 is provided with the dynamical system 6 spread out;Bridge pier 8 is provided with fixed bearing system 4 or the bearing of guidance system 2.
In the present embodiment, described guidance system 2 is girder steel, present invention additionally comprises antidumping assembly 7, and supporting system 4 or guidance system 2 are fixed in bridge deck by described antidumping assembly 7.
Building a bridge 1 between the bridge pier 8 of bridge 1, for the ease of describing the principle of the invention, we allow supporting system 4 first move.
The first step: open the rotary power support arm 5 of supporting system 4, supporting system 4, guidance system 2 has been set in bridge deck, and by both rail system 3 associations, the direction of rail system 3 is along bridge 1 length direction, namely the constructive direction of bridge 1 is arranged, and is directed to system 2 by antidumping assembly 7 and fixes;
Second step: move forward supporting system 4 to bridge 1 span 1/3rd place, installs the antidumping assembly 7 of supporting system 4, removes the antidumping assembly 7 of guidance system 2;
3rd step: be directed to system 2 and move above bridge pier 8 foremost, be directed to system 2 again through bearing and be fixed on bridge pier 8.So, the bridge 1 motion to next bridge pier 8 is just completed.
In like manner, the bridge pier 8 motion to next bridge pier 8 can be completed, certainly owing to bridge pier 8 size is big, the motion of supporting system 4 will necessarily be hindered, so we are provided with the dynamical system 6 spread out on the rotary power support arm 5 of supporting system 4, it is for the demoulding and gets around the barriers such as bridge pier 8, do not hinder the motion of supporting system 4.
Certainly, first mobile homing system 2, it is also possible to realize technical solution of the present invention.
In the present invention, Hanging Basket without arranging walking track as prior art, lower in cost, easy and simple to handle, labor intensity is low, and can overcome because being not provided with walking track, and is easily caused the danger that Hanging Basket overturns.Substantially reduce construction period.
Embodiment 2: in the present embodiment, described guidance system 2 is trussing, and all the other are identical with embodiment 1.
Owing to making guidance system 2 and supporting system 4 track each other, supporting each other, it is not necessary to arrange the walking track of Hanging Basket on the wall, overcome the defect of spare and accessory parts system many, each interspersed interference mutually run into when walking track is set.Building the bridge 1 of about 300 meters, prior art needs the duration 18 months, and the present invention only needs about 6 months, substantially reduces the duration.
Present invention can apply to such as: corrugated web bridge, Cast-in-place concrete bridge, the molding of continuous Cast-in-place concrete beam and be used as the erection etc. of precast beam.

Claims (3)

1. a mutual rail device for fixing or supporting system able to turn on or off and guidance system, including the guidance system being arranged in bridge deck, arrange along bridge length direction;
It is characterized in that: being provided with rail system on described guidance system along its length, guidance system associates supporting system by rail system, make supporting system and guidance system all can move along the direction of rail system;
Described supporting system includes rotary power support arm, and described rotary power support arm is provided with the dynamical system spread out;
Bridge pier is provided with the bearing of fixed bearing system or guidance system.
2. the mutual rail device of supporting system fixing or able to turn on or off according to claim 1 and guidance system, it is characterised in that: described guidance system is girder steel or trussing.
3. the mutual rail device of supporting system fixing or able to turn on or off according to claim 1 and guidance system, it is characterised in that: also including antidumping assembly, supporting system or guidance system are fixed in bridge deck by described antidumping assembly.
CN201610170773.3A 2016-03-24 2016-03-24 The mutual rail device of supporting system and guidance system fixed or able to turn on or off Active CN105803951B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610170773.3A CN105803951B (en) 2016-03-24 2016-03-24 The mutual rail device of supporting system and guidance system fixed or able to turn on or off

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610170773.3A CN105803951B (en) 2016-03-24 2016-03-24 The mutual rail device of supporting system and guidance system fixed or able to turn on or off

Publications (2)

Publication Number Publication Date
CN105803951A true CN105803951A (en) 2016-07-27
CN105803951B CN105803951B (en) 2018-07-03

Family

ID=56453730

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610170773.3A Active CN105803951B (en) 2016-03-24 2016-03-24 The mutual rail device of supporting system and guidance system fixed or able to turn on or off

Country Status (1)

Country Link
CN (1) CN105803951B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101210419A (en) * 2007-12-21 2008-07-02 中铁大桥局股份有限公司 Inside and outside beam system bridge fabrication machine for small radius curve concrete box girder construction and construction method thereof
CN101672018A (en) * 2009-08-27 2010-03-17 孙广喜 Trackless hanging bracket with traveling truss
CN201809726U (en) * 2010-10-08 2011-04-27 石家庄铁道大学国防交通研究所 Straddle-type bridge girder erection machine
CN102094394A (en) * 2010-12-30 2011-06-15 徐州徐工铁路装备有限公司 Through-tunnel lower pilot girder type non-moving lifting bridge girder erection machine
CN202031037U (en) * 2011-04-28 2011-11-09 湖南中铁五新钢模有限责任公司 Running guide device of descending hanging basket
ES2396291A1 (en) * 2010-02-05 2013-02-20 Rubrica Ingeniería Y Arquitectura S.L. Successive adjustable lift truck for building bridges. (Machine-translation by Google Translate, not legally binding)
CN203807947U (en) * 2014-04-16 2014-09-03 河北工业大学 Fixed-point hoisting type bridge girder erection machine
CN205474873U (en) * 2016-03-24 2016-08-17 王文龙 Fixed mutual rail device that may open and close supporting system and guide system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101210419A (en) * 2007-12-21 2008-07-02 中铁大桥局股份有限公司 Inside and outside beam system bridge fabrication machine for small radius curve concrete box girder construction and construction method thereof
CN101672018A (en) * 2009-08-27 2010-03-17 孙广喜 Trackless hanging bracket with traveling truss
ES2396291A1 (en) * 2010-02-05 2013-02-20 Rubrica Ingeniería Y Arquitectura S.L. Successive adjustable lift truck for building bridges. (Machine-translation by Google Translate, not legally binding)
CN201809726U (en) * 2010-10-08 2011-04-27 石家庄铁道大学国防交通研究所 Straddle-type bridge girder erection machine
CN102094394A (en) * 2010-12-30 2011-06-15 徐州徐工铁路装备有限公司 Through-tunnel lower pilot girder type non-moving lifting bridge girder erection machine
CN202031037U (en) * 2011-04-28 2011-11-09 湖南中铁五新钢模有限责任公司 Running guide device of descending hanging basket
CN203807947U (en) * 2014-04-16 2014-09-03 河北工业大学 Fixed-point hoisting type bridge girder erection machine
CN205474873U (en) * 2016-03-24 2016-08-17 王文龙 Fixed mutual rail device that may open and close supporting system and guide system

Also Published As

Publication number Publication date
CN105803951B (en) 2018-07-03

Similar Documents

Publication Publication Date Title
CN102121234B (en) Quick construction method of two-tower five-span steel truss girder cable-stayed bridge
US20150021119A1 (en) Self-launching movable scaffolding system
CN107338727B (en) Integrally-disassembled and assembled anti-collision wall template and walking type rail hanging and moving system thereof
CN104594918B (en) Split integrated underground passage steel mold plate trolley and construction method thereof
WO2014200443A1 (en) Self-launching movable scaffolding system
CN107640706B (en) Hoisting equipment and construction method thereof
JP2018053496A (en) Bridge girder erection method for multiple span continuous bridge
CN105952482A (en) Self-propelled tunnel invert lining trolley
CN110076889A (en) A kind of integral prefabricated immersed tube template system of dry-docking sequential method tunneling boring
JP2008274637A (en) Construction method for continuous viaduct
KR101630244B1 (en) Apparatus For Supporting A Construction Section And Method of Constructing Construction Section
CN102433844B (en) Method for erecting prefabricated beam of bridge deck
CN104328745B (en) Across the rotary body device of the little bridge beam of high ferro and construction method thereof on a kind of low-angle
JP2003253623A (en) Rebuilding construction method for bridge beam
CN104074145B (en) A kind of closure segment Hanging Basket repacking construction method
WO2015034444A1 (en) New overhead self-launching launching gantry systems
CN205474873U (en) Fixed mutual rail device that may open and close supporting system and guide system
JP2017048635A (en) Bridge disassembly method of using installation girder
JP5184248B2 (en) Construction method of level crossing
KR100928063B1 (en) Self-launching movable formwork
CN105803951A (en) Mutual track device of supporting system which is fixed or can be opened and closed and guide system
CN104831638B (en) A kind of mobile formwork straddle truck and construction method thereof
JP2004011196A (en) Erection method for arch rib of concrete arch bridge
CN109162737A (en) A kind of self-styled reinforcing steel bar-binding bench vehicle
Däbritz Movable scaffolding systems

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant