CN105775267A - Automatic cable management and binding equipment - Google Patents
Automatic cable management and binding equipment Download PDFInfo
- Publication number
- CN105775267A CN105775267A CN201610242179.0A CN201610242179A CN105775267A CN 105775267 A CN105775267 A CN 105775267A CN 201610242179 A CN201610242179 A CN 201610242179A CN 105775267 A CN105775267 A CN 105775267A
- Authority
- CN
- China
- Prior art keywords
- binding
- cable
- wire
- manipulator
- seat
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000007246 mechanism Effects 0.000 claims abstract description 66
- 238000004804 winding Methods 0.000 claims abstract description 61
- 230000008275 binding mechanism Effects 0.000 claims abstract description 24
- 230000005540 biological transmission Effects 0.000 claims description 20
- 210000000078 claw Anatomy 0.000 claims description 16
- 238000005520 cutting process Methods 0.000 claims description 14
- 238000002788 crimping Methods 0.000 claims description 9
- 238000003825 pressing Methods 0.000 claims description 8
- 150000001875 compounds Chemical class 0.000 claims description 7
- 239000002131 composite material Substances 0.000 claims description 3
- 230000009471 action Effects 0.000 abstract description 7
- 238000000034 method Methods 0.000 abstract description 5
- 230000008569 process Effects 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 8
- 238000012360 testing method Methods 0.000 description 7
- 230000006872 improvement Effects 0.000 description 6
- 230000001681 protective effect Effects 0.000 description 5
- 230000008901 benefit Effects 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 4
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000004806 packaging method and process Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65B—MACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
- B65B63/00—Auxiliary devices, not otherwise provided for, for operating on articles or materials to be packaged
- B65B63/04—Auxiliary devices, not otherwise provided for, for operating on articles or materials to be packaged for folding or winding articles, e.g. gloves or stockings
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65B—MACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
- B65B13/00—Bundling articles
- B65B13/18—Details of, or auxiliary devices used in, bundling machines or bundling tools
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65B—MACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
- B65B27/00—Bundling particular articles presenting special problems using string, wire, or narrow tape or band; Baling fibrous material, e.g. peat, not otherwise provided for
- B65B27/06—Bundling coils of wire or like annular objects
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65B—MACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
- B65B35/00—Supplying, feeding, arranging or orientating articles to be packaged
- B65B35/30—Arranging and feeding articles in groups
- B65B35/36—Arranging and feeding articles in groups by grippers
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Basic Packing Technique (AREA)
Abstract
Description
技术领域technical field
本发明涉及线缆测试设备技术领域,尤其涉及一种线缆的自动理线捆扎设备。The invention relates to the technical field of cable testing equipment, in particular to an automatic cable management and binding equipment for cables.
背景技术Background technique
一条电线终端包括线缆和与线缆连接的端子头,在生产制造过程中,端子头在与线缆连接后,需要进一步进行端子头与线缆的导通测试,从而检测端子头与线缆的连接情况。A wire terminal includes a cable and a terminal head connected to the cable. During the manufacturing process, after the terminal head is connected to the cable, it is necessary to further conduct a continuity test between the terminal head and the cable, so as to detect the connection between the terminal head and the cable. connection status.
目前,在进行电线终端测试时,总是通过人工对单条电线终端进行插拔,然后,由工人辅助,采用半自动绕线盘进行绕线,再将绕好的线缆进行人手捆扎,现有的这种捆扎方式自动化程度低、劳动强度大,有鉴于此,发明人对其提出了改进。At present, when conducting wire terminal testing, a single wire terminal is always plugged and pulled manually, and then, assisted by workers, a semi-automatic winding reel is used to wind the wires, and then the wound cables are manually bundled. This binding method has low degree of automation and high labor intensity. In view of this, the inventor has proposed an improvement.
发明内容Contents of the invention
本发明的目的在于针对现有技术的不足,提供了一种线缆的自动理线捆扎设备,它具有自动理线、自动捆扎和减少人工的优点。The object of the present invention is to provide an automatic cable management and binding equipment for cables, which has the advantages of automatic cable management, automatic binding and labor reduction.
为实现上述目的,本发明的一种线缆的自动理线捆扎设备,包括第一机械手,还包括第二机械手以及依次设置的循环理线装置、绕线机构和捆扎机构;所述绕线机构的旁侧设置有夹持机构,所述夹持机构固定夹持线缆的一端部;所述第一机械手将循环理线装置的线缆送至绕线机构进行缠绕;所述第二机械手将绕线机构的线缆送至捆扎机构,捆扎机构对线缆进行捆扎。In order to achieve the above object, an automatic cable management and binding device of the present invention includes a first manipulator, a second manipulator and a circular wire management device, a winding mechanism and a binding mechanism arranged in sequence; the winding mechanism A clamping mechanism is arranged on the side of the cable, and the clamping mechanism fixes and clamps one end of the cable; the first manipulator sends the cable of the circular cable management device to the winding mechanism for winding; the second manipulator will The cables of the winding mechanism are sent to the binding mechanism, and the binding mechanism binds the cables.
进一步的,所述绕线机构包括绕线盘、支撑柱和用于驱动绕线盘转动的绕线电机,所述支撑柱至少为两个,两个支撑柱与绕线盘连接。Further, the winding mechanism includes a winding reel, a support column and a winding motor for driving the reel to rotate, there are at least two support columns, and the two support columns are connected to the reel.
作为优选,所述绕线机构还包括与绕线盘滑动连接的调节座,所述支撑柱与调节座固定连接。Preferably, the winding mechanism further includes an adjustment seat slidably connected with the winding disk, and the support column is fixedly connected with the adjustment seat.
作为优选,所述绕线机构还包括用于驱动调节座的第一气缸。Preferably, the winding mechanism further includes a first air cylinder for driving the adjusting seat.
进一步的,所述夹持机构包括气夹头和放线夹头,所述放线夹头包括放线座,所述放线座设置有放线轮,所述放线座还设置有滑块及用于驱动滑块的第二气缸,所述滑块连接压线轴,所述压线轴与放线轮配合压紧或松开线缆。Further, the clamping mechanism includes an air chuck and a pay-off chuck, the pay-off chuck includes a pay-off seat, the pay-off seat is provided with a pay-off wheel, and the pay-off seat is also provided with a slider And the second air cylinder for driving the slide block, the slide block is connected with the crimping shaft, and the crimping shaft cooperates with the pay-off wheel to press or loosen the cable.
进一步的,所述捆扎机构包括卡爪座和设置于卡爪座的爪手,所述爪手设置有用于容置捆扎线的凹槽;还包括用于夹持捆扎线进行旋转的夹手。Further, the binding mechanism includes a claw seat and a gripper disposed on the claw seat, and the gripper is provided with a groove for accommodating the binding wire; it also includes a gripping hand for holding the binding wire for rotation.
作为优选,所述卡爪座的旁侧设置有捆扎线控制机构,所述捆扎线控制机构包括支撑板和设置于支撑板的上压轮和下压轮,所述支撑板还设置有裁切座,捆扎线从上压轮和下压轮之间通过并穿过裁切座,所述裁切座滑动连接有用于切断捆扎线的切刀,所述支撑板设置有用于驱动切刀的第三气缸。As a preference, a binding wire control mechanism is provided on the side of the claw seat, the binding wire control mechanism includes a support plate and an upper pressure wheel and a lower pressure wheel arranged on the support plate, and the support plate is also provided with a cutting seat, the binding wire passes between the upper pressing wheel and the lower pressing wheel and passes through the cutting seat, the cutting seat is slidably connected with a cutting knife for cutting the binding line, and the support plate is provided with a second driving knife Three cylinders.
进一步的,所述循环理线装置包括理线支架,所述理线支架连接有链条传动机构,所述链条传动机构连接有多个支撑导条,所述支撑导条的一端设置有第一卡座;还包括斜导槽和与支撑导条滑动连接的第二卡座,所述第二卡座延伸至斜导槽中,所述第二卡座沿着斜导槽在支撑导条上横向滑动。Further, the circular cable management device includes a cable management bracket, the cable management bracket is connected to a chain transmission mechanism, and the chain transmission mechanism is connected to a plurality of support guide bars, and one end of the support guide bar is provided with a first card Seat; also includes an inclined guide groove and a second card seat that is slidably connected with the support guide bar, the second card seat extends into the inclined guide groove, and the second card seat is transversely on the support guide bar along the inclined guide groove slide.
作为优选,所述链条传动机构包括第一传动辊、第二传动辊和用于驱动第一传动辊的伺服电机,所述第一传动辊设置有两个主动链轮,所述第二传动辊均设置有两个从动链轮,所述两个主动链轮均通过链条与两个从动链轮传动连接。Preferably, the chain drive mechanism includes a first drive roller, a second drive roller and a servo motor for driving the first drive roller, the first drive roller is provided with two driving sprockets, and the second drive roller Both are provided with two driven sprockets, and the two driving sprockets are connected to the two driven sprockets through chains.
作为进一步改进,本设备还包括第三机械手、第四机械手、归集工位和复合捆扎装置,所述第三机械手将捆扎机构的线缆送至归集工位,所述第四机械手将归集工位中的多个线缆送至复合捆扎装置进行集中捆扎。As a further improvement, the equipment also includes a third manipulator, a fourth manipulator, a collection station and a compound binding device, the third manipulator sends the cables of the binding mechanism to the collection station, and the fourth manipulator will return Multiple cables in the collection station are sent to the compound binding device for centralized binding.
本发明的有益效果:与现有技术相比,本发明的一种线缆的自动理线捆扎设备,本自动理线捆扎设备在工作时,线缆测试后,由循环理线装置对线缆进行依次理顺排列整齐,然后由第一机械手送至绕线机构进行缠绕,然后再利用第二机械手移动至捆扎机构进行自动捆扎,整个过程无须人手介入,实现全部自动化操作,节省了人工,减轻了工人的劳动强度,达到节省人力成本的优点。Beneficial effects of the present invention: Compared with the prior art, the automatic cable management and binding equipment of the present invention, when the automatic cable management and binding equipment is working, after the cable is tested, the circular cable management device will control the cables Arrange them in order, then send them to the winding mechanism by the first manipulator for winding, and then use the second manipulator to move to the tying mechanism for automatic tying. The whole process does not require manual intervention, and realizes all automatic operations, saving labor and reducing It reduces the labor intensity of workers and achieves the advantage of saving labor costs.
附图说明Description of drawings
图1为本发明的立体图。Fig. 1 is a perspective view of the present invention.
图2为本发明的循环理线装置的立体图。Fig. 2 is a perspective view of the circular cable management device of the present invention.
图3为本发明的循环理线装置的内部结构图。Fig. 3 is an internal structure diagram of the circular cable management device of the present invention.
图4为本发明的链条传动机构的结构示意图。Fig. 4 is a structural schematic diagram of the chain transmission mechanism of the present invention.
图5为本发明的第二卡座的结构示意图。Fig. 5 is a schematic structural diagram of the second card base of the present invention.
图6为本发明的斜导槽的优选结构示意图。Fig. 6 is a schematic diagram of a preferred structure of the inclined guide groove of the present invention.
图7为本发明的绕线机构与捆扎机构的组合结构示意图。Fig. 7 is a schematic diagram of the combined structure of the winding mechanism and the binding mechanism of the present invention.
图8为图7的内部结构示意图。FIG. 8 is a schematic diagram of the internal structure of FIG. 7 .
图9为本发明的绕线机构的结构示意图。Fig. 9 is a structural schematic diagram of the winding mechanism of the present invention.
图10为本发明的捆扎机构的结构示意图。Fig. 10 is a structural schematic diagram of the binding mechanism of the present invention.
附图标记包括:Reference signs include:
循环理线装置--1,理线支架--11,链条传动机构--12,Circular cable management device--1, cable management bracket--11, chain drive mechanism--12,
第一传动辊--121,第二传动辊--122,伺服电机--123,The first driving roller--121, the second driving roller--122, the servo motor--123,
主动链轮--124,从动链轮--125,支撑导条--13,Driving sprocket--124, driven sprocket--125, support guide bar--13,
第一卡座--14,第二卡座--15,延伸块--151,The first deck--14, the second deck--15, the extension block--151,
第一容置槽--152,第二容置槽--153,弹簧--154,The first accommodating groove--152, the second accommodating groove--153, the spring--154,
斜导槽--16,上段槽--161,下段槽--162,Inclined guide groove--16, upper groove--161, lower groove--162,
第一轴承导轮--163,第二轴承导轮--164,前段槽--165,The first bearing guide wheel--163, the second bearing guide wheel--164, the front groove--165,
后段槽--166,保护罩--17,第一通槽--171,Rear slot--166, protective cover--17, first slot--171,
第二通槽—172,第一机械手--18,绕线机构--2,The second slot--172, the first manipulator--18, the winding mechanism--2,
绕线盘--21,支撑柱--22,绕线电机--23,Winding reel--21, support column--22, winding motor--23,
调节座--24,第一气缸--25,捆扎机构--3,Adjusting seat--24, the first cylinder--25, strapping mechanism--3,
卡爪座--31,爪手--32,凹槽--321,Claw seat--31, claw hand--32, groove--321,
夹手--33,第二机械手--4,夹持机构--5,Gripper--33, second manipulator--4, clamping mechanism--5,
气夹头--51,放线座--52,放线轮--53,Air chuck--51, pay-off seat--52, pay-off wheel--53,
滑块--54,第二气缸--55,压线轴--56,Slider--54, the second cylinder--55, crimping shaft--56,
捆扎线控制机构--6,支撑板--61,上压轮--62,Binding line control mechanism--6, support plate--61, upper pressure wheel--62,
下压轮--63,裁切座--64,第三气缸—65,Lower pressing wheel--63, cutting seat--64, third cylinder--65,
第三机械手—71,第四机械手—72,归集工位—8,The third manipulator—71, the fourth manipulator—72, the collection station—8,
复合捆扎装置--9。Composite strapping device--9.
具体实施方式detailed description
下面结合附图对本发明进行详细的说明。The present invention will be described in detail below in conjunction with the accompanying drawings.
参见图1至图10,一种线缆的自动理线捆扎设备,包括第一机械手18,还包括第二机械手4以及依次设置的循环理线装置1、绕线机构2和捆扎机构3;所述绕线机构2的旁侧设置有夹持机构5,所述夹持机构5固定夹持线缆的一端部;所述第一机械手18将循环理线装置1的线缆送至绕线机构2进行缠绕;所述第二机械手4将绕线机构2缠绕好的线缆送至捆扎机构3,捆扎机构3对线缆进行捆扎。所述第二机械手4为了方便直接进行夹取线缆和放下线缆,第二机械手4最好设置于绕线机构2和夹持机构5的上方,这样,便于直接进行取线和放线的动作,本设备的工作原理是:线缆测试后,由循环理线装置1对线缆进行依次理顺排列整齐,然后由第一机械手18送至绕线机构2进行缠绕,夹持机构5将线缆的一端部进行固定夹持住,再利用绕线机构2将线缆进行缠绕,然后再利用第二机械手4移动至捆扎机构3进行自动捆扎,整个过程无须人手介入,实现全部自动化操作,节省了人工,减轻了工人的劳动强度,还具有工作效率高的优点。Referring to Fig. 1 to Fig. 10, an automatic cable management and binding equipment for cables includes a first manipulator 18, a second manipulator 4 and a circular wire management device 1, a winding mechanism 2 and a binding mechanism 3 arranged in sequence; A clamping mechanism 5 is provided on the side of the winding mechanism 2, and the clamping mechanism 5 fixes and clamps one end of the cable; the first manipulator 18 sends the cable of the circular cable management device 1 to the winding mechanism 2 for winding; the second manipulator 4 sends the cables wound by the winding mechanism 2 to the binding mechanism 3, and the binding mechanism 3 binds the cables. For convenience, the second manipulator 4 directly clamps and puts down the cable. The second manipulator 4 is preferably arranged above the winding mechanism 2 and the clamping mechanism 5, so that it is convenient to directly take and pay off the wire. Action, the working principle of this equipment is: after the cable test, the circular cable management device 1 arranges the cables in order, and then the first manipulator 18 sends them to the winding mechanism 2 for winding, and the clamping mechanism 5 will One end of the cable is fixed and clamped, and then the cable is wound by the winding mechanism 2, and then the second manipulator 4 is used to move to the binding mechanism 3 for automatic binding. The whole process does not require manual intervention and realizes all automatic operations. It saves labor, reduces the labor intensity of workers, and also has the advantages of high work efficiency.
详见图7,具体地,所述绕线机构2包括绕线盘21、支撑柱22和用于驱动绕线盘21转动的绕线电机23,所述支撑柱22至少为两个,两个支撑柱22与绕线盘21连接。工作时,绕线电机23驱动绕线盘21转动,线缆即可绕于两个支撑柱22上,结构简单,绕线速度快。7 for details, specifically, the winding mechanism 2 includes a winding reel 21, a support column 22 and a winding motor 23 for driving the reel 21 to rotate, the support columns 22 are at least two, two The support column 22 is connected with the winding reel 21 . When working, the winding motor 23 drives the winding reel 21 to rotate, and the cable can be wound on the two support columns 22. The structure is simple and the winding speed is fast.
通常,不同的线缆长度往往有一定的区别,为了适应不同长度的绕线,作为进一步的改进,所述绕线机构2还包括与绕线盘21滑动连接的调节座24,所述支撑柱22与调节座24固定连接。这样,对于不同线缆长度的绕线,即可通过滑动调节座24,使两个支撑柱22的相对距离实现调整即可,使用更加方便。Generally, different cable lengths often have certain differences. In order to adapt to winding wires of different lengths, as a further improvement, the winding mechanism 2 also includes an adjustment seat 24 that is slidably connected with the winding reel 21, and the support column 22 is fixedly connected with the adjustment seat 24. In this way, for winding wires with different cable lengths, the relative distance between the two support columns 22 can be adjusted by sliding the adjustment seat 24 , which is more convenient to use.
为了提高绕线的准确性和精度,线缆缠绕于支撑柱22上往往具有一定张紧力,但如果缠绕过紧,则在取出时,容易对绕好的线缆造成凌乱的状态,作为改进,所述绕线机构2还包括用于驱动调节座24的第一气缸25。这样,取线时,第一气缸25驱动调节座24进行回位,使两个支撑柱22之间的距离略微缩短,这样,即可使线缆轻松的夹取出来。In order to improve the accuracy and precision of winding, the cables are often wound with a certain tension on the support column 22, but if the winding is too tight, it is easy to cause a messy state to the wound cables when taken out, as an improvement , the winding mechanism 2 also includes a first air cylinder 25 for driving the adjusting seat 24 . In this way, when the wire is taken out, the first cylinder 25 drives the adjustment seat 24 to return, so that the distance between the two support columns 22 is slightly shortened, so that the wire can be easily clamped out.
在本技术方案中,所述夹持机构5包括气夹头51和放线夹头,所述放线夹头包括放线座52,所述放线座52设置有放线轮53,所述放线座52还设置有滑块54及用于驱动滑块54的第二气缸55,所述滑块54连接压线轴56,所述压线轴56与放线轮53配合压紧或松开线缆。所述线缆在送入绕线机构2时,线缆的一端部由气夹头51固定,线缆的另一端从压线轴56与放线轮53之间通过,绕线时,由第二气缸55驱动滑块54,使线缆在压线轴56与放线轮53之间具有一定的收放张力,从而提高绕线的准确性。In this technical solution, the clamping mechanism 5 includes an air chuck 51 and a wire-releasing chuck, and the wire-releasing chuck includes a wire-releasing seat 52, and the wire-releasing seat 52 is provided with a wire-releasing wheel 53. The pay-off seat 52 is also provided with a slide block 54 and a second cylinder 55 for driving the slide block 54. The slide block 54 is connected to the crimping shaft 56, and the crimping shaft 56 cooperates with the pay-off wheel 53 to press or loosen the wire. cable. When the cable is sent into the winding mechanism 2, one end of the cable is fixed by the air chuck 51, and the other end of the cable passes between the crimping shaft 56 and the pay-off wheel 53. The cylinder 55 drives the slide block 54, so that the cable has a certain retractable tension between the crimping shaft 56 and the pay-off wheel 53, thereby improving the accuracy of winding.
详见图8,在本技术方案中,所述捆扎机构3包括卡爪座31和设置于卡爪座31的爪手32,所述爪手32设置有用于容置捆扎线的凹槽321;还包括用于夹持捆扎线进行旋转的夹手33。捆扎线伸入所述爪手32的凹槽321中,第二机械手4将线缆送来时放于捆扎线上方,这时,爪手32抓合动作,使捆扎线将线缆包围,这时,再利用夹手33,将捆扎线的两端进行夹持并旋转即可形成捆扎固定,捆扎线一般采用带有铁线的捆扎线,结构简单,捆扎效率高。Referring to Fig. 8 for details, in this technical solution, the binding mechanism 3 includes a claw seat 31 and a claw hand 32 arranged on the claw seat 31, and the claw hand 32 is provided with a groove 321 for accommodating a binding wire; It also includes a clamping hand 33 for clamping and rotating the binding wire. The binding wire stretches into the groove 321 of the claw hand 32, and the second manipulator 4 places the cable above the binding wire when the cable is delivered. When using the gripper 33 again, the two ends of the binding wire are clamped and rotated to form a binding fixation. The binding wire generally adopts a binding wire with an iron wire, which has a simple structure and high binding efficiency.
作为进一步的改进,所述卡爪座31的旁侧设置有捆扎线控制机构6,所述捆扎线控制机构6包括支撑板61和设置于支撑板61的上压轮62和下压轮63,所述支撑板61还设置有裁切座64,捆扎线从上压轮62和下压轮63之间通过并穿过裁切座64,所述裁切座64滑动连接有用于切断捆扎线的切刀,所述支撑板61设置有用于驱动切刀的第三气缸65。当爪手32将捆扎线把线缆包围时,这时,第三气缸65工作,驱动切刀将捆扎线切断,这时,即可使捆扎线在夹手33的作用下进行夹合旋转,实现捆扎。As a further improvement, a binding wire control mechanism 6 is provided on the side of the claw seat 31, and the binding wire control mechanism 6 includes a support plate 61 and an upper pressure wheel 62 and a lower pressure wheel 63 arranged on the support plate 61, The support plate 61 is also provided with a cutting seat 64, and the binding wire passes between the upper pressing wheel 62 and the lower pressing wheel 63 and passes through the cutting seat 64, and the cutting seat 64 is slidably connected with a button for cutting the binding line. Cutter, the support plate 61 is provided with a third cylinder 65 for driving the cutter. When the claw hand 32 surrounds the cable with the binding wire, at this moment, the third cylinder 65 works to drive the cutter to cut off the binding wire. At this time, the binding wire can be clamped and rotated under the action of the gripper 33, Achieve bundling.
详见图2、图3,本设备的循环理线装置1,包括理线支架11,所述理线支架11连接有链条传动机构12,所述链条传动机构12连接有多个支撑导条13,所述支撑导条13的一端设置有第一卡座14;还包括斜导槽16和与支撑导条13滑动连接的第二卡座15,所述第二卡座15延伸至斜导槽16中,所述第二卡座15沿着斜导槽16在支撑导条13上横向滑动。本理线装置在工作时,电线终端安装于第一卡座14和第二卡座15,其中,线缆可以在第一卡座14中实现自由的滑动,当电线终端完成检测后,链条传动机构12工作,使第二卡座15沿着支撑导条13进行横向滑动,其越往前移动,其横向滑动的距离越远,从而将电线终端的线缆实现拉直,最后卸出即可,然后,当前的第二卡座15循环回去,在斜导槽16的作用下,滑动复位,以便进行再次的线缆拉伸动作,利用本装置不但生产效率高,而且减少了人手操作的劳动强度,具有便于理线的优点。See Fig. 2 and Fig. 3 for details, the circular cable management device 1 of this equipment includes a cable management bracket 11, the cable management bracket 11 is connected with a chain transmission mechanism 12, and the chain transmission mechanism 12 is connected with a plurality of support guide bars 13 , one end of the support bar 13 is provided with a first card seat 14; it also includes an inclined guide groove 16 and a second card seat 15 that is slidably connected with the support guide bar 13, and the second card seat 15 extends to the inclined guide groove 16 , the second card seat 15 slides laterally on the support guide bar 13 along the inclined guide groove 16 . When the wire management device is working, the wire terminal is installed on the first card holder 14 and the second card holder 15, wherein the cable can slide freely in the first card holder 14, and when the wire terminal is detected, the chain drive The mechanism 12 works to make the second card seat 15 slide laterally along the supporting guide bar 13, the farther it moves forward, the farther the distance of its lateral sliding, so as to straighten the cable of the wire terminal, and finally unload it , and then, the current second deck 15 circulates back, under the action of the inclined guide groove 16, slides and resets, so as to carry out the cable stretching action again, using this device not only has high production efficiency, but also reduces the labor of manual operation Strength, with the advantage of easy cable management.
在本技术方案中,所述第二卡座15包括座体,所述座体的下部设置有伸入斜导槽16中的延伸块151,所述座体的上部设置有用于容置线缆的第一容置槽152,所述第一容置槽152的旁侧设置有第二容置槽153,所述第二容置槽153与第一容置槽152之间设置有通孔,所述通孔装设有用于抵压第一容置槽152中的线缆的弹簧154。当然,所述弹簧154的抵触部最好连接一个抵触帽(图中未进一步示出),这样与线缆的抵接更加顺畅。在测试电线终端时,端子头插入测试设备中进行测试,同时,将线缆卡入第一容置槽152中,弹簧154将线缆抵压,从而使第二卡座15在滑动时,可以将端子头一端的线缆实现拉伸动作,当线缆拉直到位后,利用第一机械手18等将线缆夹持直接从第一卡座14和第二卡座15中取出即可。In this technical solution, the second card seat 15 includes a seat body, the lower part of the seat body is provided with an extension block 151 protruding into the inclined guide groove 16, and the upper part of the seat body is provided with an extension block for accommodating cables. The first accommodating groove 152, the side of the first accommodating groove 152 is provided with a second accommodating groove 153, and a through hole is arranged between the second accommodating groove 153 and the first accommodating groove 152, A spring 154 for pressing the cable in the first accommodating groove 152 is installed in the through hole. Of course, it is preferable to connect a conflicting cap (not further shown in the figure) to the conflicting part of the spring 154, so that the contact with the cable is smoother. When testing the wire terminal, the terminal head is inserted into the test equipment for testing, and at the same time, the cable is clamped into the first accommodating groove 152, and the spring 154 presses the cable, so that when the second clamp 15 slides, it can The cable at one end of the terminal head is stretched. When the cable is pulled to the right position, the cable is clamped by the first manipulator 18 and taken out from the first card holder 14 and the second card holder 15 directly.
在本技术方案中,所述链条传动机构12包括第一传动辊121、第二传动辊122和用于驱动第一传动辊121的伺服电机123,所述第一传动辊121设置有两个主动链轮124,所述第二传动辊122均设置有两个从动链轮125,所述两个主动链轮124均通过链条与两个从动链轮125传动连接。所述链条传动机构12的原理是利用两条链条分别在主动链轮124和从动链轮125的作用下实现传动,所述支撑导条13安装于两条链条上,支撑导条13随着链条进行传动。In this technical solution, the chain transmission mechanism 12 includes a first transmission roller 121, a second transmission roller 122 and a servo motor 123 for driving the first transmission roller 121, and the first transmission roller 121 is provided with two active The sprocket 124 and the second drive roller 122 are both provided with two driven sprockets 125, and the two driving sprockets 124 are connected to the two driven sprockets 125 through a chain. The principle of the chain transmission mechanism 12 is to utilize two chains to realize transmission under the action of the driving sprocket 124 and the driven sprocket 125 respectively, and the support guide bar 13 is installed on the two chains, and the support guide bar 13 follows the The chain drives.
作为优选的方案,所述斜导槽16包括上段槽161和下段槽162,所述第一传动辊121连接有第一轴承导轮163,所述第二传动辊122连接有第二轴承导轮164,所述上段槽161、第一轴承导轮163、下段槽162和第二轴承导轮164依次连接形成循环通道。所述第一轴承导轮163和第二轴承导轮164由于安装有轴承,故其本身并不随第一传动辊121和第二传动辊122进行转动,这样第二卡座15即可依次在上段槽161、第一轴承导轮163、下段槽162和第二轴承导轮164进行滑动。As a preferred solution, the inclined guide groove 16 includes an upper section groove 161 and a lower section groove 162, the first transmission roller 121 is connected with a first bearing guide wheel 163, and the second transmission roller 122 is connected with a second bearing guide wheel 164, the upper groove 161, the first bearing guide wheel 163, the lower groove 162 and the second bearing guide wheel 164 are sequentially connected to form a circulation channel. The first bearing guide wheel 163 and the second bearing guide wheel 164 do not rotate with the first drive roller 121 and the second drive roller 122 because bearings are installed, so that the second deck 15 can be in the upper section successively. The groove 161, the first bearing guide wheel 163, the lower groove 162, and the second bearing guide wheel 164 slide.
对于斜导槽16来说,作为另一优选方案,所述斜导槽16包括依次连接的上段槽161、前段槽165、下段槽162和后段槽166。所述前段槽165绕过第一传动辊121,所述后段槽166绕过第二传动辊122,这样第二卡座15即可依次在上段槽161、前段槽165、下段槽162和后段槽166进行滑动,结构简单,易于制造和使用。For the inclined guide groove 16 , as another preferred solution, the inclined guide groove 16 includes an upper section groove 161 , a front section groove 165 , a lower section groove 162 and a rear section groove 166 connected in sequence. The front section groove 165 walks around the first drive roller 121, and the rear section groove 166 walks around the second drive roller 122, so that the second card holder 15 can be in the upper section groove 161, the front section groove 165, the lower section groove 162 and the back section successively like this. The segment groove 166 slides, has a simple structure, and is easy to manufacture and use.
由于电线终端在生产制造过程中,避免端子头伸入链条传动机构12中,影响其正常工作,在本技术方案中,所述循环理线装置1还包括保护罩17,所述保护罩17设置有第一通槽171和第二通槽172,所述第一卡座14从第一通槽171通过,所述第二卡座15从第二通槽172通过。这样,只有第一卡座14和第二卡座15伸出保护罩17,在保护罩17的作用下,最大限度的避免了端子头伸入内部,运行更加稳定、安全。Since the wire terminals are prevented from protruding into the chain transmission mechanism 12 during the manufacturing process, which affects its normal operation, in this technical solution, the circular wire management device 1 also includes a protective cover 17, and the protective cover 17 is set There are a first through slot 171 and a second through slot 172 , the first card base 14 passes through the first through slot 171 , and the second card base 15 passes through the second through slot 172 . In this way, only the first card base 14 and the second card base 15 protrude from the protective cover 17, and under the action of the protective cover 17, the terminal head is prevented from protruding into the interior to the greatest extent, and the operation is more stable and safe.
通常,在捆扎包装时,不但要对单一的线缆进行捆扎,还需要将多个捆扎好的单一线缆按一定数量进行集中打捆,例如将每10个单一的线缆捆扎为一束,在本设备中,作为进一步改进,本设备还包括第三机械手71、第四机械手72、归集工位8和复合捆扎装置9,所述第三机械手71将捆扎机构3的线缆送至归集工位8,所述第四机械手72将归集工位8中的多个线缆送至复合捆扎装置9进行集中捆扎。当捆扎机构3将一条线缆完成捆扎之后,由第三机械手71取出送至归集工位8,当归集工位8的数量达到了预定的数量时,例如8个、10个或12个捆扎好的单个线缆,具体数量可以根据需要进行设定,由于第三机械手71需要移动至捆扎机构3,故,所述夹手33可以与第三机械手71集成,这样,当第三机械手71移动至捆扎机构3时,夹手33即可快速的进行夹持捆扎线进行旋转,结构更紧凑;然后,第四机械手72即可将上述数量的多个线缆送至复合捆扎装置9中,复合捆扎装置9对其进行捆扎为一起,形成一束,所述复合捆扎装置9的具体结构可采用现有的相应装置,在此不做赘述。Usually, when bundling and packaging, not only a single cable needs to be bundled, but also multiple bundled single cables need to be bundled in a certain quantity, for example, every 10 single cables are bundled into a bundle, In this equipment, as a further improvement, this equipment also includes a third manipulator 71, a fourth manipulator 72, a collection station 8 and a compound binding device 9, and the third manipulator 71 sends the cables of the binding mechanism 3 to the return The collection station 8, the fourth manipulator 72 sends the multiple cables in the collection station 8 to the compound binding device 9 for centralized binding. After the binding mechanism 3 finishes binding a cable, it is taken out by the third manipulator 71 and sent to the collection station 8. When the number of collection stations 8 reaches a predetermined number, for example, 8, 10 or 12 bundles For a good single cable, the specific quantity can be set as required. Since the third manipulator 71 needs to move to the binding mechanism 3, the gripper 33 can be integrated with the third manipulator 71, so that when the third manipulator 71 moves When the binding mechanism 3 is reached, the gripper 33 can quickly clamp and rotate the binding wire, and the structure is more compact; then, the fourth manipulator 72 can send the above-mentioned multiple cables to the compound binding device 9, and the compound The binding device 9 binds them together to form a bundle. The specific structure of the composite binding device 9 can adopt existing corresponding devices, and will not be repeated here.
以上内容仅为本发明的较佳实施例,对于本领域的普通技术人员,依据本发明的思想,在具体实施方式及应用范围上均会有改变之处,本说明书内容不应理解为对本发明的限制。The above content is only a preferred embodiment of the present invention. For those of ordinary skill in the art, according to the idea of the present invention, there will be changes in the specific implementation and application scope. limits.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610242179.0A CN105775267B (en) | 2016-04-18 | 2016-04-18 | A kind of automatic wire arrangement knot installation of cable |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610242179.0A CN105775267B (en) | 2016-04-18 | 2016-04-18 | A kind of automatic wire arrangement knot installation of cable |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN105775267A true CN105775267A (en) | 2016-07-20 |
| CN105775267B CN105775267B (en) | 2018-04-06 |
Family
ID=56396755
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610242179.0A Active CN105775267B (en) | 2016-04-18 | 2016-04-18 | A kind of automatic wire arrangement knot installation of cable |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105775267B (en) |
Cited By (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106218993A (en) * | 2016-08-26 | 2016-12-14 | 赣州金信诺电缆技术有限公司 | A kind of cable cuts out binding apparatus automatically |
| CN107902129A (en) * | 2017-11-28 | 2018-04-13 | 海盐县盛安电器有限公司 | A kind of coiling packing device |
| CN108573780A (en) * | 2018-06-19 | 2018-09-25 | 杭州良淋电子科技股份有限公司 | Flexible Flat Cable Management Machine |
| CN109545541A (en) * | 2018-12-29 | 2019-03-29 | 鲁班嫡系机器人(深圳)有限公司 | Assist coil winding machinery hand combined system |
| CN109616317A (en) * | 2018-12-29 | 2019-04-12 | 鲁班嫡系机器人(深圳)有限公司 | Coil winding machine |
| CN110589055A (en) * | 2019-09-26 | 2019-12-20 | 杭州市富阳区现代职业技术培训学校 | Plum blossom falls to receive line copper pole and ties up equipment |
| CN111409893A (en) * | 2019-01-04 | 2020-07-14 | 泰科电子(上海)有限公司 | Cable winding device and cable bundling system |
| CN112061517A (en) * | 2020-09-09 | 2020-12-11 | 中车工业研究院有限公司 | Cable blanking method and cable blanking system |
| CN112498873A (en) * | 2020-11-27 | 2021-03-16 | 贵州盘江民爆有限公司 | Winding mechanism |
| CN113120306A (en) * | 2019-12-31 | 2021-07-16 | 苏州美山子制衣有限公司 | Material collecting device for strip parts |
| CN114084401A (en) * | 2021-10-18 | 2022-02-25 | 长沙航空职业技术学院 | Wire bundling and packaging production equipment |
| CN114572767A (en) * | 2022-03-15 | 2022-06-03 | 国网黑龙江省电力有限公司齐齐哈尔供电公司 | Cable winding equipment based on power transmission line |
| CN117775432A (en) * | 2024-02-18 | 2024-03-29 | 宁波禹泰自动化科技有限公司 | Wire winding tie device |
| CN119218483A (en) * | 2024-12-04 | 2024-12-31 | 常州市武进区南夏墅宏昊机械设备有限公司 | A cable winding and binding integrated platform |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN202541878U (en) * | 2011-10-12 | 2012-11-21 | 余姚市启迪机械有限公司 | Power line plug testing, winding and bundling machine |
| CN203048304U (en) * | 2012-12-22 | 2013-07-10 | 东莞启益电器机械有限公司 | Power cord automatic winding machine |
| CN203222127U (en) * | 2012-11-28 | 2013-10-02 | 孔金生 | An automatic winding machine |
| CN103606800A (en) * | 2013-11-30 | 2014-02-26 | 浙江海宁普赛自动化科技有限公司 | Full-automatic production line of power plug wire |
| CN203780833U (en) * | 2013-12-16 | 2014-08-20 | 徐兵 | Automatic wire winding and wire bundling machine with wire feeding function |
| CN205602257U (en) * | 2016-04-18 | 2016-09-28 | 东莞市联升电线电缆有限公司 | A kind of automatic cable management and binding equipment |
-
2016
- 2016-04-18 CN CN201610242179.0A patent/CN105775267B/en active Active
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN202541878U (en) * | 2011-10-12 | 2012-11-21 | 余姚市启迪机械有限公司 | Power line plug testing, winding and bundling machine |
| CN203222127U (en) * | 2012-11-28 | 2013-10-02 | 孔金生 | An automatic winding machine |
| CN203048304U (en) * | 2012-12-22 | 2013-07-10 | 东莞启益电器机械有限公司 | Power cord automatic winding machine |
| CN103606800A (en) * | 2013-11-30 | 2014-02-26 | 浙江海宁普赛自动化科技有限公司 | Full-automatic production line of power plug wire |
| CN203780833U (en) * | 2013-12-16 | 2014-08-20 | 徐兵 | Automatic wire winding and wire bundling machine with wire feeding function |
| CN205602257U (en) * | 2016-04-18 | 2016-09-28 | 东莞市联升电线电缆有限公司 | A kind of automatic cable management and binding equipment |
Cited By (18)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106218993A (en) * | 2016-08-26 | 2016-12-14 | 赣州金信诺电缆技术有限公司 | A kind of cable cuts out binding apparatus automatically |
| CN107902129A (en) * | 2017-11-28 | 2018-04-13 | 海盐县盛安电器有限公司 | A kind of coiling packing device |
| CN108573780A (en) * | 2018-06-19 | 2018-09-25 | 杭州良淋电子科技股份有限公司 | Flexible Flat Cable Management Machine |
| CN109545541A (en) * | 2018-12-29 | 2019-03-29 | 鲁班嫡系机器人(深圳)有限公司 | Assist coil winding machinery hand combined system |
| CN109616317A (en) * | 2018-12-29 | 2019-04-12 | 鲁班嫡系机器人(深圳)有限公司 | Coil winding machine |
| CN111409893A (en) * | 2019-01-04 | 2020-07-14 | 泰科电子(上海)有限公司 | Cable winding device and cable bundling system |
| CN110589055A (en) * | 2019-09-26 | 2019-12-20 | 杭州市富阳区现代职业技术培训学校 | Plum blossom falls to receive line copper pole and ties up equipment |
| CN110589055B (en) * | 2019-09-26 | 2024-03-26 | 杭州市富阳区现代职业技术培训学校 | Plum blossom falls receives line copper pole binding equipment |
| CN113120306A (en) * | 2019-12-31 | 2021-07-16 | 苏州美山子制衣有限公司 | Material collecting device for strip parts |
| CN113120306B (en) * | 2019-12-31 | 2025-05-27 | 苏州美山子制衣有限公司 | A material receiving device for strip components |
| CN112061517B (en) * | 2020-09-09 | 2023-02-28 | 中车工业研究院有限公司 | Cable blanking method and cable blanking system |
| CN112061517A (en) * | 2020-09-09 | 2020-12-11 | 中车工业研究院有限公司 | Cable blanking method and cable blanking system |
| CN112498873A (en) * | 2020-11-27 | 2021-03-16 | 贵州盘江民爆有限公司 | Winding mechanism |
| CN114084401B (en) * | 2021-10-18 | 2022-12-06 | 长沙航空职业技术学院 | Wire bundling and packaging production equipment |
| CN114084401A (en) * | 2021-10-18 | 2022-02-25 | 长沙航空职业技术学院 | Wire bundling and packaging production equipment |
| CN114572767A (en) * | 2022-03-15 | 2022-06-03 | 国网黑龙江省电力有限公司齐齐哈尔供电公司 | Cable winding equipment based on power transmission line |
| CN117775432A (en) * | 2024-02-18 | 2024-03-29 | 宁波禹泰自动化科技有限公司 | Wire winding tie device |
| CN119218483A (en) * | 2024-12-04 | 2024-12-31 | 常州市武进区南夏墅宏昊机械设备有限公司 | A cable winding and binding integrated platform |
Also Published As
| Publication number | Publication date |
|---|---|
| CN105775267B (en) | 2018-04-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105775267B (en) | A kind of automatic wire arrangement knot installation of cable | |
| CN205602257U (en) | A kind of automatic cable management and binding equipment | |
| CN205602190U (en) | Automatic cable binding device | |
| CN107452502B (en) | Bushing wire winding package sealing-tape machine is worn to transformer | |
| CN203682746U (en) | Automatic binding wire winding machine with wire stripping function | |
| CN204793565U (en) | Automatic crimping equipment of terminal in bulk | |
| CN205282857U (en) | An automatic assembly equipment for double-ended terminals | |
| CN207993672U (en) | A kind of ten axis Double-wire parallel wound coil winding machines | |
| CN111710521A (en) | A fully automatic network transformer wire management machine and wire management method | |
| CN203681920U (en) | Wire binding machine for circular wires | |
| CN110660578B (en) | Four-wire T1 equipment and working method | |
| US10026527B2 (en) | Conductor twisting system and method for loading a twisting head | |
| US8973235B2 (en) | Pulling head work station | |
| CN206107649U (en) | A fully automatic coil binding equipment | |
| CN204497547U (en) | A kind of compression joint mechanism automatically wearing heat-shrink tube press | |
| CN207116229U (en) | A kind of transformer sleeve-penetrating coiling adhesive tape wrapping machine | |
| CN103662155A (en) | Universal equipment for automatically binding wire rods | |
| CN215245735U (en) | A winding tying device | |
| CN112499371B (en) | Full-automatic wire coiling machine | |
| CN209442401U (en) | The cable transfer device of intelligent harness machine | |
| CN210467586U (en) | Full-automatic T3 spooling equipment | |
| CN219970080U (en) | Novel wire winding bundle mechanism | |
| CN108512010B (en) | A kind of air-conditioning cable automatic production line and its workflow | |
| CN210619874U (en) | Wire binding device | |
| CN210467582U (en) | Four-strand twisted T1 equipment |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| CB02 | Change of applicant information |
Address after: 523000 longan industrial zone, Humen Town, Guangdong, Dongguan Applicant after: GUANGDONG UNIRISE CONDUCTION TECHNOLOGY CO.,LTD. Address before: 523000 No. 56 Industrial Road, longan village, Humen Town, Guangdong, Dongguan Applicant before: Dongguan UNIRISE Electric Wire & Cable Co.,Ltd. |
|
| CB02 | Change of applicant information | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Automatic cable arranging and bundling device for cable Effective date of registration: 20190613 Granted publication date: 20180406 Pledgee: Bank of Dongguan Limited by Share Ltd. Humen branch Pledgor: GUANGDONG UNIRISE CONDUCTION TECHNOLOGY CO.,LTD. Registration number: 2019440000219 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20200617 Granted publication date: 20180406 Pledgee: Bank of Dongguan Limited by Share Ltd. Humen branch Pledgor: GUANGDONG UNIRISE CONDUCTION TECHNOLOGY Co.,Ltd. Registration number: 2019440000219 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: An automatic cable management and binding equipment Effective date of registration: 20201201 Granted publication date: 20180406 Pledgee: China Co. truction Bank Corp Dongguan branch Pledgor: GUANGDONG UNIRISE CONDUCTION TECHNOLOGY Co.,Ltd. Registration number: Y2020980008687 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Granted publication date: 20180406 Pledgee: China Co. truction Bank Corp Dongguan branch Pledgor: GUANGDONG UNIRISE CONDUCTION TECHNOLOGY CO.,LTD. Registration number: Y2020980008687 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right |