CN105774018A CN201610155617.XA CN201610155617A CN105774018A CN 105774018 A CN105774018 A CN 105774018A CN 201610155617 A CN201610155617 A CN 201610155617A CN 105774018 A CN105774018 A CN 105774018A
Authority
CN
China
Prior art keywords
hole
mould
depression bar
push rod
charge level
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610155617.XA
Other languages
Chinese (zh)
Inventor
顾明华
焦贯伟
王晓刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUZHOU DIHILL GREEN TECHNOLOGY Co Ltd
Original Assignee
SUZHOU DIHILL GREEN TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU DIHILL GREEN TECHNOLOGY Co Ltd filed Critical SUZHOU DIHILL GREEN TECHNOLOGY Co Ltd
Priority to CN201610155617.XA priority Critical patent/CN105774018A/en
Publication of CN105774018A publication Critical patent/CN105774018A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B30PRESSES
    • B30BPRESSES IN GENERAL
    • B30B11/00Presses specially adapted for forming shaped articles from material in particulate or plastic state, e.g. briquetting presses, tabletting presses
    • B30B11/22Extrusion presses; Dies therefor
    • B30B11/26Extrusion presses; Dies therefor using press rams
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B30PRESSES
    • B30BPRESSES IN GENERAL
    • B30B15/00Details of, or accessories for, presses; Auxiliary measures in connection with pressing
    • B30B15/30Feeding material to presses
    • B30B15/302Feeding material in particulate or plastic state to moulding presses
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B30PRESSES
    • B30BPRESSES IN GENERAL
    • B30B15/00Details of, or accessories for, presses; Auxiliary measures in connection with pressing
    • B30B15/32Discharging presses

Abstract

The invention discloses a material pressing and discharging linking method for a metal filing briquetting device. The pressing and discharging of materials can be simultaneously realized by a material pressing and discharging linking mechanism. According to the material pressing and discharging linking method for the metal filing briquetting device, disclosed by the invention, the pressing and the discharging of the materials can be simultaneously performed, and the working efficiency is extremely-high.

Description

The binder of metal fillings briquetting device and discharge interlock method
Technical field
The present invention relates to the binder of metal fillings briquetting device and discharge interlock method.
Background technology
In today that industrialization is day by day flourishing, the field of machining application is nearly ubiquitous, and various Mechanical Processing Centers and Digit Control Machine Tool are also emerge in an endless stream, make rapid progress.Mach primary categories has car, milling, brill, mill, boring etc., and each processing mode is all attended by the generation of a large amount of metal fillings.Along with getting more and more of machining apparatus, the amount of produced metal fillings also should not be underestimated, and substantial amounts of metal fillings does not occupy very big space, also brings the problems such as environmental pollution, transport inconvenience, the wasting of resources.
In order to compressed metal bits space, metal fillings is focused on, it is necessary to metal fillings extrude in bulk, as use metal fillings briquetting device, it utilizes the crunch of hydraulic cylinder, and metal fillings is extruded, greatly reduces the floor space of metal fillings.But the technology of existing metal fillings briquetting device is comparatively backward, its groundwork flow process is: artificial loading briquetting discharge;Equipment adopts vertical structure, main hydraulic cylinder vertical, and die location is fixed, and presses one piece to arrange one piece, and lastblock metal derby is not discharged, it is impossible to carry out briquetting next time, inefficiency.
Summary of the invention
It is an object of the invention to provide the binder of a kind of metal fillings briquetting device and discharge interlock method, it can carry out binder and discharge simultaneously, and work efficiency is very high.
For achieving the above object, the technical scheme is that the binder and discharge interlock method that design a kind of metal fillings briquetting device, carry out binder and discharge by binder and discharge link gear simultaneously;
Described binder and discharge link gear include: the horizontal deflector chute of both ends open, the mould reclined with deflector chute one end open, can be stretched into by deflector chute other end opening, by the horizontal depression bar of material press-in mould in deflector chute, two horizontal push rods that material in mould can be ejected, and depression bar, two push rods can be driven along the main driving mechanism of respective reciprocal axial translation;
Described main driving mechanism includes: for compression column with fixed, two push rods be vertically arranged push pedal, and push pedal can be driven along the main hydraulic cylinder of depression bar reciprocal axial translation;Described push pedal is vertical with depression bar;Described depression bar, two push rods are fixed in push pedal, and two push rods are positioned at push pedal the same side with depression bar;Said two push rod, they are parallel with depression bar, and are located in the same horizontal plane with depression bar, are also symmetrical arranged with depression bar;The piston rod of described main hydraulic cylinder is connected with push pedal, and this piston rod and depression bar are divided into push pedal both sides and the piston rod heart coaxial with depression bar;
Axially arranged along depression bar of described deflector chute, and deflector chute is between two push rods;
Described mould generally vertical bar shaped;Described mould horizontal, and the length direction of mould is vertical with depression bar;Described mould is furnished with the displacement hydraulic cylinder that it can be driven along its length direction alternating translational;Described mould, one end of its length direction is the link for connecting displacement hydraulic cylinder, and the other end of its length direction is the end face opposing with this link;The piston rod of described displacement hydraulic cylinder is arranged along the length direction of mould, and this piston rod is connected to the link of mould;
Described mould also includes: with being vertically arranged of reclining of deflector chute into charge level, and with enter charge level opposing be vertically arranged out charge level;Described enter charge level vertical with depression bar, described in go out charge level with to enter charge level parallel;
Described mould is additionally provided with three identical horizontal through holes of shape, and these three through holes and depression bar are located in the same horizontal plane, and these three through holes are sequentially arranged along the length direction of mould, and these three through holes be all perpendicular to mould enter charge level;The both ends open of each through hole lays respectively at entering charge level, going out on charge level of mould;
Above three through hole includes: the first through hole that the length direction along mould is sequentially arranged, the second through hole, third through-hole;Described first through hole is between the link of the second through hole and above-mentioned mould;Described first through hole, third through-hole are symmetrical arranged with the second through hole;The spacing in the second through hole axle center and the first through hole axle center, equal to the spacing in depression bar axle center Yu push rod axle center;The maximum spacing of described third through-hole and above-mentioned mould end face, less than the spacing of depression bar Yu push rod;
Said two push rod includes: the first push rod and the second push rod;Described first push rod is between depression bar and displacement hydraulic cylinder;First push rod, the second push rod are all long than depression bar, and the length difference of the first push rod, the second push rod and depression bar is all not less than the length of each through hole;
Described second through hole, third through-hole enter the opening on charge level at mould, match with depression bar, can receive the material being pressed into by depression bar;Described first through hole, the second through hole enter the opening on charge level at mould, match with the first push rod, can be inserted by the first push rod;Described third through-hole enters the opening on charge level at mould, matches with the second push rod, can be inserted by the second push rod;
Described mould go out charge level also recline go out with this charge level parallel be vertically arranged baffle plate, this baffle plate cover mould go out charge level;Described baffle plate be provided with two shapes identical keep away a hole, keep away a hole for these two and be located in the same horizontal plane with depression bar, and be symmetrical arranged with depression bar;Said two is kept away a hole and is included: first keeps away a hole and second keeps away a hole;Described first keeps away a hole between depression bar and displacement hydraulic cylinder;First keeps away an axle center, hole and second keeps away a spacing in axle center, hole, equal to the spacing in the first through hole axle center Yu third through-hole axle center;Described first keeps away a hole, and the opening that itself and the second through hole go out on charge level at mould matches, the material in exportable second through hole;Described second keeps away a hole, and the opening that itself and third through-hole go out on charge level at mould matches, the material in exportable third through-hole;
Described carry out binder and discharge by binder and discharge link gear simultaneously, comprise the steps:
A) displacement Driven by Hydraulic Cylinder mould translation, by the third through-hole of mould and depression bar para-position, the second through hole and the first push rod para-position;
B) main hydraulic cylinder drives depression bar, two push rods to advance to mould;Material in deflector chute is pressed in the third through-hole of mould by push rod, and by extruded for the material in third through-hole;First push rod runs through the second through hole;Second push rod is positioned at outside mould;
C) main hydraulic cylinder drives depression bar, two push rods to reset, and depression bar, two push rods depart from mould;Deflector chute supplements material;
D) displacement Driven by Hydraulic Cylinder mould translation, by the third through-hole of mould and the second push rod para-position, the second through hole and depression bar para-position, the first through hole and the first push rod para-position;
E) main hydraulic cylinder drives depression bar, two push rods to advance to mould;Second push rod inserts third through-hole, and is ejected by the molding materials in third through-hole;Material in deflector chute is pressed in the second through hole of mould by push rod, and by extruded for the material in the second through hole;First push rod runs through the first through hole;
F) main hydraulic cylinder drives depression bar, two push rods to reset, and depression bar, two push rods depart from mould;Deflector chute supplements material;
G) displacement Driven by Hydraulic Cylinder mould translation, by the third through-hole of mould and depression bar para-position, the second through hole and the first push rod para-position;
H) main hydraulic cylinder drives depression bar, two push rods to advance to mould;Material in deflector chute is pressed in the third through-hole of mould by push rod, and by extruded for the material in third through-hole;First push rod inserts the second through hole, and is ejected by the molding materials in the second through hole;Second push rod is positioned at outside mould;
I) step c) is repeated to step h).
Preferably, described three through holes are shaped as rectangle what mould entered charge level upper shed.
Preferably, said two keeps away a hole is rectangular opening.
Advantages of the present invention and having the beneficial effects that: providing binder and the discharge interlock method of a kind of metal fillings briquetting device, it can carry out binder and discharge simultaneously, and work efficiency is very high.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of binder and discharge link gear;
Fig. 2 is the schematic diagram of three through holes of mould;
Fig. 3 is the schematic diagram of baffle plate.
Detailed description of the invention
Below in conjunction with drawings and Examples, the specific embodiment of the present invention is further described.Following example are only for clearly illustrating technical scheme, and can not limit the scope of the invention with this.
The technical scheme that the present invention is embodied as is:
The binder of a kind of metal fillings briquetting device and discharge interlock method, carry out binder and discharge by binder and discharge link gear simultaneously;
As shown in Figure 1 to Figure 3, described binder and discharge link gear include: the horizontal deflector chute 1 of both ends open, the mould 2 reclined with deflector chute 1 one end open, can be stretched into by deflector chute 1 other end opening, by the horizontal depression bar 32 of material press-in mould 2 in deflector chute 1, two horizontal push rods (31,33) that material in mould 2 can be ejected, and 32, two push rods (31,33) of depression bar can be driven along the main driving mechanism of respective reciprocal axial translation;
Described main driving mechanism includes: be vertically arranged push pedal 34 for 32, two push rods (31,33) of compression column with fixed, and push pedal 34 can be driven along the main hydraulic cylinder 35 of depression bar 32 reciprocal axial translation;Described push pedal 34 is vertical with depression bar 32;32, two push rods (31,33) of described depression bar are fixed in push pedal 34, and two push rods (31,33) are positioned at push pedal 34 the same side with depression bar 32;Said two push rod (31,33), they are parallel with depression bar 32, and are located in the same horizontal plane with depression bar 32, are also symmetrical arranged with depression bar 32;The piston rod of described main hydraulic cylinder 35 is connected with push pedal 34, and this piston rod and depression bar 32 are divided into push pedal 34 both sides and the piston rod heart coaxial with depression bar 32;
Axially arranged along depression bar 32 of described deflector chute 1, and deflector chute 1 is positioned between two push rods (31,33);
Described mould 2 generally vertical bar shaped;Described mould 2 horizontal, and the length direction of mould 2 is vertical with depression bar 32;Described mould 2 is furnished with the displacement hydraulic cylinder 24 that it can be driven along its length direction alternating translational;Described mould 2, one end of its length direction is the link for connecting displacement hydraulic cylinder 24, and the other end of its length direction is the end face opposing with this link;The piston rod of described displacement hydraulic cylinder 24 is arranged along the length direction of mould 2, and this piston rod is connected to the link of mould 2;
Described mould 2 also includes: with being vertically arranged of reclining of deflector chute 1 into charge level 201, and with enter charge level 201 opposing be vertically arranged out charge level 202;Described enter charge level 201 vertical with depression bar 32, described in go out charge level 202 with to enter charge level 201 parallel;
Described mould 2 is additionally provided with three the identical horizontal through hole of shapes (21,22,23), these three through holes (21,22,23) and depression bar 32 are located in the same horizontal plane, these three through holes (21,22,23) are sequentially arranged along the length direction of mould 2, and these three through holes (21,22,23) be all perpendicular to mould 2 enter charge level 201;The both ends open of each through hole (21,22,23) lays respectively at entering charge level 201, going out on charge level 202 of mould 2;
Above three through hole includes: first through hole the 21, second through hole 22 that the length direction along mould 2 is sequentially arranged, third through-hole 23;Described first through hole 21 is between the second through hole 22 and the link of above-mentioned mould 2;Described first through hole 21, third through-hole 23 are symmetrical arranged with the second through hole 22;The spacing in the second through hole 22 axle center and the first through hole 21 axle center, equal to the spacing in depression bar 32 axle center Yu push rod (31 or 33) axle center;The maximum spacing of described third through-hole 23 and above-mentioned mould 2 end face, less than the spacing of depression bar 32 with push rod (31 or 33);
Said two push rod includes: the first push rod 31 and the second push rod 33;Described first push rod 31 is between depression bar 32 and displacement hydraulic cylinder 24;First push rod the 31, second push rod 33 is all long than depression bar 32, and the length difference of first push rod the 31, second push rod 33 and depression bar 32 is all not less than the length of each through hole;
Described second through hole 22, third through-hole 23 enter the opening on charge level 201 at mould, match with depression bar 32, can receive the material being pressed into by depression bar 32;Described first through hole the 21, second through hole 22 enters the opening on charge level 201 at mould, matches with the first push rod 31, can be inserted by the first push rod 31;Described third through-hole 23 enters the opening on charge level 201 at mould, matches with the second push rod 33, can be inserted by the second push rod 33;
Described mould 2 go out charge level 202 also recline go out with this charge level 202 parallel be vertically arranged baffle plate 25, what this baffle plate 25 covered mould 2 goes out charge level 202;Described baffle plate 25 be provided with two shapes identical keep away a hole (251,252), keep away a hole (251,252) for these two and be located in the same horizontal plane with depression bar 32, and be symmetrical arranged with depression bar 32;Said two is kept away a hole and is included: first keeps away a hole 251 and second keeps away a hole 252;Described first keeps away a hole 251 between depression bar 32 and displacement hydraulic cylinder 24;First keeps away axle center, a hole 251 and the second spacing keeping away axle center, a hole 252, equal to the spacing in the first through hole 21 axle center Yu third through-hole 23 axle center;Described first keeps away a hole 251, and the opening that itself and the second through hole 22 go out on charge level 202 at mould matches, the material in exportable second through hole 22;Described second keeps away a hole 252, and the opening that itself and third through-hole 23 go out on charge level 202 at mould matches, the material in exportable third through-hole 23.
Described three through holes (21,22,23) are shaped as rectangle what mould entered charge level 201 upper shed.
It is rectangular opening that said two keeps away a hole (251,252).
Described carry out binder and discharge by binder and discharge link gear simultaneously, comprise the steps:
A) displacement hydraulic cylinder 24 drives mould 2 to translate, by third through-hole 23 and depression bar 32 para-position of mould 2, the second through hole 22 and the first push rod 31 para-position;
B) main hydraulic cylinder 35 drives 32, two push rods (31,33) of depression bar to advance to mould 2;Material in deflector chute 1 is pressed in the third through-hole 23 of mould 2 by push rod, and by extruded for the material in third through-hole 23;First push rod 31 runs through the second through hole 22;Second push rod 33 is positioned at outside mould 2;
C) main hydraulic cylinder 35 drives 32, two push rods (31,33) of depression bar to reset, and 32, two push rods (31,33) of depression bar and mould 2 depart from;Deflector chute 1 supplements material;
D) displacement hydraulic cylinder 24 drives mould 2 to translate, by the third through-hole 23 of mould 2 and the second push rod 33 para-position, the second through hole 22 and depression bar 32 para-position, the first through hole 21 and the first push rod 31 para-position;
E) main hydraulic cylinder 35 drives 32, two push rods (31,33) of depression bar to advance to mould 2;Second push rod 33 inserts third through-hole 23, and is ejected by the molding materials in third through-hole 23;Material in deflector chute 1 is pressed in the second through hole 22 of mould 2 by push rod, and by extruded for the material in the second through hole 22;First push rod 31 runs through the first through hole 21;
F) main hydraulic cylinder 35 drives 32, two push rods (31,33) of depression bar to reset, and 32, two push rods (31,33) of depression bar and mould 2 depart from;Deflector chute 1 supplements material;
G) displacement hydraulic cylinder 24 drives mould 2 to translate, by third through-hole 23 and depression bar 32 para-position of mould 2, the second through hole 22 and the first push rod 31 para-position;
H) main hydraulic cylinder 35 drives 32, two push rods (31,33) of depression bar to advance to mould 2;Material in deflector chute 1 is pressed in the third through-hole 23 of mould 2 by push rod, and by extruded for the material in third through-hole 23;First push rod 31 inserts the second through hole 22, and is ejected by the molding materials in the second through hole 22;Second push rod 33 is positioned at outside mould 2;
I) step c) is repeated to step h).
The above is only the preferred embodiment of the present invention; it should be pointed out that, for those skilled in the art, under the premise without departing from the technology of the present invention principle; can also making some improvements and modifications, these improvements and modifications also should be regarded as protection scope of the present invention.

Claims (3)

1. the binder of metal fillings briquetting device and discharge interlock method, it is characterised in that simultaneously carry out binder and discharge by binder and discharge link gear;
Described binder and discharge link gear include: the horizontal deflector chute of both ends open, the mould reclined with deflector chute one end open, can be stretched into by deflector chute other end opening, by the horizontal depression bar of material press-in mould in deflector chute, two horizontal push rods that material in mould can be ejected, and depression bar, two push rods can be driven along the main driving mechanism of respective reciprocal axial translation;
Described main driving mechanism includes: for compression column with fixed, two push rods be vertically arranged push pedal, and push pedal can be driven along the main hydraulic cylinder of depression bar reciprocal axial translation;Described push pedal is vertical with depression bar;Described depression bar, two push rods are fixed in push pedal, and two push rods are positioned at push pedal the same side with depression bar;Said two push rod, they are parallel with depression bar, and are located in the same horizontal plane with depression bar, are also symmetrical arranged with depression bar;The piston rod of described main hydraulic cylinder is connected with push pedal, and this piston rod and depression bar are divided into push pedal both sides and the piston rod heart coaxial with depression bar;
Axially arranged along depression bar of described deflector chute, and deflector chute is between two push rods;
Described mould generally vertical bar shaped;Described mould horizontal, and the length direction of mould is vertical with depression bar;Described mould is furnished with the displacement hydraulic cylinder that it can be driven along its length direction alternating translational;Described mould, one end of its length direction is the link for connecting displacement hydraulic cylinder, and the other end of its length direction is the end face opposing with this link;The piston rod of described displacement hydraulic cylinder is arranged along the length direction of mould, and this piston rod is connected to the link of mould;
Described mould also includes: with being vertically arranged of reclining of deflector chute into charge level, and with enter charge level opposing be vertically arranged out charge level;Described enter charge level vertical with depression bar, described in go out charge level with to enter charge level parallel;
Described mould is additionally provided with three identical horizontal through holes of shape, and these three through holes and depression bar are located in the same horizontal plane, and these three through holes are sequentially arranged along the length direction of mould, and these three through holes be all perpendicular to mould enter charge level;The both ends open of each through hole lays respectively at entering charge level, going out on charge level of mould;
Above three through hole includes: the first through hole that the length direction along mould is sequentially arranged, the second through hole, third through-hole;Described first through hole is between the link of the second through hole and above-mentioned mould;Described first through hole, third through-hole are symmetrical arranged with the second through hole;The spacing in the second through hole axle center and the first through hole axle center, equal to the spacing in depression bar axle center Yu push rod axle center;The maximum spacing of described third through-hole and above-mentioned mould end face, less than the spacing of depression bar Yu push rod;
Said two push rod includes: the first push rod and the second push rod;Described first push rod is between depression bar and displacement hydraulic cylinder;First push rod, the second push rod are all long than depression bar, and the length difference of the first push rod, the second push rod and depression bar is all not less than the length of each through hole;
Described second through hole, third through-hole enter the opening on charge level at mould, match with depression bar, can receive the material being pressed into by depression bar;Described first through hole, the second through hole enter the opening on charge level at mould, match with the first push rod, can be inserted by the first push rod;Described third through-hole enters the opening on charge level at mould, matches with the second push rod, can be inserted by the second push rod;
Described mould go out charge level also recline go out with this charge level parallel be vertically arranged baffle plate, this baffle plate cover mould go out charge level;Described baffle plate be provided with two shapes identical keep away a hole, keep away a hole for these two and be located in the same horizontal plane with depression bar, and be symmetrical arranged with depression bar;Said two is kept away a hole and is included: first keeps away a hole and second keeps away a hole;Described first keeps away a hole between depression bar and displacement hydraulic cylinder;First keeps away an axle center, hole and second keeps away a spacing in axle center, hole, equal to the spacing in the first through hole axle center Yu third through-hole axle center;Described first keeps away a hole, and the opening that itself and the second through hole go out on charge level at mould matches, the material in exportable second through hole;Described second keeps away a hole, and the opening that itself and third through-hole go out on charge level at mould matches, the material in exportable third through-hole;
Described carry out binder and discharge by binder and discharge link gear simultaneously, comprise the steps:
A) displacement Driven by Hydraulic Cylinder mould translation, by the third through-hole of mould and depression bar para-position, the second through hole and the first push rod para-position;
B) main hydraulic cylinder drives depression bar, two push rods to advance to mould;Material in deflector chute is pressed in the third through-hole of mould by push rod, and by extruded for the material in third through-hole;First push rod runs through the second through hole;Second push rod is positioned at outside mould;
C) main hydraulic cylinder drives depression bar, two push rods to reset, and depression bar, two push rods depart from mould;Deflector chute supplements material;
D) displacement Driven by Hydraulic Cylinder mould translation, by the third through-hole of mould and the second push rod para-position, the second through hole and depression bar para-position, the first through hole and the first push rod para-position;
E) main hydraulic cylinder drives depression bar, two push rods to advance to mould;Second push rod inserts third through-hole, and is ejected by the molding materials in third through-hole;Material in deflector chute is pressed in the second through hole of mould by push rod, and by extruded for the material in the second through hole;First push rod runs through the first through hole;
F) main hydraulic cylinder drives depression bar, two push rods to reset, and depression bar, two push rods depart from mould;Deflector chute supplements material;
G) displacement Driven by Hydraulic Cylinder mould translation, by the third through-hole of mould and depression bar para-position, the second through hole and the first push rod para-position;
H) main hydraulic cylinder drives depression bar, two push rods to advance to mould;Material in deflector chute is pressed in the third through-hole of mould by push rod, and by extruded for the material in third through-hole;First push rod inserts the second through hole, and is ejected by the molding materials in the second through hole;Second push rod is positioned at outside mould;
I) step c) is repeated to step h).
2. the binder of metal fillings briquetting device according to claim 1 and discharge interlock method, it is characterised in that described three through holes are shaped as rectangle what mould entered charge level upper shed.
3. the binder of metal fillings briquetting device according to claim 2 and discharge interlock method, it is characterised in that it is rectangular opening that said two keeps away a hole.
CN201610155617.XA 2016-03-18 2016-03-18 Material pressing and discharging linking method for metal filing briquetting device Pending CN105774018A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610155617.XA CN105774018A (en) 2016-03-18 2016-03-18 Material pressing and discharging linking method for metal filing briquetting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610155617.XA CN105774018A (en) 2016-03-18 2016-03-18 Material pressing and discharging linking method for metal filing briquetting device

Publications (1)

Publication Number Publication Date
CN105774018A true CN105774018A (en) 2016-07-20

Family

ID=56394061

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610155617.XA Pending CN105774018A (en) 2016-03-18 2016-03-18 Material pressing and discharging linking method for metal filing briquetting device

Country Status (1)

Country Link
CN (1) CN105774018A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005163169A (en) * 2003-11-10 2005-06-23 Ruf Gmbh & Co Kg Metal scrap briquetting machine
ES2445246A2 (en) * 2012-04-11 2014-02-28 Imabe Iberica S.A. Briquette press (Machine-translation by Google Translate, not legally binding)
US20140352557A1 (en) * 2013-06-03 2014-12-04 Lloyd C. Linton Apparatus for compacting and combining product into a single compacted disc
CN104441740A (en) * 2014-11-14 2015-03-25 重庆市龙山金属材料有限公司 Scrap iron briquetting machine
CN103213300B (en) * 2013-04-27 2015-05-27 江阴市瑞丰液压机械有限公司 Briquetting machine and briquetting method for loose metallic scraps

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005163169A (en) * 2003-11-10 2005-06-23 Ruf Gmbh & Co Kg Metal scrap briquetting machine
ES2445246A2 (en) * 2012-04-11 2014-02-28 Imabe Iberica S.A. Briquette press (Machine-translation by Google Translate, not legally binding)
CN103213300B (en) * 2013-04-27 2015-05-27 江阴市瑞丰液压机械有限公司 Briquetting machine and briquetting method for loose metallic scraps
US20140352557A1 (en) * 2013-06-03 2014-12-04 Lloyd C. Linton Apparatus for compacting and combining product into a single compacted disc
CN104441740A (en) * 2014-11-14 2015-03-25 重庆市龙山金属材料有限公司 Scrap iron briquetting machine

Similar Documents

Publication Publication Date Title
CN201164892Y (en) Workpiece transmission apparatus on punch assembly line
SU1438602A3 (en) Arrangement for pressing metal working waste into blocks
CN101602259B (en) Hydraulic press with automatic weighing device and reciprocating work table
DE112012000603T5 (en) Apparatus and method for producing a compressed metal scrap block
CN103624137B (en) Full-automatic numerical control high-speed punch machine
CN106955955B (en) A kind of multidirectional finish forge production line of valve body enclosed
CN204431775U (en) A kind of living beings multitower single lead screw ex truding briquetting machine
CN107972305A (en) A kind of lathe iron filings recycling packing apparatus
CN201579354U (en) Closed floating die stamp forming device for high-temperature alloy bolt
CN103624099A (en) Extrusion machine
CN206840791U (en) A kind of fluid pressure type powder former
CN105216058B (en) Hydraulic pressure gantry cutting machine automatic cutting die storehouse
CN101695729B (en) Compound multi-cavity type high-speed stamping die
CN201841684U (en) Scrap metal briquetting machine
CN203292211U (en) Main machine for metal plastic extrusion molding
CN110548783B (en) Automatic production device for overturning slide-pulling plate of medical gauze textile machine
CN103056210A (en) Automatic continuous horizontal-type punching machine for steel tube
CN102101364A (en) Loose metal litter briquetting machine and processing method
CN107139495B (en) A kind of fire extinguisher sebific duct automatic assembly equipment and assemble method
CN202656277U (en) Dried bag type isostatic pressing machine
CN202752404U (en) Full automation circle crimping machine
CN202684591U (en) Pneumatic jig of engine air inlet tube
CN104669661B (en) A kind of drawing method of four-column hydraulic press
CN102019331A (en) Die ejection discharge device
US6386009B1 (en) Method and apparatus for hydroforming multiple components with reduced press loading

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160720