CN105756055A - Tensioning and connection integrated prefabricated pile - Google Patents
Tensioning and connection integrated prefabricated pile Download PDFInfo
- Publication number
- CN105756055A CN105756055A CN201610122914.4A CN201610122914A CN105756055A CN 105756055 A CN105756055 A CN 105756055A CN 201610122914 A CN201610122914 A CN 201610122914A CN 105756055 A CN105756055 A CN 105756055A
- Authority
- CN
- China
- Prior art keywords
- mounting flange
- prefabricated pile
- fixing hole
- stretch
- integrally connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 claims abstract description 12
- 238000000034 method Methods 0.000 abstract description 7
- 230000003044 adaptive effect Effects 0.000 abstract 2
- 238000003466 welding Methods 0.000 description 7
- 238000010586 diagram Methods 0.000 description 6
- 210000003205 muscle Anatomy 0.000 description 6
- 230000015572 biosynthetic process Effects 0.000 description 3
- 238000005452 bending Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 239000007769 metal material Substances 0.000 description 1
- 239000011513 prestressed concrete Substances 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000007634 remodeling Methods 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/52—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
- E02D5/523—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
- E02D5/526—Connection means between pile segments
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/24—Prefabricated piles
- E02D5/30—Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses a tensioning and connection integrated prefabricated pile. The tensioning and connection integrated prefabricated pile comprises a prefabricated pile body, wherein a first connection flange disc is arranged at one end of the prefabricated pile body, and the section of the end is of a structure shaped like a Chinese character 'Tu'; a second connection flange disc is arranged at the other end of the prefabricated pile body, and the section of the end is of a structure shaped like a Chinese character 'Ao'; an annular retainer ring is formed by extending the second connection flange disc along the axial direction; the first connection flange disc is adaptive to the second connection flange disc; in a pile connection process, upper and lower sections of the piles are mechanically connected through the first connection flange disc and the second connection flange disc, which are adaptive, so that pile connection is finished. The tensioning and connection integrated prefabricated pile has the advantages of simple structure, high construction efficiency and low cost; a mechanical connection structure is adopted so that the connection is convenient and the bearing capability of a foundation pile is strong.
Description
Technical field
The present invention relates to foundation treatment technology field, especially a kind of stretch-draw is integrally connected formula prefabricated pile.
Background technology
Pretensioning prestressed concrete prefabricated pile is widely used in pile foundation, and prefabricated pile one is saved splicing by the measures such as welding, mechanical connection or anchor slurry that are generally adopted in work progress, forms a whole foundation pile.
At present, the topmost form of preformed pile connecting is to be welded to connect, position by lower joint sunk pile to overhead about 1m, by in upper joint stake lifting to lower joint stake, starting welding after adjustment, each weld time is about about 40 minutes, and the whole pile body holdup time in the earth formation is long, easily cause pile sinking difficulty, even do not reach intended design object;It addition, pile sinking scene is generally open work, when joint welding, being subject to the impact of rain, wind, weldquality not easily ensures, hides some dangers for pile extension, also can directly affect the quality of pile foundation;When wind and rain is bigger, it is impossible to construction, affect construction speed and efficiency.
It is utilize the main muscle joint of reinforcing bar to be attached that the prefabricated pile that additionally domestic use is relatively more is mechanically connected majority, although extraction-resistant behavior reaches designing requirement after making component connect, but anti-bending strength is greatly reduced, when bending is bigger, it it not overall stress due to blank area, joint stress only has pile body part reinforcing steel bar bear bottom, and joint performance can not meet the basic design principles of the reinforced concrete structure of equivalent pile body power, limits the application of mechanical splice.
Summary of the invention
The technical problem to be solved is the present situation for prior art, it is provided that simple in construction, and foundation pile bearing capacity is strong, and a kind of stretch-draw that can realize quick pile extension at the construction field (site) is integrally connected formula prefabricated pile.
This invention address that the technical scheme that above-mentioned technical problem adopts is:
A kind of stretch-draw is integrally connected formula prefabricated pile, including prefabricated pile body, one end of prefabricated pile body arranges the first mounting flange, this end section is " convex " character form structure, the other end of prefabricated pile body arranges the second mounting flange, this end section is concave structure, and the second mounting flange is axially extending is formed with annular retaining ring, and the first mounting flange is suitable with described second mounting flange;During pile extension, joint stake completes pile extension by the mechanical connection of the first suitable mounting flange and the second mounting flange up and down.
For optimizing technique scheme, the concrete measure taked also includes:
The first above-mentioned mounting flange adopts with described second mounting flange threadeds, and the periphery of the first mounting flange is shaped with external screw thread, and the inner circumferential of annular retaining ring is shaped with female thread, and external screw thread is suitable with described female thread.
The first above-mentioned mounting flange adopts with described second mounting flange and is radially located by connecting, the outer periphery of the first mounting flange offers the first fixing hole, annular retaining ring radially offers the second fixing hole on the correspondence position of described first fixing hole, second fixing hole runs through described annular retaining ring, is provided with fixture in the first corresponding fixing hole and the second fixing hole.
The first above-mentioned fixing hole and the second fixing hole are unthreaded hole, and fixture is pin.
The first above-mentioned fixing hole and the second fixing hole are screwed hole, and fixture is bolt.
The first above-mentioned mounting flange adopts snap ring to be connected with described second mounting flange, the outer periphery of the first mounting flange offers the first annular groove, radially offering the second annular groove on the correspondence position of described first annular groove on annular retaining ring, snap ring is placed in the snap ring intracavity being made up of the first annular groove and the second annular groove.
Above-mentioned snap ring is loop configuration, and this loop configuration is provided with breach.
Being evenly arranged with the first connecting hole on the first above-mentioned mounting flange, the outer end of the first mounting flange is provided with the first chamfering;Being evenly arranged with the second connecting hole on second mounting flange, the inner circumferential of the annular retaining ring of the second mounting flange is provided with the second chamfering.
The first above-mentioned mounting flange is slab construction.
The first above-mentioned mounting flange upper outer periphery axially extends annular rib, forms the cavity suitable with described prefabricated pile body end in this annular rib.
Compared with prior art, one stretch-draw of the present invention is integrally connected formula prefabricated pile, adopts the prefabricated pile of factorial praluction for basement process, good product quality, reliable construction quality;Take into full account the mechanical characteristic of basement process stake, by arranging the first mounting flange and the second mounting flange Formation cross-section respectively in " convex " character form structure with the two ends of concave structure, and complete the connection between upper and lower stake by the mechanical connection between the first suitable mounting flange and the second mounting flange, realize on-the-spot quickly pile extension, be greatly improved efficiency of construction;Without the need for welding at the scene, reduce atmospheric pollution and the electric welding body harm to operator.
First mounting flange and the second mounting flange adopt threaded, be radially located by connecting or snap ring connects, simple in construction, connect quickly, reliable.
Accompanying drawing explanation
Fig. 1 is the structural representation of the embodiment of the present invention one;
Fig. 2 is attachment structure schematic diagram one in the embodiment of the present invention one;
Fig. 3 is A portion enlarged drawing in Fig. 2;
Fig. 4 is attachment structure schematic diagram two in the embodiment of the present invention one;
Fig. 5 is the structural representation of the embodiment of the present invention two;
Fig. 6 is attachment structure schematic diagram one in the embodiment of the present invention two;
Fig. 7 is B portion enlarged drawing in Fig. 6;
Fig. 8 is attachment structure schematic diagram two in the embodiment of the present invention two;
Fig. 9 is the structural representation of the embodiment of the present invention three;
Figure 10 is attachment structure schematic diagram one in the embodiment of the present invention three;
Figure 11 is C portion enlarged drawing in Figure 10;
Figure 12 is attachment structure schematic diagram two in the embodiment of the present invention three;
Figure 13 is the structural representation one of snap ring in the embodiment of the present invention three;
Figure 14 is the structural representation two of snap ring in the embodiment of the present invention three.
Detailed description of the invention
Below in conjunction with accompanying drawing embodiment, the present invention is described in further detail.
Embodiment as shown in Fig. 1 to Figure 14,
Figure grade illustrates: prefabricated pile body the 1, first mounting flange 2, annular rib 21, cavity 21a, first connecting hole the 22, first chamfering the 23, second mounting flange 3, annular retaining ring the 31, second connecting hole the 32, second chamfering 33, external screw thread 4a, female thread 4b, the first fixing hole 5a, the second fixing hole 5b, fixture the 6, first annular groove 7a, the second annular groove 7b, snap ring 8, breach 8a, clasp piece 81.
Embodiment one, as shown in Figures 1 to 4,
A kind of stretch-draw is integrally connected formula prefabricated pile, including prefabricated pile body 1, one end of prefabricated pile body 1 arranges the first mounting flange 2, this end section is " convex " character form structure, the other end of prefabricated pile body 1 arranges the second mounting flange 3, this end section is concave structure, and the second mounting flange 3 is axially extending is formed with annular retaining ring 31, and the first mounting flange 2 is suitable with described second mounting flange 3;During pile extension, joint stake completes pile extension by the mechanical connection of the first suitable mounting flange 2 and the second mounting flange 3 up and down.
During connection, prefabricated pile is sequentially connected with, and namely the second mounting flange 3 of lower the first mounting flange 2 and upper joint stake saving stake is connected, or lower joint stake the first mounting flange 2 of the second mounting flange 3 and upper joint stake be connected.
In embodiment, the first mounting flange 2 adopts with described second mounting flange 3 threadeds, and the periphery of the first mounting flange 2 is shaped with external screw thread 4a, and it is suitable with described female thread 4b that the inner circumferential of annular retaining ring 31 is shaped with female thread 4b, external screw thread 4a.
In embodiment, the first mounting flange 2 being evenly arranged with the first connecting hole 22, the outer end of the first mounting flange 2 is provided with the first chamfering 23;Being evenly arranged with the second connecting hole 32 on second mounting flange 3, the inner circumferential of the annular retaining ring 31 of the second mounting flange 3 is provided with the second chamfering 33.
The setting of the first chamfering 23 and the second chamfering 33, when making pile extension, the alignment saving stake up and down is inserted convenient, smooth and easy.
The first described mounting flange 2 and the second mounting flange 3 are metal material and make.When first mounting flange 2 is connected with prefabricated pile body 1, in prefabricated pile body 1, main muscle stretches in the first connecting hole 22 of correspondence, then the end upsetting of main muscle is made enlarged footing thus being fixed together with prefabricated pile body 1 by the first mounting flange 2;Same, when the second mounting flange 3 is connected with prefabricated pile body 1, in prefabricated pile body 1, main muscle stretches in the second connecting hole 32 of correspondence, then the end upsetting of main muscle is made enlarged footing thus being fixed together with prefabricated pile body 1 by the second mounting flange 3.First mounting flange 2 and the second mounting flange 3 are individually fixed in the two ends of prefabricated pile body 1.
In embodiment, the first mounting flange 2 upper outer periphery axially extends annular rib 21, forms the cavity 21a suitable with described prefabricated pile body 1 end in this annular rib 21.
When first mounting flange 2 is connected with prefabricated pile body 1, the end of prefabricated pile body 1 embeds in the cavity 21a that annular rib 21 surrounds, and is fixed together with prefabricated pile body 1 by the first mounting flange 2 by the cooperation of main muscle on prefabricated pile body 1 and the first connecting hole 22 simultaneously.
First mounting flange 2 can also be adopted as slab construction.
Method of attachment: step one, lower joint stake is sink to the position of overhead 0.8 to 1.2m, suspends pile sinking, lower joint stake is fixed;Step 2, upper joint stake is winched to straightening after above lower joint stake, under slowly, put joint stake, rotate the stake of upper joint simultaneously and makes the first suitable mounting flange 2 and the second mounting flange 3 screw up;Step 3, repetition step one, to two, complete the connection of whole pile body.
Embodiment two, as shown in Fig. 5 to Fig. 8,
Prefabricated pile in the present embodiment is similar to the prefabricated pile structure in embodiment one, institute the difference is that, in the present embodiment, first mounting flange 2 adopts with described second mounting flange 3 and is radially located by connecting, the outer periphery of the first mounting flange 2 offers the first fixing hole 5a, annular retaining ring 31 radially offers the second fixing hole 5b on the correspondence position of described first fixing hole 5a, second fixing hole 5b runs through described annular retaining ring 31, is provided with fixture 6 in the first corresponding fixing hole 5a and the second fixing hole 5b.
Fixture 6 ecto-entad is radially placed in the first fixing hole 5a and the second fixing hole 5b of alignment, and after fixing, a part for fixture 6 is positioned at the first fixing hole 5a, and another part is positioned at the second fixing hole 5b.
In embodiment, the first fixing hole 5a and the second fixing hole 5b is unthreaded hole, and fixture 6 is pin.
The first fixing hole 5a and the second fixing hole 5b can also be adopted to be screwed hole, and fixture 6 is bolt, with bolts, connects more reliable.
Method of attachment: step one, lower joint stake is sink to the position of overhead 0.8 to 1.2m, suspends pile sinking, lower joint stake is fixed;Step 2, upper joint stake is winched to straightening after above lower joint stake, joint stake is put under slowly, make the first corresponding with on the first mounting flange 2 for the second fixing hole 5b fixing hole 5a on the second mounting flange 3 align, then fixture 6 is inserted in the second fixing hole 5b alignd and the first fixing hole 5a;Step 3, repetition step one, to two, complete the connection of whole pile body.
Embodiment three, as shown in Fig. 9 to Figure 14,
Prefabricated pile in the present embodiment is similar to the prefabricated pile structure in embodiment one, institute the difference is that, in the present embodiment, first mounting flange 2 adopts snap ring 8 to be connected with described second mounting flange 3, the outer periphery of the first mounting flange 2 offers the first annular groove 7a, radially offering the second annular groove 7b on the correspondence position of described first annular groove 7a on annular retaining ring 31, snap ring 8 is placed in the snap ring intracavity being made up of the first annular groove 7a and the second annular groove 7b.
In embodiment, snap ring 8 is loop configuration, and this loop configuration is provided with breach 8a.Owing to being provided with breach 8a, the snap ring 8 of loop configuration is made to have elasticity;When connecting, first breach 8a is expanded so that snap ring 8 can be inserted in the first mounting flange 2, and enter in the first annular groove 7a, then inward compression snap ring 8, make snap ring 8 completely in the first annular groove 7a, then the second mounting flange 3 is connected with the first mounting flange 2;When the second mounting flange 3 is connected with the first mounting flange 2 and to put in place, namely when the second annular groove 7b and the first annular groove 7a aligns, snap ring 8 naturally extends out thus being placed in the snap ring intracavity being made up of the first annular groove 7a and the second annular groove 7b due to natural resiliency, at this moment, a part for snap ring 8 is positioned at the first annular groove 7a, and another part is positioned at the second annular groove 7b, thus completing to connect.
Owing to prefabricated pile is relatively large in diameter, above-mentioned snap ring 8 manufacture requirements is high, and manufacturing cost is big.Snap ring 8 can also adopt the loop configuration that the clasp piece 81 of arcuate structure is constituted, when this snap ring 8 is installed, first each clasp piece 81 is put into the second annular groove 7b of the second mounting flange 3, after the second mounting flange 3 is inserted in the first suitable mounting flange 2, by the through hole offered in the second annular groove 7b periphery in advance, push away in clasp piece 81 phase with screw rod or other instrument, make in the first annular groove 7a being partly into the first mounting flange 2 of clasp piece 81, after completing, a part for snap ring 8 is positioned at the first annular groove 7a, another part in the second annular groove 7b thus the connection completed between the first mounting flange 2 and the second mounting flange 3.
Method of attachment: step one, lower joint stake is sink to the position of overhead 0.8 to 1.2m, suspends pile sinking, lower joint stake is fixed;Step 2, upper joint stake is winched to straightening after above lower joint stake, put joint stake under slowly, complete the connection between the first mounting flange 2 and the second mounting flange 3 by snap ring 8;Step 3, repetition step one, to two, complete the connection of whole pile body.
The prefabricated pile of the present invention is by arranging the two ends that the first mounting flange 2 and the second mounting flange 3 Formation cross-section are " convex " character form structure and concave structure respectively, and by the mechanical connection between suitable the first mounting flange 2 and the second mounting flange 3, adopt threaded, be radially located by connecting or snap ring connects and is capable of on-the-spot quickly pile extension, be greatly improved efficiency of construction;Without the need for welding at the scene, reduce atmospheric pollution and the electric welding body harm to operator.
Highly preferred embodiment of the present invention is elucidated with, those of ordinary skill in the art the various changes made or remodeling are all without departing from the scope of the present invention.
Claims (10)
1. a stretch-draw is integrally connected formula prefabricated pile, including prefabricated pile body (1), it is characterized in that: one end of described prefabricated pile body (1) arranges the first mounting flange (2), this end section is " convex " character form structure, the other end of described prefabricated pile body (1) arranges the second mounting flange (3), this end section is concave structure, the axially extending annular retaining ring (31) that is formed of described the second mounting flange (3), described the first mounting flange (2) is suitable with described second mounting flange (3);During pile extension, joint stake completes pile extension by the mechanical connection of suitable the first mounting flange (2) Yu the second mounting flange (3) up and down.
2. a kind of stretch-draw according to claim 1 is integrally connected formula prefabricated pile, it is characterized in that: described the first mounting flange (2) adopts with described second mounting flange (3) threadeds, the periphery of described the first mounting flange (2) is shaped with external screw thread (4a), the inner circumferential of described annular retaining ring (31) is shaped with female thread (4b), and described external screw thread (4a) is suitable with described female thread (4b).
3. a kind of stretch-draw according to claim 1 is integrally connected formula prefabricated pile, it is characterized in that: described the first mounting flange (2) adopts with described second mounting flange (3) and is radially located by connecting, the outer periphery of described the first mounting flange (2) offers the first fixing hole (5a), described annular retaining ring (31) radially offers the second fixing hole (5b) on the correspondence position of described first fixing hole (5a), described the second fixing hole (5b) runs through described annular retaining ring (31), it is provided with fixture (6) in corresponding the first fixing hole (5a) and the second fixing hole (5b).
4. a kind of stretch-draw according to claim 3 is integrally connected formula prefabricated pile, it is characterized in that: described the first fixing hole (5a) and the second fixing hole (5b) are unthreaded hole, and described fixture (6) is pin.
5. a kind of stretch-draw according to claim 3 is integrally connected formula prefabricated pile, it is characterized in that: described the first fixing hole (5a) and the second fixing hole (5b) are screwed hole, and described fixture (6) is bolt.
6. a kind of stretch-draw according to claim 1 is integrally connected formula prefabricated pile, it is characterized in that: described the first mounting flange (2) adopts snap ring (8) to be connected with described second mounting flange (3), the outer periphery of described the first mounting flange (2) offers the first annular groove (7a), described annular retaining ring (31) radially offers the second annular groove (7b) on the correspondence position of described first annular groove (7a), snap ring (8) is placed in the snap ring intracavity being made up of the first annular groove (7a) and the second annular groove (7b).
7. a kind of stretch-draw according to claim 6 is integrally connected formula prefabricated pile, it is characterized in that: described snap ring (8) is loop configuration, and this loop configuration is provided with breach (8a).
8. a kind of stretch-draw according to claim 1 to 7 any claim is integrally connected formula prefabricated pile, it is characterized in that: being evenly arranged with the first connecting hole (22) on described the first mounting flange (2), the outer end of described the first mounting flange (2) is provided with the first chamfering (23);Being evenly arranged with the second connecting hole (32) on described the second mounting flange (3), the inner circumferential of the annular retaining ring (31) of described the second mounting flange (3) is provided with the second chamfering (33).
9. a kind of stretch-draw according to claim 8 is integrally connected formula prefabricated pile, it is characterized in that: described the first mounting flange (2) is slab construction.
10. a kind of stretch-draw according to claim 8 is integrally connected formula prefabricated pile, it is characterized in that: described the first mounting flange (2) upper outer periphery axially extends annular rib (21), in this annular rib (21), form the cavity (21a) suitable with described prefabricated pile body (1) end.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610122914.4A CN105756055A (en) | 2016-03-04 | 2016-03-04 | Tensioning and connection integrated prefabricated pile |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610122914.4A CN105756055A (en) | 2016-03-04 | 2016-03-04 | Tensioning and connection integrated prefabricated pile |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN105756055A true CN105756055A (en) | 2016-07-13 |
Family
ID=56332445
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610122914.4A Pending CN105756055A (en) | 2016-03-04 | 2016-03-04 | Tensioning and connection integrated prefabricated pile |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105756055A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111005363A (en) * | 2019-12-03 | 2020-04-14 | 河海大学 | Spliced snowflake type steel sheet pile capable of monitoring self deformation and construction method thereof |
Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2001329532A (en) * | 2000-05-19 | 2001-11-30 | Kubota Corp | Columns and column joints |
| JP2004162345A (en) * | 2002-11-12 | 2004-06-10 | Mitani Sekisan Co Ltd | Joining method and joining structure of ready-made pile and foundation |
| JP2005264479A (en) * | 2004-03-17 | 2005-09-29 | Mitani Sekisan Co Ltd | Method of joining prefabricated pile, and joint hardware for prefabricated pile |
| CN103603349A (en) * | 2013-11-22 | 2014-02-26 | 山东大学 | Ribbed prestressed pipe pile, and manufacturing method and drilling-planting construction process thereof |
| CN103643673A (en) * | 2013-11-04 | 2014-03-19 | 张延策 | Self-advancing recyclable steel pipe pile and construction method |
| CN103790153A (en) * | 2012-10-26 | 2014-05-14 | 上海中技桩业股份有限公司 | Circular buckle plate mechanical pile splicing method for precast square piles |
| CN103790157A (en) * | 2012-10-26 | 2014-05-14 | 上海中技桩业股份有限公司 | Circular buckle plate mechanical pile splicing method for precast square piles |
| CN204780889U (en) * | 2015-06-05 | 2015-11-18 | 王献敏 | Prestressed concrete pipe pile connects |
| CN205369227U (en) * | 2016-03-04 | 2016-07-06 | 中淳高科桩业股份有限公司 | Precast pile with snap ring connection structure |
| CN205369221U (en) * | 2016-03-04 | 2016-07-06 | 中淳高科桩业股份有限公司 | Precast pile with radical location connection structure |
| CN205369239U (en) * | 2016-03-04 | 2016-07-06 | 中淳高科桩业股份有限公司 | Precast pile with threaded connection structure |
-
2016
- 2016-03-04 CN CN201610122914.4A patent/CN105756055A/en active Pending
Patent Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2001329532A (en) * | 2000-05-19 | 2001-11-30 | Kubota Corp | Columns and column joints |
| JP2004162345A (en) * | 2002-11-12 | 2004-06-10 | Mitani Sekisan Co Ltd | Joining method and joining structure of ready-made pile and foundation |
| JP2005264479A (en) * | 2004-03-17 | 2005-09-29 | Mitani Sekisan Co Ltd | Method of joining prefabricated pile, and joint hardware for prefabricated pile |
| CN103790153A (en) * | 2012-10-26 | 2014-05-14 | 上海中技桩业股份有限公司 | Circular buckle plate mechanical pile splicing method for precast square piles |
| CN103790157A (en) * | 2012-10-26 | 2014-05-14 | 上海中技桩业股份有限公司 | Circular buckle plate mechanical pile splicing method for precast square piles |
| CN103643673A (en) * | 2013-11-04 | 2014-03-19 | 张延策 | Self-advancing recyclable steel pipe pile and construction method |
| CN103603349A (en) * | 2013-11-22 | 2014-02-26 | 山东大学 | Ribbed prestressed pipe pile, and manufacturing method and drilling-planting construction process thereof |
| CN204780889U (en) * | 2015-06-05 | 2015-11-18 | 王献敏 | Prestressed concrete pipe pile connects |
| CN205369227U (en) * | 2016-03-04 | 2016-07-06 | 中淳高科桩业股份有限公司 | Precast pile with snap ring connection structure |
| CN205369221U (en) * | 2016-03-04 | 2016-07-06 | 中淳高科桩业股份有限公司 | Precast pile with radical location connection structure |
| CN205369239U (en) * | 2016-03-04 | 2016-07-06 | 中淳高科桩业股份有限公司 | Precast pile with threaded connection structure |
Non-Patent Citations (1)
| Title |
|---|
| 阮起楠: "《预应力混凝土管桩》", 29 February 2000 * |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111005363A (en) * | 2019-12-03 | 2020-04-14 | 河海大学 | Spliced snowflake type steel sheet pile capable of monitoring self deformation and construction method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN216238501U (en) | Mechanical connecting structure for precast pile | |
| CN109853363A (en) | Pipe pier and cushion cap connection structure and construction method | |
| CN108301570A (en) | Half grout sleeve processing method of antidetonation self-locking, concrete member processing method | |
| CN108035493A (en) | A kind of antidetonation assembles half grout sleeve of self-locking | |
| CN209099350U (en) | Pretensioned-prestressed tube pile jointing | |
| CN205369221U (en) | Precast pile with radical location connection structure | |
| CN205369227U (en) | Precast pile with snap ring connection structure | |
| CN109869166A (en) | A kind of class rectangle shield tunnel tunnel segment structure and its construction method | |
| CN105756055A (en) | Tensioning and connection integrated prefabricated pile | |
| CN205369239U (en) | Precast pile with threaded connection structure | |
| CA3170827C (en) | Flared reinforced pier and pier bracket assembly and methods of manufacturing and use | |
| CN216194672U (en) | A hybrid reinforced prefabricated pile | |
| CN108677731B (en) | Rotary splicing structure and splicing method of cover beam and bridge pier | |
| CN109778841A (en) | Recoverable presstressed reinforcing steel bored concrete pile and its construction method for foundation pit enclosure | |
| CN203613533U (en) | Reinforced prestressed pipe pile | |
| CN111424658A (en) | Anchor rod construction device for constructional engineering | |
| CN109441016A (en) | Prefabricated concrete structure column steel pipe socket shell ring point and preparation method thereof | |
| CN106759304B (en) | Quick connecting device and method for follow-up pipe pile while drilling | |
| KR101789302B1 (en) | Concrete file structure | |
| CN109057503B (en) | Construction convenience's high strength concrete pole | |
| CN104532871B (en) | A kind of blower foundation | |
| JP2015074924A (en) | Steel pipe column structure | |
| CN220620085U (en) | Prestressing force end plate convenient to installation | |
| CN209760491U (en) | Prefabricated shear wall connection structure | |
| CN208379601U (en) | A kind of recoverable foundation pit supporting pile and attaching/detaching apparatus |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160713 |
|
| RJ01 | Rejection of invention patent application after publication |